A suspended monorail traffic guidance system
By setting up a suspended monorail transportation system and a hierarchically managed transportation network in the TOD complex, the problem that the public transportation system cannot meet the demand for precise and fast transportation is solved, and the seamless connection of the last mile and the improvement of travel efficiency are achieved.
Patent Information
- Application Number
- CN201910934978.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-09-29
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2039-09-29
AI Technical Summary
The existing public transportation system cannot meet the demand for accurate and fast transportation, especially the last mile travel problem within the city, resulting in low travel efficiency.
Adopting a suspended monorail traffic-oriented system, a suspended monorail traffic system is set up in the TOD complex to form a traffic line network that passes through the building, and traffic branches and traffic loops are set up to achieve precise point-to-point transportation, and through the core transfer The area is connected to public transportation lines, and combined with elevators and other transportation devices to achieve seamless connection.
It greatly improves travel efficiency, realizes the seamless connection between public transportation and home transportation, shortens the sense of spatial distance, saves travel time, and promotes the high-quality development of comprehensive communities.
Smart Images

Figure CN110667603B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of rail transit systems, and in particular to a suspended monorail transit-oriented system. Background Art
[0002] The larger the city, the larger and more complicated its internal transportation system will be, which will lead to urban traffic congestion, resulting in reduced time efficiency and greatly affecting people's lives and work. Although the current public transportation network, such as buses and subways, is very large, it requires people to transfer multiple times and cannot predict and avoid traffic congestion, especially near the destination and when entering the house, the current public transportation cannot meet the needs. After leaving the public transportation, people still need to spend time to reach the destination, resulting in low travel efficiency.
[0003] At present, transit-oriented development (TOD) is a non-motorized planning and design method that maximizes the use of public transportation when planning a residential or commercial area. In the existing TOD complex development, public transportation is mainly subway, bus, light rail, etc. At the same time, the existing TOD complex development has a high building density and has a "mixed use" that integrates work, business, culture, education, and residence, so that residents and employees can conveniently choose a variety of travel modes such as public transportation, bicycles, and walking without excluding cars. Urban reconstruction plots, infill plots, and newly developed land can all be built with the concept of TOD. The main radiation range of TOD is 1 kilometer, while areas outside the 1 kilometer range are subject to more restrictions on traffic development.
[0004] Therefore, the existing transportation system does not meet the demand for accurate and fast transportation, and has not actually solved the problem of low transportation efficiency. The efficiency of people's daily life and work travel is still affected by transportation. Therefore, it is necessary to propose a more reasonable technical solution to solve the technical problems existing in the existing technology. Summary of the invention
[0005] The present invention provides a suspended monorail transportation-oriented system. By erecting a suspended monorail transportation system in a TOD complex, the connection between various sections and parts of the complex is promoted, a travel solution for the last 1 kilometer is provided, the integrated development between comprehensive communities is promoted, the radiation range of public transportation center points is increased, and various parts within the comprehensive community can enjoy the regional dividends brought about by the improvement of public transportation, thereby promoting the high-quality development of the comprehensive community.
[0006] In order to achieve the above effects, the present invention adopts the following technical solutions:
[0007] A suspended monorail transportation-oriented system includes a TOD complex. Each area of the TOD complex is provided with a plurality of buildings and a plurality of transfer areas. A core transfer area is provided in at least one of the buildings. The core transfer area is connected to a public transportation line, and the core transfer area is connected to the transfer area through a suspended monorail track to form a transportation network passing through the buildings. Moving vehicles are provided on the suspended monorail track.
[0008] The above-mentioned public traffic-oriented system uses the moving vehicles on the track as point-to-point public transportation within the area, shortening the spatial distance within the area, providing people with a convenient transportation mode, and also bringing passenger flow to the commercial development within the TOD. Since a traffic line network passing through the building is set up, people can take the moving vehicles from the outside area to the inside of the building, realizing the seamless connection of the last kilometer, which will greatly save people's travel time.
