A pile foundation construction method and structure spanning multiple subway tunnels

By setting bored piles and conversion foundation beams on both sides of the tunnel shield structure, the problem of balancing the bearing capacity of the building structure and underground traffic is solved, the comprehensive utilization of underground and above-ground space is achieved, and the demand for construction land and normal underground traffic are met. run.

CN111074932BActive Publication Date: 2024-10-01CHINA CONSTR FOURTH ENG DIV CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010057218.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-01-19
Publication Date
2024-10-01
Estimated Expiration
2040-01-19

AI Technical Summary

Technical Problem

It is difficult for existing technology to meet the load-bearing capacity and safety requirements of building structures without affecting the normal operation of underground traffic, while simultaneously achieving effective utilization of underground space and comprehensive utilization of above-ground construction land, and solving the scarcity of underground space utilization and above-ground construction land. problem.

Method used

Set bored piles on both sides of the built or planned tunnel shield structure, and set longitudinal and transverse conversion foundation beams on them. Building wall columns are set on these foundation beams to ensure that the bottom surface of the foundation beam is higher than the tunnel shield structure. The outer contour of the structure is more than two meters, forming a pile foundation structure spanning multiple tunnels.

Benefits of technology

It not only meets the bearing capacity and safety of the building structure, but also provides effective utilization of underground space, solves the problem of scarcity of above-ground construction land, promotes the comprehensive utilization of underground and above-ground space, and supports sustainable development.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111074932B_ABST
    Figure CN111074932B_ABST
Patent Text Reader

Abstract

The present invention discloses a pile foundation construction method and structure that spans multiple tunnels. The present invention sets bored cast-in-place piles outside the shield protection lines on both sides of the tunnel shield structure of an existing underground traffic or a planned underground traffic tunnel shield structure. The bored cast-in-place piles on both sides of the tunnel shield structure are arranged linearly along the direction of the tunnel shield structure; then longitudinal conversion foundation beams and transverse conversion foundation beams are set on the bored cast-in-place piles; the wall columns of the ground building are set on the longitudinal conversion foundation beams and transverse conversion foundation beams. The present invention breaks through the shortcomings of traditional pile foundations and structural arrangements. It can not only meet the bearing capacity and safety requirements of the building structure itself, but also provide a larger underground space for utilization, which is conducive to sustainable development and achieves the purpose of comprehensive utilization of underground and ground space.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a pile foundation construction method and structure spanning multiple tunnels, belonging to the technical field of construction. Background Art

[0002] With the development of domestic transportation, the application of subway tunnels and underground highway tunnels is becoming more and more popular. Therefore, the safety of underground tunnels is usually considered when planning urban construction. Generally, ground buildings should avoid the areas where underground tunnels pass as much as possible. As a result, the use of ground land is increasingly restricted, resulting in a scarcity of ground land. How to solve the problem of the utilization of underground space and the scarcity of ground building land is now before us. If the existing building pile foundation structure can be changed so that the pile foundation structure can meet the bearing capacity and safety requirements of the building structure itself without affecting the normal operation of underground transportation, and the purpose of comprehensive utilization of underground and ground space can be achieved, it will be a breakthrough in solving the problem of the utilization of underground space and the scarcity of ground building land. It is conducive to the needs of sustainable development. Summary of the invention

[0003] The purpose of the present invention is to provide a pile foundation construction method and structure spanning multiple tunnels to solve the contradiction between underground space utilization and the scarcity of ground building land, thereby overcoming the shortcomings of the prior art.

[0004] To achieve the above object, the present invention adopts the following technical solutions:

[0005] The invention discloses a pile foundation construction method for spanning multiple tunnels. The method comprises the following steps: arranging bored cast-in-place piles outside shield protection lines on both sides of a tunnel shield structure of an existing underground traffic or a tunnel shield structure of a planned underground traffic, wherein the bored cast-in-place piles on both sides of the tunnel shield structure are linearly arranged along the direction of the tunnel shield structure; then arranging longitudinal transfer foundation beams and transverse transfer foundation beams on the bored cast-in-place piles; and ground building wall columns are arranged on the longitudinal transfer foundation beams and the transverse transfer foundation beams.

