By designing a movable portable vertical lifting reaction frame, using pipeline track movement and steel structure design, the construction difficulty, cost and long cycle in pipeline pipe hoisting construction is solved, and efficient and safe construction results are achieved, reducing the construction results. environmental impact.

CN222122412UActive Publication Date: 2024-12-06JIAXING UNITED SEWAGE TREATMENT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323538861.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2024-12-06
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

The vertical lifting method for pipe hoisting construction has problems such as difficult construction, high cost, long cycle and great environmental impact, especially when professional and technical personnel and special equipment are needed.

Method used

A movable portable vertical lifting reaction frame is designed, composed of a steel box of the reaction frame, hydraulic jack fixing device, pulley and anti-slip device, and the pipe track is moved to provide flexible lifting operation space and reduce construction time. and cost to improve space utilization.

Benefits of technology

It has achieved shortening the construction period, reducing costs, improving construction efficiency and safety, and reducing the impact on the environment. It is suitable for construction in narrow spaces.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222122412U_ABST
    Figure CN222122412U_ABST
Patent Text Reader

Abstract

The utility model discloses a movable portable vertical jacking reaction frame, and relates to a jacking reaction frame, which comprises a reaction frame steel box, a fixing device is arranged on the reaction frame steel box, a jack is arranged in the fixing device, a plurality of pulleys are arranged at the bottom of the reaction frame steel box, and the pulleys are arranged on the top of the reaction frame steel box. And the counter-force frame steel box is longer than a single-section pipeline. Compared with the prior art, the movable reaction frame moves along with the reaction frame, and a flexible vertical jacking operation space is provided. And movement is carried out through the track for installing the pipeline, and the balance of lateral stress of the pipeline is improved. The reaction frame system is composed of a steel structure, the structural rigidity is large, and the stability is high. The stress position of the jack is adjusted by moving the counter-force frame, the recycling value is high, and the construction cost is reduced. The space utilization rate is high, the occupied space of the auxiliary equipment is integrated in a narrow space, and the overall use efficiency of the auxiliary equipment in the narrow space is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a jacking reaction frame, in particular to a movable jacking reaction frame. Background Art

[0002] The vertical jacking method of pipe jacking construction is a method of construction inside an already built pipe. The specific steps are as follows: Connect the stainless steel pipe under the cap of the pipe jacking hole, and connect the cap and the pipe section with special bolts. After the pipe section is in place and all preparations are done, remove the connecting bolts between the cap and the jacking pipe. Use the hydraulic cylinder to push the pipe section vertically upward. During the jacking process of each section, the pipe sections are welded and connected so that the pipe sections are vertically pushed into the soil or water. After the project is completed, remove the cap in the water and replace it with a normal inlet and outlet to form a drainage channel. The vertical jacking method is suitable for different soft soil layers such as saturated water-containing clay or sandy soil, and is mainly used in coastal and riverside drainage tunnel projects. However, the vertical jacking method of pipe jacking construction may have the following problems: 1. Difficult construction: The vertical jacking method needs to be constructed inside the built pipeline, which is difficult to operate and requires professional technicians to guide and operate. 2. High construction cost: Since construction needs to be carried out inside the pipeline, special equipment and materials are required, which increases the construction cost. 3. Long construction period: The vertical jacking method requires multiple processes, including pipe joint connection, vertical jacking, etc., so the construction period is relatively long. 4. Large impact on the environment: During the construction process, it may have a certain impact on the surrounding environment, such as noise, vibration, etc., and corresponding measures need to be taken to control it. Utility Model Content

[0003] In view of the deficiencies in the prior art, the utility model provides a movable portable vertical jacking reaction frame. The movable reaction frame technology moves with the reaction frame to provide a more flexible vertical jacking operation space. It reduces the necessary time for installing equipment and shortens the jacking construction period. It moves by installing the track of the pipeline to improve the balance of the lateral force on the pipeline. There is no need to install the jack position twice, only accuracy verification is required. The reaction frame system is composed of a steel structure with high structural rigidity and high stability. The dismantling process occupies less transportation space and has little impact on the normal jacking construction of the jacking pipe. The force position of the jack is adjusted by moving the reaction frame, and it has high reuse value, which reduces construction costs. The space utilization rate is high, and the space occupied by auxiliary equipment is integrated in a small space to improve the overall use efficiency of the auxiliary equipment in a small space.

