A prestressed concrete reinforcement structure for wind turbine foundation

By using prestressed concrete to strengthen the structure and elastic water-stop design in the wind power foundation, the stability problems of the wind power foundation caused by insufficient concrete foundation strength and water penetration are solved, achieving higher structural strength and stability, and reducing maintenance costs. .

CN110629784BActive Publication Date: 2024-10-22JIANGSU ZHUYAN CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910910418.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-09-25
Publication Date
2024-10-22
Estimated Expiration
2039-09-25

AI Technical Summary

Technical Problem

When the wind power foundation is subjected to long-term reciprocating wind turbine loads, the concrete foundation will cause cracks and cavities due to dislocation and water infiltration, causing the wind turbine tower to shake violently, and the original concrete foundation is insufficient in strength, threatening the safe and stable operation of the wind turbine.

Method used

The wind turbine foundation prestressed concrete reinforced structure is used, including the foundation ring, concrete foundation layer and prestressed reinforced concrete layer. Through the ring grouting reinforcement ring and elastic water-stop structure, the prestressed tension and waterproofing of the concrete foundation are realized, and the foundation is strengthened. pressure-bearing capacity and stability.

Benefits of technology

It improves the structural strength and stability of the wind power foundation, reduces safety hazards, reduces maintenance frequency, saves wind power operating costs, and avoids tearing of the waterproof material layer through flexible connections, ensuring long-term reliable operation of the wind power foundation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110629784B_ABST
    Figure CN110629784B_ABST
Patent Text Reader

Abstract

The present invention relates to a prestressed concrete reinforcement structure for a wind turbine foundation, which is used to support the tower of a wind turbine generator set, and is characterized in that it includes a foundation ring for connecting with the wind turbine tower, a concrete foundation layer arranged at the bottom and periphery of the foundation ring, a prestressed reinforced concrete layer closely attached to the upper surface of the concrete foundation layer and surrounding the periphery of the foundation ring, and at least one grouting reinforcement ring surrounding the periphery of the foundation ring for prestressing is embedded in the prestressed reinforced concrete layer, and the grouting reinforcement ring has an annular grouting cavity arranged along its own extension direction. The advantages of the present invention are: post-cast reinforced concrete is arranged above the concrete foundation layer, and the entire wind turbine reinforcement ring is expanded by pouring concrete in the annular grouting cavity to achieve prestressed post-tensioning, thereby achieving structural reinforcement of the concrete foundation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a wind power generation foundation, in particular to a prestressed concrete reinforcement structure of a wind turbine foundation. Background Art

[0002] As a clean and renewable energy source, wind energy is gaining more and more attention from countries around the world. With the development of the global economy, the wind energy market has also developed rapidly. China has a large wind energy reserve and a wide distribution area. The wind energy reserve on land alone is about 253 million kilowatts. In recent years, my country's wind power industry has developed rapidly, and there is a strong demand for onshore wind turbine infrastructure.

[0003] The foundation ring type and foundation anchor type wind turbine foundation introduced from abroad are widely used in the onshore wind power industry. The foundation ring or foundation anchor is fixed to the ground through the concrete foundation, and the tower of the wind turbine power generation system is connected and fixed with the upper flange of the foundation ring and foundation anchor. Under the action of long-term reciprocating wind turbine load, the bottom flange of the foundation ring and foundation anchor and the surrounding concrete produce relative displacement, resulting in concrete cracks, especially at the junction of the outer wall of the foundation ring and the concrete, the wind turbine foundation water stop fails, resulting in water infiltration. Under the influence of the continuous vibration and swing of the foundation ring, the concrete is continuously ground and merged with the infiltrated water to squeeze out from the cracks, hollowing out the local concrete at the bottom flange of the foundation ring to form a cavity, which will eventually cause the wind turbine tower to shake violently; and the concrete around the foundation ring and foundation anchor is affected by cracks, cavities or working environment, construction quality and other factors, resulting in the original concrete foundation strength not meeting the design requirements, seriously threatening the safe and stable operation of the wind turbine. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a prestressed concrete reinforcement structure for a wind turbine foundation which can improve the structural strength of the wind turbine foundation.

