A continuous pipeline water-cooled induction heating device

Through the continuous pipeline water-cooled induction heating device, using water-cooled induction heaters and PLC control, the problems of slow heating speed and low efficiency in steel pipe welding preheating are solved, an efficient and automated welding preheating process is realized, and the welding quality and safety are improved. sex.

CN110891342BActive Publication Date: 2024-10-22SHANGHAI INST OF TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911371744.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-24
Publication Date
2024-10-22
Estimated Expiration
2039-12-24

AI Technical Summary

Technical Problem

Existing steel pipe welding preheating methods, such as natural gas annular flame heating and air-cooling induction heating, have problems such as slow heating speed, difficulty in temperature control, high safety hazards, and low heating efficiency.

Method used

A continuous pipeline water-cooled induction heating device is used, including a water-cooled induction heater, an inclined steel pipe input and output table, a power drive device and a transfer table. Efficient heating is achieved through a radial opening and closing electromagnetic induction heater and a screw slider device. PLC control achieves automation and uniform heating.

Benefits of technology

It achieves high energy density and rapid heating, simplifies the heating process of the welding seam, improves the quality of welding preheating, and reduces labor intensity and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110891342B_ABST
    Figure CN110891342B_ABST
Patent Text Reader

Abstract

The present invention relates to a continuous pipeline water-cooled induction heating device, comprising a steel pipe input platform, a steel pipe output platform, a steel pipe conveying platform, a first power driving device, a second power driving device and a water-cooled induction heater. When working, the first power driving device drives a steel pipe on the steel pipe input platform to make it pass over the first stopper and roll onto the input conveying platform section; then the steel pipe is heated by the water-cooled induction heater; after heating, the steel pipe is transferred from the input conveying platform section to the output conveying platform section, and the steel pipe is driven by the second power driving device to roll onto the steel pipe output platform. The device adopts a water-cooled induction heater, which has the advantages of high output energy density and fast heating speed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of preheating steel pipes before welding, and in particular to a continuous pipeline water-cooling induction heating device. Background Art

[0002] Before welding steel pipes, it is often required to preheat the weld. Preheating has the following benefits:

[0003] First, when the welding area and the surrounding metal are preheated to 100-250℃, the heat generated during welding can be prevented from causing rapid heating and cooling of the metal, thereby preventing the strength from decreasing or cracking due to changes in the metallographic structure, thus avoiding the occurrence of welding defects;

[0004] Second, preheating can remove hydrogen and reduce thermal stress.

[0005] Therefore, preheating of steel pipes before welding is of great significance to the welding quality.

[0006] At present, the widely used methods for preheating pipelines before welding are:

[0007] ——Heat gas annular flame heating method

[0008] When this method is used for heating, many nozzles are evenly distributed on the annular flame heating torch, and the flame formed by the combustion of a mixture of natural gas and oxygen is ejected from the nozzles to the pipe surrounded by the heating torch. This heating method has the following disadvantages: the natural gas annular flame heats slowly; the temperature during heating is not easy to be effectively controlled; open flame heating poses certain safety hazards to the work site; natural gas cylinders must not be placed near heat sources and power sources during transportation and use to avoid explosions.

[0009] ——Air-cooled induction heating method

[0010] This method uses air-cooled heating cables to be wound around the pipe, or a frame-type air-cooled heating inductor is made and placed on the pipe for heating. Since the current density of the air-cooled induction cable is low, it is difficult to output a large power, and the heating speed is slow. The cable winding method is also troublesome, time-consuming and labor-intensive. Summary of the invention

[0011] In order to solve the above problems, the present invention provides a continuous pipeline water-cooled induction heating device, comprising:

[0012] A steel pipe input platform, which is tilted and used to carry the steel pipe before heating; the steel pipe input platform is provided with a first stopper to prevent the steel pipe thereon from rolling from the high end to the low end;

[0013] A steel pipe output platform, which is tilted and used to carry the heated steel pipe;

[0014] A steel pipe conveying platform, the steel pipe conveying platform comprises an input conveying platform section and an output conveying platform section, the lower end of the steel pipe input platform corresponds to the input conveying platform section, and the higher end of the steel pipe output platform faces the output conveying platform section;

[0015] A first power driving device is provided corresponding to the steel pipe input platform; the first power driving device is used to drive the steel pipe on the steel pipe input platform to make it pass over the first stopper and roll onto the input conveying platform section;

[0016] A second power driving device is provided corresponding to the output conveying platform section; the second power driving device is used to drive the steel pipe on the output conveying platform section to roll onto the steel pipe output platform;

[0017] A water-cooled induction heater is provided corresponding to the input conveyor section and is used to heat the steel pipe on the input conveyor section;

[0018] During operation, the first power drive device drives a steel pipe on the steel pipe input platform to make it pass over the first stopper and roll onto the input conveying platform section; then the steel pipe is heated by the water-cooled induction heater; after the heating is completed, the steel pipe is transferred from the input conveying platform section to the output conveying platform section, and the steel pipe is driven by the second power drive device to roll onto the steel pipe output platform.

