A special tool for live adjustment of 220kv vertically arranged double-split conductor sag
By designing a special tool for adjusting the 220kV vertically arranged double split conductor sag, the adjustment and protection devices are used to solve the safety hazards and high labor intensity problems of power outage operations in the existing technology, and safe and fast wire sag adjustment and wire protection are achieved. , reduces working time and risks.
Patent Information
- Application Number
- CN201911113693.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-14
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2039-11-14
AI Technical Summary
When adjusting the vertical arrangement of double-split conductor sags of the 220kV transmission line, the existing technology requires power outage operations, which poses safety hazards and high labor intensity, and the tool weight is large and the process is complex, resulting in a reduction in power supply.
A special tool for adjusting the 220kV vertically arranged double split conductor sag is designed, including adjustment devices and protection devices, using screw sleeves, screw rods, Dinima rope buckles and removable connection structures to eliminate the risk of short circuits of metal tools and reduce the tooling. Weight and operation difficulty.
It realizes safe and rapid adjustment of wire sag under live conditions, reduces tool weight and operating strength, and reduces working time and risks.
Smart Images

Figure CN110707599B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of power grid construction tools, in particular to a special tool for live adjustment of 220kv vertically arranged double-split conductor sag. Background Art
[0002] At present, when adjusting the sag of the vertically arranged double-split conductors of 220kV transmission lines, power outage operations are adopted. After the operators climb the tower to the installation location, the chain hoist and backup steel rope are hoisted by the ground electrician and installed by the operators. The defects of this traditional construction method are: there are many operators, the chain hoist is heavy, and the operators are required to have high requirements during the installation and removal process. When the chain hoist tool is connected with a wire rope sleeve, the existing feasible tool chain hoist and the steel rope sleeve as a backup protection are long and are metal tools. If the control is not good, it is very easy to cause phase short circuit. Therefore, live operation cannot be used, which brings great safety hazards; and the chain hoist is heavy, the labor intensity of the operators carrying and operating is very high, the operation risk is high, more tools are required, and the operation process is relatively complicated, which increases the power outage time of the line and reduces the power supply. Summary of the invention
[0003] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a special tool for live adjustment of the sag of 220kv vertically arranged double-split conductors, which is light in weight, easy to carry and can improve working efficiency.
[0004] In order to solve the above technical problems, the present invention is achieved through the following technical solutions:
[0005] A special tool for adjusting the sag of a 220kv vertically arranged double-split conductor under power, comprising an adjusting device and a protective device used in conjunction with each other; the adjusting device comprises a screw sleeve, two screw rods screwed on both ends of the screw sleeve, two first shackles respectively connected to the ends of the two screw rods, and a handle rod fixedly arranged in the middle of the screw sleeve and forming a T-shape with the screw sleeve.
[0006] Preferably, the protection device comprises a first Dyneema rope buckle and two second shackles respectively connected to two ends of the first Dyneema rope buckle.
[0007] Preferably, one of the first shackles is connected to the corresponding screw rod via a second Dyneema rope buckle.
[0008] Preferably, it further comprises an extension rod detachably connected to the end of the handle rod.
[0009] Preferably, the end of the screw rod used for connecting to the first shackle is provided with a U-shaped through groove, and the mouth of the through groove is provided with a bolt for connecting the shackle.
[0010] Compared with the prior art, the present invention has the following advantages:
[0011] The present invention can safely and quickly adjust the sag of 220kV vertically arranged double-split conductors under live conditions; Dyneema rope buckles are used for sag adjustment and conductor protection, eliminating the risk of short circuit caused by metal tools during live operations; the present invention has a light structure and is easy and quick to adjust, which can greatly reduce the weight of tools, reduce the work intensity of equal potential employees, and reduce the working time. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0013] Figure 1 It is a schematic structural diagram of the present invention, which shows the relevant structure of the connection between the first shackle and the conductor.
[0014] In the figure: a screw sleeve 1, a screw rod 2, a first shackle 3, a handle rod 4, a second shackle 5, a first Dyneema rope buckle 6, a through groove 7, a bolt 8, a wire clamp 9, and a conductor 10. DETAILED DESCRIPTION
[0015] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. In the following description, in order to clearly show the structure and working mode of the present invention, the drawings will be used as a reference and described with the help of many directional terms, but the words "front", "back", "left", "right", "up", "down" and so on should be understood as convenient terms, and should not be understood as restrictive terms.