[0006] In the aforementioned pile foundation construction method spanning multiple tunnels, the bottom surfaces of the longitudinal transfer foundation beam and the transverse transfer foundation beam should be more than two meters higher than the outer contour line of the tunnel shield structure.

[0007] In the aforementioned pile foundation construction method spanning multiple tunnels, the intersection of the longitudinal transfer foundation beam and the transverse transfer foundation beam is connected to the top surface of the bored cast-in-place pile.

[0008] A pile foundation structure spanning multiple tunnels of the present invention constructed according to the above-mentioned pile foundation construction method spanning multiple tunnels includes bored cast-in-place piles arranged in a vertical and horizontal arrangement for supporting a building structure; the horizontally arranged bored cast-in-place piles are positioned outside the shield protection line on both sides of the cross section of the tunnel shield structure below the ground; the vertically arranged bored cast-in-place piles are linearly arranged along the direction of the tunnel shield structure; and the top surfaces of the bored cast-in-place piles are cast connected to the bottom surfaces of the longitudinal transfer foundation beam and the transverse transfer foundation beam.

[0009] In the aforementioned pile foundation structure spanning multiple tunnels, the intersection of the longitudinal transfer foundation beam and the transverse transfer foundation beam is located on the top surface of the bored cast-in-place pile.

[0010] In the aforementioned pile foundation structure spanning multiple tunnels, the distance between the bottom surfaces of the longitudinal transfer foundation beam and the transverse transfer foundation beam and the outer contour line of the tunnel shield structure is not less than two meters.

[0011] In the aforementioned pile foundation structure spanning multiple tunnels, a building wall column is provided on the top surface of the intersection of the longitudinal transfer foundation beam and the transverse transfer foundation beam.

[0012] Due to the adoption of the above technical solution, compared with the prior art, the present invention breaks through the shortcomings of traditional pile foundations and structural arrangements. The present invention can not only meet the requirements of the building structure's own bearing capacity and safety, but also provide a larger underground space for utilization, which is conducive to sustainable development and achieves the purpose of comprehensive utilization of underground and above-ground space. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the structure and method of the present invention.

[0014] The markings in the attached figure are: 1- bored cast-in-place piles, 2- tunnel shield structure, 3- shield protection line, 4- longitudinal transfer foundation beam, 5- transverse transfer foundation beam, 6- outer contour line of tunnel shield structure, 7- building wall column. DETAILED DESCRIPTION

[0015] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.

[0016] A pile foundation construction method spanning multiple tunnels according to the present invention is as follows: Figure 1As shown, the method is to set bored cast-in-place piles 1 outside the shield protection line 3 on both sides of the tunnel shield structure 2 of the built underground traffic or the planned underground traffic, and the bored cast-in-place piles 1 on both sides of the tunnel shield structure 2 are arranged linearly along the direction of the tunnel shield structure 2; then set the longitudinal conversion foundation beam 4 and the transverse conversion foundation beam 5 on the bored cast-in-place piles 1; the building wall column 7 on the ground is set on the longitudinal conversion foundation beam 4 and the transverse conversion foundation beam 5. The bottom surface of the longitudinal conversion foundation beam 4 and the transverse conversion foundation beam 5 should be more than two meters higher than the outer contour line 6 of the tunnel shield structure. The intersection of the longitudinal conversion foundation beam 4 and the transverse conversion foundation beam 5 is connected to the top surface of the bored cast-in-place pile 1.