[0019] Preferably, the steel pipe input platform is composed of a plurality of horizontal cross bars arranged at intervals and a plurality of inclined longitudinal bars arranged at intervals. When the steel pipe is placed on the steel pipe input platform parallel to the horizontal cross bars, the steel pipe can roll along the inclined longitudinal bars.

[0020] Preferably, the first power drive device is arranged below the steel pipe input platform, and comprises a first mounting frame, a first cylinder, a first transmission shaft, a first transmission connecting member and a first top plate, and the first transmission shaft is rotatably arranged on the first mounting frame;

[0021] The first transmission connecting member and the first top plate are both fixed on the first transmission shaft;

[0022] The first cylinder is tilted, and its two ends are respectively hinged to the first mounting frame and the first transmission connecting member. When the first cylinder is working, it drives the first transmission shaft to rotate, and the first top plate lifts up a steel pipe on the steel pipe input platform, and the steel pipe passes over the first stop block and rolls onto the input conveying platform section.

[0023] Preferably, the steel pipe input platform and the steel pipe output platform are inclined in opposite directions and are arranged side by side on the same side of the steel pipe conveying platform;

[0024] A plurality of rollers are arranged on the input conveying stage section and the output conveying stage section to rotate at intervals, and the plurality of rollers are connected by at least one transmission mechanism, and the transmission mechanism is connected to the first motor;

[0025] The conveying directions of the plurality of rollers are consistent with the length direction of the steel pipe.

[0026] Preferably, the transmission mechanism includes a plurality of synchronous belts and a plurality of synchronous pulleys, a synchronous pulley is coaxially fixed to one end of the roller, and the plurality of synchronous pulleys rotate synchronously through the plurality of synchronous belts; and the output shaft of the first motor is drivingly connected to a synchronous pulley.

[0027] Preferably, a screw slider device is provided below the input conveying stage section, and the water-cooled induction heater is provided on the screw slider device, and is driven by the screw slider device to move along the length direction of the input conveying stage section.

[0028] Preferably, the water-cooled induction heater adopts a radial opening and closing electromagnetic induction heater, which includes an upper semicircular copper tube bracket, a lower semicircular copper tube bracket, a left frame copper tube and a right frame copper tube, wherein the upper semicircular copper tube bracket and the lower semicircular copper tube bracket constitute an induction heating coil for heating the steel tube; the lower semicircular copper tube bracket is respectively arranged on the top of the left frame copper tube and the right frame copper tube, and an insulating connecting plate is arranged between the left frame copper tube and the right frame copper tube;

[0029] One end of the upper semicircular copper tube bracket and the lower semicircular copper tube bracket are hinged, and the other end is open. The open end can be locked by a locking mechanism, so that the upper semicircular copper tube bracket and the lower semicircular copper tube bracket are closed to form a circular ring;

[0030] At the hinged end of the upper semicircular copper tube bracket and the lower semicircular copper tube bracket, the upper semicircular copper tube bracket and the lower semicircular copper tube bracket are elastically connected by an elastic member. In a natural state, the opening end is opened by the elastic member, and the steel tube rolled down from the steel tube input platform rolls into the induction heating coil through the opening;

[0031] The lead screw and slider device includes a second motor, a mounting seat, a lead screw and a slider, wherein the lead screw is rotatably arranged on the mounting seat; the second motor is fixed on the mounting seat and is drivingly connected to the lead screw; the slider is threadedly connected to the lead screw and is slidably arranged on the mounting seat; the insulating connecting plate is fixedly connected to the slider.

[0032] Preferably, the arc length of the upper semicircular copper tube bracket is greater than the arc length of the lower semicircular copper tube bracket, and after the upper semicircular copper tube bracket and the lower semicircular copper tube bracket are closed, the hinged end and the open end are both lower than the center of the circular ring;

[0033] At the hinged end, an upper extension part 1 is arranged outwardly at the end of the upper semicircular copper tube bracket, and a lower extension part 1 is arranged outwardly at the end of the lower semicircular copper tube bracket, the upper extension part 1 is hinged with the lower extension part 1, and the upper extension part 1 and the lower extension part 1 are elastically connected through the elastic member;

[0034] At the open end, an upper extension part 2 is arranged outwardly from the end of the upper semicircular copper tube bracket, and a lower extension part 2 is arranged outwardly from the end of the lower semicircular copper tube bracket, a U-shaped notch is arranged on the upper extension part 2, and a through hole is arranged on the lower extension part 2;

[0035] The locking mechanism includes a handle, a pressure plate, a connecting screw and a nut, and the handle is rotatably arranged at the top end of the connecting screw; when the upper semicircular copper tube bracket and the lower semicircular copper tube bracket are closed, the connecting screw passes through the U-shaped notch and the through hole in sequence from top to bottom, and the nut is tightened on the connecting screw and is located below the through hole; the pressure plate is sleeved on the upper end of the connecting screw, and the handle is pressed down to press it on the U-shaped notch; when the induction heating coil needs to be opened, the nut is loosened, the handle is lifted, the handle releases the pressure plate, and the elastic member lifts the upper semicircular copper tube bracket upward by elastic force, the connecting screw is disengaged from the U-shaped notch, and the opening is opened.

