A combined cutter suction dredger with a super-deep dredging capacity of more than 40 meters

By increasing the length of the bridge frame on the cutter suction dredger and adopting a main pontoon structure that can be assembled and disassembled in sections, combined with the positioning system and functional cabins, the problem that traditional cutter suction dredgers cannot reach a digging depth of more than 40 meters has been solved and achieved More efficient dredging capacity and flexible assembly form meet the depth requirements of large reservoir dredging projects.

CN110593335BActive Publication Date: 2024-10-29CCCC TIANJIN DREDGING
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN201910962366.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-10-11
Publication Date
2024-10-29
Estimated Expiration
2039-10-11

AI Technical Summary

Technical Problem

Due to structural limitations, traditional cutter suction dredgers cannot reach a digging depth of more than 40 meters, and cannot meet the depth requirements of inland river dredging, especially large reservoir dredging projects in recent years.

Method used

A combined cutter suction dredger with a large digging depth of more than 40 meters is designed. The length of the bridge is increased through the large-slotted hull structure, and the main pontoon and bridge structure are removable in sections, combined with a three-cable positioning system. and the setting of functional cabins to achieve ultra-large digging depth functions and adapt to different digging depth requirements through different assembly forms.

Benefits of technology

The ship that has realized the ultra-large dredging function has improved the applicability and construction efficiency of the ship, can be flexibly assembled according to different project needs, simplified the installation and transportation process, and met the needs of deeper dredging.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110593335B_ABST
    Figure CN110593335B_ABST
Patent Text Reader

Abstract

The present invention relates to a combined cutter suction dredger with a super-large dredging depth of more than 40 meters, comprising a main hull, a bridge, a positioning system, a functional cabin and a control room; the main hull is formed by splicing two groups of left and right main pontoons, a gantry and a tail sealing box; the two ends of one side of the gantry are respectively connected to the left and right main pontoons, and the two ends of the tail sealing box are respectively connected to the left and right main pontoons. The left and right main pontoons and the bridge are both segmented and detachable structures, the left main pontoon is spliced ​​by the left tail section of the main pontoon, the left middle section of the main pontoon and the left head section of the main pontoon, the right main pontoon is spliced ​​by the right tail section of the main pontoon, the right middle section of the main pontoon and the right head section of the main pontoon, and the bridge is spliced ​​by the bridge tail section, the bridge middle section, the bridge head section and the auger front section; the middle space of the main hull is slotted for installing the bridge. The present invention can be flexibly assembled according to different digging depth requirements, realize super-large digging depth and shallow digging depth, and improve installation and transportation efficiency and ship construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of dredging engineering, and in particular relates to a combined cutter suction dredger with an ultra-large dredging depth of more than 40 meters. Background Art

[0002] The dredging depth of traditional suction dredgers in inland river dredging is very shallow, mainly for dredging of rivers, wetlands and lakes, and the dredging depth is generally within 30 meters.

[0003] In recent years, due to the expansion of the dredging market, the required dredging depth has gradually increased. The most obvious in inland river dredging is the large reservoir desilting project. In order to meet the needs of reservoir expansion and environmental dredging, the dredging depth needs to reach 40 meters, 50 meters, or even deeper. Traditional cutter suction dredgers cannot meet this dredging depth requirement due to structural limitations. Summary of the invention

[0004] In view of the problems existing in the prior art, the present invention provides a combined cutter suction dredger with an ultra-large dredging depth of more than 40 meters. While achieving the ultra-large dredging function, the dredger can be spliced ​​and combined with different dredging depths according to engineering needs.

[0005] The cutter suction dredger increases the length of the bridge through the large slotted hull structure design, realizes the installation of an extra-long bridge, and achieves the function of ultra-deep dredging; through the form of combined assembly, different assembly forms are realized under different dredging conditions, thereby improving the applicability of the ship. And different assembly combinations can be carried out according to different dredging depth requirements.

