A pipe jacking tunnel construction simulation method and model device
By designing a construction model device for pipe jacking tunnels to simulate the tunneling process of pipe jacking machines, the problem of lacking large-scale physical model tests in existing technologies has been solved. This enables the monitoring of ground displacement and stress changes during the pipe jacking construction process, which has important theoretical and practical significance.
Patent Information
- Application Number
- CN201910498945.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-06-10
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2039-06-10
AI Technical Summary
In the existing technology, there are few indoor or model test studies on the pipe jacking construction process, especially the failure to effectively consider the impact of the excavation construction process and the lack of large-scale physical model test methods.
A pipe jacking tunnel construction model device was designed, including a model test bench and a pipe jacking machine simulation device. It uses components such as a cutting head, a soil mixing chamber, a spiral soil discharger, pipe sections, a drive shaft, a stepper motor, and a jacking cylinder to simulate the tunneling process of the pipe jacking machine, and monitors soil displacement and stress changes through sensors.
It enables simulation analysis of spatial displacement and stress changes in the stratum during pipe jacking construction, providing scientific research and construction guidance. It has a simple structure, low cost, and can effectively monitor the soil displacement field and stress field during construction.
Smart Images

Figure CN110261151B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of large-scale physical model test in a pipe jacking construction process, is used for geomechanics model test in geotechnical engineering, and is a pipe jacking tunnel construction simulation method and model device. Background Art
[0002] With the development of society and the rapid growth of population density, the pace of urban underground space development is also accelerating. Rail transit, urban pipeline corridors, and underground power pipelines, as the main forms of urban underground space development and utilization, often need to pass through densely built areas. Since traditional open-cut construction is severely restricted in these areas, the use of dark excavation construction methods that have relatively little impact on the ground and the surrounding environment is a trend and necessity. Among them, the pipe jacking method has little impact on surrounding residents because it does not hinder traffic, does not damage the environment, has little noise and pollution, and has little impact on surrounding residents. At the same time, it has the advantages of small excavation volume, small working surface, short construction period, and low comprehensive cost. It has become a relatively common and important dark excavation construction method.
[0003] Since the pipe jacking construction process is relatively complicated and will have a certain impact on the buildings and structures in the surrounding cities, relevant scholars at home and abroad have also carried out some related research.
[0004] At present, considering the tunneling construction process of the front-end pipe jacking machine, there are few indoor or model test studies on pipe jacking construction, and the influence of the excavation construction process has not been considered in a few tests. Therefore, it is very necessary to explore new methods for large-scale physical model tests of pipe jacking construction. Summary of the invention
[0005] This design is aimed at the large-scale physical model test of pipe jacking construction, develops the corresponding test device, establishes its applicable monitoring system and method, conducts simulation analysis of the pipe jacking construction process considering the excavation of the pipe jacking machine, and studies the spatial displacement characteristics and stress changes of the stratum during its construction process, which has important theoretical and practical significance. Its structure is simple and the simulation process is convenient.
[0006] In order to achieve the above object, the present invention adopts the following technical solutions:
[0007] A pipe jacking tunnel construction model device comprises a model test bench and a pipe jacking machine simulation device, wherein the model test bench comprises a model body pit, and a well wall is arranged around the model body pit. The well wall at the start of construction of the pipe jacking machine simulation device is a working well wall, and the well wall opposite to the working well wall is a receiving well wall.
[0008] The receiving well wall and the working well wall are provided with reserved construction openings for simulation.
[0009] During the test, the model pit is filled with the prepared model soil inside the model pit;
[0010] The pipe jacking machine simulation device includes a housing, a cutting head, and a spiral excavator.
[0011] The cutting head is arranged at the front end of the pipe jacking machine simulation device to cut the soil.
[0012] The housing is connected to the cutting head arranged at the front end to support the excavated soil so as not to collapse and provide working space for the spiral excavator to convey the soil.
[0013] The spiral excavator is located inside the rear half of the shell body, and is used for conveying the cut soil to the rear of the pipe jacking machine model.
[0014] Furthermore, the pipe jacking machine simulation device also includes a mixing soil bin, which is arranged between the cutting head installed on the shell and the spiral excavator; an agitator is arranged in the mixing soil bin, which is used to rotate and stir the soil that enters the mixing soil bin after being cut by the cutting head until it is loose and falls into the spiral excavator at the rear of the mixing soil bin.