[0005] In order to solve the above technical problems, the technical solution of the present invention is: a prestressed concrete reinforcement structure for a wind turbine foundation, used to support the tower of a wind turbine generator set, and its innovative point is: comprising:

[0006] A foundation ring for connection with a wind turbine tower;

[0007] A concrete foundation layer provided at the bottom and periphery of the foundation ring;

[0008] A prestressed reinforced concrete layer is closely attached to the upper surface of the concrete foundation layer and surrounds the periphery of the foundation ring. At least one grouting reinforcement ring surrounding the periphery of the foundation ring for prestressing is embedded in the prestressed reinforced concrete layer. The grouting reinforcement ring has an annular grouting cavity arranged along its own extension direction, and a grouting pipe and a return grouting pipe connected to the annular grouting cavity are arranged on the grouting reinforcement ring, and the pipe openings of the grouting pipe and the return grouting pipe extend out of the upper surface or side surface of the prestressed reinforced concrete layer.

[0009] Furthermore, its innovation lies in that the grouting reinforcement ring is composed of a plurality of arc segments connected in sequence end to end through flanges, the center of the arc segment has a flow channel running through it along its own extension direction, and each of the arc segments is connected in sequence to form an annular grouting cavity.

[0010] Furthermore, the innovation point is that the cross section of the annular grouting cavity is composed of a pair of vertically and symmetrically arranged transition sections connecting the upper arc section and the lower arc section.

[0011] Furthermore, the innovation point is that the cross section of the annular grouting cavity is rectangular.

[0012] Furthermore, its innovation lies in: a plurality of vertical rebar holes that do not penetrate the concrete foundation layer are also opened on the upper surface of the concrete foundation layer; a steel bar skeleton is built into the prestressed reinforced concrete layer, and rebars are vertically connected to the steel bar skeleton, and the lower ends of the rebars extend vertically downward into the rebar holes.

[0013] Furthermore, the innovation point is that: the upper surface of the concrete foundation layer is coaxially provided with several annular grooves with the foundation ring axis as the center.

[0014] Furthermore, the innovation point is that an elastic water-stopping structure is arranged between the outer circumferential surface of the foundation ring and the concrete foundation layer and the prestressed reinforced concrete layer.

[0015] Furthermore, the innovation point is that the elastic water-stopping structure is:

[0016] A first annular sealing groove surrounding the outer wall of the base ring is provided on the upper surface of the concrete base layer close to the outer wall of the base ring, a first sealing strip is provided in the first annular sealing groove, and a first polyurethane sealant layer is filled at the top of the first annular sealing groove;

[0017] The junction of the outer wall of the foundation ring, the concrete foundation layer and the prestressed reinforced concrete layer is an annular dividing line. Taking the annular dividing line as a reference, in the vertical direction, the area between the outer wall of the foundation ring and the prestressed reinforced concrete layer above the annular dividing line is defined as a vertical annular waterproof area. In the horizontal direction, the area between the concrete foundation layer and the prestressed reinforced concrete layer outside the annular dividing line is positioned as a horizontal annular waterproof area.

[0018] A circle of rubber tube is arranged at the annular dividing line, the circle of rubber tube is closely attached to the first polyurethane sealant layer, and a third polyurethane sealant layer is filled in the gap between the rubber tube and the outer wall of the base ring, the concrete base layer and the first polyurethane sealant layer;

[0019] A waterproof material layer extending to the horizontal annular waterproof area is arranged in the vertical annular waterproof area, wherein the waterproof material layer includes a waterproof coating layer, a first waterproof coiled material layer, a second waterproof coiled material layer and a light-colored paint protective layer arranged in sequence from inside to outside in the vertical annular waterproof area;

[0020] A second annular sealing groove surrounding the outer wall of the foundation ring is arranged on the upper surface of the prestressed reinforced concrete layer, close to the outer wall of the foundation ring. A second sealing strip is arranged in the second annular sealing groove, and a second polyurethane sealant layer is filled at the top of the second annular sealing groove.

[0021] Furthermore, its innovation lies in: a first non-woven geotextile layer is arranged between the waterproof material layer and the outer wall of the foundation ring, and the lower part of the first non-woven geotextile layer extends to the horizontal annular waterproof area; a second non-woven geotextile layer is arranged between the waterproof material layer and the post-cast concrete layer.

[0022] The advantages of the present invention are:

[0023] Post-cast reinforced concrete is set above the wind power concrete foundation layer, and a grouting reinforcement ring is placed in the heightened reinforced concrete. After the post-cast reinforced concrete layer meets the strength requirements, the entire grouting reinforcement ring is expanded by high-pressure grouting in the annular grouting cavity to achieve prestressed post-tensioning, thereby strengthening the structure of the concrete foundation and ensuring that the wind power foundation meets the strength requirements. It is widely used in the reinforcement of wind power foundations using foundation rings. Multiple waterproof and water-blocking layers composed of sealing strips, sealants, waterproof material layers, etc. are set between the foundation ring and the concrete foundation layer and the prestressed reinforced concrete layer. At the same time, a flexible connection is used to set it up, so that a certain degree of displacement can occur between the waterproof and water-blocking structure and the foundation ring, concrete foundation layer, and prestressed reinforced concrete layer, so as to avoid the failure of the water-stopping measures caused by the vibration of the foundation ring and the tearing of the waterproof material layer, thereby improving the structural stability of the wind power foundation, reducing safety hazards, reducing maintenance frequency, and saving wind power operation costs.

