Duty timing detector, device including duty timing detector and operation method

By designing a duty time detector, using a sawtooth voltage generator and voltage divider to detect the duty time of the switching signal, the problem of lack of switching signal timing detection in the prior art is solved, and accurate monitoring and detection of the switching signal is achieved.

CN111103463BActive Publication Date: 2024-11-05SAMSUNG ELECTRONICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911021532.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2018-10-29
Filing Date
2019-10-25
Publication Date
2024-11-05
Estimated Expiration
2039-10-25

AI Technical Summary

Technical Problem

The prior art lacks a timing detection device or method for detecting a switching signal, and it is impossible to monitor or verify whether the current timing of the switching signal meets the target timing.

Method used

A duty-time detector is designed, including a sawtooth voltage generator, a sample block, a hold block, a voltage divider and a comparator, by generating a sawtooth voltage synchronized with the switching signal, splitting the voltage, and comparing it with the split voltage, to Detects the target timing of each of the switching signals.

Benefits of technology

Accurate detection of the duty timing of the switching signal is realized, and it can verify whether the switching signal is generated normally, and is applied to the detection and monitoring of duty timing in various fields.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111103463B_ABST
    Figure CN111103463B_ABST
Patent Text Reader

Abstract

A duty timing detector includes a sawtooth voltage generator that outputs a sawtooth voltage synchronized with a switching signal that repeatedly switches between a high level and a low level. A sampling block obtains a level of the sawtooth voltage synchronized with the switching signal and outputs the obtained level as a first sample voltage. A holding block stores the first sample voltage synchronized with the switching signal and outputs the stored first sample voltage as a second sample voltage. A voltage divider divides the second sample voltage to output a divided voltage. A comparator compares the sawtooth voltage with the divided voltage to detect a target timing in each duty of the switching signal.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Embodiments of the present disclosure described herein relate to electronic devices, and more particularly, to a duty timing detector that detects duty timing of a switching signal, a device including the duty timing detector, and an operating method of a device that receives a switching signal. Background Art

[0002] A switching signal is a signal that repeatedly switches from high to low and from low to high. Switching signals are used differently in electronic devices. For example, a switching signal can be used to indicate accurate timing as a clock signal or a strobe signal. For another example, a switching signal can be used to control the operation of a device that receives the switching signal, such as a pulse width modulation (PWM) control.

[0003] One of the devices that uses the switching signal as a control signal may be a DC (Direct Current)-DC converter. A DC-DC converter is configured to step up or step down an input voltage. A DC-DC converter may adjust the amount of output current by using the switching signal, depending on the amount of current consumed by the load.

[0004] When a switching signal is used as an operation control signal, detecting whether the current timing of the switching signal is the target timing helps monitor the state of the device using or receiving the switching signal. However, so far, no device or method for detecting the timing of the switching signal has been developed. Summary of the invention

[0005] Embodiments of the present disclosure provide a duty timing detector that detects a duty timing of a switching signal, a device including the duty timing detector, and an operating method of the device that receives the switching signal.

[0006] According to an exemplary embodiment, the duty timing detector includes a sawtooth voltage generator that outputs a sawtooth voltage synchronized with a switching signal that repeatedly switches between a high level and a low level. A sampling block obtains a level of the sawtooth voltage synchronized with the switching signal and outputs the obtained level as a first sample voltage. A holding block stores the first sample voltage synchronized with the switching signal and outputs the stored first sample voltage as a second sample voltage. A voltage divider divides the second sample voltage to output a divided voltage. A comparator compares the sawtooth voltage with the divided voltage to detect a target timing in each duty cycle of the switching signal.

[0007] According to an exemplary embodiment, a device includes a voltage converter that converts a first voltage into a second voltage by using a switching signal that repeatedly converts between a high level and a low level, and outputs the second voltage to a load. A current detector detects a load current transmitted from the voltage converter to the load. The current detector may include a duty timing detector that activates a detection voltage at a timing when half of each duty cycle of the switching signal passes. A voltage drop detector detects an internal voltage drop of the voltage converter in response to the detection voltage. The logic obtains the load current by performing a calculation on the internal voltage drop detected by the voltage drop detector.

[0008] According to an exemplary embodiment, an operating method of an apparatus receiving a switching signal that repeatedly switches between a high level and a low level includes: (1) generating a sawtooth voltage synchronized with the switching signal, (2) obtaining a level of the sawtooth voltage synchronized with the switching signal, (3) dividing the level of the sawtooth voltage to obtain a divided voltage, and (4) comparing the sawtooth voltage with the divided voltage to detect a target timing in each duty cycle of the switching signal.

[0009] According to an exemplary embodiment, a waveform timing device includes a timing circuit that generates a first voltage having a value proportional to a first on-time of a waveform applied to the timing circuit during a first cycle of the waveform including a first on-time and a first off-time. A comparator compares the first voltage with a reference signal generated during a second cycle of the waveform to generate a timing signal indicating whether a predetermined portion of a second on-time during the second cycle of the waveform has expired. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] The above and other objects and features of the present disclosure will become apparent by describing in detail exemplary embodiments of the present invention with reference to the attached drawings.

[0011] Figure 1 is a block diagram illustrating a duty timing detector according to an embodiment of the present disclosure.

[0012] Figure 2 is a flow chart illustrating a method of operation of a duty timing detector according to an embodiment of the present disclosure.

[0013] Figure 3 A controller according to an embodiment of the present disclosure is illustrated.

[0014] Figure 4 An example of timing when the controller according to the embodiment of the present disclosure generates the first signal, the second signal, and the third signal from the switching signal is illustrated.

[0015] Figure 5 The diagram shows Figure 4 Before the first time Figure 3 The initial state of the controller.

[0016] Figure 6 Pictured Figure 3 The logic level of the controller, which Figure 4 Change at the first time.

[0017] Figure 7 Pictured Figure 3 The logic level of the controller, which Figure 4 The second time changes.

[0018] Figure 8 Pictured Figure 3 The logic level of the controller, which Figure 4 The third time changes.

[0019] Fig. 9 Pictured Figure 3 The logic level of the controller, which Figure 4 The fourth time changes.

[0020] Fig.10 Pictured Figure 3 The logic level of the controller, which Figure 4 The fifth time changes.

[0021] Fig.11 A sawtooth voltage generator, a sampling block, a holding block, and a voltage divider according to an embodiment of the present disclosure are illustrated in detail.

[0022] Fig.12 An example of timing when the duty timing detector operates depending on the first to third signals is illustrated.

[0023] Fig.13 Pictured Figure 1 An example of a duty timing detector generating a detection voltage depending on the second sample voltage.

[0024] Fig.14 A device according to a first embodiment of the present disclosure is illustrated.

[0025] Fig.15 The diagram shows the fluctuation of the output current of the voltage converter.

[0026] Fig.16 Examples of pulse width modulation signal, first voltage drop, detection voltage, and inductor current variation are illustrated.

[0027] Fig.17 A device according to a second embodiment of the present disclosure is illustrated.

[0028] Fig.18 Examples of pulse width modulation signal, second voltage drop, detection voltage, and inductor current variation are illustrated.

[0029] Fig.19 A device according to a third embodiment of the present disclosure is illustrated.

[0030] Fig. 20 Examples of pulse width modulation signals, first voltage drops, second voltage drops, detection voltages, and inductor current variations are illustrated.

[0031] Fig.21 is a flowchart illustrating an operating method of a device according to an embodiment of the present disclosure.

[0032] Fig. 22 is a flowchart illustrating an operating method of a device according to another embodiment of the present disclosure.

[0033] Fig.23 A device according to a fourth embodiment of the present disclosure is illustrated. DETAILED DESCRIPTION

[0034] Below, the embodiments of the present disclosure may be described in detail and clearly to the extent that a person of ordinary skill in the art can easily implement the present disclosure.

[0035] Figure 1 is a block diagram illustrating a duty timing detector 100 according to an embodiment of the present disclosure. The duty timing detector 100 can detect a specific timing (e.g., a target timing) on ​​duty from a switching signal that repeats a transition from high to low and a transition from low to high (or repeatedly transitions between a high level and a low level). The duty can indicate a duration for which the switching signal has a high level (or a low level). The duty ratio can indicate a ratio of a high level (or a low level) duration of the switching signal to a period.