[0036] Preferably, the steel pipe output platform is composed of a plurality of horizontal cross bars arranged at intervals and a plurality of inclined longitudinal bars arranged at intervals. When the steel pipe is placed on the steel pipe output platform parallel to the horizontal cross bars, the steel pipe can roll along the inclined longitudinal bars.

[0037] Preferably, the second power drive device is arranged below the output conveying stage, and comprises a second mounting frame, a second cylinder, a second transmission shaft, a second transmission connecting member and a second top plate, and the second transmission shaft is rotatably arranged on the second mounting frame;

[0038] The second transmission connecting member and the second top plate are both fixed on the second transmission shaft;

[0039] The second cylinder is arranged at an angle, and its two ends are respectively hinged to the second mounting frame and the second transmission connecting member. When the second cylinder is working, it drives the second transmission shaft to rotate, and the second transmission shaft drives the second top plate to lift the steel pipe on the output conveying platform section and make it fall onto the steel pipe output platform.

[0040] Preferably, the device is controlled by PLC.

[0041] Compared with the prior art, the present invention has the following technical effects:

[0042] 1. The present invention provides a continuous pipeline water-cooled induction heating device, which adopts a water-cooled induction heater and has the advantages of high output energy density and fast heating speed;

[0043] 2. The water-cooled induction heater of the present invention adopts a radially opened and closed electromagnetic induction heater, which changes the previous method of having to axially feed the pipe into the induction heater: since the pipe has a certain length and there are certain positioning requirements for the butt joint of the two pipes before welding, the previous axial insertion of the induction heater makes the whole process complicated; the radially opened and closed induction heater of the present invention can conveniently move the heater to the weld opening to complete closed heating;

[0044] 3. The induction heater can move axially through the screw slider device, and then can move and heat the steel pipe in the length direction, making the heating of the steel pipe more uniform.

[0045] 4. The device will realize multiple functions such as clamping and automatic shifting of the water-cooled induction heater along the motion trajectory of the steel pipe, full-circumferential induction heating, temperature control, radial opening and closing control of the sensor, and automatic water cooling control of the sensor. The action process of the device is completed by the programmable controller PLC to complete the sequence control of mechanical actions and signal warning, which will effectively improve the quality of pipeline preheating and reduce the labor intensity and labor cost of workers.

[0046] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative work. In the drawings:

[0048] Figure 1 A schematic structural diagram of a continuous pipeline water-cooled induction heating device provided for a preferred embodiment of the present invention;

[0049] Figure 2 A side view of a steel pipe input station provided for a preferred embodiment of the present invention;

[0050] Figure 3 A schematic structural diagram of a first power drive device provided for a preferred embodiment of the present invention;

[0051] Figure 4 A schematic diagram of the structure of a water-cooled induction heater provided for a preferred embodiment of the present invention;

[0052] Figure 5A side view of a water-cooled induction heater provided for a preferred embodiment of the present invention;

[0053] Figure 6 A is a partial enlarged view of a water-cooled induction heater provided in a preferred embodiment of the present invention;

[0054] Figure 7 An assembly diagram of a water-cooled induction heater and a lead screw slider device provided for a preferred embodiment of the present invention;

[0055] Figure 8 A schematic structural diagram of a locking mechanism provided for a preferred embodiment of the present invention;

[0056] Fig. 9 A schematic diagram of the structure of a water-cooled induction heater for heating a steel pipe provided in a preferred embodiment of the present invention;

[0057] Fig.10 A schematic structural diagram of a steel pipe conveyor provided in a preferred embodiment of the present invention;

[0058] Fig.11 A side view of a steel pipe output station provided for a preferred embodiment of the present invention. DETAILED DESCRIPTION

[0059] The following will be combined Figures 1 to 11 A continuous pipeline water-cooled induction heating device provided by the present invention is described in detail. This embodiment is implemented on the premise of the technical solution of the present invention, and a detailed implementation method and a specific operation process are given. However, the protection scope of the present invention is not limited to the following embodiments. Those skilled in the art can modify and polish it without changing the spirit and content of the present invention.

[0060] Please refer to Figures 1 to 11 , a continuous pipeline water-cooled induction heating device, comprising:

[0061] A steel pipe input platform 1, which is tilted and used to carry the steel pipe 2 before heating; a first stopper 11 is provided on the steel pipe input platform 1 to prevent the steel pipe 2 thereon from rolling down from the high end to the low end;

[0062] A steel pipe output platform 7, wherein the steel pipe output platform 7 is tilted and used to carry the heated steel pipe;

[0063] The steel pipe conveying platform 4 includes an input conveying platform section 41 and an output conveying platform section 42. The lower end of the steel pipe input platform 1 corresponds to the input conveying platform section 41, and the upper end of the steel pipe output platform 7 faces the output conveying platform section 42;

[0064] A first power driving device 8 is provided corresponding to the steel pipe input platform 1; the first power driving device 8 is used to drive the steel pipe 2 on the steel pipe input platform 1 to make it pass over the first stopper 11 and roll onto the input conveying platform section 41;