[0004] In order to solve the above technical problems, the present invention solves the problems through the following technical solutions: a movable portable vertical jacking reaction frame, comprising a reaction frame steel box, a fixing device is arranged on the reaction frame steel box, a jack is arranged in the fixing device, a plurality of pulleys are arranged at the bottom of the reaction frame steel box, and the length of the reaction frame steel box is greater than the length of a single section of the pipeline.

[0005] In the above technical solution, preferably, the jacks are evenly and densely arranged.

[0006] In the above technical solution, preferably, the reaction frame steel box is arc-shaped, and its center is located above the reaction frame steel box.

[0007] In the above technical solution, preferably, the pulley is arranged at an angle, and the center line of the pulley extends upward through the center of the reaction frame steel box.

[0008] In the above technical solution, preferably, the pulley is detachably provided with an anti-slip device.

[0009] In the above technical solution, preferably, the distance between the front and rear pulleys is greater than the length of a single section of the pipeline.

[0010] In the above technical solution, preferably, the movable portable vertical jacking reaction frame moves on a track.

[0011] The mobile reaction frame system model in this application is mainly composed of four parts: a reaction frame steel box, a hydraulic jack fixing device, a pulley, and an anti-slip device. The mobile reaction frame system moves the frame and extends the support through the track inside the pipeline. Before construction, the reaction frame is moved to the vicinity of the jacking position and the jack is installed. During the slow jacking process of the jack, the jacking position is accurately determined by moving the overall steel box, and then the pulley is fixed to officially jack the pipeline. In the first stage of jacking, the reaction frame is fixed with anti-movement device components, and then the reaction frame is moved forward to lengthen the rear frame support; after the cyclic construction, the reaction frame moves to complete the construction of all jacking pipe sections.

[0012] Compared with the traditional step-by-step installation of reaction frames, the movable reaction frames of this application greatly reduce the re-construction time, thereby reducing the construction period. The use of mobile reaction frames for construction not only ensures the reaction force required for jacking operations, but also occupies a smaller space due to the use of steel supports, ensuring the space required for the operation. At the same time, the mobile reaction frame system is all steel structure, which reduces the loss of re-assembly, and can be reused or recycled, saving costs. Through scientific construction management, efficient cyclic operation process, strict safety precautions and strict equipment management, accurate, safe, stable and fast construction of split-body starting is ensured.

[0013] Compared with the prior art, the movable reaction frame technology of the present application moves with the reaction frame, providing a more flexible vertical jacking operation space. It reduces the necessary time for installing equipment and shortens the jacking construction period. It moves by installing the track of the pipeline to improve the balance of the lateral force on the pipeline. There is no need to install the jack position a second time, only accuracy verification is required. The reaction frame system is composed of a steel structure with high structural rigidity and high stability; the dismantling process occupies less transportation space and has little impact on the normal jacking construction of the jacking pipe. The force position of the jack is adjusted by moving the reaction frame, and it has high reuse value, which reduces construction costs. The space utilization rate is high, and the space occupied by auxiliary equipment is integrated in a small space to improve the overall use efficiency of the auxiliary equipment in a small space. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be discussed below. Obviously, the technical solutions described in conjunction with the drawings are only some embodiments of the utility model. For ordinary technicians in this field, other embodiments and their drawings can be obtained based on the embodiments shown in these drawings without paying creative work.

[0015] Figure 1 It is a front schematic diagram of the utility model.

[0016] Figure 2 It is a top view schematic diagram of the utility model.