[0036] refer to Figure 1 The duty timing detector 100 includes a sawtooth voltage generator 110 , a sampling block 120 , a holding block 130 , a voltage divider 140 , a comparator 150 , and a controller 160 .

[0037] The sawtooth voltage generator 110 is configured to generate a sawtooth voltage Vsaw in response to a first signal S1 from the controller 160. The sawtooth voltage Vsaw may have an idle interval maintaining a ground level and a sawtooth interval in which a level continuously increases from the ground level. The sawtooth voltage Vsaw is provided to the sampling block 120 and the comparator 150.

[0038] The sampling block 120 may receive the sawtooth voltage Vsaw from the sawtooth voltage generator 110. The sampling block 120 may obtain (eg, sample or store) a level of the sawtooth voltage Vsaw in response to a second signal S2 from the controller 160. The obtained level may be output as a first sample voltage Vsp1.

[0039] The holding block 130 may receive the first sample voltage Vsp1 from the sampling block 120. The holding block 130 may store (eg, hold) a level of the first sample voltage Vsp1 in response to a third signal S3 from the controller 160. The stored level may be output as the second sample voltage Vsp2.

[0040] The voltage divider 140 may receive the second sample voltage Vsp2 from the holding block 130. The voltage divider 140 may divide the second sample voltage Vsp2 depending on a specific division ratio. As a result of the division, the voltage divider 140 may output a division voltage Vdiv.

[0041] The comparator 150 may receive the division voltage Vdiv through a negative input. The comparator 150 may receive the sawtooth voltage Vsaw through a positive input. When the sawtooth voltage Vsaw is lower than the division voltage Vdiv, the comparator 150 may output a low-level detection voltage Vdet. When the sawtooth voltage Vsaw is not lower than the division voltage Vdiv, the comparator 150 may output a high-level detection voltage Vdet.

[0042] The detection voltage Vdet may indicate whether the timing on the duty of the switching signal Stgl reaches the target timing. The target timing may be determined depending on the division ratio of the voltage divider 140. Moreover, the detection voltage Vdet may have a duty determined by dividing the duty of the switching signal Stgl by the division ratio of the voltage divider 140.

[0043] The controller 160 may receive the switching signal Stgl. The controller 160 may generate a first signal S1, a second signal S2, and a third signal S3 synchronized with the switching signal Stgl. That is, the sawtooth voltage generator 110 may generate a sawtooth voltage Vsaw synchronized with the switching signal Stgl. The sawtooth voltage Vsaw may switch between an idle interval and a sawtooth interval in synchronization with the switching timing of the switching signal Stgl.

[0044] Also, the sampling block 120 and the holding block 130 may respectively store the first sample voltage Vsp1 and the second sample voltage Vsp2 synchronized with the switching signal Stgl. The first and second sample voltages Vsp1 and Vsp2 may be stored in synchronization with the switching timing of the switching signal Stgl.

[0045] The duty timing detector 100 according to an embodiment of the present disclosure can detect a target timing on the duty of the switching signal Stgl. Thus, a device that can verify whether the switching signal Stgl is normally generated is provided. Moreover, the duty timing detector 100 can generate a detection voltage Vdet having a duty obtained by dividing the duty of the switching signal Stgl. The duty division function of the duty timing detector 100 can be usefully adopted in various fields.

[0046] Figure 2 is a flow chart illustrating an operation method of the duty timing detector 100 according to an embodiment of the present disclosure. Figure 1 and 2 In operation S110, the sawtooth voltage generator 110 may generate a sawtooth voltage Vsaw synchronized with the switching signal Stgl. In operation S120, the sampling block 120 and the holding block 130 may obtain a level of the sawtooth voltage Vsaw to output a sample voltage (eg, Vsp2) in synchronization with the switching signal Stgl.

[0047] In operation S130, the voltage divider 140 may divide the sample voltage (e.g., Vsp2) to generate a division voltage Vdiv. In operation S140, the comparator 150 may compare the sawtooth voltage Vsaw with the division voltage Vdiv to detect the target timing on the duty of the switching signal Stgl. The position or time point of the target timing may be adjusted depending on the division ratio.

[0048] Figure 3 The controller 200 according to an embodiment of the present disclosure is illustrated. In an embodiment, the controller 200 may include a Figure 1 The controller 160 described above. Figure 1 and 3 , the controller 200 includes first to third inverters 211 , 212 , and 213 , first and second NOR blocks 221 and 222 , first to fourth delays 231 , 232 , 233 , and 234 , and an AND block 241 .

[0049] The first inverter 211 may receive the switching signal Stgl and may invert and output the switching signal Stgl. The output of the first inverter 211 may be input to an input terminal of the first NOR block 221. The first NOR block 221 may perform a NOR operation on the output of the first inverter 211 and the output of the second delay 232. The second NOR block 222 may perform a NOR operation on the switching signal Stgl and the output of the first delay 231.

[0050] The first delayer 231 may delay the output of the first NOR block 221, and may output the delayed result to the second NOR block 222. The second delayer 232 may delay the output of the second NOR block 222, and may output the delayed output to the first NOR block 221. The output of the first NOR block 221 may be used as the second signal S2. The output of the second NOR block 222 may be used as the third signal S3.

[0051] The second inverter 212 may invert and output the output (e.g., the second signal S2) of the first NOR block 221. The third delay 233 may delay the output of the second inverter 212, and may output the delayed output to the AND block 241. The fourth delay 234 may delay and output the output (e.g., the second signal S2) of the first NOR block 221. The third inverter 213 may invert the output of the fourth delay 234, and may output the inverted result to the AND block 241.

[0052] The AND block 241 may perform an AND operation on the output of the third delayer 233 and the output of the third inverter 213. The output of the AND block 241 may be used as the first signal S1.

[0053] Figure 4 2 illustrates an example of timing when the controller 200 according to an embodiment of the present disclosure generates the first signal S1, the second signal S2, and the third signal S3 from the switching signal Stgl. Figure 3 and 4 , at the first time T1 , the switching signal Stg1 may be converted from a low level to a high level.

[0054] Similarly, at the first time T1, the third signal S3 can be converted from a high level to a low level in synchronization with the conversion of the switching signal Stgl. After the switching signal Stgl and the third signal S3 are converted, at the second time T2, the second signal S2 can be converted from a low level to a high level in synchronization with the conversion of the switching signal Stgl (for example, the conversion at the first time T1). After the second signal S2 is converted, at the third time T3, the first signal S1 can be converted from a high level to a low level in synchronization with the conversion of the switching signal Stgl (for example, the conversion at the first time T1).

[0055] At the fourth time T4, the switching signal Stgl may be converted from a high level to a low level. Similarly, at the fourth time T4, the second signal S2 may be converted from a high level to a low level in synchronization with the conversion of the switching signal Stgl. After the switching signal Stgl and the second signal S2 are converted, at the fifth time T5, the third signal S3 may be converted from a low level to a high level in synchronization with the conversion of the switching signal Stgl (e.g., the conversion at the fourth time T4). After the third signal S3 is converted, at the sixth time T6, the first signal S1 may be converted from a low level to a high level in synchronization with the conversion of the switching signal Stgl (e.g., the conversion at the fourth time T4).

[0056] Thereafter, when the switching signal Stgl is converted from a low level to a high level, the first to third signals S1 to S3 may be sequentially converted as described with reference to the first to third times T1 to T3. When the switching signal Stgl is converted from a high level to a low level, the first to third signals S1 to S3 may be sequentially converted as described with reference to the fourth to sixth times T4 to T6.

[0057] The interval between the timings of the conversion of the first to third signals S1 to S3 may be a dead time. The dead time may make it possible to prevent abnormal operation or current leakage that occurs when transistors in the sawtooth voltage generator 110, the sampling block 120, and the holding block 130 to which the first signal S1, the second signal S2, and the third signal S3 are respectively applied are turned on at the same time.

[0058] For the sake of clarity, in Figure 4 The dead time is exaggerated in FIG. 1. Actually, the dead time may correspond to a small interval (or a short time interval) to the extent that it is negligible compared with the period or duty of the switching signal Stgl.

[0059] Figure 5 The diagram shows Figure 4 The first time before T1 Figure 3 The initial state of the controller 200. Figure 4 and 5 , the switching signal Stg1 may be at a low level (0), and the first inverter 211 may output a high level (1). The third signal S3 may be at a high level (1), and the output of the delayer 232 may be at the same high level as the third signal S3. Since the high level (1, 1) is input to the first NOR block 221, the output of the first NOR block 221 (ie, the second signal S2) may be at a low level (0).