[0024] The cross section of the annular grouting cavity is designed to be composed of a pair of transition sections connected between the upper and lower semicircles, so that the wind turbine reinforcement ring not only has better pressure bearing capacity, but also can achieve expansion and tensioning more smoothly. The hollow annular body is composed of several arc-shaped segments connected by flanges, which facilitates faster assembly at the foundation ring construction site during the wind power foundation reinforcement process, improves construction efficiency, and is convenient for transportation. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a plan view of the fan foundation structure of the present invention.

[0026] Figure 2 It is a vertical view of the fan foundation structure of the present invention.

[0027] Figure 3 It is a schematic diagram of the reinforcement of the prestressed concrete reinforcement structure of the wind turbine foundation of the present invention.

[0028] Figure 4 It is a schematic cross-sectional view of the annular groove in the present invention.

[0029] Figure 5 It is a schematic diagram of the grouting reinforcement ring structure in the present invention.

[0030] Figure 6 It is a schematic diagram of the arc segmented structure in the present invention.

[0031] Figure 7 It is a schematic cross-sectional view of the arc segment at the grouting pipe in the present invention.

[0032] Figure 8 It is a schematic diagram of the elastic water-stopping structure of the fan foundation in the present invention.

[0033] Fig. 9 It is a schematic diagram of the rubber tube structure in the elastic water-stop structure of the present invention. DETAILED DESCRIPTION

[0034] The prestressed concrete reinforcement structure of the wind turbine foundation of the present invention is used to support the tower of the wind turbine generator set, such as Figure 1 , 2 , 3, which includes

[0035] A base ring 1 for connecting to a wind turbine tower;

[0036] A concrete foundation layer 2 arranged at the bottom and periphery of the foundation ring 1;

[0037] A prestressed reinforced concrete layer 3 is closely attached to the upper surface of the concrete foundation layer 2 and surrounds the periphery of the foundation ring 1. A steel skeleton 6 is pre-embedded in the prestressed reinforced concrete layer 3 and at least one grouting reinforcement ring 5 surrounds the periphery of the foundation ring 1 for prestressing.

[0038] The upper surface of the concrete foundation layer 2 is roughened to increase the bonding property with the prestressed reinforced concrete layer 3 poured later, and several annular grooves 22 with the axis of the foundation ring 1 as the center are coaxially arranged on the upper surface of the concrete foundation layer. Figure 4 As shown, the bottom of the annular groove 22 is inclined downward, and the bottom of the groove is also roughened to form an irregular wavy cross-section. It should be noted that: in the radial direction of the foundation ring from the center of the foundation ring to the outside, the bottom of the annular groove 22 gradually inclines downward. The upper surface of the concrete foundation layer 2 is also provided with a plurality of vertical rebar holes 21 that do not penetrate the concrete foundation layer 2. The steel skeleton 6 is vertically connected with rebars 61, and the lower end of the rebar 61 extends vertically downward into the rebar hole 21.

[0039] like Figure 5 , 6 As shown, the grouting reinforcement ring 5 has an annular grouting cavity arranged along its own extension direction, which is specifically composed of a plurality of arc segments 51 connected end to end in sequence through flanges 52. The center of the arc segment 51 has a flow channel 53 that passes through along its own extension direction. The arc segments 51 are connected in sequence to form an annular grouting cavity.

[0040] A grouting pipe 54 and a return grouting pipe 55 connected to the annular grouting cavity are provided on the grouting reinforcement ring 5, and the length or height of the grouting pipe 54 and the return grouting pipe 55 needs to make their pipe openings extend out of the upper surface or side surface of the prestressed reinforced concrete layer. Usually, the grouting pipe 54 and the return grouting pipe 55 are located at the upper end of the outer surface of the hollow annular body, a feed check valve is installed on the grouting pipe 54, and a stop valve is installed on the return grouting pipe 55. In addition, it is recommended that the grouting pipe and the return grouting pipe be staggered in the circumferential direction of the annular grouting cavity.