[0009] Furthermore, the traffic network extends from the core transfer station to the interior of the building. If only a direct route from the core transfer station to the building is set up, the laying of the suspended monorail will be complicated, and at the same time, it will lead to the emergence of vacant track sections and congested track sections, which will reduce the utilization rate of the track and reduce travel efficiency. Therefore, hierarchical management of the traffic network can avoid the above situation. Specifically, the following feasible solutions are given: the traffic network includes traffic branches and traffic loops. The traffic branches are connected to the public transportation lines through the core transfer area, and the traffic branches are connected to the adjacent traffic branches through the transfer area. When set up in this way, it can be ensured that the traffic branches and traffic loops are both single loop lines, without redundant forks, and there will be no congested sections, and the traffic branches and traffic loops can achieve congestion-free operation.
[0010] Furthermore, the traffic branch line realizes the function of diverting traffic from the public transportation system, and the traffic ring line is used to realize the diversion of the traffic branch line, and realize the demand of traffic entering households, and realize point-to-point precise transportation. Therefore, the arrow ring line disclosed in the above technical scheme is optimized. Specifically: there are several traffic ring lines, and the traffic ring lines are connected with the traffic branch lines in the transfer area. Each traffic ring line passes through different buildings. After several buildings form a concentrated area, each building in the concentrated area is communicated through a traffic exchange line, which can avoid traffic congestion and complexity.
[0011] Furthermore, the traffic branch line must be connected with the adjacent traffic branch line as well as the traffic ring line. The traffic branch line is basically set outdoors, and the traffic line is mainly used for entering households. In order to avoid congestion when the two lines are connected, the transfer area disclosed in the above technical solution is optimized, and the following feasible solutions are given: the transfer area includes an indoor transfer area set inside the building and an outdoor transfer area set outside the building. The traffic ring line is connected with the traffic branch line through the indoor transfer area, and the traffic branch line is connected with the adjacent traffic branch line through the outdoor transfer area.
[0012] Furthermore, in order to facilitate the connection between the traffic branch line and the public transportation system and to facilitate the transfer of pedestrians, the core transfer area in the above technical solution is optimized, and the following feasible solution is given: the core transfer area is set inside the building.
[0013] Furthermore, the transfer area disclosed in the above technical solution is optimized, and the following feasible solution is given: a corridor bridge passage is set between the transfer area and the building, the corridor bridge passage connects the entrance passage and the exit passage of the transfer area, and the corridor bridge passage is also connected to the transportation device inside the building.
[0014] Furthermore, the corridor bridge passage disclosed in the above technical solution is optimized, and the following feasible solution is given: the corridor bridge passage is arranged at the lower part of the building body, and the height of the corridor bridge passage is 6 to 10 meters.
[0015] Furthermore, the transport device disclosed in the above technical solution is optimized, and the following feasible solution is given: the transport device at least includes an elevator, an escalator and stairs.
[0016] Furthermore, the building disclosed in the above technical solution is optimized, and the following feasible solution is given: the building includes a parking building. The parking building is a three-dimensional parking building. The advantage of such a setting is that vehicles can be parked in a centralized manner to avoid vehicles entering the residential area, which can effectively reduce the automobile exhaust emissions in the residential area and improve the air quality of the residential area.
[0017] Preferably, the building body also includes buildings, markets, business districts and residential buildings.
[0018] Furthermore, the moving vehicle disclosed in the above technical solution is optimized, and the following feasible solution is given: the moving vehicle is a suspended aerial train.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] The traffic-oriented system disclosed in the present invention can realize seamless connection between the public transportation system and the home transportation system, making it convenient for people to realize fast and convenient transportation within the TOD complex; the traffic branches and traffic loops arranged in the system can realize point-to-point precise home travel, greatly improving people's travel efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only represent some embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0022] Figure 1 It is the overall structural diagram of this system;
[0023] Figure 2 is a schematic diagram of the component modules of the system disclosed in Example 1;
[0024] Figure 3 This is a schematic diagram of the component modules of the system disclosed in Example 2.