[0060] The first delayer 231 may output the same low level (0) as the second signal S2. Since the low level (0, 0) is input to the second NOR block 222, the output of the second NOR block 222 (ie, the third signal S3) may be at a high level (1).

[0061] The output of the second inverter 212 may be at a high level, and the output of the third delayer 233 may be at a high level (1). The output of the fourth delayer 234 may be at a low level, and the output of the third inverter 213 may be at a high level (1). Since the high level (1, 1) is input to the AND block 241, the output of the AND block 241 (i.e., the first signal S1) may be at a high level (1).

[0062] As described above, the controller 200 can be stabilized to a state where the first signal S1 is at a high level (1), the second signal S2 is at a low level (0), and the third signal S3 is at a high level (1).

[0063] Figure 6 Pictured Figure 3 The logic level of the controller 200, which is Figure 4 The first time T1 changes. Figure 4 and 6 , the switching signal Stg1 may be switched from a low level (0) to a high level (1). When the switching signal Stgl is switched, the output of the first inverter 211 may be switched from a high level (1) to a low level (0). Even if the output of the first inverter 211 is switched to a low level (0), the output of the first NOR block 221 may be maintained at a low level (0).

[0064] Likewise, since a low level (0) and a high level (1) are input to the second NOR block 222 when the switching signal Stgl transitions, the output of the second NOR block 222 (ie, the third signal S3) may transition from a high level (1) to a low level (0).

[0065] The transition of the switching signal Stgl may not be applied to the first signal S1 and the second signal S2 due to the first to fourth delayers 231 to 234. That is, the dead time is defined by the first to fourth delayers 231 to 234.

[0066] Figure 7 Pictured Figure 3 The logic level of the controller 200, which is Figure 4 The second time T2 changes. Figure 4 and 7 , due to the transition of the output of the second NOR block 222 (ie, the transition of the third signal S3), the output of the second delayer 232 may transition from a high level (1) to a low level (0).

[0067] Since the low level (0, 0) is input to the first NOR block 221, the output of the first NOR block 221 (i.e., the second signal S2) may be converted from the low level (0) to the high level (1). Due to the third and fourth delayers 233 and 234, the conversion of the switching signal Stgl may not be applied to the first signal S1. That is, the third and fourth delayers 233 and 234 define an additional dead time.

[0068] Figure 8 Pictured Figure 3 The logic level of the controller 200, which is Figure 4 The third time T3 changes. Figure 4 and 8, since the conversion of the output of the first NOR block 221 (i.e., the conversion of the second signal S2) is applied, the output of the first delayer 231 can be converted from a low level (0) to a high level (1). Since the high level (1, 1) is input to the second NOR block 222, the output of the second NOR block 222 (i.e., the third signal S3) can be maintained at a low level (0).

[0069] Due to the conversion of the output of the first NOR block 221 (i.e., the conversion of the second signal S2), the output of the third delayer 233 can be converted from a high level (1) to a low level (0). Moreover, the output of the third inverter 213 can be converted from a high level (1) to a low level (0). Since the low level (0,0) is input to the AND block 241, the output of the AND block 241 (i.e., the first signal S1) can be converted from a high level (1) to a low level (0).

[0070] Fig. 9 Pictured Figure 3 The logic level of the controller 200, which is Figure 4 The fourth time T4 changes. Figure 4 and 9 , the switching signal Stg1 may be switched from a high level (1) to a low level (0). When the switching signal Stgl is switched, the output of the first inverter 211 may be switched from a low level (0) to a high level (1).

[0071] Since the high level (1) and the low level (0) are input to the first NOR block 221, the output of the first NOR block 221 (i.e., the second signal S2) can be converted from the high level (1) to the low level (0). Since the high level (1) and the low level (0) are input to the second NOR block 222, the output of the second NOR block 222 (i.e., the third signal S3) can be maintained at the low level (0).

[0072] The transition of the switching signal Stgl may not be applied to the first signal S1 and the second signal S2 due to the first to fourth delayers 231 to 234. That is, the dead time is defined by the first to fourth delayers 231 to 234.

[0073] Fig.10 Pictured Figure 3 The logic level of the controller 200, which is Figure 4 The fifth time T5 changes. Figure 4 and 10 , due to the application of the transition of the output of the first NOR block 221 (ie, the transition of the second signal S2 ), the output of the first delayer 231 may transition from a high level (1) to a low level (0).

[0074] Since the low level (0,0) is input to the second NOR block 222, the second NOR block 222

[0075] The output of the switching signal Stgl (i.e., the third signal S3) may be switched from a low level (0) to a high level (1). Due to the third and fourth delayers 233 and 234, the switching of the switching signal Stgl may not be applied to the first signal S1. That is, the third and fourth delayers 233 and 234 define an additional dead time.

[0076] Thereafter, when the switching signal Stgl is applied, the output of the third delayer 233 may be converted from a low level (0) to a high level (1). Also, the output of the third inverter 213 may be converted from a low level (0) to a high level (1). Since the high level (1, 1) is input to the AND block 241, the output of the AND block 241 (i.e., the first signal S1) may be converted from a low level (0) to a high level (1).

[0077] As described above, due to the first to fourth delayers 231 to 234, the first to third signals S1 to S3 may not be switched at the same time. The first to third signals S1 to S3 may be switched sequentially with the dead time. Figure 1 Abnormal operation or current leakage occurs at the sawtooth voltage generator 110, the sampling block 120 and the holding block 130.

[0078] Fig.11 The sawtooth voltage generator 110, the sampling block 120, the holding block 130, and the voltage divider 140 according to an embodiment of the present disclosure are illustrated in detail. Figure 1 and 11 , the sawtooth voltage generator 110 includes a current source 111 , a first capacitor 112 and a first transistor 113 .

[0079] The current source 111 is connected between a power supply node to which the power supply voltage VDD is supplied and an output node from which the sawtooth voltage Vsaw is output. The current source 111 may output a constant current to the output node. The first capacitor 112 is connected between the output node and a ground node to which the ground voltage VSS is supplied. The first capacitor 112 may be charged by the current output from the current source 111, and a sawtooth interval may be formed in which the level of the sawtooth voltage Vsaw increases continuously.

[0080] The first transistor 113 is connected between the output node and the ground node. The first transistor 113 operates in response to the first signal S1. The first transistor 113 can be implemented with an NMOS transistor, and when the first signal S1 is at a low level, the NMOS transistor is turned off. By discharging the voltage charged in the first capacitor 112, the first transistor 113 can form an idle interval in which the level of the sawtooth voltage Vsaw is the ground level.

[0081] The sampling block 120 includes a second capacitor 121 and a second transistor 122. The second capacitor 121 is connected between an output node from which the first sample voltage Vsp1 is output and a ground node supplied with a ground voltage VSS. The second transistor 122 is connected between an output node from which the first sample voltage Vsp1 is output and an input node to which the sawtooth voltage Vsaw is input.

[0082] The second transistor 122 operates in response to the second signal S2. The second transistor 122 can be implemented with an NMOS transistor, and when the second signal S2 is at a high level, the NMOS transistor is turned on. When the second transistor 122 is turned on, the level of the sawtooth voltage Vsaw can be charged to the second capacitor 121. That is, the level of the sawtooth voltage Vsaw can be obtained (or stored or sampled). The voltage charged to the second capacitor 121 can be output as the first sample voltage Vsp1.

[0083] The holding block 130 includes a third capacitor 131 and a third transistor 132. The third capacitor 131 is connected between an output node from which the second sample voltage Vsp2 is output and a ground node supplied with a ground voltage VSS. The third transistor 132 is connected between an output node from which the second sample voltage Vsp2 is output and an input node to which the first sample voltage Vsp1 is input.

[0084] The third transistor 132 operates in response to the third signal S3. The third transistor 132 can be implemented with an NMOS transistor, which is turned on when the third signal S3 is at a high level. When the third transistor 132 is turned on, the first sample voltage Vsp1 charged to the second capacitor 121 can be charged to the third capacitor 131. That is, the first sample voltage Vsp1 can be retained (or maintained). The voltage charged to the third capacitor 131 can be output as the second sample voltage Vsp2.