[0015] Furthermore, the pipe jacking machine simulation device is also provided with a pipe joint, a transmission shaft, a stepping motor, and a jacking cylinder;
[0016] The pipe section is connected to the shell and is a hollow tube connected in sequence.
[0017] The transmission shaft is arranged in the pipe section, one end of which is connected to the spiral excavator and the stirrer in the mixing soil bin, and the other end is connected to the stepping motor and the jacking cylinder.
[0018] Furthermore, the model test bench is also provided with a jacking reaction wall.
[0019] Furthermore, the stepper motor and the jacking cylinder are arranged at the jacking reaction wall.
[0020] Furthermore, a simulation opening for simulating an existing pipeline is provided on the wall of the receiving well and / or the wall of the working well.
[0021] Furthermore, during construction, the model pit is filled with the prepared model soil inside the model pit.
[0022] Furthermore, during construction,
[0023] The stepper motor and the jacking cylinder are arranged at the jacking reaction wall;
[0024] Align the cutting head of the pipe jacking machine simulation device with the reserved construction opening for simulation set on the wall of the working well;
[0025] Start the stepper motor of the pipe jacking machine simulation device, the jacking cylinder extends, and the cutting head moves forward to cut the soil;
[0026] The driving shaft drives the agitator in the mixing soil bin to rotate and mix the soil cut off by the cutting head and entering the mixing soil bin until it is loose and falls into the spiral excavator at the rear of the mixing soil bin. The driving shaft drives the spiral excavator to transport the loose soil to the rear of the pipe jacking machine model, completing the mixing and spiral output of the excavated soil.
[0027] After pushing in a pipe section, the pushing cylinder is retracted, the drive shaft is extended, a pipe section is installed at the same time, and then the soil is cut by pushing in.
[0028] This cycle is repeated until the cutting head of the pipe jacking machine simulation device pushes out of the reserved construction opening on the wall of the receiving well, completing the simulation of the jacking construction process.
[0029] Furthermore, during construction, the displacement field and stress field of the soil are measured by sensors arranged inside and on the upper surface of the model soil.
[0030] Furthermore, during construction, the stress of the pipe segment is measured by means of strain gauges arranged on the pipe segments.
[0031] Furthermore, during construction, the soil pressure in the soil bin is monitored by arranging a pressure sensor in the mixing soil bin.
[0032] Compared with the prior art, the invention has the following beneficial effects: the design is aimed at the large-scale physical model test of pipe jacking construction, the corresponding test device is developed, the applicable monitoring system and method are established, the simulation analysis of the pipe jacking construction process considering the excavation of the pipe jacking machine is carried out, and the spatial displacement characteristics and stress changes of the stratum during the construction process are studied, which has important theoretical and practical significance. The structure is simple and the simulation process is convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a schematic diagram of the experimental principle of the present invention.
[0034] In the figure:
[0035] 1 is the cutting head
[0036] 2 is the mixing soil bin
[0037] 3 is the spiral excavator
[0038] 4 is the shell
[0039] 5 is the transmission shaft
[0040] 6 is the tube section
[0041] 7 is the stepper motor
[0042] 8 is the jacking cylinder
[0043] 9 is the reserved construction opening
[0044] 10 is the receiving well wall
[0045] 11 is the wall of the working well
[0046] 12 is the jacking reaction wall
[0047] 13 is the model body pit. DETAILED DESCRIPTION
[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0049] The application discloses a pipe jacking tunnel construction model device, comprising a model test bench and a pipe jacking machine simulation device.
[0050] The model test bench includes a model pit 13, which is surrounded by well walls. The well wall on the side where the pipe jacking machine simulation device starts construction is the working well wall 11, and the well wall opposite to the working well wall 11 is the receiving well wall 10. The receiving well wall 10 and the working well wall 11 are provided with reserved construction openings 9 for simulation. During the test, the model pit 13 is filled with prepared model soil inside.
