Arch rib double-ship positioning, assembling and integral floating transportation construction method

By excavating the dock on the shore and fixing the ship with ballast water, directly connecting the arch ribs with the support on the ship, the problems of uncertain construction time and inaccurate alignment in the existing technology are solved, and the stable docking of the arch ribs and Rapid floating transportation improves construction speed and safety.

CN119041302APending Publication Date: 2024-11-29ROAD & BRIDGE INT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411265867.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

In the prior art, the construction method of steel pipe arch bridge arch ribs depends on high and low tide level and weather conditions, resulting in uncertain construction time, difficult to control the synchronization of the two ships during the arch rib lifting process, and the ship is inaccurate in alignment in the floating state. It is easy to cause overturning and docking of the arch ribs, and delay the construction period.

Method used

Two parallel docks are excavated on the shore. After the ship is fixed in the dock, the arch ribs are assembled, and the ballast water is used to stabilize the ship and is directly fixedly connected to the support on the ship, avoiding the arch rib slippage and boarding process. The arch rib lifting and floating transport are achieved through synchronous drainage and uplifting.

Benefits of technology

实现了拱肋与船上支座的稳定对接和固定,缩短了施工时间,提高了施工速度和安全性,减少了对水文条件的依赖,避免了拱肋倾覆风险。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041302A_ABST
    Figure CN119041302A_ABST
Patent Text Reader

Abstract

The invention relates to an arch rib double-ship positioning, assembling and integral floating transportation construction method, which comprises the following steps of: excavating two docks on a shore, pressurizing cabin water seats in the docks by two arch rib transport ships, erecting a bracket on the bottom surface between the two docks to assemble arch ribs, butting and fixing two ends of the arch ribs with supports on the ships, and after the arch ribs are assembled, fixing the arch ribs on the ship, the two ships synchronously drain water and float upwards to jack up the arch rib, and the arch rib is conveyed to a bridge site in a floating mode for installation. When the arch rib is in butt joint with the support on the ship, the ship is absolutely stable, and construction safety can be guaranteed; the method is not limited by hydrological conditions, the floating window period of the arch rib is flexibly selected, and the total construction time can be greatly shortened; and the arch rib sliding boarding procedure is avoided, and the construction speed is higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge construction, and relates to an assembly and transportation construction of an arch rib of an arch bridge, and specifically to a double-ship positioning assembly and overall floating construction method for an arch rib. Background Art

[0002] There are many methods for installing the arch ribs of steel tube arch bridges, such as the inclined buckle hanging method, the bracket method, the rotation method, the overall lifting method, etc. Each method has its own applicable conditions. For the arch ribs of cross-river or sea arch bridges, if the conditions for navigation are met, the arch ribs can be assembled in different locations and floated to the bridge site by ship for overall lifting.

[0003] In the prior art, patent CN105603861B discloses "an integrally assembled floating arch bridge and its construction method", assembling the arch ribs into a whole on the shore, setting up two trestles in the water, with a barge docked outside each trestle, and then adding pressurized water to the barge to lower the height of the ship when the tide is low, and then sliding the arch ribs onto the trestles as a whole, with the two ends of the arch ribs located above the two barges, and then at high tide, the barges are drained and raised, and the two ends of the arch ribs are welded or screwed to the supports on the barge, and the arch ribs are lifted up, and the two ships float the arch ribs to the bridge position for installation. The above construction method makes full use of water transportation conditions, but there are the following problems in construction:

[0004] 1. It is highly dependent on hydrological and weather conditions, and needs to wait for the window period of high and low tide levels. If bad weather occurs, the construction period will be delayed;

[0005] 2. During the process of lifting the arch rib to board the ship, it is difficult to control the synchronization of the two ships floating up. If the lifting height deviation of the two ships exceeds a certain range before the arch rib is fixed to the ship, there is a risk of the arch rib capsizing;

[0006] 3. The docking accuracy between the two ends of the arch rib and the supports on the ship is required to be high. However, when the ship is floating, it will inevitably sway due to the influence of wind and waves. The stability and position of the ship are not easy to control, and it is easy to have misalignment problems. Once the docking fails, the ship needs to be re-pressurized with cabin water to lower the height, and then the position of the ship needs to be adjusted to drain and float again to dock with the arch rib, which makes it time-consuming to board the arch rib. Summary of the invention

[0007] The purpose of the present invention is to provide a method for the overall floating construction of double-ship positioning assembly of arch ribs in view of the problems existing in the prior art, so as to ensure the smooth docking and fixation of the arch ribs with the supports on the ship and ensure the safety of the construction.

[0008] The technical solution of the present invention is as follows:

[0009] A method for positioning and assembling an overall floating construction of two arch rib ships, characterized in that:

[0010] (1) Add ballast water to the two arch rib transport ships respectively. The weight of the ballast water is 1 / 2 of the design weight of the arch rib. Measure the draft of the ships.

