A device and method for fast and safe tunnel construction under high ground stress and high geological hazards

By designing a device including cutting board, cutting head, gravel trough, conveyor and telescopic rod mechanism, the existing shield method has solved the problems of slow construction speed and complex equipment, and achieved rapid and safe tunnel construction under high ground stress , improves construction speed and flexibility, reduces costs, and is suitable for small cave excavation.

CN110836118BActive Publication Date: 2024-11-01GUANGXI ZHONGKE JUNENG ENVIRONMENTAL PROTECTION INVESTMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911265490.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-11
Publication Date
2024-11-01
Estimated Expiration
2039-12-11

AI Technical Summary

Technical Problem

The existing shield structure method has a slow construction speed under high ground stress and geological hazards, making it difficult to meet the increasingly high construction progress requirements, and the equipment is huge in size and complex in operation, making it difficult to flexibly cope with complex geological conditions.

Method used

A device including cutting plate, cutting head, gravel groove, conveyor, bracket, telescopic rod, anchor machine and other components is designed. The rotating cutting plate and telescopic rod mechanism can achieve rapid rock breaking and rock transportation, and the anchor is used. The rod machine performs rock anchoring and equipment propulsion, simplifies the process and improves flexibility.

Benefits of technology

It realizes rapid and safe tunnel construction under high ground stress and geological hazards, improves construction speed and flexibility, reduces equipment costs, and is suitable for excavating small cave rooms and meets the economic requirements of engineering.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110836118B_ABST
    Figure CN110836118B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of tunnel construction, and specifically relates to a device and method for fast and safe tunnel construction under high ground stress and high geological hazards. The device for fast and safe tunnel construction under high ground stress and high geological hazards includes a cutter disc, a plurality of cutter heads, a plurality of slag troughs, a conveyor, a front bracket, a middle bracket, a rear bracket, a telescopic rod, a rotating shaft, an anchor machine, an anchor groove, a driving motor, and a rotating bearing. Compared with the existing shield machine, its cost is relatively low and can meet the requirements of engineering economy. In addition, the shield machine used in the method of use adopts a telescopic rod for advancement and retreat, and can move forward and backward freely during the excavation process. Therefore, in terms of construction technology, this method is more flexible, convenient, and easy to operate.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The invention belongs to the field of tunnel construction, and in particular relates to a device and a method for fast and safe tunnel construction under high ground stress and high geological hazards. [Background technology]

[0002] With the development of society, the civil engineering industry has played an increasingly important role in the national economic construction. As the construction scale continues to expand and the available surface space is decreasing, various underground projects must be built to meet the requirements of various fields such as water conservancy and hydropower development, metal coal mining, transportation engineering construction and energy reserves in my country. Tunnels are the most common form of construction in underground engineering construction and occupy a very important position in underground development. At present, the construction of tunnel projects also shows a trend of expanding construction scale and increasing burial depth. In the field of hydropower, taking Jinping II Hydropower Station, the water diversion tunnel project with the largest burial depth and the highest comprehensive difficulty among the hydraulic tunnels built in the world, as an example, the length of the single tunnel of the four water diversion tunnels is 16.7 km, the excavation diameter is 14.6 m, and the maximum burial depth is 2525 m. In the field of transportation engineering, the mileage of tunnel construction in my country continues to grow, and large-scale tunnel groups continue to emerge. Among them, the Guancunba Tunnel of the Chengdu-Kunming Railway is 6187m long and has a maximum buried depth of 1650m; the Qinling Tunnel is about 18460m long and has a maximum buried depth of 1600m; the Chongqing-Yuzhou Tunnel is about 655m long and has a maximum buried depth of 1015m.

[0003] It can be seen that my country's tunnel projects are of many types and huge scale, and the current construction speed ranks among the top in the world. However, due to the very complex geological conditions below the surface, there is a possibility of facing geological disasters such as sudden water and mud, rock bursts, surface subsidence, and landslides during the construction process, which have brought huge challenges to tunnel construction.

