A constant temperature curing box for cement specimens
By setting up a partition plate, a temperature adjustment device and a ventilation system in the constant temperature maintenance box of cement specimens, the problems of fast temperature changes and low heating efficiency during the maintenance process of cement specimens in the prior art are solved, and the uniformity of temperature is achieved and Easy to remove cement specimens.
Patent Information
- Application Number
- CN201911331383.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-12-21
- Publication Date
- 2025-02-21
- Estimated Expiration
- 2039-12-21
AI Technical Summary
The existing constant temperature water curing box changes rapidly due to the heat absorption and heat dissipation of water during the maintenance of cement specimens. The existing heating methods are inefficient, which easily leads to unbalanced temperatures on the upper and lower levels, and it is difficult to take out the cement specimens.
A constant temperature maintenance box for cement specimens was designed. The maintenance box was divided into component storage room and temperature control room by setting up a partition board, and a temperature control device, temperature sensor, ventilation pipe, valve and air outlet are installed in the temperature control room. , ensure the uniformity of the temperature inside the entire curing box, and at the same time, the leakage grid and baffle are installed in the placement groove to facilitate the removal of cement specimens.
During the temperature control process, the temperature uniformity of the cement specimens inside the entire curing box is achieved, the heating efficiency is improved, the problem of temperature imbalance is avoided, and the removal process of the cement specimens is simplified, making it easy to use.
Smart Images

Figure CN110843111B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of highway detection, in particular to a constant temperature curing box for cement test pieces. Background Art
[0002] Cement specimen curing is to artificially create certain humidity and temperature conditions so that the newly poured concrete can harden and increase its strength normally or accelerate its hardening. The reason why concrete can gradually harden and increase its strength is the result of cement hydration, and cement hydration requires certain temperature and humidity conditions.
[0003] At present, constant temperature water curing box is the main equipment for testing the performance indicators of cement products. Cement specimens must be cured under the specified standard temperature and humidity, and the test data can truly reflect the quality of cement products. Generally, cement specimens are cured using water curing equipment. However, in the process of water curing, because water is very easy to absorb and dissipate heat, it is easy to cause rapid temperature changes during the curing process. The existing temperature control method mostly uses a single electric heating rod to heat the entire curing box. This heating method is inefficient and easily causes uneven temperatures between the upper and lower parts. In addition, the cement specimens cured in the curing box are not easy to be removed from the inside of the curing tank. For this reason, we propose a constant temperature curing box for cement specimens. Summary of the invention
[0004] The purpose of the present invention is to provide a constant temperature curing box for cement specimens to solve the problems raised in the background technology.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a constant temperature curing box for cement specimens, comprising a curing box body, a partition plate, a component storage chamber and a temperature control chamber, wherein the interior of the curing box body is provided with a partition plate, and the interior of the curing box body is divided into a component storage chamber and a temperature control chamber located at the top of the inner wall of the curing box body by the partition plate, a temperature regulating device is provided at the top of the inner wall of the temperature control chamber, a temperature sensor is provided at one side of the top of the inner wall of the curing box body and located inside the component storage chamber, a ventilation pipe is fixedly connected to the bottom of the temperature control chamber, the ventilation pipes are connected to each other by a through valve, and the component storage chamber is provided with a temperature regulating device. An air outlet is provided inside the storage chamber, and one end of the air outlet away from the interior of the component storage chamber is fixedly connected to the ventilation pipe, and slots are provided on both sides of the inner wall of the component storage chamber, and the interior of the slots is clamped with a placement slot, and the placement slot includes a storage box, a clamping block, a leakage net and a baffle, and both sides of the storage box are fixedly connected with clamping blocks, and the clamping block and the slots are clamped with each other. A leakage net is provided inside the storage box, and baffles are fixedly connected on both sides of the top of the leakage net, and the baffles are overlapped on both sides of the top of the storage box, and a closing door is fixedly installed on the surface of the maintenance box body through symmetrically distributed hinges, and a handle is fixedly connected to the surface of the closing door.