[0085] The voltage divider 140 includes an amplifier 141, a first resistor 142, and a second resistor 143. The first resistor 142 and the second resistor 143 are connected in series between the output terminal of the amplifier 141 and a ground node to which the ground voltage VSS is supplied. The second sample voltage Vsp2 is input to the positive input terminal of the amplifier 141. The negative input terminal of the amplifier 141 is connected to the output terminal of the amplifier 141. The voltage of the node between the first resistor 142 and the second resistor 143 may be the division voltage Vdiv.

[0086] As described above, the level of the sawtooth voltage Vsaw at a specific timing can be provided to the voltage divider 140 as the first sample voltage Vsp1 and the second sample voltage Vsp2. The amplifier 141 of the voltage divider 140 is implemented with a voltage follower. The amplifier 141 can output the second sample voltage Vsp2 to the first resistor 142 and the second resistor 143. That is, the level of the sawtooth voltage Vsaw at a specific timing is divided by the first resistor 142 and the second resistor 143 so as to be output as the divided voltage Vdiv.

[0087] As reference Figure 1 and 11 As described above, the duty timing detector 100 according to the embodiment of the present disclosure has a feedforward structure. The amplifier 141 of the voltage divider 140 is only a voltage follower and can be a part of the feedforward structure of the duty timing detector 100. Due to the feedforward structure, the duty timing detector 100 according to the embodiment of the present disclosure can have high stability without verification.

[0088] Fig.12 An example of timing when the duty timing detector 100 operates depending on the first to third signals S1 to S3 is illustrated. Figure 1 , 11 and 12, the timing of the switching signal Stg1 and the first to third signals S1 to S3 and the reference Figure 4 Therefore, additional description will be omitted to avoid redundancy.

[0089] In the embodiment, a description will be given under the following assumption: starting from the first time T1, the controller 200 starts controlling the first to third signals S1 to S3, and the sawtooth voltage generator 110 starts generating the sawtooth voltage Vsaw. Also, it is assumed that the voltages of the first, second, and third capacitors 112, 121, and 131 are ground voltages before the first time T1.

[0090] At the first time T1, the third signal S3 may be converted from a high level to a low level in synchronization with the switching signal Stgl. In response to the third signal S3, the third transistor 132 is turned off. The second capacitor 121 and the third capacitor 131 are electrically separated.

[0091] At the second time T2, the second signal S2 is converted from a low level to a high level in synchronization with the switching signal Stgl. In response to the second signal S2, the second transistor 122 is turned on. The first capacitor 112 and the second capacitor 121 are electrically connected.

[0092] At the third time T3, the first signal S1 may be converted from a high level to a low level in synchronization with the switching signal Stgl. In response to the first signal S1, the first transistor 113 is turned off. When the first transistor 113 is turned off, the current from the current source 111 may be charged to the first capacitor 112 and the second capacitor 121. Starting from the third time T3, the levels of the sawtooth voltage Vsaw and the first sample voltage Vsp1 may be continuously increased.

[0093] At the fourth time T4, the second signal S2 may be converted from a high level to a low level in synchronization with the switching signal Stgl. In response to the second signal S2, the second transistor 122 is turned off. When the second transistor 122 is turned off at the fourth time T4, the second capacitor 121 may obtain (or store or sample) the level of the sawtooth voltage Vsaw.

[0094] At the fifth time T5, the third signal S3 is converted from a low level to a high level in synchronization with the switching signal Stgl. In response to the third signal S3, the third transistor 132 is turned on. The second capacitor 121 and the third capacitor 131 are electrically connected, and therefore, the first sample voltage Vsp1 is provided as the second sample voltage Vsp2. That is, at the fifth time T5, the level of the sawtooth voltage Vsaw at the fourth time T4 is retained (or maintained) in the third capacitor 131 as the second sample voltage Vsp2.

[0095] At the sixth time T6, the first signal S1 is converted from a low level to a high level in synchronization with the switching signal Stgl. In response to the first signal S1, the first transistor 113 is turned on. The level of the sawtooth voltage Vsaw may be discharged to the ground level at the sixth time T6 and may enter an idle interval.

[0096] Due to the dead time, the sampling block 120 obtains the level of the sawtooth voltage Vsaw before the sawtooth voltage Vsaw reaches a final level. Thus, the level of the sawtooth voltage Vsaw can be sampled by the sampling block 120 without noise associated with the generation and blocking of the sawtooth voltage Vsaw.

[0097] Due to the dead time, after the sampling block 120 blocks the electrical connection with the sawtooth voltage Vsaw, the holding block 130 stores the first sample voltage Vsp1 as the second sample voltage Vsp2 . Thus, the operation of the holding block 130 may not affect the sampling operation of the sampling block 120 .

[0098] At the seventh time T7, the third signal S3 is converted from a high level to a low level in synchronization with the switching signal Stgl. In response to the third signal S3, the third transistor 132 is turned off. That is, at the seventh time T7 and regardless of the operation of the sampling block 120, the holding block 130 can maintain the level of the sawtooth voltage Vsaw at the fourth time T4 as the second sample voltage Vsp2.

[0099] At the eighth time T8, the second signal S2 is converted from a low level to a high level in synchronization with the switching signal Stgl. In response to the second signal S2, the second transistor 122 is turned on. Since the sawtooth voltage Vsaw is in an idle interval, the first sample voltage Vsp1 becomes a ground level.

[0100] At the ninth time T9, the first signal S1 may be converted from a high level to a low level in synchronization with the switching signal Stgl. In response to the first signal S1, the first transistor 113 is turned off. The sawtooth voltage Vsaw and the first sample voltage Vsp1 may be continuously increased starting from the ninth time T9.

[0101] In the following operation, the changes of the sawtooth voltage Vsaw, the first sample voltage Vsp1, and the second sample voltage Vsp2 described with reference to the first to ninth times T1 to T9 may be repeated except that the second sample voltage Vsp2 is not a ground level.

[0102] As reference Figure 4 As described, the dead time may correspond to a small interval (or short time interval) to the extent that it is negligible compared to the period or duty of the switching signal Stgl. Thus, it can be understood that the period or duty of each of the first to third signals S1 to S3 is substantially the same as the period or duty of the switching signal Stgl.

[0103] The sawtooth voltage Vsaw may be understood as increasing during the duty period of the switching signal Stg1. The first sample voltage Vsp1 may also be understood as increasing during the duty period of the switching signal Stg1. The second sample voltage Vsp2 may be understood as having a level indicating the length (or time) of the duty of the switching signal Stg1.

[0104] refer to Figure 1 and 11 A description is given because the comparator 150 compares the sawtooth voltage Vsaw with the division voltage Vdiv. However, in the case where the dead time is short enough to be ignored, the comparator 150 may be changed or modified to compare the division voltage Vdiv with the first sample voltage Vsp1 instead of the sawtooth voltage Vsaw.

[0105] In the case where pulse width modulation (PWM) is applied to the switching signal Stgl, the pulse width (ie, duty) of the switching signal Stgl may vary. As the duty varies, the interval at which the sawtooth voltage Vsaw and the first sample voltage Vsp1 increase may vary. The second sample voltage Vsp2 may have a level that tracks the varying duty.

[0106] Fig.13 The diagram shows Figure 1An example of a duty timing detector generating a detection voltage Vdet depending on the second sample voltage Vsp2. Figure 1 and 13 , in response to the switching signal Stg1, can be as referenced Fig.12 The second sample voltage Vsp2 is generated as described.

[0107] The level of the second sample voltage Vsp2 includes information about the duty. For example, the level of the second sample voltage Vsp2 may be proportional to the duty. The level of the second sample voltage Vsp2 may be the maximum level of the sawtooth voltage Vsaw determined by the width of the duty DT1 of the switching signal Stgl.

[0108] The voltage divider 140 divides the second sample voltage Vsp2 to generate a division voltage Vdiv. When the sawtooth voltage Vsaw indicating one duty of the switching signal Stgl is not less than the division voltage Vdiv, the comparator 150 allows the detection voltage Vdet to transition to a high level.

[0109] The comparator 150 can detect a target timing corresponding to the ratio of the target value in each duty DT1 of the switching signal Stgl by allowing the detection voltage Vdet to transition to a high level at a timing corresponding to the ratio of the target value. The target timing can be determined depending on the ratio of the first resistor 142 to the second resistor 143.