[0004] The shield machine is the main mechanical equipment of the existing shield method and plays a very important role in tunnel construction. The existing shield machine is mainly composed of three parts: excavation system, stable support system, and grouting system. Through excavation construction in the front and grouting operation in the back, excavation and grouting are carried out simultaneously to achieve full-section tunneling.

[0005] The existing shield machine construction mainly has the following problems: the current shield method adopts large-diameter full-section excavation, the construction speed is relatively slow, and cannot meet the increasingly increasing construction progress requirements. [Summary of the invention]

[0006] In view of the above problems, the present invention provides a device and method for fast and safe tunnel construction under high ground stress and high geological hazards.

[0007] The technical problem to be solved by the present invention is achieved by adopting the following technical solutions:

[0008] A device for fast and safe tunnel construction under high ground stress and high geological hazards, comprising a cutter disc, a plurality of cutter heads, a plurality of slag troughs, a conveyor, a front bracket, a middle bracket, a rear bracket, a telescopic rod, a rotating shaft, an anchor machine, an anchor groove, a drive motor, and a rotating bearing.

[0009] A plurality of cutter heads are arranged on the front end surface of the cutter disc in a circular array, and the cutter disc is fixedly connected to the rotating shaft; a plurality of slag grooves are arranged through the cutter disc, one end of the plurality of slag grooves are respectively arranged in a circular array on the front end surface of the cutter disc, and the other end of the plurality of slag grooves are arranged at the front end of the conveyor in a circular array, and the plurality of slag grooves are used to convey the rocks crushed by the cutter heads to the conveyor; a rotating bearing is rotatably sleeved on the cutter disc; the rotating bearing is connected to the front bracket through a telescopic rod; the front bracket, the middle bracket and the rear bracket are all rotatably sleeved on the rotating shaft; the front bracket is arranged between the middle bracket and the cutter disc, the middle bracket is arranged between the front bracket and the rear bracket, and the two sides of the middle bracket are respectively connected to the front bracket and the rear bracket through telescopic rods; the driving motor is fixedly connected to the rear bracket, and the motor shaft of the driving motor is fixedly connected to the rotating shaft;

[0010] One end of the conveyor is arranged at the rear end of the cutter disc, and the other end extends to the rear part of the rear bracket.

[0011] The front bracket, the middle bracket and the rear bracket are all provided with four anchor rod grooves in a ring shape; and an anchor rod machine is provided in each anchor rod groove.

[0012] When used, the equipment for fast and safe tunnel construction under high ground stress and high geological hazards includes anchoring the rock of the tunnel by anchoring machines accommodated in anchor grooves in the front bracket, the middle bracket and the rear bracket; starting the driving motor to drive the rotating shaft to rotate; the rotating shaft drives a plurality of cutter heads on the cutter disc to rotate to break the rock; the telescopic rod connected to the rotating bearing is extended to drive the cutter disc forward to break the rock; the broken rock is transported to a conveyor by a plurality of slag troughs, and then the conveyor transports the rock to the rear of the rear bracket.

[0013] Furthermore, the cutter disc, the front bracket, the middle bracket and the rear bracket are all cylindrical; the diameter of the cutter disc is 2.5m to 4m, and the diameters of the front bracket, the middle bracket and the rear bracket are the same and are all smaller than the diameter of the cutter disc.

[0014] Some cutter heads are disc-type hobs.

[0015] Furthermore, the plurality of cutter heads are divided into a group of three cutter heads and are arranged in a ring shape on the front end surface of the cutter disc, and each group of cutter heads is correspondingly provided with a slag groove.

[0016] The drive motor is a low-speed, high-torque outer rotor permanent magnet synchronous motor.