[0006] The present invention is implemented as follows: a combined suction dredger with an ultra-large dredging depth of more than 40 meters comprises a main hull, a bridge, a positioning system, a functional cabin and a control room; the main hull is formed by splicing a left and a right group of main pontoons, a gantry and a tail sealing box; the two ends of one side of the gantry are respectively connected to the bows of the left and right groups of main pontoons, and the two ends of the tail sealing box are respectively connected to the tails of the left and right groups of main pontoons; the left and right groups of main pontoons and the bridge are both segmented and detachable structures, the main pontoon on the left is spliced ​​by the left tail section of the main pontoon, the left middle section of the main pontoon and the left head section of the main pontoon, the main pontoon on the right is spliced ​​by the right tail section of the main pontoon, the right middle section of the main pontoon and the right head section of the main pontoon, and the bridge is spliced ​​by the bridge tail section, the bridge middle section, the bridge head section and the auger front section; the space in the middle of the main hull is slotted for installing the bridge.

[0007] In the above technical solution, preferably, the positioning system is arranged on one group of main buoyancy tanks.

[0008] In the above technical solution, it is further preferred that the positioning system is a three-cable positioning system, and the three-cable positioning system is arranged on the right tail section of the main pontoon or the left tail section of the main pontoon. Since the ship is deep, the steel piles of the ship cannot be used, and the three-cable positioning system is used to move and position the ship.

[0009] In the above technical solution, preferably, the functional cabins are arranged on the left and right sets of main buoyancy tanks.

[0010] In the above technical solution, it is further preferred that the functional cabin is arranged on the left tail section of the main pontoon and the right tail section of the main pontoon.

[0011] In the above technical solution, preferably, the control room is arranged on the main deck spanning the left and right sets of main pontoons.

[0012] In the above technical solution, it is further preferred that the control room is arranged on the main deck spanning the left middle section and the right middle section of the main pontoon, and an anchor winch is arranged under the control room.

[0013] In the above technical solution, preferably, two ends of one side of the gantry are respectively connected to the left first section of the main pontoon and the right first section of the main pontoon, and a lifting A-frame is provided in front of the gantry.

[0014] In the above technical solution, preferably, two ends of the tail sealing box are respectively connected to the left tail section of the main pontoon and the right tail section of the main pontoon.

[0015] In the above technical solution, preferably, a submersible pump system is provided on the tail section of the bridge, and a reamer system is provided on the front section of the reamer.

[0016] Compared with the prior art, the present invention has the following advantages and positive effects:

[0017] ① The main pontoon of the present invention is designed into two groups, the functional cabins and the positioning system are all arranged on the main pontoon, and the middle space of the main hull is all used to place the bridge structure. When the length of the main pontoon is constant, the length of the bridge is greatly increased, thereby increasing the dredging depth of the ship;

[0018] ② The main pontoon and the bridge structure of the present invention are designed in a multi-section splicing combination form, which can reduce the length of a single section and facilitate land transportation;

[0019] ③ The present invention can be flexibly assembled according to different digging working conditions through different combined assembly forms to achieve ultra-large digging depth and shallow digging depth, thereby improving the efficiency of installation and transportation and the efficiency of ship construction.

[0020] ④ The present invention has the advantages of simple structure, complete functions and multiple combination forms. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the overall arrangement structure of a ship with all components provided by the present invention;

[0022] Figure 2 yes Figure 1 A top view of

[0023] Figure 3 This is a schematic diagram of the exploded assembly components of a super-deep dredging combination ship provided in the first embodiment of the present invention;

[0024] Figure 4 yes Figure 3 Assembly diagram after assembly is completed;

[0025] Figure 5 This is a schematic diagram of the overall structural arrangement of a super-large dredging combination ship provided in the first embodiment of the present invention;

[0026] Figure 6 It is a schematic diagram of the assembly of a common dredging combination ship provided in the second embodiment of the present invention;

[0027] Figure 7 It is a schematic diagram of the general layout structure of a ship of a common dredging combination type provided in the second embodiment of the present invention.