[0065] The second power driving device 10 is arranged corresponding to the output conveying platform section 42; the second power driving device 10 is used to drive the steel pipe on the output conveying platform section 42 to roll onto the steel pipe output platform 7;

[0066] A water-cooled induction heater 3 is provided corresponding to the input conveying stage section 41 and is used to heat the steel pipe on the input conveying stage section 41;

[0067] During operation, the first power drive device 8 drives a steel pipe on the steel pipe input platform 1 to make it pass over the first stopper 11 and roll onto the input conveying platform section 41; then the steel pipe is heated by the water-cooled induction heater 3; after the heating is completed, the steel pipe is transferred from the input conveying platform section 41 to the output conveying platform section 42, and the steel pipe is driven by the second power drive device 10 to roll onto the steel pipe output platform 7.

[0068] In this embodiment, the steel pipe input platform 1 is composed of a plurality of horizontal cross bars 12 and a plurality of inclined longitudinal bars 13 arranged at intervals, and the steel pipe input platform 1 is supported on a first support frame 14. The present invention does not limit the number of first stoppers 11 on the steel pipe input platform 1. In this embodiment, two first stoppers 11 are preferably arranged at intervals, and the two first stoppers 11 are parallel to the horizontal cross bars 12 and close to the lower end of the steel pipe input platform 1. The steel pipe is placed at the high end of the steel pipe input platform 1 parallel to the horizontal cross bars 12, and the steel pipe can roll along the inclined longitudinal bars 13 and roll to the first stoppers 11, and the first stoppers 11 block the steel pipe to prevent it from continuing to roll.

[0069] Please refer to Figure 2 and Figure 3 The first power drive device 8 is arranged below the steel pipe input platform 1, and includes a first mounting frame 81, a first cylinder 82, a first transmission shaft 87, a first transmission connecting member 84 and a first top plate 83. The first transmission shaft 87 is rotatably arranged on the first mounting frame 81 through a first bearing 86;

[0070] The first transmission connecting member 84 and the first top plate 83 are both fixed on the first transmission shaft 87;

[0071] The first cylinder 82 is tilted, and its two ends are hinged to the first mounting frame 81 and the first transmission connector 84 respectively. When the first cylinder 82 is working, it drives the first transmission shaft 87 to rotate, and the first top plate 83 lifts a steel pipe on the steel pipe input platform 1. The steel pipe passes over the first stopper 11 and falls on the steel pipe input platform 1, and then rolls to the bottom end of the steel pipe input platform 1 until it rolls onto the input conveying platform section 41.

[0072] In order to ensure that the first top plate 83 lifts a steel pipe on the steel pipe input platform 1 so that it can pass over the first stopper 11 and fall onto the steel pipe input platform 1, in this embodiment, the first cylinder 82 is preferably hinged to the first mounting frame 81 through a 45° first connecting member 85.

[0073] A lead screw slider device 9 is disposed below the input conveying stage section 41 , and the water-cooled induction heater 3 is disposed on the lead screw slider device 9 , and can be moved along the length direction of the input conveying stage section 41 by being driven by the lead screw slider device 9 .

[0074] Please refer to Figures 4 to 9 In this embodiment, the water-cooled induction heater 3 adopts a radial opening and closing electromagnetic induction heater, which includes an upper semicircular copper tube bracket 32, a lower semicircular copper tube bracket 36, a left frame copper tube 37 and a right frame copper tube 39. The upper semicircular copper tube bracket 32 ​​and the lower semicircular copper tube bracket 36 form an induction heating coil for heating the steel pipe. In a natural state, the opening of this electromagnetic induction heating coil is open. When a steel pipe rolls from the steel pipe input platform 1 to the input conveying platform section 41, it also enters the electromagnetic induction heating coil through the opening of the electromagnetic induction heating coil, and then closes the opening to heat the steel pipe. The specific structure is as follows:

[0075] The lower semicircular copper tube bracket 36 is respectively arranged on the top of the left frame copper tube 37 and the right frame copper tube 39, and an insulating connecting plate 38 is fixedly arranged on the inner side of the left frame copper tube 37 and the right frame copper tube 39;

[0076] The upper semicircular copper tube bracket 32 ​​is hinged at one end with the lower semicircular copper tube bracket 36, and the other end is open. The open end can be locked by a locking mechanism 320, so that the upper semicircular copper tube bracket 32 ​​and the lower semicircular copper tube bracket 36 are closed to form a circular ring;

[0077] At the hinged end of the upper semicircular copper tube bracket 32 ​​and the lower semicircular copper tube bracket 36, the upper semicircular copper tube bracket 32 ​​and the lower semicircular copper tube bracket 36 are elastically connected by an elastic member 35. In a natural state, the opening end is in an open state through the elastic member 35, and the steel pipe rolled down from the steel pipe input platform 1 rolls into the induction heating coil through this opening. The present invention does not impose specific restrictions on this elastic member 35, as long as it is ensured that the opening of the electromagnetic induction heating coil is in an open state, that is, in an open state, in a natural state. At this time, the elastic member 35 has no elastic force; in a closed state, this elastic member 35 has elastic force. When the locking mechanism 320 is not locked, the elastic member 35 will return to its original state, so the opening will be opened. In this embodiment, the elastic member 35 is preferably a spring tube.