[0017] Furthermore, several slag troughs are concave structures, and the openings of the concave structures are located on the cutter disc from the center of the cutter disc toward one side of several cutter heads, and the opening tail ends of the concave structures of the slag troughs are inclined toward the front end of the conveyor, and the distances from the front ends of several slag troughs to the center of the front end surface of the cutter disc are greater than the distances from the rear ends of several slag troughs to the center of the front end surface of the cutter disc, and the openings of the concave structures at the rear ends of several slag troughs face away from the front end of the conveyor, so that when several slag troughs rotate with the cutter disc to above the front end of the conveyor, the rocks can fall onto the conveyor for transportation due to gravity.

[0018] Furthermore, the conveyor is a screw conveyor or a belt conveyor.

[0019] When the equipment for fast and safe tunnel construction under high ground stress and high geological hazards needs to move forward, the anchor bolters set on the rear support are all retracted, and the telescopic rod between the middle support and the rear support is contracted. After the contraction, the anchor bolters set on the rear support are all anchored, and the anchor bolters of the middle support are retracted. At the same time, the telescopic rod between the middle support and the rear support is extended, and at the same time, the telescopic rod between the front support and the middle support is contracted, driving the middle support to move toward the front support; after the middle support moves, the anchor bolters of the middle support are all anchored; the anchor bolters of the front support are all retracted, and the telescopic rod between the front support and the middle support is extended, and the cutter head moves forward, thereby completing the overall advancement of the equipment for fast and safe tunnel construction under high ground stress and high geological hazards.

[0020] When the equipment for fast and safe tunnel construction under high ground stress and high geological hazards needs to retreat, the anchor bolters set on the front support are all retracted, and the telescopic rod between the middle support and the front support is contracted. After the contraction, the anchor bolters set on the front support are all anchored, and the anchor bolters of the middle support are all retracted. At the same time, the telescopic rod between the middle support and the front support is extended, and at the same time, the telescopic rod between the rear support and the middle support is contracted, driving the middle support to move toward the rear support; after the middle support moves, the anchor bolter of the middle support is anchored; the anchor bolter of the rear support is retracted, the telescopic rod between the rear support and the middle support is extended, and the rear support moves backward, thereby completing the overall retreat of the equipment for fast and safe tunnel construction under high ground stress and high geological hazards.

[0021] A method for fast and safe tunnel construction under high ground stress and high geological hazards using equipment for fast and safe tunnel construction under high ground stress and high geological hazards, comprising the following steps:

[0022] (1) Excavation of pilot tunnel: Excavation is carried out on the working section using equipment that can quickly and safely construct tunnels under high ground stress and high geological hazards to release ground stress in advance;

[0023] (2) Advance consolidation grouting: If geological defects are found during excavation, the equipment for fast and safe tunnel construction under high ground stress and high geological hazards will be withdrawn from the tunnel; the shield mechanism will be driven into the tunnel chamber, and consolidation grouting operations will be carried out inside the shield of the shield machine; after consolidation is completed, the shield mechanism will be withdrawn from the tunnel, and excavation will continue using the equipment for fast and safe tunnel construction under high ground stress and high geological hazards;

[0024] (3) Pre-plug grouting: using equipment that can quickly and safely construct tunnels under high ground stress and high geological hazards to squeeze and shear the rock through the cutter head on the cutter head, and fill the rock defects by pouring concrete and mortar on the tunnel wall during the tunnel excavation process;

[0025] (4) Transporting slag out of the tunnel: The slag after rock breaking is transported by the conveyor of the equipment for fast and safe tunnel construction under high ground stress and high geological hazards to the rear of the rear support of the equipment for fast and safe tunnel construction under high ground stress and high geological hazards, and then transported out of the tunnel by the shuttle slag truck;

[0026] (5) Steel plate prestressed anchor support: After the tunnel boring machine excavates the tunnel, a steel plate is laid on the tunnel wall at the rear of the rear support of the equipment for fast and safe tunnel construction under high ground stress and high geological hazards, and prestressed anchor support is carried out.