[0110] The comparator 150 can output the detection voltage Vdet having the duty DT2 obtained by dividing the duty DT1 of the switching signal Stgl from the target timing by maintaining the detection voltage Vdet during the remaining duty of the switching signal Stgl at a high level. The division ratio can be determined depending on the ratio of the first resistor 142 to the second resistor 143.

[0111] In an embodiment, the resistance values ​​of the first resistor 142 and the second resistor 143 may be determined depending on the target timing or the target ratio (duty cycle). The first resistor 142 and the second resistor 143 may be implemented with variable resistors. That is, the target timing or the target ratio may be adjusted by the user.

[0112] In the embodiment, the duty cycle of the detection voltage Vdet is shown as delayed relative to the duty cycle of the switching signal Stg1 due to the exaggerated dead time. However, the dead time may correspond to a small interval (or short time interval) to the extent that it is actually negligible compared to the period or duty cycle of the switching signal Stgl. Thus, in reality, the duty cycle of the detection voltage Vdet is shown as having no delay relative to the duty cycle of the switching signal Stgl.

[0113] For example, the first resistor 142 and the second resistor 143 may be implemented to have the same resistance value in order to detect the timing of half of each duty by the switching signal Stgl. When the second sample voltage Vsp2 indicates duty, the division voltage Vdiv may have a level corresponding to half of the level.

[0114] At the timing of half of each duty cycle of the switching signal Stgl, the detection voltage Vdet may be switched from a low level to a high level. Thereafter, the detection voltage Vdet may be maintained at a high level until the duty cycle of the switching signal Stgl ends. When the duty cycle of the switching signal Stgl ends, the detection voltage Vdet may be switched from a high level to a low level. Fig.12 and 13 In the figure, because the delay between the switching signal Stgl and the sawtooth voltage Vsaw is emphasized, it seems that the transition of the detection voltage Vdet does not accurately match the duty of the switching signal Stg1. However, in practice, the delay can be small enough to be ignored, so the transition of the detection voltage Vdet will match the duty of the switching signal Stg1.

[0115] According to an embodiment of the present disclosure, by using a simple analog circuit, the duty timing detector 100 can detect the target timing in each duty and divide the duty by the target ratio. The target timing or target ratio can be determined by the ratio of resistors and can have infinite resolution.

[0116] Fig.14 The device 300 according to the first embodiment of the present disclosure is illustrated. For example, the device 300 may be a power management device or a power management integrated circuit (PMIC). Fig.14 , the device 300 may include a voltage converter 310 and a current detector 320 .

[0117] The voltage converter 310 may be a DC-DC converter. Also, the voltage converter 310 may be a buck converter that generates an output voltage VOUT lower than the input voltage VIN. Fig.14 The voltage converter 310 includes a first switch 311 , a second switch 312 , a first switch controller 313 , a second switch controller 314 , a first charging element 315 , a second charging element 316 , a feedback controller 317 , and a pulse width modulation signal generator 318 .

[0118] The first switch 311 is connected between an input node to which an input voltage VIN is input and a switch node SW. The first switch 311 may operate in response to a first control signal PDRV output from a first switch controller 313. The first switch 311 may be a PMOS transistor.

[0119] The second switch 312 is connected between the switch node SW and the ground node. The second switch 312 may operate in response to a second control signal NDRV output from the second switch controller 314. The second switch 312 may be an NMOS transistor.

[0120] The first switch controller 313 is configured to control the first switch 311. The first switch controller 313 may activate or deactivate the first control signal PDRV in response to the pulse width modulation signal PWM. For example, the first switch controller 313 may receive the voltage of the switch node SW or the second control signal NDRV, and may control the first control signal PDRV based on at least two of the pulse width modulation signal PWM, the voltage of the switch node SW, and the second control signal NDRV.

[0121] The second switch controller 314 is configured to control the second switch 312. The second switch controller 314 may activate or deactivate the second control signal NDRV in response to the pulse width modulation signal PWM. For example, the second switch controller 314 may receive the voltage of the switch node SW or the first control signal PDRV, and may control the second control signal NDRV based on at least two of the pulse width modulation signal PWM, the voltage of the switch node SW, and the first control signal PDRV.

[0122] For example, the first switch controller 313 and the second switch controller 314 can control the first control signal PDRV and the second control signal NDRV to complement each other. When the first control signal PDRV or the second control signal NDRV is converted, the first switch controller 313 and the second switch controller 314 can provide a dead time when both the first control signal PDRV and the second control signal NDRV are deactivated.

[0123] The first charging element 315 is connected between the switch node SW and the output node OUT from which the output voltage VOUT is output. The first charging element 315 may be an inductor. The second charging element 316 is connected between the output node OUT and the ground node. The second charging element 316 may be a capacitor.

[0124] The feedback controller 317 can detect the level of the output voltage VOUT. The feedback controller 317 can output the control signal CS depending on whether the level of the output voltage VOUT is higher or lower than the target voltage. When the level of the output voltage VOUT is higher than the target voltage, the feedback controller 317 can output the control signal CS so that the output voltage VOUT decreases. When the level of the output voltage VOUT is lower than the target voltage, the feedback controller 317 can output the control signal CS so that the output voltage VOUT increases.

[0125] The pulse width modulation signal generator 318 may generate a pulse width modulation signal PWM in response to the control signal CS. For example, when the control signal CS indicates that it is necessary to increase the output voltage VOUT, the pulse width modulation signal generator 318 may reduce (or increase) the pulse width of the pulse width modulation signal PWM. When the control signal CS indicates that it is necessary to reduce the output voltage VOUT, the pulse width modulation signal generator 318 may increase (or reduce) the pulse width of the pulse width modulation signal PWM.

[0126] The current detector 320 may detect a current output from the voltage converter 310 to the load. The current detector 320 may include a timing detector 321, a voltage detector 322, and logic 323.

[0127] The timing detector 321 may receive a pulse width modulation signal PWM from the voltage converter 310. The timing detector 321 may detect a specific timing in the duty cycle of the pulse width modulation signal PWM of the voltage converter 310. The timing detector 321 may include a reference signal. Figures 1 to 13 The duty timing detector 100 can determine a specific timing depending on the ratio of the resistance values ​​of the first resistor 142 and the second resistor 143 .

[0128] When a specific timing is detected, the timing detector 321 may allow the detection voltage Vdet to transition from a low level to a high level, as shown in FIG. Fig.13 When the duty of the pulse width modulation signal PWM ends, the timing detector 321 may allow the detection voltage Vdet to be converted from a high level to a low level. The detection voltage Vdet may indicate a specific timing and may also have a duty obtained by dividing the duty of the pulse width modulation signal PWM.

[0129] The voltage detector 322 may detect the first voltage drop VDR1 within the voltage converter 310 in response to the detection voltage Vdet. For example, the voltage detector 322 may detect the first voltage drop VDR1 at a specific timing, ie, at a timing when the detection voltage Vdet transitions from a low level to a high level.

[0130] For example, the voltage detector 322 is configured to detect a first voltage drop VDR1 occurring at the first switch 311 of the converter 310. The voltage detector 322 may receive voltages at opposite ends of the first switch 311 and may detect a difference between the received voltages as the first voltage drop VDR1. The first voltage drop VDR1 may have a level corresponding to the amount of load current.

[0131] The voltage detector 322 can provide the first voltage drop VDR1 to the logic 323 as the voltage information VI in digital or analog form. The logic 323 can perform a preset calculation on the voltage information VI. The logic 323 can process the voltage information VI to obtain an accurate (or approximate) load current amount. The logic 323 can control the operation or operation mode of the voltage converter 310 by using the load current amount. The logic 323 can provide the load current amount to the external device automatically or depending on the request of the external device.

[0132] Fig.15 The diagram shows the fluctuation of the output current of the voltage converter 310. Fig.15 , the horizontal axis represents time "T" and the vertical axis represents current, for example, the inductor current IL flowing through the first charging element 315. Fig.14 and 15 , the amount of the inductor current IL may be repeatedly increased and decreased. For example, when the first switch 311 is turned on, the amount of the inductor current IL may be increased. When the second switch 312 is turned on, the amount of the inductor current IL may be decreased.

[0133] When the inductor current IL repeatedly increases and decreases, the average current Iavg may be an intermediate value between the maximum value and the minimum value of the inductor current IL. In the case where the amount of the inductor current IL is detected at the target timing Ttar when the inductor current IL passes through the intermediate value, the amount of the average current Iavg (i.e., the amount of the load current ILOAD) may be obtained.