[0078] The lead screw slider device 9 includes a second motor 91, a mounting seat 92, a lead screw 95 and a slider 93. The lead screw 95 is rotatably mounted on the mounting seat 92. The second motor 91 is fixed on the mounting seat 92 and is drivingly connected to the lead screw 95. The slider 93 is threadedly connected to the lead screw 95 and is slidably mounted on the mounting seat 92. The insulating connecting plate 38 is fixedly connected to the slider 93 via a connecting member 94. In this embodiment, the second motor 91 is preferably a stepping motor.

[0079] In this embodiment, the arc length of the upper semicircular copper tube bracket 32 ​​is greater than the arc length of the lower semicircular copper tube bracket 36. After the upper semicircular copper tube bracket 32 ​​and the lower semicircular copper tube bracket 36 are closed, the hinged end and the open end are both lower than the center of the circular ring;

[0080] At the hinged end, an upper extension part 33 is arranged outwardly at the end of the upper semicircular copper tube bracket 32, and a lower extension part 35 is arranged outwardly at the end of the lower semicircular copper tube bracket 36. The upper extension part 33 is hinged with the lower extension part 35, and the upper extension part 33 and the lower extension part 35 are elastically connected through the elastic member 35;

[0081] Please refer to Figure 5 and Figure 6 At the open end, an upper extension part 31 is provided outwardly at the end of the upper semicircular copper tube bracket 32, and a lower extension part 310 is provided outwardly at the end of the lower semicircular copper tube bracket 36. A U-shaped notch 311 is provided on the upper extension part 31, and a through hole 3101 is provided on the lower extension part 310;

[0082] Please refer to Figure 8The locking mechanism 320 includes a handle 3201, a pressure plate 3203, a connecting screw 3205 and a nut 3206. The handle 3201 is rotatably arranged at the top of the connecting screw 3205. In this embodiment, the connecting end of the handle 3201 is an eccentric structure 3203 integrally connected thereto, and the eccentric structure 3203 is rotatably arranged at the top of the connecting screw 3205 via an axis. The lower end of the connecting screw 3205 is provided with a thread adapted to the nut 3206.

[0083] The present embodiment does not impose any specific restrictions on the specific structure of the eccentric structure 3203, which may be a circular, elliptical or arc-shaped structure, as long as the distance between the axis center of the eccentric structure 3203 and the axis center of the pressure plate 3203 becomes longer or shorter when the handle is rotated. In the present embodiment, when the handle 3201 is pressed down, the distance between the axis center of the eccentric structure 3203 and the axis center of the pressure plate 3203 becomes longer; when the handle 3201 is lifted, the distance between the axis center of the eccentric structure 3203 and the axis center of the pressure plate 3203 becomes shorter.

[0084] When the upper semicircular copper tube bracket 32 ​​and the lower semicircular copper tube bracket 36 are closed, the connecting screw 3205 passes through the U-shaped notch 311 and the through hole 3101 from top to bottom in sequence, and the nut 3206 is tightened on the connecting screw 3205 and is located below the through hole 3101; the pressing plate 3203 is sleeved on the upper end of the connecting screw 3205, pressing down the handle 3201, and the eccentric structure 3203 presses down the pressing plate 3203, so that it is pressed tightly on the U-shaped notch 311.

[0085] When the induction heating coil needs to be opened from a closed state, the nut 3206 is loosened, the handle 3201 is lifted, the eccentric structure 3203 releases the pressure plate 3203, and the elastic member 35 lifts the upper semicircular copper tube bracket 32 ​​upward by elastic force, the connecting screw 3205 is disengaged from the U-shaped notch 311, and the opening is radially opened, thereby realizing the rapid opening of the induction heating coil.

[0086] When the induction heating coil needs to be closed from an open state, the U-shaped notch 311 is firstly put on the connecting screw 3205, the nut 3206 is tightened, and the handle 3201 is pressed down to realize the rapid closing of the induction heating coil.

[0087] In this embodiment, the steel pipe input platform 1 and the steel pipe output platform 7 are inclined in opposite directions, and the steel pipe coming down from the output conveying platform section 42 first falls on the high end of the steel pipe output platform 7 and rolls from the high end to the bottom end.

[0088] The steel pipe input platform 1 and the steel pipe output platform 7 can be arranged on the same side or both sides of the steel pipe conveying platform 4, and the present invention does not make any specific limitation on this. In this embodiment, the steel pipe input platform 1 and the steel pipe output platform 7 are preferably arranged side by side on the same side of the steel pipe conveying platform 4.

[0089] A plurality of rollers 43 are rotatably arranged on the input conveying stage section 41 and the output conveying stage section 42 at intervals, and the plurality of rollers 43 are connected by at least one transmission mechanism, and the transmission mechanism is connected by driving with a first motor 45;

[0090] The conveying direction of the plurality of rollers 43 is consistent with the length direction of the steel pipe.