[0006] Furthermore, the temperature regulating device includes a quartz tube, an electric heating seat and an electric heating rod. The quartz tube is fixedly installed on the top of the inner wall of the temperature control chamber. The two ends of the quartz tube are fixedly connected to the electric heating seat, and the opposite side of the electric heating seat is fixedly connected to the electric heating rod.
[0007] Furthermore, an observation window is provided on the surface of the closed door, and the observation window is made of a transparent material.
[0008] Furthermore, the bottom of the maintenance box body is fixedly connected with symmetrically distributed support bases.
[0009] Furthermore, a label placement area is provided on the surface of the placement slot.
[0010] Compared with the prior art, the present invention has the following beneficial effects: the present invention can connect each component storage chamber to the temperature control chamber by arranging a vent pipe, a valve and an air outlet. Such an arrangement can ensure that the temperature of the cement specimens stored inside the entire curing box body is always the same during temperature control, and the cement specimens can be placed on the surface of the mesh by arranging a mesh and a baffle. When it is needed to be taken out, the baffle can be pulled to take out the cement specimen. The operator does not need to pour out the water in the storage tank and then take it out by hand. The present invention has a reasonable structure and is easy to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the internal structure of the present invention;
[0012] Figure 2 It is a front view structural schematic diagram of the present invention;
[0013] Figure 3 This is a schematic diagram of the placement slot structure of the present invention;
[0014] Figure 4 It is a schematic diagram of the structure of the temperature regulating device of the present invention.
[0015] In the figure: 1 curing box body, 2 partition plate, 3 component storage room, 4 temperature control room, 5 temperature regulating device, 6 temperature sensor, 7 card slot, 8 placement slot, 9 ventilation pipe, 10 valve, 11 air outlet, 12 storage box, 13 card block, 14 leakage net, 15 baffle, 16 hinge, 17 closing door, 18 handle, 19 observation window, 20 quartz tube, 21 electric heating seat, 22 electric heating rod, 23 support base, 24 label placement area. DETAILED DESCRIPTION
[0016] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0017] See also Figure 1-4 , the present invention provides a technical solution: To achieve the above-mentioned purpose, the present invention provides the following technical solution: a constant temperature curing box for cement specimens, comprising a curing box body 1, a partition plate 2, a component storage chamber 3 and a temperature control chamber 4, the interior of the curing box body 1 is provided with a partition plate 2, the interior of the curing box body 1 is divided into a component storage chamber 3 and a temperature control chamber 4 located at the top of the inner wall of the curing box body 1 by the partition plate 2, the top of the inner wall of the temperature control chamber 4 is provided with a temperature regulating device 5, a temperature sensor 6 is provided on one side of the top of the inner wall of the curing box body 1 and located inside the component storage chamber 3, the bottom of the temperature control chamber 4 is fixedly connected with a ventilation pipe 9, the ventilation pipes 9 are interconnected by a through valve 10, the interior of the component storage chamber 3 is provided with a An air outlet 11 is provided, and one end of the air outlet 11 away from the inside of the component storage chamber 3 is fixedly connected to the ventilation pipe 9. Slots 7 are provided on both sides of the inner wall of the component storage chamber 3, and a placement slot 8 is clamped inside the slot 7. The placement slot 8 includes a storage box 12, a clamping block 13, a leakage net 14 and a baffle 15. Blocks 13 are fixedly connected on both sides of the storage box 12, and the block 13 and the slot 7 are clamped with each other. A leakage net 14 is provided inside the storage box 12, and baffles 15 are fixedly connected on both sides of the top of the leakage net 14, and the baffles 15 are overlapped on both sides of the top of the storage box 12. A closing door 17 is fixedly installed on the surface of the maintenance box body 1 through symmetrically distributed hinges 16, and a handle 18 is fixedly connected to the surface of the closing door 17.
[0018] Furthermore, the temperature regulating device 5 includes a quartz tube 20, an electric heating seat 21 and an electric heating rod 22. The quartz tube 20 is fixedly installed on the top of the inner wall of the temperature control chamber 4. The two ends of the inside of the quartz tube 20 are fixedly connected to the electric heating seat 21, and the opposite side of the electric heating seat 21 is fixedly connected to the electric heating rod 22.
