A nitrogen supplement device for sludge drying system
By designing multiple sets of nitrogen replenishment devices linked to air compressors, combined with an automatic control system, the problems of insufficient nitrogen replenishment and high transportation costs in traditional sludge drying systems have been solved, and the stable operation and safety of the system have been improved. .
Patent Information
- Application Number
- CN201811228409.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-10-22
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2038-10-22
AI Technical Summary
The traditional sludge drying system has problems with limited gas, unstable equipment operation and high transportation costs in terms of nitrogen supplementation, resulting in unstable system operation and equipment outage.
A nitrogen replenishment device is designed. Through the linkage of multiple groups of nitrogen cylinders and air compressors, combined with automatic control cabinets and nitrogen production equipment, sensors and PLC are used to realize automatic nitrogen replenishment, reducing the use frequency and transportation requirements of nitrogen cylinders.
It improves the operational stability and safety of the sludge drying system, reduces equipment outage and transportation costs, and enhances the reliability and automated control capabilities of the system.
Smart Images

Figure CN111087150B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a sludge drying system, and more particularly to a nitrogen supplementing device for a sludge drying system. Background Art
[0002] When the traditional sludge drying system is started, nitrogen is output from the nitrogen cylinder to control the oxygen content of the drying system. However, the amount of nitrogen in the nitrogen cylinder can only be used for emergency purposes and cannot meet the long-term stable nitrogen replenishment work of the drying system. At the same time, air is used for gas sealing in the feed distributor, mixer, fan and other gas sealing parts, which will increase the oxygen content inside the fluidized system and cause great hidden dangers to the overall operation of the drying system.
[0003] The sludge drying system controls the oxygen content in the three elements of combustion to prevent the hidden danger of sludge particle explosion. At the end of each cleaning and maintenance of the drying fluidized bed or when there is a sudden lack of oxygen content, three groups of 48 bottles of nitrogen are usually installed to temporarily supplement nitrogen to ensure the stable and safe operation of the drying system. At the same time, the fluidized equipment can perform simple emergency treatment for emergency situations such as sudden increase in oxygen content in the drying system and smoldering of sludge particles.
[0004] In the existing sludge drying system, due to the limited gas in the nitrogen cylinder, it can only perform emergency treatment functions. In addition, the nitrogen cylinder is severely corroded in the air environment of the sewage treatment plant. The annual calibration and filling of the pressure vessel takes about 3-4 months, and the transportation takes a total of 1-2 months. The cost incurred during this period is about 100,000 yuan, and the transportation and handling process must be supervised by a dedicated person, which wastes manpower and material resources. Summary of the invention
[0005] In view of the above-mentioned defects existing in the prior art, the purpose of the present invention is to provide a nitrogen replenishing device for a sludge drying system, which reduces the costs of filling, maintenance, and transportation of nitrogen cylinders, avoids equipment shutdown caused by failure of the sludge drying system's own air compressor, and increases the reliability of the overall system operation.