[0027] Due to the adoption of the above technical scheme, the present invention has the following beneficial effects: (1) The present invention follows the general construction principle of super-large tunnels, that is, long tunnels are short, large tunnels are small, and multiple branch tunnels are opened for construction. The present invention adopts equipment for fast and safe tunnel construction under high ground stress and high geological hazards. Before excavating a large tunnel, a small-diameter pilot tunnel is opened first, and then full-section excavation is carried out; when excavating a small cavern, it can be formed in one go, and the construction speed is relatively fast.

[0028] (2) Compared with the existing shield machines, the equipment used in the present invention for fast and safe tunnel construction under high ground stress and high geological hazards also has the characteristics of simple procedures and flexible operation. Due to the huge size of the existing shield machines, the machine body needs to be split into three sections before entering the underground, transported to the tunnel through the vertical shaft, and then assembled. When the project is completed, the shield machine also needs to be disassembled into three sections and then pulled out of the tunnel. The equipment used in this method for fast and safe tunnel construction under high ground stress and high geological hazards uses a telescopic rod for advancement and retreat, and can move forward and backward freely during the excavation process. Therefore, in terms of construction technology, this method is more flexible, convenient and easy to operate.

[0029] (3) The method of the present invention uses a small-diameter device for fast and safe tunnel construction under high ground stress and high geological hazards, and can be applied to excavating small caverns. Compared with the existing shield machine, its cost is relatively low, which can meet the requirements of engineering economy.

Brief Description of the Drawings

[0030] Figure 1 The present invention is a schematic structural diagram of a device for fast and safe tunnel construction under high ground stress and high geological hazards.

[0031] Figure 2 The present invention is a schematic structural diagram of a device for fast and safe tunnel construction under high ground stress and high geological hazards.

[0032] Main component symbols

[0033] Knife plate 1 Segment 2 Gravel trough 3 Conveyor 4 Front bracket 5 Middle bracket 6 Rear bracket 7 Telescopic rod 8 Rotation axis 9 Anchor bolter 10 Anchor groove 11 Drive motor 12 Rotary bearing 13 [Specific implementation method]

[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0036] In addition, the descriptions of "first", "second", etc. in the present invention are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text is to include three parallel solutions. Taking "A and / or B as an example", it includes solution A, or solution B, or a solution that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0037] Example

[0038] Reference Figure 1-2 The present invention proposes a device for fast and safe tunnel construction under high ground stress and high geological hazards, which includes a cutter disc 1, a plurality of cutter heads 2, a plurality of slag troughs 3, a conveyor 4, a front bracket 5, a middle bracket 6, a rear bracket 7, a telescopic rod 8, a rotating shaft 9, an anchor machine 10, an anchor groove 11, a drive motor 12, and a rotating bearing 13.

[0039] A number of cutter heads 2 are arranged on the front end surface of the cutter disc 1 in a circular array, and the cutter disc 1 is fixedly connected to the rotating shaft 9; a number of slag grooves 3 are arranged through the cutter disc 1, one end of the number of slag grooves 3 is respectively arranged in a circular array on the front end surface of the cutter disc 1, and the other end of the number of slag grooves 3 is arranged at the front end of the conveyor 4 in a circular array, and the number of slag grooves 3 are used to convey the rocks crushed by the cutter heads 2 to the conveyor 4; a rotating bearing 13 is rotatably sleeved on the cutter disc 1; the rotating bearing 13 is connected to the front bracket 5 through a telescopic rod 8; the front bracket 5, the middle bracket 6 and the rear bracket 7 are all rotatably sleeved on the rotating shaft 9; the front bracket 5 is arranged between the middle bracket 6 and the cutter disc 1, and the middle bracket 6 is arranged between the front bracket 5 and the rear bracket 7, and the two sides of the middle bracket 6 are respectively connected to the front bracket 5 and the rear bracket 7 through the telescopic rod 8; the driving motor 12 is fixedly connected to the rear bracket 7, and the motor shaft of the driving motor 12 is fixedly connected to the rotating shaft 9;

[0040] The distances from the plurality of cutter heads 2 to the center of the front end surface of the cutter disc 1 are all greater than the distances from the rear ends of the plurality of slag grooves 3 to the center of the front end surface of the cutter disc 1;

[0041] One end of the conveyor 4 is arranged at the rear end of the cutter disc 1, and the other end extends to the rear of the rear support 7. The conveyor 4 passes through the front support 5, the middle support 6 and the rear support 7 respectively.