[0016] Figure 1 The special tool for adjusting the sag of a 220kv vertically arranged double-split conductor under power shown in the figure includes a matching adjusting device and a protective device; the adjusting device includes a screw sleeve 1, two screw rods 2 screwed on both ends of the screw sleeve 1, two first shackles 3 respectively connected to the ends of the two screw rods 2, and a handle rod 4 fixedly arranged in the middle of the screw sleeve 1 and forming a T-shape with the screw sleeve 1.
[0017] As a preferred technical solution, the protection device includes a first Dyneema rope buckle 6 and two second shackles 5 respectively connected to the two ends of the first Dyneema rope buckle 6. This protection device is light in weight and has interphase insulation function. Obviously, the protection device can also adopt the currently common protection device.
[0018] As a further improvement, one of the first shackles 3 is connected to the corresponding screw rod 2 through a second Dyneema rope buckle (not shown in the figure), and both ends of the second Dyneema rope buckle are connected to the corresponding first shackle 3 and the screw rod 2 through quick-release connectors (such as hanging buckles, etc.) to meet the needs when the maximum length of the screw sleeve 1 plus the two screw rods 2 is not enough, thereby improving applicability.
[0019] As a further improvement, it also includes an extension rod (not shown in the figure) detachably connected to the end of the handle rod 4. The extension rod can be connected to the handle rod 4 through a threaded structure or a clamping structure. It is convenient to carry after disassembly and can save labor after assembly when used.
[0020] In this embodiment, the end of the screw rod 2 for connecting the first shackle 3 is provided with a U-shaped through groove 7, and the mouth of the through groove 7 is provided with a bolt 8 for connecting the shackle. Obviously, a structure or component such as a lifting ring can also be fixed on the end plate of the screw rod 2 to facilitate the connection of the first shackle 3.
[0021] When it is necessary to adjust the sag of the 220kv vertically arranged double-split conductor, the operator carries the special tool and climbs the soft ladder to reach the equipotential installation position. If more tools need to be carried, the special tool can also be hoisted by the ground electrician; then the second shackle at one end of the protection device is connected to a construction hole of the triangular connecting plate, and the second shackle at the other end is connected to the conductor through a wire clamp (directly in contact with the conductor and locked, it is the force point between the tool and the conductor, and wire clamps of different specifications are selected according to the wire diameter of different conductors.), and the installation of the protection device is completed. Then the first shackle 3 at one end of the adjustment device is connected to the triangular connecting plate, and the first shackle 3 at the other end is connected to the conductor through a wire clamp. After the connection is completed, the handle 4 can be rotated to shorten the adjustment device, so that the force on the connection end of the triangular connecting plate and the conductor is released. At this time, the connector at the connection between the triangular connecting plate and the conductor can be loosened, and the connection position of the triangular connecting plate and the conductor is adjusted and the connector is tightened, and then the conductor sag is adjusted. After the adjustment is completed, the adjustment device and the protection device can be removed in turn.
[0022] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention. For those skilled in the art, any modification, equivalent replacement and improvement of the technical solutions or partial technical features recorded in the above specific embodiments within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A special tool for adjusting the sag of 220kv vertically arranged double-split conductors under power, including a matching adjustment device and a protective device; characterized in that: The adjusting device comprises a screw sleeve, two screw rods screwed on two ends of the screw sleeve, two first shackles respectively connected to the ends of the two screw rods, and a handle rod fixedly arranged in the middle of the screw sleeve and forming a T-shape with the screw sleeve; The protection device comprises a first Dyneema rope buckle and two second shackles respectively connected to the two ends of the first Dyneema rope buckle; one of the first shackles is connected to a corresponding screw rod through the second Dyneema rope buckle; the end of the screw rod used for connecting the first shackle is provided with a U-shaped through groove, and the mouth of the through groove is provided with a bolt for connecting the shackle; When it is necessary to adjust the sag of the 220kv vertically arranged double-split conductor, connect the second shackle at one end of the protection device to a construction hole of the triangular connecting plate, and connect the second shackle at the other end to the conductor through a wire clamp. At this time, the protection device is installed; then connect the first shackle at one end of the adjustment device to the triangular connecting plate, and connect the first shackle at the other end to the conductor through a wire clamp; after the connection is completed, the handle can be rotated to shorten the adjustment device, so that the force on the connection end of the triangular connecting plate and the conductor is released. At this time, the connector at the connection between the triangular connecting plate and the conductor can be loosened, the connection position of the triangular connecting plate and the conductor is adjusted and the connector is tightened, and then the conductor sag is adjusted. After the adjustment is completed, the adjustment device and the protection device can be removed in turn.