[0017] A pile foundation structure spanning multiple tunnels according to the pile foundation construction method spanning multiple tunnels of the present invention is as follows: Figure 1 As shown, the structure includes bored piles 1 arranged in a longitudinal and transverse arrangement for supporting the building structure; the bored piles 1 arranged transversely are positioned outside the shield protection line 3 on both sides of the cross section of the tunnel shield structure 2 below the ground; the bored piles 1 arranged longitudinally are arranged linearly along the direction of the tunnel shield structure 2; the top surface of the bored piles 1 is cast and connected with the bottom surface of the longitudinal transfer foundation beam 4 and the transverse transfer foundation beam 5. The intersection of the longitudinal transfer foundation beam 4 and the transverse transfer foundation beam 5 is located on the top surface of the bored piles 1. The distance between the bottom surface of the longitudinal transfer foundation beam 4 and the transverse transfer foundation beam 5 and the outer contour line 6 of the tunnel shield structure is not less than two meters. The top surface of the intersection of the longitudinal transfer foundation beam 4 and the transverse transfer foundation beam 5 is provided with a building wall column 7.

[0018] Some supplementary explanations of the present invention are as follows:

[0019] The present invention includes bored cast-in-place piles 1, which are positioned outside the shield protection line 3 of the tunnel shield structure 2 and arranged in rows. The bored cast-in-place piles 1 shall not enter the range of the shield protection line 3, and the longitudinal spacing, pile diameter and effective pile length of the bored cast-in-place piles 1 are calculated and determined according to geological conditions and upper design loads. The distance between two adjacent rows of bored cast-in-place piles 1 should cross the shield protection line 3. A longitudinal conversion foundation beam 4 and a transverse conversion foundation beam 5 are provided on the top surface of the bored cast-in-place pile 1. The cross-sectional dimensions and reinforcement of the longitudinal conversion foundation beam 4 and the transverse conversion foundation beam 5 are determined by structural calculation according to the arrangement and positioning of the upper building wall columns 7; the bottom surfaces of the longitudinal conversion foundation beam 4 and the transverse conversion foundation beam 5 are not less than two meters away from the outer contour line of the tunnel shield structure; the shield protection line 3 is a guarantee for the smooth passage of the shield, and the outer contour line 6 of the tunnel shield structure is the control edge line of the tunnel shield.

[0020] The bored piles 1 are the pile foundation of the entire building. They should be arranged in rows along the direction of the tunnel shield structure 2. The bored piles 1 should be positioned outside the shield protection line 3. When the building is constructed first, the row-to-row span of the bored piles 1 arranged in rows should meet the requirements of the shield protection line 3 of the planned tunnel to ensure that the bored piles 1 will not be affected during the tunnel shield structure 2. The longitudinal spacing between the bored piles 1 arranged in rows must meet the construction process requirements, and the diameter and depth of the piles are determined by design calculation according to the geological conditions. The longitudinal transfer foundation beams 4 and the transverse transfer foundation beams 5 are arranged in a longitudinal direction according to the linear arrangement of the piles, and in a transverse direction according to the positioning of the upper building wall columns 7. The cross-sectional dimensions and reinforcement of the longitudinal transfer foundation beams 4 and the transverse transfer foundation beams 5 are determined by design calculation according to the design load of the upper building and the positioning of the building wall columns 7. The shield protection line 3 is the guarantee for the smooth passage of the tunnel shield structure, and the tunnel shield structure outer contour line 6 is the control edge line of the tunnel shield structure 2.

[0021] The present invention breaks through the shortcomings of traditional pile foundations and structural arrangements, can meet the requirements of the building structure's own bearing capacity and safety, and can provide a larger underground space for utilization, which is conducive to sustainable development and achieves the purpose of comprehensive utilization of underground and above-ground space.