[0091] The present invention does not limit the number of transmission mechanisms. If the length of the steel pipe conveying platform 4 is long, multiple transmission mechanisms can be used to drive the rollers 43 to rotate; if the length of the steel pipe conveying platform 4 is short, one transmission mechanism can be used to drive all the rollers 43 to rotate synchronously. This embodiment is described in detail with one transmission mechanism.

[0092] In this embodiment, the steel pipe conveying platform 4 is supported on a second support frame, and a plurality of rollers 43 are rotatably arranged at intervals horizontally on the second support frame.

[0093] Please refer to Fig.10 The transmission mechanism includes a plurality of synchronous belts 44 and a plurality of synchronous pulleys 46. One end of the roller 43 is coaxially fixed with a synchronous pulley 46. The plurality of synchronous pulleys 46 rotate synchronously through the plurality of synchronous belts 44 (in this embodiment, two adjacent synchronous pulleys 46 are connected by a synchronous belt 44). The output shaft of the first motor 45 is drivingly connected to a synchronous pulley 46. In this embodiment, the transmission mechanism is a bidirectional synchronous belt mechanism, the synchronous pulley 46 is key-connected to the roller shaft, and the first motor 45 is an AC motor controlled by a PLC.

[0094] In order to prevent the steel pipe from falling off during the conveying process of the roller 43 , a baffle 5 is further provided on the outer side of the roller 43 .

[0095] The steel pipe output platform 7 is composed of a plurality of horizontal cross bars 72 and a plurality of inclined longitudinal bars 73 arranged at intervals, and the steel pipe output platform 7 is supported on a second support frame 74. A second stopper 71 is also provided at the lower end of the steel pipe output platform 7. When the steel pipe is placed on the steel pipe output platform 7 in parallel with the horizontal cross bar 72, the steel pipe can roll along the inclined longitudinal bar 73. When rolling to the lower end, the steel pipe is stopped by the second stopper 71 to prevent it from falling off the steel pipe output platform 7.

[0096] Please refer to Fig.11In this embodiment, the second power drive device 10 is arranged below the output conveying stage section 42, and includes a second mounting frame, a second cylinder, a second transmission shaft, a second transmission connecting member and a second top plate, and the second transmission shaft is rotatably arranged on the second mounting frame;

[0097] The second transmission connecting member and the second top plate are both fixed on the second transmission shaft;

[0098] The second cylinder is arranged at an angle, and its two ends are respectively hinged to the second mounting frame and the second transmission connecting member. When the second cylinder is working, it drives the second transmission shaft to rotate, and the second transmission shaft drives the second top plate to lift the steel pipe on the output conveying platform section 42 and make it fall onto the steel pipe output platform 7.

[0099] The continuous pipeline water-cooled induction heating device provided by the present invention is based on PLC control. In this embodiment, since the steel pipe has a certain length and there are certain positioning requirements for the butt joint of the two steel pipes before welding, this embodiment realizes the axial movement of the induction heater 3 through the screw slider device 9. The speed and time of the movement are adjusted according to the temperature and time required for heating the steel pipe, and the displacement of the movement is fed back to the PLC in real time.

[0100] After the induction heater 3 is closed, the heating process is automatically started. During the heating process, the temperature sensor detects the temperature of the steel pipe heating area, adjusts the current of the heater according to the temperature rise and insulation requirements, and then adjusts the temperature change generated by the heater. At the same time, the total time of the induction heating process is controlled, and if the corresponding temperature rise is still not achieved after the timeout, an alarm will be issued in time.

[0101] The induction heating power supply adopts an induction heating power supply. The PLC and the induction heating power supply adopt MODBUS communication control. It is necessary to read the operating parameters, operating status, and fault alarm status of the induction heating power supply, set the target output current or output power of the power supply, control the start and stop of the power supply, set the heating time, and make a fault judgment on the power supply. After a fault occurs, subsequent work will be stopped and an alarm message will be issued.

[0102] The water cooling circulation system of the induction heater 3 includes the following parts:

[0103] 1) Water circulation system. The water circulation system, which is composed of a water pump, a water valve, a spiral tube condenser, a filter, etc., automatically starts the cooling water circulation after the induction heater 3 starts the heating program to cool the induction heater 3.

[0104] 2) Water level, water temperature, water quality, and water pump online monitoring and control system. Using liquid level sensors, pressure sensors, temperature sensors, flow meters, thermal resistors, etc., the operating parameters in the water tank are fed back to the analog input terminal of the PLC in real time, and the water level, water temperature, and working status of the water circulation system are monitored in real time. The fouling thermal resistance measurement is used to monitor the changes in water quality. After the CPU performs calculations and diagnoses, it will promptly issue an alarm signal and shut down the system when abnormal phenomena occur.

[0105] In this embodiment, two sensors are arranged on the output conveyor section 42 for controlling the first motor 45 to start or end operation. In this embodiment, two sensor brackets are arranged on the second support frame, and the sensor brackets are fixed to the second support frame by threaded fasteners. There is an elongated hole in the middle of the sensor bracket, which is used to fix the sensor by threaded fasteners and adjust the position of the sensor. The sensor in this embodiment is preferably an inductive sensor.