[0028] In the figure, 1. the left tail section of the main pontoon; 2. the left middle section of the main pontoon; 3. the left front section of the main pontoon; 4. the right tail section of the main pontoon; 5. the right middle section of the main pontoon; 6. the right front section of the main pontoon; 7. the tail section of the bridge; 8. the middle section of the bridge; 9. the front section of the bridge; 10. the front section of the auger; 11. the gantry; 12. the stern sealing box; 13. the control room; 14. the three-cable positioning system; 15. the steel pile trolley system; 16. the functional cabin; 17. the anchor winch; 18. the lifting A-frame; 19. the underwater pump system; 20. the auger system. DETAILED DESCRIPTION

[0029] In order to further understand the content, features and effects of the present invention, the following embodiments are given as examples and described in detail with reference to the accompanying drawings:

[0030] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0031] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0032] Example 1

[0033] like Figures 1 to 5 As shown, if the dredging depth of the project is increased, the ship can be assembled into a super-deep dredging form. This embodiment provides a combined suction dredger with a super-deep dredging depth of more than 40 meters, including a main hull, a bridge, a positioning system, a functional cabin and a control room; the main hull is composed of a left and right set of main pontoons, a gantry 11 and a tail seal box 12; the two ends of one side of the gantry 11 are respectively connected to the bows of the left and right sets of main pontoons, and the two ends of the tail seal box 12 are respectively connected to the tails of the left and right sets of main pontoons; the space in the middle of the assembled main hull is slotted for installing the bridge. In this embodiment, the assembled main hull is 46m long, 10.3m wide, 2.9m deep, and has a designed draft of 1.7m.

[0034] The left and right main pontoons and bridge frames are both detachable structures. The left main pontoon is composed of the left tail section 1, the left middle section 2 and the left head section 3 of the main pontoon, and the right main pontoon is composed of the right tail section 4, the right middle section 5 and the right head section 6 of the main pontoon. The left (right) tail section of the main pontoon is 17.5m long, the left (right) middle section of the main pontoon is 17.5m long, and the left (right) head section of the main pontoon is 12m long. The two ends of one side of the gantry 11 are respectively connected to the left head section 3 and the right head section 6 of the main pontoon, and the two ends of the tail sealing box 12 are respectively connected to the left tail section 1 and the right tail section 4 of the main pontoon.

[0035] The bridge frame is composed of the tail section 7, the middle section 8, the front section 9 and the front section 10 of the auger; the tail section of the bridge frame is 17.5m long, the middle section of the bridge frame is 17.5m long, the front section of the bridge frame is 12m long, and the front end of the bridge frame is 12.8m long. When the bridge frame is lowered 60°, the excavation depth is 50m.

[0036] The positioning system is arranged on one of the main pontoons. The functional cabin 16 is arranged on the left and right main pontoons. The control room 13 is arranged on the main deck spanning the left and right main pontoons. This leaves enough space for the midship bridge structure, so that the bridge length can reach the maximum and realize the function of super deep digging.

[0037] Specifically, the positioning system is a three-cable positioning system 14. The three-cable positioning system 14 of this embodiment is arranged on the right tail section 4 of the main pontoon. Due to the large excavation depth of the ship, the steel pile trolley system 15 of the ship cannot be used in this combination form, and the three-cable positioning system 14 is required to move and position the ship. The functional cabin 16 is arranged on the left tail section 1 of the main pontoon and the right tail section 4 of the main pontoon. The control room 13 is arranged on the main deck spanning the left middle section 2 of the main pontoon and the right middle section 5 of the main pontoon, and an anchor winch 17 is arranged under the control room 13. A lifting A-frame 18 is arranged in front of the gantry 11. An underwater pump system 19 is arranged on the tail section 7 of the bridge, and a reamer system 20 is arranged on the front section 10 of the reamer.

[0038] The cutter suction dredger adopts a main hull and bridge in the form of a spliced ​​structure, and a hull structure with a large slot in the middle of the main hull, which increases the length of the bridge, enables the installation of an extra-long bridge, and achieves an extra-large dredging depth.