[0041] In the present invention, Figure 7 As shown, the cross section of the annular grouting cavity is composed of a pair of symmetrically arranged transition sections 513 connected between the upper arc section 511 and the lower arc section 512. Specifically, it is composed of a pair of vertical transition sections connected between the upper semicircle and the lower semicircle arranged up and down. In this way, it is conducive to using a circular metal tube to cut and form the upper and lower semicircles of the cross section, and then welding a vertically arranged arc steel plate between the ends of the two. The circular metal tube is usually made of steel tube, and the arc steel plate is obtained by cutting a cylindrical steel plate. The manufacturing process is simple, and more importantly, it is easy to control the quality. Of course, the cross section of the above-mentioned annular grouting cavity is only an exemplary solution, and it can also be rectangular or other shapes.

[0042] An elastic water-stopping structure is arranged between the outer circumference of the foundation ring 1 and the concrete foundation layer 2 and the prestressed reinforced concrete layer 3. Figure 8 , 9 As shown:

[0043] It includes a first sealing strip 41 , a first polyurethane sealing adhesive layer 42 , a rubber tube 43 , a third polyurethane sealing adhesive layer 44 , a waterproof material layer 45 , a first non-woven geotextile layer 46 , a second non-woven geotextile layer 47 , a second sealing strip 48 , and a second polyurethane sealing adhesive layer 49 .

[0044] A first annular sealing groove surrounding the outer wall of the foundation ring 1 is provided on the upper surface of the concrete foundation layer 2 close to the outer wall of the foundation ring 1, a first sealing strip 41 is provided in the first annular sealing groove, and a first polyurethane sealant layer 42 is filled at the top of the first annular sealing groove.

[0045] The junction of the outer wall of the foundation ring 1, the concrete foundation layer 2 and the prestressed reinforced concrete layer 3 is an annular dividing line, and the annular dividing line is used as a reference: in the vertical direction, the area between the outer wall of the foundation ring 1 and the prestressed reinforced concrete layer 3 above the annular dividing line is defined as a vertical annular waterproof area; in the horizontal direction, the area between the concrete foundation layer 2 and the prestressed reinforced concrete layer 3 outside the annular dividing line is positioned as a horizontal annular waterproof area; of course, those skilled in the art should understand that the reason why the annular dividing line is annular is that the outer wall of the foundation ring is usually circular, and the shape of the dividing line depends on the shape of the outer wall of the foundation ring, which will not be repeated here.

[0046] A circle of rubber tube 43 is provided at the annular dividing line, and the circle of rubber tube 43 is closely attached to the first polyurethane sealant layer 42, and the gaps between the rubber tube 43 and the outer wall of the base ring 1, between the rubber tube 43 and the first polyurethane sealant layer 42, and even between the rubber tube 43 and the concrete base layer 2 are filled with a third polyurethane sealant layer 44. The rubber tube 43 is usually a rubber tube with an inner diameter of 10-18 mm and an outer diameter of 28-40 mm.

[0047] A waterproof material layer 45 extending to the horizontal annular waterproof area is provided in the vertical annular waterproof area. The waterproof material layer 45 includes a waterproof coating layer, a first waterproof roll material layer, a second waterproof roll material layer and a light-colored paint protective layer which are provided in sequence from the inside to the outside of the vertical annular waterproof area. A first non-woven geotextile layer 46 is provided between the waterproof material layer 45 and the outer wall of the foundation ring 1, and the lower part of the first non-woven geotextile layer 46 extends to the horizontal annular waterproof area. The first non-woven geotextile layer 46 and the outer wall of the foundation ring 1 are movably connected by multi-point pasting, and a second non-woven geotextile layer 47 is provided between the waterproof material layer 45 and the prestressed reinforced concrete layer 3. It is ensured that the waterproof material layer 45 is free to be detached in the junction area between the foundation ring 1 and the concrete foundation layer 2 and the prestressed reinforced concrete layer 3. In addition, in this embodiment, the first and second waterproof membrane layers use natural asphalt waterproof membranes with a thickness of about 1.5 mm. The two waterproof membranes are cut and pasted together. The overlapping positions of the first waterproof membrane layer and the second waterproof membrane layer are staggered, and the cutting seams are required to be staggered in the center.

[0048] A second annular sealing groove surrounding the outer wall of the base ring 1 is provided on the upper surface of the prestressed reinforced concrete layer 3, close to the outer wall of the base ring 1. A second sealing strip 48 is provided in the second annular sealing groove, and a second polyurethane sealant layer 49 is filled at the top of the second annular sealing groove. Of course, the above elastic water-stopping structure is only exemplary and not limiting.