[0051] The pipe jacking machine simulation device includes a shell 4, a cutting head 1, a mixing soil bin 2, and a spiral excavator 3. The cutting head 1 is arranged at the front end of the pipe jacking machine simulation device to cut the soil; the shell 4 is connected to the cutting head 1 arranged at the front end to support the excavated soil from collapsing and provide an operating space for the spiral excavator 3 to convey the soil; the mixing soil bin 2 is arranged between the cutting head 1 and the spiral excavator 3 installed on the shell 4; a stirrer is arranged in the mixing soil bin 2 to rotate and stir the soil cut by the cutting head 1 and enter the mixing soil bin 2 until it is loose and falls into the spiral excavator 3 at the rear of the mixing soil bin 2; the spiral excavator 3 is located inside the rear half of the shell 4, and the spiral excavator 3 is used to convey the cut soil to the rear of the pipe jacking machine model.
[0052] The pipe jacking machine simulation device is also provided with a pipe section 6, a transmission shaft 5, a stepper motor 7, and a jacking oil cylinder 8. The pipe section 6 is connected to the housing 4 and is a hollow pipe connected in sequence. The transmission shaft 5 is arranged in the pipe section 6, one end of which is connected to the spiral excavator 3 and the stirrer in the mixing soil bin 2, and the other end is connected to the stepper motor 7 and the jacking oil cylinder 8.
[0053] In order to facilitate the arrangement of the pipe jacking machine simulation device, the model test bench is also provided with a jacking reaction wall 12 , and the stepping motor 7 and the jacking cylinder 8 are arranged at the jacking reaction wall 12 .
[0054] In order to simulate the impact on the existing pipeline during construction, a simulation opening for simulating the existing pipeline is provided on the receiving well wall 10 and / or the working well wall 11.
[0055] During construction, the model pit 13 is filled with the prepared model soil inside the model pit 13; the stepper motor 7 and the jacking cylinder 8 are arranged at the jacking reaction wall 12; the cutting head 1 of the pipe jacking machine simulation device is aligned with the simulation reserved construction opening 9 arranged on the wall 11 of the working well; the stepper motor 7 of the pipe jacking machine simulation device is started, and the jacking cylinder 8 is extended to push the cutting head 1 to move forward to cut the soil; the agitator in the mixing soil bin 2 is driven by the transmission shaft 5 to cut the cutting head 1 and then enter the soil of the mixing soil bin 2 The mixture is rotated and stirred until it is loose and falls into the spiral excavator 3 at the rear of the mixing soil bin 2. The transmission shaft 5 drives the spiral excavator 3 to transport the loose soil to the rear of the pipe jacking machine model to complete the mixing and spiral output of the excavated soil. After pushing in a length of pipe segment 6, the jacking oil cylinder 8 contracts, the transmission shaft 55 is extended, and a pipe segment 6 is installed at the same time, and then the soil is continued to be pushed in and cut. This cycle is repeated until the cutting head 1 of the pipe jacking machine simulation device pushes out the reserved construction opening 9 on the wall 10 of the receiving well, completing the simulation of the jacking construction process. The displacement field and stress field of the soil are measured by sensors arranged inside and on the upper surface of the model soil; the stress of the pipe segment is measured by strain gauges arranged on the pipe segment 6; and the soil pressure of the soil bin is monitored by pressure sensors arranged in the mixing soil bin 2.
[0056] The test process and principle are as follows: the jacking cylinder pushes the pipe section forward (the pipe sections are longitudinally connected in series one by one), and the pipe section then pushes the pipe jacking machine simulation device (a combination of excavation cutter head, mixing soil bin, spiral excavator, and shell) to move forward to cut the soil. The stepper motor is connected to the transmission shaft of the pipe jacking machine simulation device through the transmission shaft, driving the agitator and spiral blades to rotate, completing the mixing and spiral output of the excavated soil. After jacking a pipe section, the jacking cylinder contracts, the transmission shaft is extended, and a new pipe section is added, and then jacking continues. This cycle is repeated until the reserved construction opening is pushed out, completing the simulation of the jacking construction process.
[0057] During the test, the displacement field and stress field of the soil are measured by sensors arranged inside and on the upper surface of the model soil; the stress of the pipe segment is measured by strain gauges arranged on the pipe segment; the soil pressure in the soil bin is monitored by pressure sensors arranged in the mixing soil bin (a miniature soil pressure box is used in the test, which is a mature product. The name of the sensor is the miniature soil pressure box, and those who understand geomechanical model test technology will understand it).