[0039] Example 2

[0040] like Figure 6 and 7 As shown, different from Example 1, if the excavation depth of the project is not very large, the ship can be assembled into a normal excavation form. At this time, it is only necessary to remove the left head section 3 of the main pontoon, the right head section 6 of the main pontoon and the first section 9 of the bridge frame, and splice the left tail section 1 of the main pontoon, the left middle section 2 of the main pontoon, the right tail section 4 of the main pontoon, the right middle section 5 of the main pontoon, the gantry 11, and the tail sealing box 12 to form the main hull of the ship. The bridge frame tail section 7, the bridge frame middle section 8, and the reamer front section 10 are spliced ​​into the bridge frame, that is, a normal excavation combination form is formed. In addition, the ship positioning system of the normal excavation form adopts a steel pile trolley system 15 for ship movement and positioning, which can improve the construction accuracy of the ship. The steel pile trolley system 15 is installed on the left tail section 1 of the main pontoon or the right tail section 4 of the main pontoon, and does not conflict with the three-cable positioning system 14. The steel pile trolley system 15 of this embodiment is installed on the left tail section 1 of the main pontoon. At the same time, for the normal excavation form, the number of assembled parts is reduced, which improves the efficiency of transportation and installation of ships.

[0041] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention are within the scope of the technical solution of the present invention.

Claims

1. A combined cutter suction dredger with a maximum dredging depth of more than 40 meters, comprising a main hull, a bridge, a positioning system, a functional cabin and a control room; characterized in that: The main hull is composed of two groups of left and right main pontoons, a gantry and a stern sealing box; the two ends of one side of the gantry are respectively connected to the bows of the left and right main pontoons, and the two ends of the stern sealing box are respectively connected to the sterns of the left and right main pontoons; the left and right main pontoons and the bridge are both segmented and detachable structures, the main pontoon on the left is composed of the left stern section, the left middle section and the left head section of the main pontoon, the main pontoon on the right is composed of the right stern section, the right middle section and the right head section of the main pontoon, and the bridge is composed of the stern section, the middle section, the head section and the front section of the auger; the space in the middle of the main hull is slotted for installing the bridge; The positioning system is a three-cable positioning system, which is arranged on the right tail section of the main pontoon or the left tail section of the main pontoon; since the ship is deep enough, the steel piles of the ship cannot be used, and the three-cable positioning system is used to move and position the ship; The functional cabins are arranged on the left and right sets of main buoyancy tanks; The control room is arranged on the main deck spanning the left and right sets of main buoyancy tanks.

2. The combined cutter suction dredger with a super-large dredging depth of more than 40 meters according to claim 1 is characterized in that: The positioning system is arranged on one of the main buoyancy tanks.

3. The combined cutter suction dredger with a super-large dredging depth of more than 40 meters according to claim 1 is characterized in that: The functional cabins are arranged on the left tail section and the right tail section of the main pontoon.

4. The combined cutter suction dredger with a super-large dredging depth of more than 40 meters according to claim 1 is characterized in that: The control room is arranged on the main deck spanning the left middle section and the right middle section of the main pontoon, and an anchor winch is arranged below the control room.

5. The combined cutter suction dredger with a super-large dredging depth of more than 40 meters according to claim 1 is characterized in that: Two ends of one side of the gantry are respectively connected to the left first section of the main pontoon and the right first section of the main pontoon, and a lifting A-shaped frame is arranged in front of the gantry.

6. The combined cutter suction dredger with a super-large dredging depth of more than 40 meters according to claim 1 is characterized in that: The two ends of the tail sealing box are respectively connected to the left tail section of the main pontoon and the right tail section of the main pontoon.

7. The combined cutter suction dredger with a super-large dredging depth of more than 40 meters according to claim 1, characterized in that: The tail section of the bridge is provided with an underwater pump system, and the front section of the reamer is provided with a reamer system.

Citation Information

Patent Citations

  • Environment-friendly modular dredger

    CN106088200A

  • Cutter-suction dredger single-steel-pile trolley and three-cable combination positioning system

    CN201296941Y

  • Combined cutter suction dredger with ultra-large digging depth of more than 40 meters

    CN211172139U