[0025] In the above-mentioned attached figures, the meanings of the numbers are as follows: 1. public transportation line; 2. core transfer area; 3. building; 4. traffic branch line; 5. transfer area; 501. outdoor transfer area; 502. indoor transfer area; 6. traffic loop line. DETAILED DESCRIPTION
[0026] The present invention will be further explained below in conjunction with the accompanying drawings and specific embodiments.
[0027] It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention. The specific structures and functional details disclosed herein are only used to describe the exemplary embodiments of the present invention. However, the present invention can be embodied in many alternative forms, and it should not be understood that the present invention is limited to the embodiments set forth herein.
[0028] The terms used herein are only used to describe specific embodiments and are not intended to limit the exemplary embodiments of the present invention. As used herein, the singular forms "a", "an", and "the" are intended to include the plural forms unless the context clearly indicates the opposite meaning. It should also be understood that the terms "include", "comprise", "include", and / or "comprising" when used herein specify the existence of the claimed features, integers, steps, operations, units and / or components, and do not exclude the existence or increase of one or more other features, quantities, steps, operations, units, components and / or their combinations.
[0029] It should also be noted that in some alternative embodiments, the functions / acts that appear may be different from the order in which the figures appear. For example, depending on the functions / acts involved, they may actually be performed substantially concurrently, or two figures shown in succession may sometimes be performed in the reverse order.
[0030] In the following description, specific details are provided to facilitate a complete understanding of the example embodiments. However, it should be understood by those of ordinary skill in the art that the example embodiments may be implemented without these specific details. For example, the system may be shown in a block diagram to avoid obscuring the example with unnecessary details. In other embodiments, well-known processes, structures, and techniques may not be shown in unnecessary detail to avoid obscuring the example embodiments.
[0031] Example 1
[0032] like Figure 1 , Figure 2 As shown, this embodiment discloses a suspended monorail transportation-oriented system, including a TOD complex, wherein each area of the TOD complex is provided with a plurality of buildings 3, and also includes a plurality of transfer areas 5, and at least one of the buildings 3 is provided with a core transfer area 2, wherein the core transfer area 2 is connected to a public transportation line 1, and the core transfer area 2 is connected to the transfer area 5 through a suspended monorail track to form a transportation network passing through the building 3, and a moving vehicle is provided on the suspended monorail track.
[0033] The above-disclosed traffic-oriented system uses the moving vehicles on the track as point-to-point public transportation within the area, shortening the spatial distance within the area, providing people with a convenient transportation mode, and also bringing passenger flow to the commercial development within the TOD. Since a traffic line network passing through the building 3 is set up, people can take moving vehicles from the external area to the inside of the building 3, realizing the seamless connection of the last kilometer, which will greatly save people's travel time.
[0034] In this embodiment, the suspended monorail traffic guidance system is set for a single area, and in this area, it includes a traffic branch line 4 connected to the public transportation line 1, and the traffic branch line 4 is connected to the public transportation line 1 through the core transfer area 2; the traffic branch line 4 is also connected to the traffic loop line 6 for entering the house, and the traffic branch line 4 and the traffic loop line 6 are connected through the transfer area 5. Through the two-level distribution of the traffic branch line 4 and the traffic loop line 6, it is possible to transfer from the public transportation line 1 to the final building 3, and the intermediate transfer does not pass through other external transportation tools, which is very fast.
[0035] An optional setting is that a plurality of traffic loops 6 can be arranged on the corresponding traffic branch line 4, and the corresponding traffic loops 6 respectively connect different buildings 3 to form a single area.