[0106] Working principle of the present invention:

[0107] In the first step, the first cylinder 82 works, which drives the first transmission shaft 87 to rotate, and the first top plate 83 on the first transmission shaft 87 lifts the steel pipe closest to the first stopper 11 on the steel pipe input platform 1, and the steel pipe passes over the first stopper 11 and rolls onto the roller 43 of the input conveyor stage section 41. At this time, the induction heater 3 is in a naturally open state, and the steel pipe rolls to the middle heating area of ​​the induction heater 3.

[0108] In the second step, the nut of the locking mechanism 320 is tightened, and the handle 3201 is pressed down to close the induction heater 3.

[0109] In the third step, after the induction heater 3 is closed, the heating process is automatically started. During the heating process, the temperature of the steel pipe heating area is detected, and the current of the heater is adjusted according to the temperature rise and the insulation requirements, thereby adjusting the temperature change generated by the heater. At the same time, the total time of the induction heating process is controlled, and an alarm will be given in time if the corresponding temperature rise is still not reached after the timeout. After preheating for a certain period of time, the second motor 91 works, and the slider 93 drives the induction heater 3 to move axially, and the steel pipe is heated in a certain area. While the induction heating power supply is working, the water circulation mechanism works. Clean water is output from the water tank, enters the induction heater 3, cools down, and is output from the other end of the induction heater 3 into the water tank.

[0110] Step 4: After the heating is completed, loosen the nut, open the locking mechanism 320, and the opening of the induction heater 3 opens naturally under the action of the spring tube.

[0111] In the fifth step, the first motor 45 starts to work, and the roller 43 rotates to transfer the steel pipe from the input conveying stage section 41 to the output conveying stage section 42.

[0112] Step 6: When the steel pipe reaches the top of the inductive sensor, a trigger signal is received by the PLC end, and the first motor 45 is controlled to stop working. At the same time, the PLC controls the second cylinder of the output conveying stage section 42 to work, lifting the steel pipe and rolling it forward to the steel pipe output stage 7.

[0113] Step 7: Repeat the above process.

[0114] The whole process mentioned above is controlled by PLC.

[0115] The above disclosure is only a specific embodiment of the present application, but the present application is not limited thereto, and any changes that can be conceived by technicians in this field should fall within the protection scope of the present application.

Claims

1. A continuous pipeline water-cooled induction heating device, characterized in that: include: A steel pipe input platform, which is tilted and used to carry the steel pipe before heating; the steel pipe input platform is provided with a first stopper to prevent the steel pipe thereon from rolling from the high end to the low end; A steel pipe output platform, which is tilted and used to carry the heated steel pipe; A steel pipe conveying platform, the steel pipe conveying platform comprises an input conveying platform section and an output conveying platform section, the lower end of the steel pipe input platform corresponds to the input conveying platform section, and the higher end of the steel pipe output platform faces the output conveying platform section; A first power driving device is provided corresponding to the steel pipe input platform; the first power driving device is used to drive the steel pipe on the steel pipe input platform to make it pass over the first stopper and roll onto the input conveying platform section; A second power driving device is provided corresponding to the output conveying platform section; the second power driving device is used to drive the steel pipe on the output conveying platform section to roll onto the steel pipe output platform; A water-cooled induction heater is provided corresponding to the input conveyor section and is used to heat the steel pipe on the input conveyor section; The steel pipe input platform is composed of a plurality of horizontal cross bars and a plurality of inclined longitudinal bars arranged at intervals. When the steel pipe is placed on the steel pipe input platform parallel to the horizontal cross bars, the steel pipe can roll along the inclined longitudinal bars. A lead screw slider device is provided below the input conveying stage section, and the water-cooled induction heater is provided on the lead screw slider device and can be moved along the length direction of the input conveying stage section by the lead screw slider device; The water-cooled induction heater adopts a radial opening and closing electromagnetic induction heater, which includes an upper semicircular copper tube bracket, a lower semicircular copper tube bracket, a left frame copper tube and a right frame copper tube. The upper semicircular copper tube bracket and the lower semicircular copper tube bracket form an induction heating coil for heating the steel pipe; the lower semicircular copper tube bracket is respectively arranged on the top of the left frame copper tube and the right frame copper tube, and an insulating connecting plate is arranged between the left frame copper tube and the right frame copper tube; One end of the upper semicircular copper tube bracket and the lower semicircular copper tube bracket are hinged, and the other end is open. The open end can be locked by a locking mechanism, so that the upper semicircular copper tube bracket and the lower semicircular copper tube bracket are closed to form a circular ring; At the hinged end of the upper semicircular copper tube bracket and the lower semicircular copper tube bracket, the upper semicircular copper tube bracket and the lower semicircular copper tube bracket are elastically connected by an elastic member. In a natural state, the opening end is opened by the elastic member, and the steel tube rolled down from the steel tube input platform rolls into the induction heating coil through the opening; The lead screw and slider device comprises a second motor, a mounting seat, a lead screw and a slider, wherein the lead screw is rotatably arranged on the mounting seat; the second motor is fixed on the mounting seat and is drivingly connected to the lead screw; the slider is threadedly connected to the lead screw and is slidably arranged on the mounting seat; the insulating connecting plate is fixedly connected to the slider; During operation, the first power drive device drives a steel pipe on the steel pipe input platform to make it pass over the first stopper and roll onto the input conveying platform section; then the steel pipe is heated by the water-cooled induction heater; after the heating is completed, the steel pipe is transferred from the input conveying platform section to the output conveying platform section, and the steel pipe is driven by the second power drive device to roll onto the steel pipe output platform.