[0017] Figure 3 It is a side schematic diagram of the utility model. DETAILED DESCRIPTION

[0018] The following will be combined with the accompanying drawings to clearly and completely describe the technical solutions of the various embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments described in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0019] Example 1: Figures 1 to 3As shown, a movable portable vertical lifting reaction frame includes a reaction frame steel box 1, wherein the reaction frame steel box 1 is in an arc shape, and its center is located above the reaction frame steel box 1. The length of the reaction frame steel box 1 is greater than the length of a single section of the pipeline. A fixing device 2 is provided on the reaction frame steel box 1, and a jack 3 is provided in the fixing device 2, and the jacks 3 are evenly and densely arranged. The jacks 3 are arranged in the middle of the reaction frame steel box 1. A plurality of pulleys 4 are provided at the bottom of the reaction frame steel box 1, and the pulleys 4 are arranged in a front two and a rear two form, and the pulleys 4 are arranged obliquely, and the center line of the pulleys 4 extends upward through the center of the reaction frame steel box 1. The distance between the front and rear pulleys 4 is greater than the length of a single section of the pipeline. The pulley 4 is detachably provided with an anti-slip device 5. The movable portable vertical lifting reaction frame moves on the track. Before construction, the reaction frame is moved to the vicinity of the jacking position and the jack 4 is installed. During the jacking process of the jack 4, the jacking position is accurately determined by moving the reaction frame steel box 1, and then the pulley 4 is fixed to officially jack up the pipeline. In the first stage of jacking, the reaction frame steel box 1 is fixed by the anti-slip device 5, and then the reaction frame steel box 1 is moved forward to lengthen the rear frame support of the reaction frame steel box 1; after the cyclic construction, the reaction frame steel box 1 is moved to complete the construction of all jacking pipe sections.

[0020] Since the vertical jacking section has vertical openings for the risers, which destroys the integrity of its original structure, whether buckling failure will occur during the vertical jacking process is a special concern in the design. Therefore, it is necessary to use the finite element method to analyze it. The longitudinal buckling stability analysis of the jacking pipe is calculated using relevant software to determine the stability of the vertical jacking operation of the reaction frame steel box 1 in this project. In the initial stage of loading, the jacking force increases with the increase of the displacement of a certain control point. When reaching a certain extreme point, the jacking force shows a downward trend with the increase of displacement, and the construction can be stabilized after repeated attempts. When calculating the structural strength of the drainage pipe, due to the complexity of the structure, the stability verification method is also used for repeated tests. It is determined that the reaction frame steel box 1 can fully withstand the jacking force caused by the jacking process and does not cause damage to the reaction frame steel box 1 and the main pipe.

Claims

1. A portable vertical lifting reaction frame, comprising a reaction frame steel box, characterized in that: The reaction frame steel box is provided with a fixing device, a jack is provided in the fixing device, a plurality of pulleys are provided at the bottom of the reaction frame steel box, and the length of the reaction frame steel box is greater than the length of a single section of the pipeline.

2. A movable and portable vertical jacking reaction frame according to claim 1, characterized in that: The jacks are evenly and densely arranged.

3. A movable and portable vertical jacking reaction frame according to claim 1, characterized in that: The reaction frame steel box is in an arc shape, and the center of the arc is located above the reaction frame steel box.

4. A movable and portable vertical jacking reaction frame according to claim 3, characterized in that: The pulley is arranged at an angle, and the center line of the pulley extends upward through the center of the reaction frame steel box.

5. A movable and portable vertical jacking reaction frame according to claim 1, characterized in that: The pulley is detachably provided with an anti-slip device.

6. A movable and portable vertical jacking reaction frame according to claim 1, characterized in that: The distance between the front and rear pulleys is greater than the length of a single section of pipeline.

7. A movable and portable vertical jacking reaction frame according to claim 1, characterized in that: The movable portable vertical jacking reaction frame moves on the track.