[0036] Example 2
[0037] like Figure 1 , Figure 3 As shown, this embodiment discloses a suspended monorail transportation-oriented system, including a TOD complex, wherein each area of the TOD complex is provided with a plurality of buildings 3, and also includes a plurality of transfer areas 5, and at least one of the buildings 3 is provided with a core transfer area 2, wherein the core transfer area 2 is connected to a public transportation line 1, and the core transfer area 2 is connected to the transfer area 5 through a suspended monorail track to form a transportation network passing through the building 3, and a moving vehicle is provided on the suspended monorail track.
[0038] The above-disclosed traffic-oriented system uses the moving vehicles on the track as point-to-point public transportation within the area, shortening the spatial distance within the area, providing people with a convenient transportation mode, and also bringing passenger flow to the commercial development within the TOD. Since a traffic line network passing through the building 3 is set up, people can take moving vehicles from the external area to the inside of the building 3, realizing the seamless connection of the last kilometer, which will greatly save people's travel time.
[0039] The traffic network extends from the core transfer station to the interior of the building 3. If only a direct route from the core transfer station to the building 3 is set, the laying of the suspended monorail will be complicated, and at the same time, it will lead to the appearance of vacant track sections and congested track sections, which will reduce the utilization rate of the track and reduce travel efficiency. Therefore, hierarchical management of the traffic network can avoid the above situation. Specifically, the following feasible solutions are given: the traffic network includes a traffic branch line 4 and a traffic ring line 6. The traffic branch line 4 is connected to the public transportation line 1 through the core transfer area 2, and the traffic branch line 4 is connected to the adjacent traffic branch line 4 through the transfer area 5. When set up in this way, it can be ensured that the traffic branch line 4 and the traffic ring line 6 are both single loop lines, without redundant forks, and no congested sections, and the traffic branch line 4 and the traffic ring line 6 can achieve non-congested operation.
[0040] The traffic system disclosed in this embodiment can carry out comprehensive and unified management of multiple areas. When traveling, after transferring from the public transportation line 1 to the traffic branch line 4, you can also transfer between branches and finally transfer to the corresponding traffic ring line 6 and reach the destination building 3.
[0041] It can be seen that the traffic branch line 4 realizes the function of diverting traffic from the public transportation system, and the traffic ring line 6 is used to divert traffic branch line 4 and meet the needs of traffic entering households, and realize point-to-point precise transportation. Therefore, the arrow ring line disclosed in the above technical solution is optimized. Specifically: there are several traffic ring lines 6, and the traffic ring lines 6 are connected with the traffic branch lines 4 in the transfer area 5. Each traffic ring line 6 passes through different buildings 3. After several buildings 3 form a concentrated area, each building in the concentrated area is communicated through a traffic exchange line, which can avoid traffic congestion and complexity.
[0042] The traffic branch line 4 must be connected to the adjacent traffic branch line 4 and the traffic ring line 6. The traffic branch line 4 is basically set outdoors, and the traffic line is mainly used for entering the house. In order to avoid congestion when the two lines are connected, the transfer area 5 disclosed in the above technical solution is optimized, and the following feasible solutions are given: the transfer area 5 includes an indoor transfer area 502 set inside the building 3 and an outdoor transfer area 501 set outside the building 3. The traffic ring line 6 is connected to the traffic branch line 4 through the indoor transfer area 502, and the traffic branch line 4 is connected to the adjacent traffic branch line 4 through the outdoor transfer area 501.
[0043] In order to facilitate the connection between the traffic branch line 4 and the public transportation system and to facilitate the transfer of pedestrians, the core transfer area 2 in the above technical solution is optimized, and the following feasible solution is given: the core transfer area 2 is set inside the building 3.
[0044] The transfer area 5 disclosed in the above technical solution is optimized, and the following feasible solution is given: a corridor bridge passage is set between the transfer area 5 and the building 3, the corridor bridge passage connects the entrance passage and the exit passage of the transfer area 5, and the corridor bridge passage is also connected to the transportation device inside the building 3.