2. A continuous pipeline water-cooled induction heating device as claimed in claim 1, characterized in that: The first power drive device is arranged below the steel pipe input platform, and comprises a first mounting frame, a first cylinder, a first transmission shaft, a first transmission connection member and a first top plate, and the first transmission shaft is rotatably arranged on the first mounting frame; The first transmission connecting member and the first top plate are both fixed on the first transmission shaft; The first cylinder is tilted, and its two ends are respectively hinged to the first mounting frame and the first transmission connecting member. When the first cylinder is working, it drives the first transmission shaft to rotate, and the first top plate lifts up a steel pipe on the steel pipe input platform, and the steel pipe passes over the first stop block and rolls onto the input conveying platform section.

3. A continuous pipeline water-cooled induction heating device as claimed in claim 1, characterized in that: The steel pipe input platform and the steel pipe output platform are inclined in opposite directions and are arranged side by side on the same side of the steel pipe conveying platform; A plurality of rollers are arranged on the input conveying stage section and the output conveying stage section to rotate at intervals, and the plurality of rollers are connected by at least one transmission mechanism, and the transmission mechanism is connected to the first motor; The conveying directions of the plurality of rollers are consistent with the length direction of the steel pipe.

4. A continuous pipeline water-cooled induction heating device as claimed in claim 3, characterized in that: The transmission mechanism includes a plurality of synchronous belts and a plurality of synchronous pulleys. A synchronous pulley is coaxially fixed to one end of the roller, and the plurality of synchronous pulleys rotate synchronously through the plurality of synchronous belts. The output shaft of the first motor is drivingly connected to a synchronous pulley.

5. A continuous pipeline water-cooled induction heating device as claimed in claim 1, characterized in that: The arc length of the upper semicircular copper tube bracket is greater than that of the lower semicircular copper tube bracket. After the upper semicircular copper tube bracket and the lower semicircular copper tube bracket are closed, the hinged end and the open end are both lower than the center of the circular ring; At the hinged end, an upper extension part 1 is arranged outwardly at the end of the upper semicircular copper tube bracket, and a lower extension part 1 is arranged outwardly at the end of the lower semicircular copper tube bracket, the upper extension part 1 is hinged with the lower extension part 1, and the upper extension part 1 and the lower extension part 1 are elastically connected through the elastic member; At the open end, an upper extension part 2 is arranged outwardly from the end of the upper semicircular copper tube bracket, and a lower extension part 2 is arranged outwardly from the end of the lower semicircular copper tube bracket, a U-shaped notch is arranged on the upper extension part 2, and a through hole is arranged on the lower extension part 2; The locking mechanism includes a handle, a pressure plate, a connecting screw and a nut, and the handle is rotatably arranged at the top end of the connecting screw; when the upper semicircular copper tube bracket and the lower semicircular copper tube bracket are closed, the connecting screw passes through the U-shaped notch and the through hole in sequence from top to bottom, and the nut is tightened on the connecting screw and is located below the through hole; the pressure plate is sleeved on the upper end of the connecting screw, and the handle is pressed down to press it on the U-shaped notch; when the induction heating coil needs to be opened, the nut is loosened, the handle is lifted, the handle releases the pressure plate, and the elastic member lifts the upper semicircular copper tube bracket upward by elastic force, the connecting screw is disengaged from the U-shaped notch, and the opening is opened.

6. A continuous pipeline water-cooled induction heating device as claimed in claim 1, characterized in that: The steel pipe output platform is composed of a plurality of horizontal cross bars and a plurality of inclined longitudinal bars arranged at intervals. When the steel pipe is placed on the steel pipe output platform parallel to the horizontal cross bars, the steel pipe can roll along the inclined longitudinal bars.

7. A continuous pipeline water-cooled induction heating device as claimed in claim 1, characterized in that: The second power drive device is arranged below the output conveying stage section, and comprises a second mounting frame, a second cylinder, a second transmission shaft, a second transmission connecting member and a second top plate, and the second transmission shaft is rotatably arranged on the second mounting frame; The second transmission connecting member and the second top plate are both fixed on the second transmission shaft; The second cylinder is arranged at an angle, and its two ends are respectively hinged to the second mounting frame and the second transmission connecting member. When the second cylinder is working, it drives the second transmission shaft to rotate, and the second transmission shaft drives the second top plate to lift the steel pipe on the output conveying platform section and make it fall onto the steel pipe output platform.

8. A continuous pipeline water-cooled induction heating device according to any one of claims 1 to 7, characterized in that: The device is controlled by PLC.