[0006] To achieve the above object, the present invention adopts the following technical solution:
[0007] A nitrogen replenishing device for a sludge drying system comprises: a first group of nitrogen cylinders, connected to a first fluidized bed and a fourth air compressor in a channel after the first group of nitrogen cylinders through pipelines, a second group of nitrogen cylinders, connected to a second fluidized bed and a fifth air compressor in a channel after the second group of nitrogen cylinders through pipelines, a third group of nitrogen cylinders, connected to a third fluidized bed and a sixth air compressor in a channel after the third group of nitrogen cylinders through pipelines, and further comprising: a nitrogen making device connected to the first group of nitrogen cylinders, the second group of nitrogen cylinders and the front of the third group of nitrogen cylinders through pipelines, an automatic control cabinet is arranged between the nitrogen making device and the first group of nitrogen cylinders, the second group of nitrogen cylinders and the third group of nitrogen cylinders, and the nitrogen making device is connected to the first group of nitrogen cylinders, the second group of nitrogen cylinders and the third group of nitrogen cylinders through pipelines. A first electric control valve and a second electric control valve are provided between the nitrogen generating equipment and the first fluidized bed, a fourth electric control valve and a fifth electric control valve are provided between the nitrogen generating equipment and the second fluidized bed, a seventh electric control valve and an eighth electric control valve are provided between the nitrogen generating equipment and the third fluidized bed, the first group of nitrogen cylinders are connected between the first electric control valve and the second electric control valve through the third electric control valve, the second group of nitrogen cylinders are connected between the fourth electric control valve and the fifth electric control valve through the sixth electric control valve, and the third group of nitrogen cylinders are connected between the seventh electric control valve and the eighth electric control valve through the ninth electric control valve;
[0008] The nitrogen generating equipment comprises: a first nitrogen generating equipment group and a second nitrogen generating equipment group, wherein the first nitrogen generating equipment group and the second nitrogen generating equipment group work in coordination in a linkage manner;
[0009] The first nitrogen making equipment group includes: a first air compressor, a first dryer and a first nitrogen making machine connected in sequence through pipelines;
[0010] The second nitrogen generator set includes: a second air compressor, a second dryer and a second nitrogen generator connected in sequence through pipelines;
[0011] It also includes a sensor for sensing the inert gas content in the sludge drying system, and the sensor is connected to the automatic control cabinet signal.
[0012] The automatic control cabinet is provided with an electric control main valve and a PLC.
[0013] The first air compressor and the second air compressor are both connected with a bypass pipe.
[0014] The first nitrogen generator and the second nitrogen generator are both connected with a bypass pipeline.
[0015] In the above technical scheme, the nitrogen supplement device for the sludge drying system provided by the present invention greatly increases the stability of the operation of the sludge drying system, solves the defect that the line needs to be stopped for inspection once the oxygen content inside the sludge drying system is too high, and makes it possible to detect problems with the system equipment without stopping the system and affecting production, thereby greatly improving the safety of the sludge drying system. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the pipeline connection of the nitrogen replenishing device of the present invention. DETAILED DESCRIPTION
[0017] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0018] Please combine Figure 1 As shown, a nitrogen replenishing device for a sludge drying system provided by the present invention comprises: a first group of nitrogen cylinders 1, which are sequentially connected to a first fluidized bed 2 and a fourth air compressor 3 behind the first group of nitrogen cylinders 1 through pipelines, a second group of nitrogen cylinders 4, which are sequentially connected to a second fluidized bed 5 and a fifth air compressor 6 behind the second group of nitrogen cylinders 4 through pipelines, and a third group of nitrogen cylinders 7, which are sequentially connected to a third fluidized bed 8 and a sixth air compressor 9 behind the third group of nitrogen cylinders 7 through pipelines. According to the operation of the system, the valves on the first group of nitrogen cylinders 1, the second group of nitrogen cylinders 4 and the third group of nitrogen cylinders 7 are manually opened, and nitrogen is replenished with the fourth air compressor 3, the fifth air compressor 6 and the sixth air compressor 9. The above is part of the prior art and will not be repeated here. Different from the prior art, the nitrogen replenishing device of the present invention further comprises: a nitrogen generating device connected to the front of the first group of nitrogen cylinders 1, the second group of nitrogen cylinders 4 and the third group of nitrogen cylinders 7 through a pipeline, an automatic control cabinet 10 is arranged between the nitrogen generating device and the first group of nitrogen cylinders 1, the second group of nitrogen cylinders 4 and the third group of nitrogen cylinders 7, a first electric control valve 11 and a second electric control valve 12 are arranged between the nitrogen generating device and the first fluidized bed 2, a fourth electric control valve 13 and a fifth electric control valve 14 are arranged between the nitrogen generating device and the second fluidized bed 5, and a fifth electric control valve 15 is arranged between the nitrogen generating device and the second fluidized bed 5. Valve 14, a seventh electric control valve 15 and an eighth electric control valve 16 are provided between the nitrogen making equipment and the third fluidized bed 8, the first group of nitrogen cylinders 1 are connected between the first electric control valve 11 and the second electric control valve 12 through a third electric control valve 17, the second group of nitrogen cylinders 4 are connected between the fourth electric control valve 13 and the fifth electric control valve 14 through a sixth electric control valve 18, and the third group of nitrogen cylinders 7 are connected between the seventh electric control valve 15 and the eighth electric control valve 16 through a ninth electric control valve 19.