[0134] Fig.16 An example of changes in the pulse width modulation signal PWM, the first voltage drop VDR1, the detection voltage Vdet, and the inductor current IL is shown. Fig.14 and 16 , when the pulse width modulation signal PWM is at a low level, the first switch 311 is turned on. Thus, with respect to the first switch 311, reference may be made to the duty of the inverted signal PWMb corresponding to the inverted version of the pulse width modulation signal PWM. For example, the inverted signal PWMb may be referenced. Figure 3 The output signal of the first inverter 211 is described.

[0135] When the inverting signal PWMb is at a high level, the first switch 311 is turned on. When the first switch 311 is turned on, the amount of the inductor current IL increases. When half the duty of the inverting signal PWMb passes, the inductor current IL has a current amount corresponding to the load current ILOAD. Thus, the timing detector 321 can be implemented to have a time point when half the duty of the inverting signal PWMb passes as the target timing Ttar. For example, the voltage divider 140 (refer to Figure 1 ) of the first resistor 142 (reference Fig.11) and the second resistor 143 may be implemented to have the same resistance value.

[0136] When the detection voltage Vdet indicates that half of the duty cycle of the inverted signal PWMb passes, the average current Iavg, that is, the load current ILOAD, can be obtained from the inductor current IL. Generally speaking, the current amount can be sensed by inserting a resistor in the line through which the current flows and sensing the voltage across the resistor.

[0137] However, this solution causes power loss due to the current flowing through the resistor. In addition, a high-precision resistor is required to measure the amount of current with high accuracy, so the resistor can be mounted outside the semiconductor chip or package. This causes an increase in area.

[0138] According to the embodiments of the present disclosure, Fig.14 As shown in FIG. 1 , when the first switch 311 is turned on, the voltage across the first switch 311 is sensed, and the current amount is calculated by using the sensed voltage as a voltage drop. Thus, an increase in power loss and area is prevented.

[0139] like Fig.16 As shown in , when the inductor current IL increases, the waveform of the first voltage drop VDR1 completely tracks the waveform. Therefore, information corresponding to the load current ILOAD can be obtained by detecting the first voltage drop VDR1 at the target timing Ttar. By detecting the first voltage drop VDR1, information of the load current ILOAD is obtained without additional components and power loss. The voltage detector 322 can provide the voltage information VI of the first voltage drop VDR1 to the logic 323.

[0140] The logic 323 may calculate the load current ILOAD based on the voltage information VI. For example, when the first switch 311 is turned on, current flows from the power supply node to the load through the first switch 311 and the first charging element 315. Most of the resistance components of the first switch 311 and the first charging element 315 correspond to the resistance component of the first switch 311. Thus, the logic 323 may obtain the value of the load current ILOAD by dividing the voltage information VI indicating the first voltage drop VDR1 by the resistance value of the first switch 311.

[0141] For example, the logic 323 may store information of the resistance value of the first switch 311. The logic 323 may store information of the resistance value of the first switch 311, which varies with temperature. The logic 323 may obtain temperature information from a temperature sensor located inside or outside the device 300, and may select the resistance value of the first switch 311 depending on the temperature information.

[0142] exist Figures 14 to 16310 and the pulse width modulation signal PWM. However, the pulse width modulation signal generator 318 of the voltage converter 310 may be replaced by a pulse frequency modulation signal generator, or may be provided together with the pulse frequency modulation signal generator so as to selectively operate. The first switch controller 313, the second switch controller 314 and the timing detector 321 may operate in response to the pulse width modulation signal or the pulse frequency modulation signal.

[0143] Fig.17 FIG. 4 illustrates a device 400 according to a second embodiment of the present disclosure. Fig.17 , the device 400 may include a voltage converter 410 and a current detector 420. The voltage converter 410 includes a first switch 411, a second switch 412, a first switch controller 413, a second switch controller 414, a first charging element 415, a second charging element 416, a feedback controller 417, and a pulse width modulation signal generator 418.

[0144] The configuration and operation of the voltage converter 410 are similar to those of the reference Fig.14 The voltage converter 310 described is identical. Therefore, additional description associated with the voltage converter 410 will be omitted to avoid redundancy.

[0145] The current detector 420 may include a timing detector 421, a voltage detector 422, and a logic 423. The configuration and operation of the current detector 420 may be similar to the reference 420 except that the voltage detector 422 detects the second voltage drop VDR2 of the second switch 412 instead of the first voltage drop VDR1 of the first switch 411. Fig.14 The current detector 320 described is substantially the same (or similar).

[0146] Fig.18 An example of changes in the pulse width modulation signal PWM, the second voltage drop VDR2, the detection voltage Vdet, and the inductor current IL is shown. Fig.17 and 18 , when the pulse width modulation signal PWM is at a high level, the second switch 412 is turned on. Therefore, with respect to the second switch 412, reference may be made to the duty of the pulse width modulation signal PWM.

[0147] When the pulse width modulation signal PWM is at a high level, the second switch 412 is turned on. When the second switch 412 is turned on, the amount of the inductor current IL decreases. When half of the duty of the pulse width modulation signal PWM passes, the inductor current IL has a current amount corresponding to the average current Iavg, for example, the load current ILOAD. Thus, the timing detector 421 can be implemented to have a time point at which half of the duty of the pulse width modulation signal PWM passes as the target timing Ttar.

[0148] When the detection voltage Vdet indicates that half of the duty cycle of the pulse width modulation signal PWM passes, the voltage detector 422 can detect the second voltage drop VDR2. Fig.18 As shown in , when the inductor current IL decreases, the waveform of the second voltage drop VDR2 tracks the waveform exactly the same. Therefore, information corresponding to the load current ILOAD can be obtained by detecting the second voltage drop VDR2 at the target timing Ttar. The voltage detector 422 can provide the voltage information VI of the second voltage drop VDR2 to the logic 423.

[0149] The logic 423 may calculate the load current ILOAD based on the voltage information VI. For example, when the second switch 412 is turned on, current flows from the load to the ground node through the second switch 412 and the first charging element 415. Most of the resistance components of the second switch 412 and the first charging element 415 correspond to the resistance component of the second switch 412. Thus, the logic 423 may obtain the value of the load current ILOAD by dividing the voltage information VI indicating the second voltage drop VDR2 by the resistance value of the second switch 412.

[0150] For example, the logic 423 may store information of the resistance value of the second switch 412. The logic 423 may store information of the resistance value of the second switch 412, which varies with temperature. The logic 423 may obtain temperature information from a temperature sensor located inside or outside the device 400, and may select the resistance value of the second switch 412 depending on the temperature information.

[0151] exist Figures 17 to 18 4 and 5. In the embodiment when the voltage converter 410 uses the pulse width modulation signal generator 418 and the pulse width modulation signal PWM, it is described. However, the pulse width modulation signal generator 418 of the voltage converter 410 can be replaced by a pulse frequency modulation signal generator, or can be provided together with the pulse frequency modulation signal generator so as to selectively operate. The first switch controller 413, the second switch controller 414 and the timing detector 421 can operate in response to the pulse width modulation signal or the pulse frequency modulation signal.

[0152] Fig.19 FIG. 5 illustrates a device 500 according to a third embodiment of the present disclosure. Fig.19 , the device 500 may include a voltage converter 510 and a current detector 520. The voltage converter 510 includes a first switch 511, a second switch 512, a first switch controller 513, a second switch controller 514, a first charging element 515, a second charging element 516, a feedback controller 517, and a pulse width modulation signal generator 518.

[0153] The configuration and operation of the voltage converter 510 are similar to those of the reference Fig.14 or Fig.17 The described voltage converter 310 or 410 is identical. Therefore, additional description associated with the voltage converter 510 will be omitted to avoid redundancy.

[0154] The current detector 520 may include a timing detector 521, a voltage detector 522, and a logic 523. Fig.14 and 16 As described above, the timing detector 521 may allow the first detection voltage Vdet1 to be detected at the time when the inverted signal PWMb (see Fig. 20 ) transitions to a high level when half of the duty cycle passes.

[0155] As reference Figure 1 and 18 As described above, when the pulse width modulation signal PWM (see Fig. 20 ) passes, the timing detector 321 may allow the second detection voltage Vdet2 to transition to a high level.