[0042] The front support 5 , the middle support 6 and the rear support 7 are all provided with four anchor grooves 11 in a ring shape; and an anchor machine 10 is provided in each anchor groove 11 .

[0043] The invention discloses a device for fast and safe tunnel construction under high ground stress and high geological hazards. When in use, the anchor bolt machine 10 accommodated in the anchor bolt groove 11 in the front bracket 5, the middle bracket 6 and the rear bracket 7 in the tunnel is used to anchor the rock of the tunnel; the driving motor 12 is started to drive the rotating shaft 9 to rotate; the rotating shaft 9 drives the multiple cutter heads 2 on the cutter disc 1 to rotate to break the rock; the telescopic rod 8 connected to the rotating bearing 13 is extended to drive the cutter disc 1 forward to break the rock; the broken rock is transported to the conveyor 4 by the multiple slag troughs 3, and then the conveyor 4 transports the rock to the rear of the rear bracket 7.

[0044] In this embodiment, the cutter head 1, the front bracket 5, the middle bracket 6 and the rear bracket 7 are all cylindrical;

[0045] Some of the cutter heads 2 are disc-type roller cutters.

[0046] In this embodiment, a plurality of slag grooves 3 are concave structures, the openings of the concave structures are located on the cutter disc 1 from the center of the cutter disc 1 toward one side of a plurality of cutter heads 2, and the opening tail ends of the concave structures of the slag grooves 3 are inclined toward the front end of the conveyor, and the distances from the front ends of the plurality of slag grooves 3 to the center of the front end surface of the cutter disc 1 are greater than the distances from the rear ends of the plurality of slag grooves 3 to the center of the front end surface of the cutter disc 1, and the openings of the concave structures at the rear ends of the plurality of slag grooves 3 face away from the front end of the conveyor 4, so that when the plurality of slag grooves 3 rotate with the cutter disc 1 to above the front end of the conveyor 4, the rocks can fall onto the conveyor 4 for transportation due to the action of gravity.

[0047] In this embodiment, the diameter of the cutter disc 1 is 2.5 m to 4 m, and the diameters of the front bracket 5, the middle bracket 6 and the rear bracket 7 are the same and are all smaller than the diameter of the cutter disc.

[0048] In this embodiment, the drive motor 12 is a low-speed, high-torque outer rotor permanent magnet synchronous motor.

[0049] In this embodiment, the plurality of cutter heads 2 are divided into a group of three cutter heads 2 and are arranged in a ring shape on the front end surface of the cutter disc 1 , and each group of cutter heads 2 is correspondingly provided with a slag groove 3 .

[0050] In this embodiment, the telescopic rod 8 is a telescopic hydraulic cylinder.

[0051] When the equipment for fast and safe tunnel construction under high ground stress and high geological hazards needs to move forward, the anchor bolters 10 set on the rear support 7 are all retracted, and the telescopic rod 8 between the middle support 6 and the rear support 7 is retracted. After the retraction is completed, the anchor bolters 10 set on the rear support 7 are all anchored, the anchor bolters 10 of the middle support 6 are retracted, and the telescopic rod 8 between the middle support 6 and the rear support 7 is extended. At the same time, the telescopic rod 8 between the front support 5 and the middle support 6 is retracted, driving the middle support 6 to move in the direction of the front support 5; after the middle support 6 moves, the anchor bolters 10 of the middle support 6 are all anchored; the anchor bolters 10 of the front support 5 are all retracted, and the telescopic rod 8 between the front support 5 and the middle support 6 is extended, and the cutter head 1 moves forward, thereby completing the overall advancement of the equipment for fast and safe tunnel construction under high ground stress and high geological hazards.