[0019] Furthermore, an observation window 19 is provided on the surface of the closed door 17. The observation window 19 is made of a transparent material. The observation window 19 made of the transparent material can timely observe the condition of the cement specimen inside the curing box body 1.
[0020] Furthermore, the bottom of the curing box body 1 is fixedly connected with a symmetrically distributed support base 23.
[0021] Furthermore, a label placement area 24 is provided on the surface of the placement groove 8 .
[0022] When in use, first, place the cement specimen that needs to be cured inside the filter screen 14, then add a certain amount of water into the storage box 12, and then align the blocks 13 on both sides of the storage box 12 with the card slots 7 to complete the storage of the cement specimens. Then, mark the cement specimens that need to be numbered on the surface of the label placement area 24, and then close the closing door 17. When the temperature sensor 6 detects a drop in temperature, the temperature regulating device 5 will be started. The operation of the electric heating seat 21 and the electric heating rod 22 can make the quartz tube 20 heat up quickly, which will provide a heat source for the interior of the temperature control chamber 4, and then transmit the heat source to the interior of the component storage chamber 3 through the ventilation pipe 9, the valve 10 and the air outlet 11, so as to timely regulate the temperature inside the component storage chamber 3. When it is necessary to take out the cement specimen, it is only necessary to take out the blocks 13 on both sides of the placement slot 8 from the inside of the card slot 7, and then pull the baffle 15 to take out the filter screen 14 and the cement specimen placed inside the filter screen 14.
[0023] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A constant temperature curing box for cement specimens, comprising a curing box body (1), a partition plate (2), a component storage chamber (3) and a temperature control chamber (4), wherein the curing box body (1) is provided with a partition plate (2), and the interior of the curing box body (1) is divided into a component storage chamber (3) and a temperature control chamber (4) located at the top of the inner wall of the curing box body (1) by the partition plate (2), characterized in that: A temperature regulating device (5) is provided at the top of the inner wall of the temperature control chamber (4); a temperature sensor (6) is provided on one side of the top of the inner wall of the curing box body (1) and located inside the component storage chamber (3); a ventilation pipe (9) is fixedly connected to the bottom of the temperature control chamber (4); the ventilation pipes (9) are connected to each other via a valve (10); an air outlet (11) is provided inside the component storage chamber (3); one end of the air outlet (11) away from the inside of the component storage chamber (3) is fixedly connected to the ventilation pipe (9); and a card slot (7) is provided on both sides of the inner wall of the component storage chamber (3); a placement slot ( 8), the placement slot (8) comprises a storage box (12), a clamping block (13), a leakage net (14) and a baffle (15), the two sides of the storage box (12) are fixedly connected with the clamping block (13), the clamping block (13) and the clamping slot (7) are mutually clamped, the interior of the storage box (12) is provided with a leakage net (14), the two sides of the top of the leakage net (14) are fixedly connected with the baffle (15), the baffle (15) is overlapped on the two sides of the top of the storage box (12), the surface of the curing box body (1) is fixedly installed with a closing door (17) through symmetrically distributed hinges (16), and the surface of the closing door (17) is fixedly connected with a handle (18); The temperature regulating device (5) comprises a quartz tube (20), an electric heating seat (21) and an electric heating rod (22); the quartz tube (20) is fixedly mounted on the top of the inner wall of the temperature regulating chamber (4); the two ends of the interior of the quartz tube (20) are fixedly connected to the electric heating seat (21); and the opposite side of the electric heating seat (21) is fixedly connected to the electric heating rod (22); An observation window (19) is provided on the surface of the closed door (17), and the observation window (19) is made of a transparent material.
2. A cement specimen constant temperature curing box according to claim 1, characterized in that: The bottom of the curing box body (1) is fixedly connected to symmetrically distributed support bases (23).
3. A cement specimen constant temperature curing box according to claim 1, characterized in that: The surface of the placement groove (8) is provided with a label placement area (24).
Citation Information
Patent Citations
Cement test piece constant-temperature curing box
CN211616048U
Cited By
Constant-temperature and constant-pH-value filling body curing box
CN120422340A