A transverse pipeline fixing device for transversely crossing under a structure and a construction method thereof
By using structures such as brick piers, channel steel and concrete cushions in municipal pipeline projects, the problem of pavement settlement when crossing structures has been solved, rapid and safe construction of large-diameter pipelines has been achieved, and the performance of concrete has been improved and laid the foundation for Facility construction provides a reference.
Patent Information
- Application Number
- CN201911290943.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-12-16
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2039-12-16
AI Technical Summary
In municipal pipeline projects, when crossing structures, existing technology is difficult to effectively solve the problem of road surface settlement caused by loose grouting, and there is a lack of guided construction technology to add professional pipelines, especially when large-diameter pipelines cross.
The rectangular-shaped brick piers and brick formwork support structure are used, combined with transverse and longitudinal channel steel, concrete cushions and steel pipe slide rails. Through the use of low-grade poured fine stone concrete and micro-expansion concrete, a stable support structure is formed. to secure across the pipeline.
It realizes the fast, safe and low-cost construction of large-diameter pipelines passing through small structures, improves the performance of concrete, ensures the quality of the project, and provides a reference for urban infrastructure construction.
Smart Images

Figure CN110924435B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of pipeline installation and construction, and in particular relates to a transverse pipeline fixing device that crosses under a structure and a construction method thereof. Background Art
[0002] Municipal pipeline engineering is an important part of municipal engineering and an important infrastructure facility in the city. Municipal pipeline engineering includes: water supply pipelines, drainage pipelines, gas pipelines, thermal pipelines, and power cables.
[0003] At present, when most municipal engineering underground pipelines cross main pipelines or structures, a small number of them adopt jacking or horizontal directional drilling construction, and most of them adopt the construction method of breaking them and then restoring them. For the grouting reinforcement after jacking or horizontal directional drilling construction, the road surface often has quality problems such as different degrees of settlement due to the loose grouting. With the expansion and reconstruction of urban municipal infrastructure, the service capacity of supporting infrastructure around the community has gradually increased. However, during the expansion or reconstruction process, the main road lines or cable trenches need to be retained, and only the corresponding professional pipelines need to be added on the original basis to achieve the purpose of upgrading. However, there is no similar guiding construction process when crossing structures or large-diameter pipelines. Summary of the invention
[0004] In order to solve the above problems, the present invention provides a transverse pipeline fixing device for crossing under a structure and a construction method thereof, and the technical solution adopted is as follows:
[0005] A cross-pipeline fixing device that crosses under a structure, characterized in that it mainly includes brick piers distributed under the structure in a rectangular shape, and brick mold supports connected between the inner sides of the brick piers, each brick pier is distributed vertically up and down, and transverse channel steels distributed along a direction parallel to the length of the structure and longitudinal channel steels distributed along a direction parallel to the length of the cross-pipeline are arranged above the brick piers, the brick mold supports are distributed along a direction parallel to the length of the structure, and along the length of the structure, the brick mold supports are connected between the inner sides of the front and rear brick piers, the brick mold supports are provided with through holes for the cross-pipeline to pass through, and in addition, the space between the two brick mold supports is filled with concrete.
[0006] Preferably, a reserved pouring hole is provided on the upper part of the brick mold support.
[0007] Preferably, the longitudinal channel steel and the transverse channel steel are located in the same horizontal plane in the height direction.
[0008] Preferably, a concrete cushion layer located below the crossing pipeline is provided between the brick piers.
[0009] Preferably, a steel pipe slide rail is fixedly connected above the concrete cushion layer to facilitate sliding of the cross-pipeline, and the length of the steel pipe slide rail is distributed in a direction parallel to the axis of the cross-pipeline.
