An in-situ protection method for parallel masonry trenches across foundation pits

By using a steel support system and concrete supports in the parallel masonry pipe trenches spanning the foundation pit, an overall protective structure was constructed, which solved the problem of cracking and leakage of masonry pipe trenches caused by ground deformation during foundation pit construction, reduced safety risks and project costs, and optimized the construction period and economic benefits.

CN110700273BActive Publication Date: 2024-11-08CHINA RAILWAY DESIGN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911086413.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-11-08
Publication Date
2024-11-08
Estimated Expiration
2039-11-08

AI Technical Summary

Technical Problem

In existing technologies, parallel masonry pipe trenches spanning foundation pits present significant challenges in in-situ protection during foundation pit construction. They are prone to cracking and leakage due to ground deformation, affecting normal use and lifespan. Furthermore, relocation schemes involve social impact and high project investment.

Method used

Steel profiles are used as the support system, combined with concrete support. The side support structure is constructed by supporting steel profiles on the bottom plate, fixing steel profiles, steel profile diagonal braces and horizontal grouting pipes to form an overall protection, ensuring the control of vertical and lateral deformation of the trench. Connecting steel profiles and ESP foam boards are installed in the pit retaining structure for protection.

Benefits of technology

It effectively reduced the safety risks of in-situ protection of pipe trenches, reduced the social impact and project investment caused by relocation, optimized the construction period, provided the necessary construction space, and improved economic efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110700273B_ABST
    Figure CN110700273B_ABST
Patent Text Reader

Abstract

The present invention discloses an in-situ protection method for parallel masonry pipe trenches across a foundation pit, comprising the following steps: determining the top elevation of the concrete support, constructing the concrete support, passing the supporting bottom plate steel under the in-situ protection pipe trench, inserting the fixed steel into the supporting bottom plate, installing the steel brace, and reinforcing the soil through a horizontal grouting pipe. The present invention avoids the social impact of the relocation of the pipe trench caused by the excavation of the foundation pit, reduces the project investment, optimizes the construction period, and has significant social and economic benefits. The present invention connects the supporting bottom plate at the bottom of the pipe trench to the concrete support of the foundation pit, and connects the side support structure of the pipe trench to the bottom support platform. The support system has high rigidity, good control effect on the vertical and lateral deformation of the pipe trench, and reduces the safety risk of in-situ protection of the pipe trench. At the same time, it provides the necessary construction space for the excavation of the foundation pit and the backbuilding of the underground structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of geotechnical engineering, and in particular relates to an in-situ protection method for parallel masonry pipe trenches across a foundation pit. Background Art

[0002] With the acceleration of my country's urbanization process, more and more urban construction projects are in conflict with existing important underground pipe trenches. When the pipe trenches are not relocated, the normal construction of the foundation pits will be affected. If the in-situ protection plan for the pipe trenches is not formulated properly, it may cause greater risks to the excavation of the foundation pits and the normal use of the pipe trenches. This is one of the difficulties faced by urban foundation pit construction.

[0003] At present, the in-situ protection of pipelines is mostly for various flexible pipelines such as electricity and communications, or transportation pipelines made of various materials with high tensile strength such as steel, PVC, and reinforced concrete. Compared with masonry trenches, these pipelines are relatively less sensitive to stratum deformation, and the difficulty of in-situ protection is relatively small, and the risk is controllable. However, the tensile strength of masonry structures is very low. When the stratum near the trench undergoes large deformation, it is very easy to cause cracking and leakage in the masonry trench, affecting its normal use function and life. Especially when important trenches are arranged closely and side by side, it makes foundation pit construction difficult, and there is a great risk of in-situ protection. At present, the domestic technical solution for relocation of side-by-side masonry trenches across foundation pits is still adopted, and the research on in-situ protection of trenches has not been systematically carried out or practiced in engineering. Summary of the invention

[0004] The present invention is proposed to solve the problems existing in the prior art, and its purpose is to provide an in-situ protection method for parallel masonry pipe trenches across a foundation pit.