[0011] (2) excavating two parallel docks on the shore, wherein the distance between the inner sides of the two docks is less than the span of the arch rib, and the distance between the outer sides of the two docks is greater than the span of the arch rib; the excavation depth of the dock is greater than the draft of the ship measured in step (1) and less than the hull height of the ship;

[0012] (3) The two ships are separately docked and filled with ballast water;

[0013] (4) An arch rib assembly bracket is set up on the ground between the two docks, and arch rib supports are installed on the two ships respectively; the arch ribs are assembled on the bracket, and the two ends of the arch ribs are fixedly connected to the supports on the two ships respectively; after the arch ribs are assembled, a temporary tie rod is installed between the two ends of the arch ribs, and a temporary suspension rod is installed between the temporary tie rod and the arch ribs;

[0014] (5) The two ships simultaneously drain and float up to lift up the arch ribs, remove the arch rib assembly brackets, and then float the arch ribs to the bridge location for installation.

[0015] Compared with the prior art, the present invention has the following advantages:

[0016] 1. The arch rib is directly fixed to the support on the ship during assembly. The ship is in a fixed state at the bottom of the seat during the assembly of the arch rib, which is convenient for the arch rib to be connected with the support on the ship;

[0017] 2. The arch rib lifting does not depend on the high and low tide levels, the hydrological conditions have little impact on the construction, and the arch rib floating window period selection is more flexible, which can greatly shorten the total construction time;

[0018] 3. After the arch ribs are assembled, they can be directly lifted and floated, avoiding the arch rib sliding and boarding process, which makes the construction faster and safer. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a construction flow chart of the present invention;

[0020] Figure 2 It is a schematic diagram of the plan structure of the two ships sitting in the dock;

[0021] Figure 3 It is a schematic diagram of the elevation structure of the two ships sitting in the dock;

[0022] Figure 4 This is a schematic diagram of the state of the arch rib assembly bracket set up between the two docks;

[0023] Figure 5 This is a schematic diagram of the state when the arch rib is assembled;

[0024] Figure 6This is a schematic diagram of the state when the two ships lift the arch ribs;

[0025] Figure 7 It is a schematic diagram of the status of the floating arch ribs of the two ships. DETAILED DESCRIPTION

[0026] Figure 1 It is the construction flow chart of the present invention, and the specific construction method is as follows:

[0027] (1) Ballast water is added to two arch rib transport ships respectively. The weight of the ballast water is 1 / 2 of the design weight of the arch rib. The draft of the ship is measured. The arch rib transport ship can be a power ship or a barge, which is towed by a tugboat.

[0028] (2) Figure 2 , Figure 3 As shown, a flat site is selected on the shore, and two parallel docks 1 are excavated, wherein the distance between the inner sides of the two docks is less than the span of the arch rib, and the distance between the outer sides of the two docks is greater than the span of the arch rib; the excavation depth of the dock is greater than the draft of the arch rib transport ship measured in step (1) and less than the hull height of the arch rib transport ship;

[0029] (3) The two arch rib transport ships 2 enter the dock 1 respectively and add ballast water to the bottom;

[0030] (4) Figure 4 As shown, an arch rib assembly bracket 3 is set up on the ground between the two docks, and arch rib supports 4 are respectively installed on the two arch rib transport ships 2;

[0031] like Figure 5 As shown, the arch rib 5 is assembled on the bracket 3, and the two ends of the arch rib 5 are respectively fixedly connected to the supports 4 on the two arch rib transport ships; after the arch rib 5 is assembled, a temporary tie rod 6 is installed between the two ends of the arch rib, and a temporary suspension rod 7 is installed between the temporary tie rod and the arch rib;

[0032] (5) Figure 6 As shown, the two arch rib transport ships 2 simultaneously drain and float up to lift up the arch rib 5, the arch rib is separated from the bracket, and the arch rib assembly bracket 3 is removed;

[0033] Figure 7 As shown, two arch rib transport ships 2 sail out of the dock and float the arch rib 5 to the bridge site for installation.

Claims

1. A method for the overall floating construction of double-ship positioning assembly of arch ribs, characterized in that: (1) Add ballast water to the two arch rib transport ships respectively. The weight of the ballast water is 1 / 2 of the design weight of the arch rib. Measure the draft of the ships. (2) excavating two parallel docks on the shore, wherein the distance between the inner sides of the two docks is less than the span of the arch rib, and the distance between the outer sides of the two docks is greater than the span of the arch rib; the excavation depth of the dock is greater than the draft of the ship measured in step (1) and less than the hull height of the ship; (3) The two ships are separately docked and filled with ballast water; (4) An arch rib assembly bracket is set up on the ground between the two docks, and arch rib supports are installed on the two ships respectively; the arch ribs are assembled on the bracket, and the two ends of the arch ribs are fixedly connected to the supports on the two ships respectively; after the arch ribs are assembled, a temporary tie rod is installed between the two ends of the arch ribs, and a temporary suspension rod is installed between the temporary tie rod and the arch ribs; (5) The two ships simultaneously drain and float up to lift up the arch ribs, remove the arch rib assembly brackets, and then float the arch ribs to the bridge location for installation.