[0045] The corridor bridge passage disclosed in the above technical solution is optimized, and the following feasible solution is given: the corridor bridge passage is arranged at the lower part of the building body 3, and the height of the corridor bridge passage is 6 to 10 meters.
[0046] In this embodiment, taking a residential building as an example, the number of floors of the residential building should be less than or equal to 33, and the transfer area 5 should be located on the third floor of the residential building; when passengers get off from a moving vehicle on the traffic ring line 6, they enter the residential building through the corridor bridge and take the elevator in the residential building to reach their residence.
[0047] The transport device disclosed in the above technical solution is optimized, and the following feasible solution is given: the transport device at least includes an elevator, an escalator and stairs.
[0048] The building 3 disclosed in the above technical solution is optimized, and the following feasible solution is given: the building 3 includes a parking building. The parking building is a three-dimensional parking building. The advantage of such a setting is that vehicles can be parked in a centralized manner to avoid vehicles entering the residential area, which can effectively reduce the automobile exhaust emissions in the residential area and improve the air quality of the residential area.
[0049] Specifically, the building body 3 also includes buildings, markets, business districts, and residential buildings.
[0050] The moving vehicle disclosed in the above technical solution is optimized, and the following feasible solution is given: the moving vehicle is a suspended aerial train.
[0051] The above are the embodiments of the present invention, but the present invention is not limited to the above optional embodiments. Those skilled in the art can arbitrarily combine the above methods to obtain other various embodiments. Anyone can obtain other various forms of embodiments under the enlightenment of the present invention. The above specific embodiments should not be understood as limiting the scope of protection of the present invention. The scope of protection of the present invention shall be based on the definition in the claims, and the description can be used to interpret the claims.
Claims
1. A suspended monorail transit-oriented system, comprising a TOD complex, wherein each area of the TOD complex is provided with a plurality of buildings (3), characterized in that: It also includes a plurality of transfer areas (5), and at least one building (3) is provided with a core transfer area (2), the core transfer area (2) is connected to the public transportation line (1), and the core transfer area (2) and the transfer area (5) are connected via a suspended monorail to form a transportation network passing through the building (3), and a moving vehicle is provided on the suspended monorail; The traffic network comprises a traffic branch line (4) and a traffic ring line (6), wherein the traffic branch line (4) is connected to the public transportation line (1) via the core transfer area (2), and the traffic branch line (4) is connected to an adjacent traffic branch line (4) via the transfer area (5); There are a number of traffic loops (6), the traffic loops (6) are connected to the traffic branch lines (4) in the transfer area (5), and each traffic loop (6) passes through a different building (3); The transfer area (5) comprises an indoor transfer area (502) arranged inside the building (3) and an outdoor transfer area (501) arranged outside the building (3); the traffic loop (6) is connected to the traffic branch line (4) through the indoor transfer area (502); and the traffic branch line (4) is connected to an adjacent traffic branch line (4) through the outdoor transfer area (501); The core transfer area (2) is arranged inside the building (3).
2. The suspended monorail transit-oriented system according to claim 1, characterized in that: A corridor bridge passage is provided between the transfer area (5) and the building (3), the corridor bridge passage connecting the entrance passage and the exit passage of the transfer area (5), and the corridor bridge passage also connects the transport device inside the building (3).
3. The suspended monorail transportation-oriented system according to claim 2, characterized in that: The corridor bridge passage is arranged at the lower part of the building body (3), and the height of the corridor bridge passage is 6 to 10 meters.
4. The suspended monorail transit-oriented system according to claim 2, characterized in that: The transport device at least comprises an elevator, an escalator and stairs.
5. The suspended monorail transit-oriented system according to claim 1, characterized in that: The building (3) includes a parking building.
6. The suspended monorail transit-oriented system according to claim 1, characterized in that: The traveling vehicle is a suspended sky train.