[0005] The technical solution of the present invention is: an in-situ protection method for parallel masonry trenches across a foundation pit, comprising the following steps:

[0006] ⅰ. Determine the top elevation of the concrete support

[0007] Determine the top elevation of the concrete support based on the outer bottom elevation of the parallel deeper masonry trench and the construction height of the supporting bottom plate steel passing through the trench;

[0008] ⅱ. Concrete support

[0009] Excavate the soil on both sides of the in-situ protection trench to the bottom of the concrete support, and construct the concrete support to the designed strength;

[0010] ⅲ. The supporting bottom plate steel passes under the in-situ protection trench

[0011] Use supporting bottom plate steel to be closely arranged in parallel and pass through the in-situ protection pipe trench from under the top surface of the concrete support, and place the supporting bottom plate steel upside down on the concrete support as the supporting bottom plate;

[0012] ⅳ. Insert the fixed steel into the support base plate

[0013] Excavate the soil on one side of the shallow masonry trench to the bottom of the trench, set up a counter-pressure soil platform, and insert the fixed steel at the side wall of the trench close to the side wall of the shallow masonry trench vertically into the counter-pressure soil to the supporting bottom plate.

[0014] ⅴ. Install steel braces

[0015] Set up steel braces to connect the fixed steel and supporting bottom plate steel of the trench side wall to form a whole, forming a side support structure for trench in-situ protection;

[0016] ⅵ. Soil reinforcement through horizontal grouting pipes

[0017] Excavate the counter-pressure soil outside the fixed steel in sections, and set up horizontal grouting pipes to reinforce the soil under the parallel shallow masonry trenches by grouting.

[0018] In step iii, supporting bottom plate connecting steel sections are respectively arranged at both ends perpendicular to the direction of the supporting bottom plate steel sections to form a whole, thereby constituting the entire supporting bottom plate.

[0019] At the connection between the foundation pit retaining structure under the pipe trench and the ground construction section, connecting steel of the retaining structure is also set and filled with ESP foam board for protection.

[0020] When excavating the soil below the trench, the plain concrete and ESP foam board of the retaining structure at the connection are removed, and the reverse construction section of the retaining structure is connected with the ground construction section to form a whole.

[0021] The present invention avoids the social impact of trench relocation caused by foundation pit excavation construction, reduces project investment, optimizes the construction period, and has significant social and economic benefits.

[0022] The present invention adopts steel sections as the supporting system for the in-situ protection of the pipe trench, and combines it with the concrete support setting of the foundation pit, which has little impact on the foundation pit construction, and the raw materials can be partially reused, and the technical and economic benefits of the in-situ protection of the pipe trench are remarkable.

[0023] The present invention connects the bottom support plate of the trench to the concrete support of the foundation pit, and the side support structure of the trench is connected to the bottom support platform. The support system has high rigidity, good control effect on the vertical and lateral deformation of the trench, and reduces the safety risk of in-situ protection of the trench. At the same time, it provides necessary construction space for foundation pit excavation and underground structure backbuilding.

[0024] The connection node between the reverse construction section and the ground construction section of the foundation pit retaining structure under the pipe trench adopted in the present invention ensures the integrity of the foundation pit retaining structure and prevents damage to the in-situ protection pipe trench due to water leakage or excessive deformation of the foundation pit during the excavation of the foundation pit under the pipe trench. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 is a plan view of the present invention;

[0026] Figure 2 is a cross-sectional view of the present invention;

[0027] Figure 3 It is a partial connection schematic diagram of the supporting bottom plate section steel in the present invention;

[0028] Figure 4 It is a schematic diagram of the connection of the side wall support structure steel diagonal braces in the present invention;

[0029] in:

[0030] 1 Foundation pit retaining structure 2 Outer contour of pipe trench

[0031] 3 concrete supports 4 bottom plate steel

[0032] 5 connection steel 6ESP foam board

[0033] 7 parallel deeper masonry trench 8 parallel shallower masonry trench

[0034] 9 Supporting bottom plate connecting steel 10 Fixed steel

[0035] 11 steel diagonal braces and 12 horizontal grouting pipes. DETAILED DESCRIPTION

[0036] Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and embodiments:

[0037] like Figures 1 to 4 As shown, an in-situ protection method for parallel masonry trenches across a foundation pit comprises the following steps:

[0038] ⅰ. Determine the top elevation of the concrete support

[0039] The top elevation of the concrete support 3 is determined according to the outer bottom elevation of the parallel deeper masonry trench 7 and the construction height of the supporting bottom plate steel 4 passing through the trench;

[0040] ⅱ. Concrete support

[0041] Excavate the soil on both sides of the in-situ protection trench to the bottom of the concrete support 3, and construct the concrete support 3 to the design strength;

[0042] ⅲ. The supporting bottom plate steel 4 passes under the in-situ protection pipe trench

[0043] The supporting bottom plate steels 4 are arranged in parallel and closely arranged to pass through the in-situ protection trench from under the top surface of the concrete support 3, and the supporting bottom plate steels 4 are inverted on the concrete support 3 as the supporting bottom plate;

[0044] ⅳ. Insert the fixed steel into the support base plate

[0045] Excavate the soil on one side of the shallow masonry trench 8 to the bottom of the trench, set up a counter-pressure soil platform, and vertically insert the fixed steel 10 at the side wall of the trench into the counter-pressure soil close to the side wall of the shallow masonry trench 8 to support the bottom plate.

[0046] ⅴ. Install steel braces

[0047] The steel brace 11 is arranged to connect the fixed steel 10 and the supporting bottom plate steel 4 of the side wall of the trench to form a whole, forming a side support structure for the in-situ protection of the trench;

[0048] ⅵ. Soil reinforcement through horizontal grouting pipes

[0049] The counter-pressure soil outside the fixed steel section 10 is excavated in sections, and horizontal grouting pipes 12 are arranged to perform grouting reinforcement on the soil below the parallel shallow masonry trenches 8.

[0050] In step iii, supporting bottom plate connecting steels 9 are respectively arranged at both ends perpendicular to the direction of the supporting bottom plate steels 4 to form a whole, thereby constituting the entire supporting bottom plate.

[0051] A connecting steel 5 of the retaining structure is also arranged at the connection between the foundation pit retaining structure 1 under the pipe trench and the ground construction section, and is filled with ESP foam board 6 for protection.

[0052] When excavating the soil below the trench, the plain concrete and ESP foam board 6 of the retaining structure at the connection are removed, and the reverse construction section of the retaining structure is connected with the ground construction section to form a whole.

[0053] like Figure 1 As shown, the outer contour of the trench 2 passes through the middle of the connecting steel 5.

[0054] In step V, the soil on one side of the parallel shallow masonry trench 8 is excavated to the bottom of the trench, a counter-pressure soil platform is set, and then the slope is excavated to the top surface of the supporting bottom plate. The fixed steel 10 is inserted vertically into the counter-pressure soil close to the side wall of the shallow trench to the supporting bottom plate, and the steel brace 11 is placed at a 45° angle and is fully welded on both sides with the fixed steel 10 and the supporting platform channel steel to form a whole.

[0055] In step ⅵ, the trench is excavated and grouting pipes are used to horizontally reinforce the soil below the parallel shallow masonry trench 8.

[0056] The in-situ protection of the present invention is specifically as follows:

[0057] An in-situ protection structure of parallel masonry trenches across a foundation pit, comprising parallel deeper masonry trenches 7 and parallel shallower masonry trenches 8, wherein the parallel deeper masonry trenches 7 and the parallel shallower masonry trenches 8 are connected as a whole and arranged side by side, and the parallel deeper masonry trenches 7 and the parallel shallower masonry trenches 8 are supported by a supporting bottom plate, and the supporting bottom plate is arranged on a concrete support 3 in the foundation pit.

[0058] The supporting bottom plate comprises a plurality of supporting bottom plate section steels 4 for support, and supporting bottom plate connecting section steels 9 are arranged on both sides of the upper ends of the supporting bottom plate section steels 4 .

[0059] A lower soil body is arranged between the parallel shallow masonry trench 8 and the supporting bottom plate.

[0060] A side wall fixing assembly is arranged between the parallel shallow masonry pipe trench 8 and the supporting bottom plate.

[0061] The side walls of the parallel deeper masonry pipe trenches 7 and the parallel shallower masonry pipe trenches 8 are both provided with fixed steel sections 10 .

[0062] The side wall fixing assembly includes a steel brace 11 , one end of which is connected to the supporting bottom plate steel 4 , and the other end of which is connected to the fixing steel 10 .