[0010] The construction method of the cross-pipeline fixing device under the cross-structure includes the following steps:
[0011] ①First, according to the location of the crossing pipeline and the location of the crossing structure, locate and measure the location, burial depth and size of the existing structure;
[0012] ② Excavate the earth covering the structure to reduce the pressure of the covering earth on the structure;
[0013] ③ According to normal construction technology, install the cross-over pipeline 1 to 2 meters away from the structure;
[0014] ④ Measure and lay out the positions of the four corner piers, excavate the earth at the four corners below the structure, build brick piers, and set up transverse channel steels on the top of the brick piers for support. After all the earth at the crossing position of the transverse pipeline is excavated, set up longitudinal channel steels for support;
[0015] ⑤ Lay a concrete cushion inside the brick pier in a direction perpendicular to the length of the structure, and place underground pipelines on the concrete cushion;
[0016] ⑥ Finally, a brick formwork support is set inside each of the two groups of brick piers distributed along the front-to-back direction of the axis of the cross-pipeline, and concrete is backfilled between the two brick formwork supports to make the cross-pipeline and the support structure become one.
[0017] Preferably, in step ④, when excavating the earth at the underground pipeline, the earth at the transverse channel steel position below the main line pipeline is excavated first, and the earth is excavated from top to bottom, from both sides to the middle, and from outside to inside. After the transverse channel steel is placed, the earth at the longitudinal channel steel position and below it is excavated from top to bottom, from both sides to the middle, and from outside to inside, and finally the longitudinal channel steel is placed.
[0018] Preferably, in step ⑤, when laying the concrete cushion layer, a steel pipe slide rail is prefabricated at the same time, so that the steel pipe slide rail is fixedly connected to the concrete cushion layer, and the cross-pipeline is located above the steel pipe slide rail.
[0019] Preferably, in step ⑥, when making the brick mold support, a reserved pouring hole is set on the upper part of the brick mold support, and concrete backfill is performed through the reserved pouring hole to integrate the underground pipeline and the support structure.
[0020] Preferably, in step ⑥, the concrete is backfilled with low-grade poured fine stone concrete. When backfilling the concrete, the concrete is first poured to a position half the height from the lower surface of the structure. After the concrete has initially set, a second pouring is performed until the concrete is flush with the reserved pouring holes. Finally, the reserved pouring holes are shrunk and sealed, and micro-expansive concrete is injected into the holes until the bottom of the structure foundation.
[0021] The beneficial effects of the present invention are:
[0022] 1. Since the bottom of the structure cannot be compacted, low-grade fine stone concrete is used for backfilling, and micro-expansion concrete is injected at the same time to prevent concrete cracks and improve concrete performance;
[0023] 2. This technical solution can quickly complete the construction of large-diameter pipelines crossing small structures. Compared with pipe jacking or horizontal directional drilling, it is not only safe, simple in process, low in cost, fast in speed, but also can ensure the quality of the project. In the future urban infrastructure construction, more and more cities will add cross-pipelines or structures above or below existing structures or main pipelines to improve the supporting service capabilities of infrastructure. The implementation of this technology provides a reference for future cross-pipeline construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 A top view of the structure of the present invention without the structure
[0025] Figure 2 AA section view with structure
[0026] Figure 3 BB section view with structure
[0027] Among them, 1-structure, 2-longitudinal channel steel, 3-transverse channel steel, 4-brick pier, 5-brick formwork support, 6-crossing pipeline, 7-concrete cushion layer, 8-reserved pouring holes, 9-steel pipe slide rail. DETAILED DESCRIPTION
[0028] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