[0052] When the equipment for fast and safe tunnel construction under high ground stress and high geological hazards needs to retreat, the anchor bolters 10 set on the front bracket 5 are all retracted, and the telescopic rod 8 between the middle bracket 6 and the front bracket 5 is retracted. After the retraction is completed, the anchor bolters 10 set on the front bracket 5 are all anchored, and the anchor bolters 10 of the middle bracket 6 are all retracted. At the same time, the telescopic rod 8 between the middle bracket 6 and the front bracket 5 is extended, and at the same time, the telescopic rod 8 between the rear bracket 7 and the middle bracket 6 is retracted, driving the middle bracket 6 to move in the direction of the rear bracket 7; after the middle bracket 6 moves, the anchor bolter 10 of the middle bracket 6 is anchored; the anchor bolter 10 of the rear bracket 7 is retracted, the telescopic rod 8 between the rear bracket 7 and the middle bracket 6 is extended, and the rear bracket 7 moves backward, thereby completing the overall retreat of the equipment for fast and safe tunnel construction under high ground stress and high geological hazards.

[0053] A method for fast and safe tunnel construction under high ground stress and high geological hazards using equipment for fast and safe tunnel construction under high ground stress and high geological hazards, comprising the following steps:

[0054] (1) Excavation of pilot tunnel: Excavation is carried out on the working section using equipment that can quickly and safely construct tunnels under high ground stress and high geological hazards to release ground stress in advance;

[0055] (2) Advance consolidation grouting: If geological defects are found during excavation, the equipment for fast and safe tunnel construction under high ground stress and high geological hazards will be withdrawn from the tunnel; the shield mechanism will be driven into the tunnel chamber, and consolidation grouting operations will be carried out inside the shield of the shield machine; after consolidation is completed, the shield mechanism will be withdrawn from the tunnel, and excavation will continue using the equipment for fast and safe tunnel construction under high ground stress and high geological hazards;

[0056] (3) Pre-plug grouting: using equipment that can quickly and safely construct tunnels under high ground stress and high geological hazards to squeeze and shear the rocks through a number of cutter heads 2 on the cutter head 1, and filling the rock defects by pouring concrete and mortar on the tunnel wall during the tunnel excavation process;

[0057] (4) Transporting slag out of the tunnel: The slag after rock breaking is transported out of the tunnel by the conveyor 4 of the equipment for fast and safe tunnel construction under high ground stress and high geological hazards, and then by the shuttle slag truck to the rear of the rear support 7 of the equipment for fast and safe tunnel construction under high ground stress and high geological hazards;

[0058] (5) Steel plate prestressed anchor support: After the tunnel boring machine excavates the tunnel, a steel plate is laid on the tunnel wall at the rear of the rear support 7 of the equipment for fast and safe tunnel construction under high ground stress and high geological hazards, and prestressed anchor support is performed.

[0059] In this embodiment, the shield machine model is CREC015.

[0060] Although the present invention has been described in detail above with general descriptions and specific embodiments, it is obvious to those skilled in the art that some modifications or improvements may be made thereto based on the present invention. Therefore, these modifications or improvements made without departing from the spirit of the present invention all fall within the scope of protection claimed by the present invention.