[0063] A horizontal grouting pipe 12 is provided in the lower soil for grouting reinforcement.

[0064] The supporting bottom plate steel sections 4 arranged side by side are fully welded and fixed.

[0065] The present invention avoids the social impact of trench relocation caused by foundation pit excavation construction, reduces project investment, optimizes the construction period, and has significant social and economic benefits.

[0066] The present invention adopts steel sections as the supporting system for the in-situ protection of the pipe trench, and combines it with the concrete support setting of the foundation pit, which has little impact on the foundation pit construction, and the raw materials can be partially reused, and the technical and economic benefits of the in-situ protection of the pipe trench are remarkable.

[0067] The present invention connects the bottom support plate of the trench to the concrete support of the foundation pit, and the side support structure of the trench is connected to the bottom support platform. The support system has high rigidity, good control effect on the vertical and lateral deformation of the trench, and reduces the safety risk of in-situ protection of the trench. At the same time, it provides necessary construction space for foundation pit excavation and underground structure backbuilding.

[0068] The connection node between the reverse construction section and the ground construction section of the foundation pit retaining structure under the pipe trench adopted in the present invention ensures the integrity of the foundation pit retaining structure and prevents damage to the in-situ protection pipe trench due to water leakage or excessive deformation of the foundation pit during the excavation of the foundation pit under the pipe trench.

Claims

1. An in-situ protection method for parallel masonry trenches across foundation pits, characterized in that: The following steps are involved: (i) Determine the top elevation of the concrete support The top surface elevation of the concrete support (3) is determined according to the outer bottom elevation of the parallel deeper masonry pipe trench (7) and the construction height of the supporting bottom plate steel (4) passing through the pipe trench; (ii) Construction of concrete support Excavate the soil on both sides of the in-situ protection trench to the bottom of the concrete support (3), and construct the concrete support (3) to the designed strength; (iii) The supporting bottom plate steel (4) passes under the in-situ protection trench The supporting bottom plate steel (4) is arranged in parallel and closely spaced to pass through the in-situ protection trench from under the top surface of the concrete support (3), and the supporting bottom plate steel (4) is inverted on the concrete support (3) as the supporting bottom plate, and supporting bottom plate connecting steels (9) are respectively arranged at both ends perpendicular to the direction of the supporting bottom plate steel (4) to form a whole, thereby constituting the entire supporting bottom plate; (iv) Insert the fixed steel into the support base plate Excavate the soil on one side of the parallel shallow masonry trench (8) to the bottom of the trench, set up a counter-pressure soil platform, and vertically insert the fixed steel (10) at the side wall of the trench into the counter-pressure soil close to the side wall of the parallel shallow masonry trench (8) to the supporting bottom plate. The parallel deeper masonry trench (7) and the parallel shallow masonry trench (8) are connected as a whole and arranged side by side. The side walls of the parallel deeper masonry trench (7) and the parallel shallow masonry trench (8) are both provided with fixed steel (10); (v) Install steel braces A steel brace (11) is provided to connect the fixed steel (10) and the supporting bottom plate steel (4) of the side wall of the trench to form a whole, thereby forming a side support structure for in-situ protection of the trench. The steel brace (11) is placed at an angle of 45° and is fully welded on both sides with the fixed steel (10) and the supporting platform channel steel to form a whole. (vi) Soil reinforcement through horizontal grouting pipes The counter-pressure soil outside the fixed steel (10) is excavated in sections, and a horizontal grouting pipe (12) is arranged to perform grouting reinforcement on the soil below the parallel shallow masonry pipe trench (8).

2. The in-situ protection method of a masonry trench across a foundation pit according to claim 1, characterized in that: A connecting steel (5) of the retaining structure is also provided at the connection between the foundation pit retaining structure (1) under the pipe trench and the ground construction section, and is filled with ESP foam boards (6) for protection.

3. The in-situ protection method of a parallel masonry trench across a foundation pit according to claim 2, characterized in that: When excavating the soil below the trench, the plain concrete and ESP foam board (6) of the enclosure structure at the connection are removed, and the reverse construction section of the enclosure structure is connected with the ground construction section to form a whole.