[0058] This design is aimed at the large-scale physical model test of pipe jacking construction, develops the corresponding test equipment, establishes the applicable monitoring system and method, conducts simulation analysis of the pipe jacking construction process considering the excavation of the pipe jacking machine, and studies the spatial displacement characteristics and stress changes of the stratum during the construction process, which has important theoretical and practical significance.
[0059] The model test bench has a simple structure, relatively low production cost, and can effectively simulate the construction environment. The pipe jacking machine simulation device is similar to the pipe jacking machine device. It has a simple structure and a convenient simulation process. It is extended in sections by pipe segments to ensure the orderly development of the construction process. Through various preset sensors, it can detect a series of impacts of construction on the environment, such as the measurement of soil displacement field and stress field, the measurement of pipe segment stress, and the monitoring of soil pressure during the construction process. It has good practical significance for scientific research and construction guidance.
[0060] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A pipe jacking tunnel construction model device, It is characterized in that The invention comprises a model test bench and a pipe jacking machine simulation device. The model test bench comprises a model pit (13). The model pit (13) is surrounded by a well wall. The well wall at the start of construction of the pipe jacking machine simulation device is a working well wall (11). The well wall opposite to the working well wall (11) is a receiving well wall (10). The receiving well wall (10) and the working well wall (11) are provided with reserved construction openings (9). During the test, the model pit (13) is filled with prepared model soil inside the model pit (13). The pipe jacking machine simulation device comprises a housing (4), a cutting head (1), and a spiral excavator (3); the cutting head (1) is arranged at the front end of the pipe jacking machine simulation device, the housing (4) is connected to the cutting head (1) arranged at the front end, and the spiral excavator (3) is located inside the rear half of the housing (4); The pipe jacking machine simulation device further comprises a soil mixing bin (2), wherein the soil mixing bin (2) is arranged between the cutting tool head (1) mounted on the housing (4) and the screw excavator (3); The mixing soil bin (2) is provided with a stirrer for rotating and stirring the soil cut by the cutting head (1) and entering the mixing soil bin (2) until the soil is loose and falls into the spiral excavator (3) at the rear of the mixing soil bin (2); The pipe jacking machine simulation device is also provided with a pipe joint (6), a transmission shaft (5), a stepping motor (7), and a jacking oil cylinder (8); The pipe section (6) is connected to the shell (4) and is a hollow tube connected in sequence. The transmission shaft (5) is arranged in the pipe section (6), one end of which is connected to the spiral excavator (3) and the stirrer in the mixing soil bin (2), and the other end is connected to the stepping motor (7) and the jacking cylinder (8); The model test bench is also provided with a jacking reaction wall (12); the stepping motor (7) and the jacking oil cylinder (8) are arranged at the jacking reaction wall (12); During construction, Filling the model pit (13) with prepared model soil inside the model pit (13); The stepping motor (7) and the jacking oil cylinder (8) are arranged at the jacking reaction wall (12); Align the cutting head (1) of the pipe jacking machine simulation device with the reserved construction opening (9) for simulation provided on the wall (11) of the working well; The stepping motor (7) of the pipe jacking machine simulation device is started, and the jacking cylinder (8) is extended to push the cutting head (1) forward to cut the soil; The driving shaft (5) drives the stirrer in the mixing soil bin (2) to rotate and stir the soil cut by the cutting head (1) and then enter the mixing soil bin (2) until it is loose and falls into the spiral excavator (3) at the rear of the mixing soil bin (2). The driving shaft (5) drives the spiral excavator (3) to transport the loose soil to the rear of the pipe jacking machine model, thereby completing the mixing and spiral output of the excavated soil. After a pipe section (6) is pushed in, the pushing oil cylinder (8) is retracted, the transmission shaft (5) is extended, a pipe section (6) is installed at the same time, and then the soil is cut by pushing in. This cycle is repeated until the cutting head (1) of the pipe jacking machine simulation device pushes out the reserved construction opening (9) on the receiving well wall (10), completing the simulation of the jacking construction process; The displacement field and stress field of the soil are measured by sensors arranged inside and on the upper surface of the model soil; The stress of the pipe segment is measured by means of strain gauges arranged on the pipe segment (6); The soil pressure in the soil bin is monitored by means of a pressure sensor arranged in the mixing soil bin (2).
2. A pipe jacking tunnel construction model device according to claim 1, It is characterized in that The receiving well wall (10) and / or the working well wall (11) are provided with simulation openings for simulating existing pipelines.