[0019] Preferably, the nitrogen making equipment comprises: a first nitrogen making equipment group and a second nitrogen making equipment group, the first nitrogen making equipment group and the second nitrogen making equipment group work together in a linkage manner, and in daily production, the first nitrogen making equipment group and the second nitrogen making equipment group work in a one-in-use and one-in-standby manner.
[0020] Preferably, the first nitrogen making equipment group includes: a first air compressor 20, a first dryer 21 and a first nitrogen making machine 22 which are sequentially connected via pipelines.
[0021] Preferably, the second nitrogen making equipment group includes: a second air compressor 23, a second dryer 24 and a second nitrogen making machine 25 which are sequentially connected through pipelines.
[0022] Preferably, it also includes a sensor for sensing the inert gas content in the fluidized equipment of the sludge drying system, and the sensor is connected to the automatic control cabinet 10 by signal.
[0023] Preferably, the automatic control cabinet 10 is provided with an electric control main valve 26 and a PLC.
[0024] Preferably, the first air compressor 20 and the second air compressor 23 are both connected with bypass pipes 27 and 28, which can pass air into the first, second and third fluidized beds 2, 5 and 8, so that the work of cleaning the fluidized beds is improved.
[0025] Preferably, the first nitrogen generator 22 and the second nitrogen generator 25 are both connected with bypass pipes 29 and 30, so that the system can keep running while the pipes are regularly cleaned, reducing the impact of pipe blockage on system operation.
[0026] The nitrogen replenishing device of the present invention can replenish nitrogen at any time according to the gas content of the system under strict working conditions, effectively ensuring the stable operation of the fluidized equipment. At the same time, the excess nitrogen can be distributed to the feed distributor, mixer, fan and other equipment for gas sealing, greatly improving the safety and stability of the system operation. The working principle is as follows:
[0027] When the inert gas content in the fluidized equipment decreases, the sensor transmits a signal to the automatic control cabinet 10. At this time, the PLC in the automatic control cabinet 10 controls the third electric control valve 17, the sixth control valve 18, and the ninth control valve 19 to open automatically to supplement a small amount of nitrogen to the system. If the nitrogen in the first, second, and third groups of nitrogen cylinders 1, 4, and 7 is replenished, but the oxygen content of the system still exceeds the standard and does not meet the requirements, at this time, the PLC controls the automatic switching of the nitrogen making equipment to replenish nitrogen in real time, and all the electric control valves on the pipeline will be automatically opened to cooperate with the delivery of nitrogen. While replenishing the system nitrogen, the nitrogen inside the first, second, and third groups of nitrogen cylinders 1, 4, and 7 is replenished. In this way, the first, second, and third groups of nitrogen cylinders 1, 4, and 7 do not need to be replaced many times and can be reused, which can save energy and maintain the stable operation of the fluidized equipment.
[0028] In summary, the nitrogen replenishing device of the present invention replaces the use of nitrogen cylinders in the drying area by adding nitrogen making equipment, and at the same time, an air compressor connecting pipe is added, so that the air compressor in the nitrogen making equipment not only serves the nitrogen making equipment, but also provides compressed air for each pneumatic valve in the drying system. At the same time, automatic control methods such as sensors and PLCs are adopted to automatically start the nitrogen making machine when the oxygen content in the working condition reaches a certain proportion, replenish nitrogen, and optimize the system. After completion, the costs of filling, maintenance, and transportation of nitrogen cylinders are reduced. The linkage use of air compressors avoids equipment shutdown caused by failure of the air compressor of the sludge drying system itself, and increases the reliability of the overall system operation.