[0156] For example, the timing detector 521 may include: a first block configured to generate a first detection voltage Vdet1 from the inverted signal PWMb; and a second block configured to generate a second detection voltage Vdet2 from the pulse width modulation signal PWM. Each of the first block and the second block may include a reference Fig.12 The first and second blocks can share a reference Figure 3 The controller 200 is described.

[0157] As reference Fig.14 and 16 As described above, the voltage detector 522 may detect the first voltage drop VDR1 from the first switch 511 in response to the first detection voltage Vdet1. The first voltage information VI1 of the first voltage drop VDR1 may be provided to the logic 523.

[0158] As reference Fig.17 and 18 As described above, the voltage detector 522 may detect the second voltage drop VDR2 from the second switch 512 in response to the second detection voltage Vdet2. Second voltage information VI2 of the second voltage drop VDR2 may be provided to the logic 523.

[0159] As reference Fig.14 and 16 As described above, the logic 523 can calculate the load current ILOAD (reference Fig. 20 ). As reference Fig.17 and 18As described above, the logic 523 can calculate the load current ILOAD (referenced to Fig. 20 ).

[0160] Fig. 20 An example of changes in the pulse width modulation signal PWM, the first voltage drop VDR1, the second voltage drop VDR2, the detection voltage Vdet, and the inductor current IL is shown. Fig.19 and 20 , the timing detector 521 may allow the first detection voltage Vdet1 to be converted to a high level when half the duty of the inverted signal PWMb corresponding to the inverted version of the pulse width modulation signal PWM passes, as shown in FIG. Fig.16 described.

[0161] Moreover, as referenced Fig.18 As described above, when half the duty of the pulse width modulation signal PWM passes, the timing detector 521 may allow the second detection voltage Vdet2 to be converted to a high level.

[0162] As reference Fig.16 As described above, the voltage detector 522 may detect the first voltage drop VDR1 in response to the first detection voltage Vdet1. Fig.18 As described above, the voltage detector 522 may detect the second voltage drop VDR2 in response to the second detection voltage Vdet2. The voltage detector 522 may provide the first voltage drop VDR1 and the second voltage drop VDR2 to the logic 523 as the voltage information VI.

[0163] As reference Fig.16 As described above, the logic 523 can calculate the load current ILOAD according to the resistance value of the first switch 511 and the first voltage information VI1 corresponding to the first voltage drop VDR1. Fig.18 As described above, the logic 523 may calculate the load current ILOAD according to the resistance value of the second switch 512 and the second voltage information VI2 corresponding to the second voltage drop VDR2.

[0164] exist Figures 19 to 20 5 describes an embodiment in which the voltage converter 510 uses the pulse width modulation signal generator 518 and the pulse width modulation signal PWM. However, the pulse width modulation signal generator 518 of the voltage converter 510 may be replaced by a pulse frequency modulation signal generator, or may be provided together with the pulse frequency modulation signal generator so as to selectively operate. The first switch controller 513, the second switch controller 514 and the timing detector 521 may operate in response to the pulse width modulation signal or the pulse frequency modulation signal.

[0165] Fig.21is a flowchart illustrating an operating method of the device 300, 400, or 500 according to an embodiment of the present disclosure. Fig.14 , 17 , 19 and 21, in operation S210, the timing detector 321, 421 or 521 of the current detector 320, 420 or 520 of the device 300, 400 or 500 can detect the half-duty timing of the pulse width modulation signal PWM (or the inverted signal PWMb).

[0166] In operation S220 , the voltage detector 322 , 422 , or 522 of the current detector 320 , 420 , or 520 of the device 300 , 400 , or 500 may detect a voltage drop VDR1 or VDR2 of at least one switch 311 or 312 , 411 or 412 , or 511 or 512 of the voltage converter 310 , 410 , or 510 at half duty timing.

[0167] In operation S230 , the logic 323 , 423 , or 523 of the current detector 320 , 420 , or 520 of the device 300 , 400 , or 500 may calculate the load current based on the detected voltage drop VDR1 or VDR2 .

[0168] Fig. 22 is a flowchart illustrating an operating method of the device 300, 400, or 500 according to another embodiment of the present disclosure. Fig.14 , 17 , 19 and 22, in operation S310, the current detector 320, 420 or 520 of the device 300, 400 or 500 may detect a duty ratio of the pulse width modulation signal PWM.

[0169] In operation S320, the current detector 320, 420, or 520 of the device 300, 400, or 500 may determine whether the duty cycle exceeds the first threshold TH1. When the duty cycle exceeds the first threshold TH1, in operation S330, the current detector 320, 420, or 520 of the device 300, 400, or 500 may perform current detection by using the second voltage drop VDR2.

[0170] When the duty ratio is not greater than the first threshold TH1, in operation S340, the current detector 320, 420, or 520 of the device 300, 400, or 500 may determine whether the duty ratio is lower than the second threshold TH2. The second threshold TH2 may be lower than the first threshold TH1. When the duty ratio is lower than the second threshold TH2, in operation S350, the current detector 320, 420, or 520 of the device 300, 400, or 500 may perform current detection by using the first voltage drop VDR1.

[0171] When the duty ratio is not less than the second threshold TH2, in operation S360, the current detector 320, 420, or 520 of the apparatus 300, 400, or 500 may perform current detection by using at least one or both of the first voltage drop VDR1 and the second voltage drop VDR2.

[0172] When the duty ratio of the pulse width modulation signal PWM exceeds the first threshold value TH1, the detection voltage Vdet can be generated from the duty of the pulse width modulation signal PWM more stably and easily by using the second voltage drop VDR2. When the duty ratio of the pulse width modulation signal PWM is lower than the second threshold value TH2, the detection voltage Vdet can be generated from the duty of the inverted signal PWMb more stably and easily by using the first voltage drop VDR1.

[0173] Fig.23 The device 600 according to the fourth embodiment of the present disclosure is illustrated. For example, the device 600 may be a power management device or a power management integrated circuit (PMIC). Fig.23 , the device 600 may include a voltage converter 610 and a current detector 620 .

[0174] The voltage converter 610 may be a DC-DC converter. Moreover, the voltage converter 610 may be a boost converter that generates an output voltage VOUT higher than the input voltage VIN. The voltage converter 610 includes a first switch 611, a second switch 612, a first switch controller 613, a second switch controller 614, a first charging element 615, a second charging element 616, a feedback controller 617, and a pulse width modulation signal generator 618.

[0175] The first switch 611 is connected between an output node OUT from which an output voltage VOUT is output and a switch node SW. The first switch 611 may operate in response to a first control signal PDRV output from a first switch controller 613. The first switch 611 may be a PMOS transistor.

[0176] The second switch 612 is connected between the switch node SW and the ground node. The second switch 612 may operate in response to a second control signal NDRV output from the second switch controller 614. The second switch 612 may be an NMOS transistor.

[0177] As reference Figures 14 to 22 As described above, the first switch controller 613 and the second switch controller 614 may respectively output the first control signal PDRV and the second control signal NDRV in response to the pulse width modulation signal PWM.

[0178] The first charging element 615 is connected between an input node to which an input voltage VIN is input and a switch node SW. The first charging element 615 may be an inductor. The second charging element 616 is connected between an output node OUT and a ground node. The second charging element 616 may be a capacitor.

[0179] As reference Figures 14 to 23 As described above, the feedback controller 617 can control the pulse width modulation signal generator 618 through the control signal CS so that the output voltage VOUT is maintained at the target level.

[0180] The current detector 620 may include a timing detector 621, a voltage detector 622, and a logic 623. The configuration and operation of the current detector 620 are similar to those of the reference Fig.19 and 20 The configuration and operation described are exactly the same. The current detector 620 can calculate the load current of the voltage converter 610 .

[0181] In the embodiments, as referenced Figures 14 to 16 As described above, the voltage detector 622 of the device 600 can detect and use the first voltage drop VDR1 from the first switch 611. Fig.17 and 18 As described above, the voltage detector 622 of the device 600 can detect and use the second voltage drop V DR2 from the second switch 612 .

[0182] According to the present invention, a duty timing detector for detecting the duty timing of a switching signal, a device including the duty timing detector, and an operating method of a device receiving a switching signal are provided. Thus, it is possible to verify the switching signal and it is possible to easily monitor the device using or receiving the switching signal.