Claims

1. A pile foundation construction method spanning multiple tunnels, characterized in that: The method is to set bored cast-in-place piles outside the shield protection line on both sides of the tunnel shield structure of the built underground traffic or the planned underground traffic, and the bored cast-in-place piles on both sides of the tunnel shield structure are arranged linearly along the direction of the tunnel shield structure; then set the longitudinal transfer foundation beam and the transverse transfer foundation beam on the bored cast-in-place piles; set the building wall columns on the ground on the longitudinal transfer foundation beam and the transverse transfer foundation beam; The bottom surfaces of the longitudinal transfer foundation beam and the transverse transfer foundation beam should be more than two meters higher than the outer contour line of the tunnel shield structure; The intersection of the longitudinal transfer foundation beam and the transverse transfer foundation beam is connected to the top surface of the bored pile; The top surface of the intersection of the longitudinal transfer foundation beam and the transverse transfer foundation beam is provided with a building wall column; The bored piles are positioned outside the shield protection line of the tunnel shield structure and arranged in rows; the bored piles shall not enter the shield protection line, and the longitudinal spacing, pile diameter and effective pile length of the bored piles shall be calculated and determined according to the geological conditions and the upper design load; the distance between two adjacent rows of bored piles shall cross the shield protection line; the top surface of the bored piles is provided with a longitudinal transfer foundation beam and a transverse transfer foundation beam; the cross-sectional dimensions and reinforcement of the longitudinal transfer foundation beam and the transverse transfer foundation beam are determined through structural calculation according to the arrangement and positioning of the upper building wall columns; the bottom surface of the longitudinal transfer foundation beam and the transverse transfer foundation beam shall be no less than two meters away from the outer contour line of the tunnel shield structure; the shield protection line is the guarantee for the smooth crossing of the shield, and the outer contour line of the tunnel shield structure is the control edge line of the tunnel shield; The bored cast-in-place piles are the pile foundation of the entire building. They should be arranged in rows along the direction of the tunnel shield structure, and the bored cast-in-place piles should be positioned outside the shield protection line. When the building is constructed first, the row-to-row spans of the bored cast-in-place piles arranged in rows should meet the shield protection line requirements of the planned tunnel to ensure that the bored cast-in-place piles will not be affected during the tunnel shield structure's passage. The longitudinal spacing between the bored cast-in-place piles arranged in rows should meet the construction process requirements, and the diameter and depth of the piles should be determined by design calculations based on geological conditions. The longitudinal and transverse transfer foundation beams are arranged in a linear manner in the longitudinal direction, and in the transverse direction according to the positioning of the upper building wall columns. The cross-sectional dimensions and reinforcement of the longitudinal and transverse transfer foundation beams are determined by design calculations based on the upper building design load and the positioning of the building wall columns. The shield protection line is the guarantee for the smooth passage of the tunnel shield structure, and the outer contour line of the tunnel shield structure is the controlling edge line of the tunnel shield structure.

2. A pile foundation structure spanning multiple tunnels constructed according to the method of claim 1, comprising bored piles (1) arranged in a longitudinal and transverse arrangement for supporting a building structure; characterized in that: The bored cast-in-place piles (1) arranged transversely are positioned outside the shield protection lines (3) on both sides of the cross section of the tunnel shield structure (2) below the ground; the bored cast-in-place piles (1) arranged longitudinally are arranged linearly along the direction of the tunnel shield structure (2); and the top surfaces of the bored cast-in-place piles (1) are connected by pouring to the bottom surfaces of the longitudinal transfer foundation beam (4) and the transverse transfer foundation beam (5).

3. The pile foundation structure spanning multiple tunnels according to claim 2, characterized in that: The intersection of the longitudinal conversion foundation beam (4) and the transverse conversion foundation beam (5) is located on the top surface of the bored cast-in-place pile (1).

4. The pile foundation structure spanning multiple tunnels according to claim 3, characterized in that: The distance between the bottom surface of the longitudinal transfer foundation beam (4) and the transverse transfer foundation beam (5) and the outer contour line (6) of the tunnel shield structure is not less than two meters.

5. The pile foundation structure spanning multiple tunnels according to claim 4, characterized in that: A building wall column (7) is provided on the top surface of the intersection of the longitudinal conversion foundation beam (4) and the transverse conversion foundation beam (5).