[0049] Working principle: The prestressed reinforced concrete layer and the concrete foundation layer are combined by roughening the surface, planting reinforcement and annular grooves of specific structure, and concrete is poured into the annular grouting cavity to make the entire grouting reinforcement ring expand to achieve prestressed post-tensioning, and obtain a prestressed reinforced concrete layer with strength grade C40 or above, thereby strengthening the structure of the concrete foundation; at the same time, under the long-term reciprocating wind turbine load of the wind turbine blades at the top of the tower, although the foundation ring 1 or the foundation anchor bolts will have a certain slight vibration, the water-stopping structure has a large deformable performance, as well as the freedom of separation between the waterproof material layer and the foundation ring 1, the concrete foundation layer 2, and the prestressed reinforced concrete layer 3, so as to avoid the direct infiltration of water caused by gaps and the tearing failure of the waterproof membrane.

Claims

1. A prestressed concrete reinforcement structure for a wind turbine foundation, used to support the tower of a wind turbine generator set, characterized in that: include A foundation ring for connection with a wind turbine tower; A concrete foundation layer provided at the bottom and periphery of the foundation ring; A prestressed reinforced concrete layer is closely attached to the upper surface of the concrete foundation layer and surrounds the periphery of the foundation ring. At least one grouting reinforcement ring surrounding the periphery of the foundation ring for prestressing is embedded in the prestressed reinforced concrete layer. The grouting reinforcement ring has an annular grouting cavity arranged along its own extension direction, and a grouting pipe and a return grouting pipe connected to the annular grouting cavity are arranged on the grouting reinforcement ring, and the pipe openings of the grouting pipe and the return grouting pipe extend out of the upper surface or side surface of the prestressed reinforced concrete layer; the grouting reinforcement ring is composed of a plurality of arc segments connected in sequence end to end by flanges, and the center of the arc segment has a flange along its own extension direction. The through-flow channel, each of the arc segments is connected in sequence to form an annular grouting cavity; the cross section of the annular grouting cavity is composed of a pair of vertical and symmetrical transition sections connected between the upper arc segment and the lower arc segment; the cross section of the annular grouting cavity is rectangular; the upper surface of the concrete foundation layer is also provided with a number of vertical and non-penetrating reinforcement holes; the prestressed reinforced concrete layer is provided with a steel skeleton, and reinforcements are vertically connected to the steel skeleton, and the lower ends of the reinforcements extend vertically downward into the reinforcement holes; the upper surface of the concrete foundation layer is coaxially provided with a number of annular grooves with the foundation ring axis as the center; An elastic water-stopping structure is arranged between the outer circumferential surface of the foundation ring and the concrete foundation layer and the prestressed reinforced concrete layer; the elastic water-stopping structure is: A first annular sealing groove surrounding the outer wall of the base ring is provided on the upper surface of the concrete base layer close to the outer wall of the base ring, a first sealing strip is provided in the first annular sealing groove, and a first polyurethane sealant layer is filled at the top of the first annular sealing groove; The junction of the outer wall of the foundation ring, the concrete foundation layer and the prestressed reinforced concrete layer is an annular dividing line. Taking the annular dividing line as a reference, in the vertical direction, the area between the outer wall of the foundation ring and the prestressed reinforced concrete layer above the annular dividing line is defined as a vertical annular waterproof area. In the horizontal direction, the area between the concrete foundation layer and the prestressed reinforced concrete layer outside the annular dividing line is positioned as a horizontal annular waterproof area. A circle of rubber tube is arranged at the annular dividing line, the circle of rubber tube is closely attached to the first polyurethane sealant layer, and a third polyurethane sealant layer is filled in the gap between the rubber tube and the outer wall of the base ring, the concrete base layer and the first polyurethane sealant layer; A waterproof material layer extending to the horizontal annular waterproof area is arranged in the vertical annular waterproof area, wherein the waterproof material layer includes a waterproof coating layer, a first waterproof coiled material layer, a second waterproof coiled material layer and a light-colored paint protective layer arranged in sequence from inside to outside in the vertical annular waterproof area; A second annular sealing groove surrounding the outer wall of the foundation ring is arranged on the upper surface of the prestressed reinforced concrete layer, close to the outer wall of the foundation ring. A second sealing strip is arranged in the second annular sealing groove, and a second polyurethane sealant layer is filled at the top of the second annular sealing groove; a first non-woven geotextile layer is arranged between the waterproof material layer and the outer wall of the foundation ring, and the lower part of the first non-woven geotextile layer extends to the horizontal annular waterproof area; a second non-woven geotextile layer is arranged between the waterproof material layer and the post-cast concrete layer.