[0029] like Figure 1-3The cross-pipeline fixing device shown below the cross-structure mainly includes a brick pier 4, a brick mold support 5, a transverse channel steel 3, and a longitudinal channel steel 2. It should be noted that in this embodiment, the structure 1 takes the power trench as an example to illustrate the present invention in detail, and the longitudinal direction of the cross-pipeline 6 is described as the front-to-back direction. Figure 3 As shown, the length direction of the cross-pipeline 6 is the front-to-back direction. Specifically, there are 4 brick piers 4, which are distributed in the shape of a rectangle at the front, back, left and right corners of the bottom of the power trench. Two longitudinal channel steels 2 and two transverse channel steels 3 are arranged above the 4 brick piers 4. The longitudinal channel steels 2 are distributed in a length direction parallel to the axis of the cross-pipeline 6, and the two transverse channel steels 3 are distributed in a length direction perpendicular to the axis of the cross-pipeline 6. The two longitudinal channel steels 2 and the two transverse channel steels 3 are on the same horizontal plane and form a rectangular frame structure, which has a certain supporting effect on the power trench. In addition, a concrete cushion layer 7 is provided under the crossing pipeline 6, and two steel pipes with lengths distributed along the axial direction of the crossing pipeline 6 are provided on the concrete cushion layer 7. The two steel pipes form a steel pipe slide rail 9, which is convenient for the crossing pipeline 6 to pass under the power trench during installation, and a brick mold support 5 is provided between the outer circular surface of the crossing pipeline 6 and the inner side surfaces of the brick piers on the left and right sides. The brick mold support 5 is distributed in a direction perpendicular to the axial direction of the crossing pipeline 6, and the front and rear ends of the crossing pipeline 6 extend out of the brick mold support 5. The upper part of the brick mold support 5 is provided with a reserved pouring hole 8, which is convenient for pouring concrete inside.
[0030] The construction method of the cross-pipeline fixing device under the cross-structure is as follows:
[0031] ① First, according to the position of the cross-pipeline 6 and the position of the crossing structure 1, locate and measure the position, burial depth and size of the existing structure 1;
[0032] ② Excavate the earth covering the structure 1 to reduce the pressure of the covering earth on the structure 1;
[0033] ③Install the cross-over pipeline 6 to a distance of 1 to 2 meters from the structure;
[0034] ④ Measure and lay out the positions of four brick piers 4, excavate the earthwork at the four corners below the structure 1, and build brick piers 4. After the height reaches 10 cm below the structure 1, excavate the earthwork at the position of the transverse channel steel 3, and excavate from top to bottom, from both sides to the middle, and from outside to inside. After checking that it meets the requirements, fix the transverse channel steel 3 on the brick pier 4, then excavate the earthwork at the position of the longitudinal channel steel 2 and below it, and after checking that it meets the requirements, fix the longitudinal channel steel 2 on the brick pier 4;
[0035] ⑤ Lay a concrete cushion layer 7 inside the brick pier 4 along the direction perpendicular to the length of the structure 1. The concrete cushion layer 7 is 10 cm thick. When laying the concrete cushion layer 7, prefabricate the steel pipe slide rail 9 at the same time, so that the steel pipe slide rail 9 is fixedly connected to the concrete cushion layer 7, and place the cross-pipe 6 on the steel pipe slide rail 9 and slide along the steel pipe slide rail 9 to place the cross-pipe 6 at the construction position;
[0036] ⑥ Finally, a brick mold support 5 is respectively set inside the two groups of brick piers 4 distributed in the front-to-back direction of the axis of the cross-pipeline 6, and a reserved pouring hole 8 is set on the upper part of the brick mold support 5. Concrete backfilling is carried out through the reserved pouring hole 8. Specifically, low-grade poured fine stone concrete is backfilled between the two brick mold supports. First, the concrete is poured to a position half the height from the lower surface of the structure 1. After the concrete is initially set, a second pouring is carried out until the concrete is flush with the reserved pouring hole 8. Finally, the reserved pouring hole 8 is reduced and sealed, and micro-expansion concrete is injected into the hole until it reaches the bottom of the structure 1, so that the cross-pipeline 6 and the support structure become one.
[0037] The use of this support system can quickly complete the construction of large-diameter reinforced concrete pipelines crossing small structures. Compared with pipe jacking or horizontal directional drilling, it is not only safe, simple in process, low in cost, fast in speed, but also can ensure the quality of the project. In the future urban infrastructure construction, more and more cities will add cross-pipelines or structures above or below existing structures or main pipelines to improve the supporting service capacity of infrastructure. The implementation of this process provides a reference for the future construction of cross-pipelines.