[0183] As traditional in the art, the block for performing one or more functions described can be described and illustrated in terms of the embodiment. These blocks (which may be referred to herein as units or modules, etc.) are physically implemented by analog and / or digital circuits, such as logic gates, integrated circuits, microprocessors, microcontrollers, memory circuits, passive electronic components, active electronic components, optical components, hard-wired circuits, etc., and may be optionally driven by firmware and / or software. For example, the circuit may be implemented in one or more semiconductor chips, or implemented on substrate supports such as printed circuit boards, etc. The circuit constituting the block may be implemented by dedicated hardware, or implemented by a processor (e.g., one or more programmed microprocessors and associated circuits), or implemented by a combination of dedicated hardware that performs some functions of the block and a processor that performs other functions of the block. Without departing from the scope of the present disclosure, each block of the embodiment may be physically divided into two or more interactive and discrete blocks. Similarly, without departing from the scope of the present disclosure, the block of the embodiment may be physically combined into more complex blocks.

[0184] While the present disclosure has been described with reference to exemplary embodiments thereof, it will be apparent to those skilled in the art that various changes and modifications can be made therein without departing from the spirit and scope of the present disclosure as described in the following claims.

Claims

1. A duty timing detector, include: a sawtooth voltage generator configured to output a sawtooth voltage synchronized with a switching signal repeatedly switching between a high level and a low level; a sampling circuit configured to obtain a level of the sawtooth voltage synchronized with the switching signal and output the level as a first sample voltage; a holding circuit configured to store the first sample voltage synchronized with the switching signal and output the first sample voltage as a second sample voltage; a voltage divider configured to divide the second sample voltage to output a divided voltage; as well as A comparator is configured to compare the sawtooth voltage with the division voltage to detect a target timing in each duty cycle of the switching signal.

2. A duty timing detector as claimed in claim 1, wherein the target timing is determined depending on a division ratio of the voltage divider.

3. The duty timing detector according to claim 1, wherein the comparator outputs a signal having a duty obtained by dividing the duty of the switching signal by a division ratio of the voltage divider.

4. The duty timing detector as described in claim 1 further includes a controller, which is configured to provide a first signal synchronized with the switching signal to the sawtooth voltage generator, a second signal synchronized with the switching signal to the sampling circuit, and a third signal synchronized with the switching signal to the holding circuit.

5. The duty timing detector as claimed in claim 4, in: The controller comprises: A first inverter, receiving the switching signal; a first delay device; a second delay device; a first NOR circuit, receiving the output of the first inverter and the output of the second delayer, and providing an output to an input terminal of the first delayer; a second NOR circuit, receiving the switching signal and the output of the first delayer, and providing an output to an input terminal of the second delayer; a second inverter, receiving an output of the first NOR circuit; a third delayer, delaying the output of the second inverter; a fourth delayer, delaying the output of the first NOR circuit; a third inverter, receiving an output of the fourth delayer; and an AND circuit receiving the output of the third delay device and the output of the third inverter, and The output of the AND circuit is the first signal, the output of the first NOR circuit is the second signal, and the output of the second NOR circuit is the third signal.

6. The duty timing detector as claimed in claim 4, in: When the switching signal is converted from the low level to the high level, the controller is configured to allow the third signal to be converted from the high level to the low level, then allow the second signal to be converted from the low level to the high level, and then allow the first signal to be converted from the high level to the low level, and When the switching signal is converted from the high level to the low level, the controller is configured to allow the second signal to be converted from the high level to the low level, then allow the third signal to be converted from the low level to the high level, and then allow the first signal to be converted from the low level to the high level.

7. The duty timing detector of claim 1, in: The sawtooth voltage generator comprises: a current source connected to a power node to which a power supply voltage is supplied; a capacitor connected between the current source and a ground node to which a ground voltage is supplied; and a transistor connected in parallel with the capacitor between the current source and the ground node, the transistor being turned off for a first time period after the switching signal is switched from the low level to the high level, and being turned on for a second time period after the switching signal is switched from the high level to the low level, and A voltage between the current source and the capacitor is output as the sawtooth voltage.

8. The duty timing detector of claim 1, in: The sampling circuit includes a transistor and a capacitor connected in series between a node to which the sawtooth voltage is transmitted and a ground node to which a ground voltage is supplied, When the switching signal changes from the low level to the high level, the transistor is turned on, and when the switching signal changes from the high level to the low level, the transistor is turned off, and A voltage between the transistor and the capacitor is output as the first sample voltage.

9. The duty timing detector of claim 1, wherein the first sample voltage tracks the sawtooth voltage until the switching signal transitions from the high level to the low level and then maintains the level of the sawtooth voltage tracked thereby.

10. The duty timing detector of claim 1, in: The holding circuit includes a transistor and a capacitor connected in series between a node to which the first sample voltage is transmitted and a ground node to which a ground voltage is supplied, When the switching signal is switched from the high level to the low level, the transistor is turned on, and when the switching signal is switched from the low level to the high level, the transistor is turned off, and A voltage between the transistor and the capacitor is output as the second sample voltage.

11. The duty timing detector of claim 1, wherein the holding circuit is configured to output an accumulated average voltage of the first sample voltage as the second sample voltage when the switching signal transitions.

12. An electronic device, include: a voltage converter configured to convert a first voltage into a second voltage by using a switching signal that repeatedly switches between a high level and a low level and output the second voltage to a load; as well as a current detector configured to detect a load current transmitted from the voltage converter to the load, wherein the current detector comprises: a duty timing detector configured to activate a detection voltage at a timing when half of each duty of the switching signal passes; a voltage drop detector configured to detect an internal voltage drop of the voltage converter in response to the detection voltage; and logic configured to obtain the load current by performing a calculation on the internal voltage drop detected by the voltage drop detector, and Wherein the duty timing detector comprises: a sawtooth voltage generator configured to output a sawtooth voltage synchronized with the switching signal; a sampling circuit configured to obtain a level of the sawtooth voltage synchronized with the switching signal and output the level as a first sample voltage; a holding circuit configured to store the first sample voltage synchronized with the switching signal and output the first sample voltage as a second sample voltage; a voltage divider configured to divide the second sample voltage to output a divided voltage; and A comparator is configured to compare the sawtooth voltage with the division voltage to activate the detection voltage when half of each duty cycle of the switching signal passes.

13. The electronic device according to claim 12, in: The voltage converter comprises: A first transistor and a second transistor connected in series between a node to which the first voltage is input and a ground node to which a ground voltage is supplied; an inductor connected between a node between the first transistor and the second transistor and an output node from which the second voltage is output; and a capacitor connected between the output node and the ground node, and When the switching signal is at the low level, the first transistor is turned on, and when the switching signal is at the high level, the second transistor is turned on. 14 . The electronic device of claim 13 , wherein the voltage drop detector is configured to detect the internal voltage drop from the first transistor or the second transistor at a timing when half of each duty cycle of the switching signal passes. 15 . The electronic device of claim 14 , wherein the logic is configured to calculate the load current by applying a resistance component of the first transistor or the second transistor to the internal voltage drop.

16. The electronic device according to claim 14, in: The logic detects the internal voltage drop from the second transistor when the duty cycle of the switching signal exceeds a first threshold, and The logic detects the internal voltage drop from the first transistor when the duty cycle of the switching signal is below a second threshold.

17. The electronic device according to claim 12, in: The voltage converter comprises: a first transistor and a second transistor connected in series between an output node through which the second voltage is output to the load and a ground node to which a ground voltage is supplied; an inductor connected between a node between the first transistor and the second transistor and an input node to which the first voltage is input; and a capacitor connected between the output node and the ground node, and When the switching signal is at the low level, the first transistor is turned on, and when the switching signal is at the high level, the second transistor is turned on.

18. A method for operating a device that receives a switching signal that repeatedly switches between a high level and a low level, the method include: generating a sawtooth voltage synchronized with the switching signal; obtaining a level of the sawtooth voltage synchronized with the switching signal; dividing the level of the sawtooth voltage to obtain a divided voltage; as well as The sawtooth voltage is compared with the divided voltage to detect a target timing in each duty cycle of the switching signal.

19. The method of claim 18, further comprising: include: detecting an internal voltage drop of a voltage converter that converts a first voltage into a second voltage at the target timing; as well as A calculation is performed on the internal voltage drop to calculate a load current output by the voltage converter.