[0029] Those skilled in the art should recognize that the above embodiments are only used to illustrate the present invention, and are not intended to limit the present invention. As long as they are within the spirit of the present invention, any changes or modifications to the above embodiments will fall within the scope of the claims of the present invention.
Claims
1. A nitrogen supplement device for a sludge drying system, comprising: The first group of nitrogen cylinders is connected to the first fluidized bed and the fourth air compressor of the first group of nitrogen cylinders through pipelines in sequence, the second group of nitrogen cylinders is connected to the second fluidized bed and the fifth air compressor of the second group of nitrogen cylinders through pipelines in sequence, and the third group of nitrogen cylinders is connected to the third fluidized bed and the sixth air compressor of the third group of nitrogen cylinders through pipelines in sequence, characterized in that it also includes: nitrogen making equipment connected to the first group of nitrogen cylinders, the second group of nitrogen cylinders and the front of the third group of nitrogen cylinders through pipelines, an automatic control cabinet is arranged between the nitrogen making equipment and the first group of nitrogen cylinders, the second group of nitrogen cylinders and the third group of nitrogen cylinders, and the nitrogen making equipment is connected to the first fluidized bed and the sixth air compressor of the third group of nitrogen cylinders through pipelines. A first electric control valve and a second electric control valve are provided between the beds, a fourth electric control valve and a fifth electric control valve are provided between the nitrogen generator and the second fluidized bed, a seventh electric control valve and an eighth electric control valve are provided between the nitrogen generator and the third fluidized bed, the first group of nitrogen cylinders are connected between the first and second electric control valves through the third electric control valve, the second group of nitrogen cylinders are connected between the fourth and fifth electric control valves through the sixth electric control valve, and the third group of nitrogen cylinders are connected between the seventh and eighth electric control valves through the ninth electric control valve; The nitrogen generating equipment comprises: a first nitrogen generating equipment group and a second nitrogen generating equipment group, the first nitrogen generating equipment group and the second nitrogen generating equipment group work in a linkage manner, and in the daily production process, the first nitrogen generating equipment group and the second nitrogen generating equipment group work in a one-in-one-standby manner; The first nitrogen making equipment group includes: a first air compressor, a first dryer and a first nitrogen making machine connected in sequence through pipelines; The second nitrogen generator set includes: a second air compressor, a second dryer and a second nitrogen generator connected in sequence through pipelines; It also includes a sensor for sensing the inert gas content in the sludge drying system, and the sensor is connected to the automatic control cabinet signal. The automatic control cabinet is equipped with an electric control main valve and PLC. When the inert gas content in the fluidized equipment decreases, the sensor transmits a signal to the automatic control cabinet. At this time, the PLC in the automatic control cabinet controls the third electric control valve, the sixth control valve, and the ninth control valve to open automatically to supplement a small amount of nitrogen to the system. If the nitrogen in the first nitrogen bottle, the second nitrogen bottle, and the third group of nitrogen bottles is replenished, but the oxygen volume in the system still exceeds the standard and does not meet the requirements, the PLC control automatically switches the nitrogen making equipment to replenish nitrogen in real time, and all the electric control valves on the pipeline will be automatically opened to cooperate with the delivery of nitrogen. While replenishing the system nitrogen, the nitrogen inside the first nitrogen bottle, the second nitrogen bottle, and the third group of nitrogen bottles is replenished. In this way, the first nitrogen bottle, the second nitrogen bottle, and the third group of nitrogen bottles do not need to be replaced many times and can be reused, which saves energy and maintains the stable operation of the fluidized equipment. The first nitrogen generator and the second nitrogen generator are both connected with a bypass pipeline. The system can be kept running while the pipeline is regularly cleaned, thereby reducing the impact of pipeline blockage on system operation.
2. A nitrogen supplement device for a sludge drying system according to claim 1, characterized in that: The first air compressor and the second air compressor are both connected with a bypass pipe.