[0038] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A construction method for a pipeline fixing device crossing under a structure, characterized in that: A cross-pipeline fixing device based on crossing the bottom of a structure comprises brick piers distributed in a rectangular shape under the structure, brick mold supports connected between the inner sides of the brick piers, each brick pier is distributed in a vertical direction, and a transverse channel steel distributed along a direction parallel to the length of the structure and a longitudinal channel steel distributed along a direction parallel to the length of the cross-pipeline are arranged above the brick piers, the brick mold supports are distributed along a direction parallel to the length of the structure, and the brick mold supports are connected between the inner sides of the front and rear brick piers along the length of the structure, a through hole for the cross-pipeline to pass through is provided on the brick mold supports, and concrete is filled between the two brick mold supports, and the construction method comprises the following steps: ①First, according to the location of the crossing pipeline and the location of the crossing structure, locate and measure the location, burial depth and size of the existing structure; ② Excavate the earth covering the structure to reduce the pressure of the covering earth on the structure; ③ According to normal construction technology, install the cross-over pipeline 1 to 2 meters away from the structure; ④ Measure and lay out the positions of the brick piers at the four corners, excavate the earth at the four corners below the structure, build brick piers, and set up transverse channel steels on the top of the brick piers for support. After all the earth at the crossing position of the transverse pipeline is excavated, set up longitudinal channel steels for support; ⑤ Lay a concrete cushion inside the brick pier along the direction perpendicular to the length of the structure, and place the crossing pipeline on the concrete cushion; ⑥Finally, a brick formwork support is set inside each of the two groups of brick piers distributed along the front-to-back direction of the axis of the cross-pipeline, and concrete is backfilled between the two brick formwork supports to make the cross-pipeline and the support structure become one.
2. The construction method of a pipeline fixing device crossing under a structure according to claim 1, characterized in that: In step ④, when excavating the earth at the place where the pipeline is crossed, the earth at the position of the transverse channel steel below the pipeline is excavated first, and the earth is excavated from top to bottom, from both sides to the middle, and from outside to inside. After the transverse channel steel is placed, the earth at the position of the longitudinal channel steel and the earth below it is excavated from top to bottom, from both sides to the middle, and from outside to inside, and finally the longitudinal channel steel is placed.
3. The construction method of a pipeline fixing device crossing under a structure according to claim 1, characterized in that: In step ⑤, when laying the concrete cushion layer, a steel pipe slide rail is prefabricated at the same time, so that the steel pipe slide rail is fixedly connected to the concrete cushion layer, and the cross-over pipeline is located above the steel pipe slide rail.
4. The construction method of a pipeline fixing device crossing under a structure according to claim 1, characterized in that: In step ⑥, when making the brick mold support, a reserved pouring hole is set on the upper part of the brick mold support, and concrete backfilling is performed through the reserved pouring hole to make the cross-pipeline and the support structure become one.
5. The construction method of a pipeline fixing device crossing under a structure according to claim 4, characterized in that: In step ⑥, the concrete is backfilled with low-grade fine stone concrete. When backfilling the concrete, first pour the concrete to a position half the height from the lower surface of the structure. After the concrete has initially set, pour it a second time until the concrete is flush with the reserved pouring holes. Finally, the reserved pouring holes are reduced and sealed, and micro-expansive concrete is injected into the holes until the bottom of the structure foundation.
6. The construction method of a pipeline fixing device crossing under a structure according to claim 1, characterized in that: The longitudinal channel steel and the transverse channel steel are located in the same horizontal plane in the height direction.
Citation Information
Patent Citations
Construction method for underground pipeline reinforcement
CN105544603A
Municipal administration path pipeline protection structure and construction method thereof
CN106988343A
Tunnel support structure passing underneath existing building and construction method
CN108119149A
Protection method for gas pipeline crossed above during heating power pipeline laying and production structure of production method
CN109339062A
Municipal road pipeline reinforcement protection structure and construction method thereof
CN109826230A