Claims

1. A method for fast and safe tunnel construction under high ground stress and high geological hazards, characterized in that: The following steps are involved: (1) Excavating a pilot tunnel: Excavating the working section using equipment for fast and safe tunnel construction under high ground stress and high geological hazards to release the ground stress in advance; wherein the equipment for fast and safe tunnel construction under high ground stress and high geological hazards includes a cutter head, a plurality of cutter heads, a plurality of slag troughs, a conveyor, a front bracket, a middle bracket, a rear bracket, a telescopic rod, a rotating shaft, an anchor bolt machine, an anchor bolt groove, a driving motor, and a rotating bearing; A plurality of cutter heads are arranged on the front end surface of the cutter disc in a circular array, and the cutter disc is fixedly connected to the rotating shaft; a plurality of slag grooves are arranged through the cutter disc, one end of the plurality of slag grooves are respectively arranged in a circular array on the front end surface of the cutter disc, and the other end of the plurality of slag grooves are arranged at the front end of the conveyor in a circular array, and the plurality of slag grooves are used to convey the rocks crushed by the cutter heads to the conveyor; a rotating bearing is rotatably sleeved on the cutter disc; the rotating bearing is connected to the front bracket through a telescopic rod; the front bracket, the middle bracket and the rear bracket are all rotatably sleeved on the rotating shaft; the front bracket is arranged between the middle bracket and the cutter disc, the middle bracket is arranged between the front bracket and the rear bracket, and the two sides of the middle bracket are respectively connected to the front bracket and the rear bracket through telescopic rods; the driving motor is fixedly connected to the rear bracket, and the motor shaft of the driving motor is fixedly connected to the rotating shaft; The distances from the plurality of cutter heads to the center of the front end surface of the cutter disc are all greater than the distances from the plurality of slag grooves to the center of the front end surface of the cutter disc; One end of the conveyor is arranged at the rear end of the cutter disc, and the other end extends to the rear of the rear support; The front bracket, the middle bracket and the rear bracket are all provided with four anchor rod grooves in a ring shape; each anchor rod groove is provided with an anchor rod machine; (2) Advance consolidation grouting: If geological defects are found during excavation, the equipment for fast and safe tunnel construction under high ground stress and high geological hazards will be withdrawn from the tunnel; the shield mechanism will be driven into the tunnel chamber, and consolidation grouting operations will be carried out inside the shield of the shield machine; after consolidation is completed, the shield mechanism will be withdrawn from the tunnel, and excavation will continue using the equipment for fast and safe tunnel construction under high ground stress and high geological hazards; (3) Pre-plug grouting: using equipment that can quickly and safely construct tunnels under high ground stress and high geological hazards to squeeze and shear the rock through the cutter head on the cutter head, and fill the rock defects by pouring concrete and mortar on the tunnel wall during the tunnel excavation process; (4) Transporting slag out of the tunnel: The slag after rock breaking is transported by the conveyor of the equipment for fast and safe tunnel construction under high ground stress and high geological hazards to the rear of the rear support of the equipment for fast and safe tunnel construction under high ground stress and high geological hazards, and then transported out of the tunnel by the shuttle slag truck; (5) Steel plate prestressed anchor support: After the tunnel boring machine excavates the tunnel, a steel plate is laid on the tunnel wall at the rear of the rear support of the equipment for fast and safe tunnel construction under high ground stress and high geological hazards, and prestressed anchor support is carried out.

2. A method for fast and safe tunnel construction under high ground stress and high geological hazards according to claim 1, characterized in that: The plurality of cutter heads are divided into a group of three cutter heads and are arranged in a ring shape on the front end surface of the cutter disc, and each group of cutter heads is correspondingly provided with a slag groove.

3. A method for fast and safe tunnel construction under high ground stress and high geological hazards according to claim 1, characterized in that: The cutter disc, the front bracket, the middle bracket and the rear bracket are all cylindrical.

4. A method for fast and safe tunnel construction under high ground stress and high geological hazards according to claim 1, characterized in that: Some cutter heads are disc-type hobs.

5. A method for fast and safe tunnel construction under high ground stress and high geological hazards according to claim 1, characterized in that: The conveyor is a screw conveyor or a belt conveyor.

6. A method for fast and safe tunnel construction under high ground stress and high geological hazards according to claim 1, characterized in that: The drive motor is a low-speed, high-torque outer rotor permanent magnet synchronous motor.

7. A method for fast and safe tunnel construction under high ground stress and high geological hazards according to any one of claims 1 to 5, characterized in that: The diameter of the cutter disc is 2.5m to 4m, and the diameters of the front bracket, the middle bracket and the rear bracket are the same and are all smaller than the diameter of the cutter disc.