A quick installation device for installing bridge bearings and installation and use method thereof

By using components such as embedded steel plates and limit tensile blocks in the installation of bridge support, the existing installation methods are complex, high accuracy, and unsolid connections are solved, and the rapid and reliable installation of bridge support is achieved, ensuring the safety and stability of the support under earthquake conditions.

CN111119035BActive Publication Date: 2025-03-21柳州东方工程橡胶制品有限公司
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010017265.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-01-08
Publication Date
2025-03-21
Estimated Expiration
2040-01-08

AI Technical Summary

Technical Problem

The existing bridge bearing installation methods have problems such as complex installation process, high accuracy requirements, easy bolts to be sheared, welding may damage the support structure, rapid installation methods fail to connect during earthquakes, inability to meet the bidirectional anchoring requirements, and insufficient installation speed.

Method used

A quick installation device including embedded steel plates, anchoring devices, longitudinal limit tensile blocks, transverse limit blocks and transverse positioning blocks are adopted. The embedded steel plate is anchored with the beam body or bridge pier through the embedded steel plate, and the support is stablely installed by using longitudinal and transverse limit blocks, and the installation error is adapted to the adjustment block.

Benefits of technology

It realizes rapid and simple installation of bridge bearings, ensuring that the bearings are reliable in both the horizontal and vertical directions, can resist vertical tension during earthquakes, prevent falling beams, meet the installation needs of different types of bearings, and reduce installation difficulty and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111119035B_ABST
    Figure CN111119035B_ABST
Patent Text Reader

Abstract

A quick installation device for installing a bridge bearing comprises an embedded steel plate, an anchoring device, a longitudinal limit tensile block, a transverse limit block and a transverse positioning block, wherein the anchoring device is connected to the back of the embedded steel plate, the longitudinal limit tensile block is connected to the left and right sides of the embedded steel plate installation surface, the transverse limit block and the transverse positioning block are respectively connected to the front and rear sides of the embedded steel plate installation surface, the distance between the two longitudinal limit tensile blocks corresponds to the longitudinal width of the bearing top plate or the bearing bottom plate, and the distance between the transverse positioning block and the transverse limit block corresponds to the transverse width of the bearing top plate or the bearing bottom plate. The method for installing a bridge bearing using the device comprises: processing the bearing top plate or the bearing bottom plate, installing the quick installation device, installing the bridge bearing, installing the transverse limit block, filling in the adjustment block and fixing the bridge bearing. The quick installation device has a simple structure, low cost, is economical and practical, and the method for installing a bridge bearing using the device is simple, efficient, safe and reliable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an auxiliary installation device and an installation method for a bridge bearing, and in particular to a quick installation device for installing a bridge bearing and a method for installing the bridge bearing using the device. Background Art

[0002] Bridge bearings are important components that connect bridge beams and piers. Their function is to reliably transmit the reaction force and deformation of the beam to the piers. Therefore, the reliability of the connection between the bearings and the beams and piers will directly affect the safety and life of the bridge. At present, the connection between bridge bearings and beams is generally achieved by bolt anchoring or welding. Both connection methods have shortcomings:

[0003] (1) The bolt anchoring method has a complex installation process and high installation accuracy requirements. The hole position is often inaccurate when the bolt is aligned with the hole. In addition, when an earthquake or disaster occurs and the bolt is sheared off and the support needs to be replaced, it is extremely difficult to remove the bolt broken in the beam body, which increases the difficulty of replacement;

[0004] (2) The welding connection method may damage the internal structure of the support during welding. If the support is damaged and needs to be replaced, a large number of welds need to be processed, which will also increase the difficulty of replacement. It is rarely used in current projects.

[0005] At present, there are some solutions for quick installation of brackets that replace bolt anchoring in the industry: using slots, keys or pins to replace the original threaded connection or welding; the existing methods for quick installation of brackets have the following problems:

[0006] 1. The support bears the gravity of the beam and the horizontal force generated by the structure. The key and slot connection method of the support can meet the requirements under normal working conditions. However, vertical tension will occur during an earthquake, which may cause the connection to fail and lead to the beam falling.

[0007] 2. Fixed pier bearings and bidirectional sliding bearings require reliable anchoring in both the transverse and longitudinal directions of the bridge. However, the existing quick installation method using keys and slots is movable in the direction parallel to the keys and slots due to installation requirements, which cannot meet the requirements;

[0008] 3. The existing quick installation methods using keys and slots are generally multi-key or multi-slot, and the number of installation positions is generally not less than 4, which cannot achieve true "quickness". Summary of the invention

[0009] The purpose of the present invention is to provide a quick installation device for installing a bridge bearing and an installation and use method thereof, so as to overcome the above-mentioned shortcomings of the prior art.

[0010] In order to solve the above technical problems, the technical solution adopted by the present invention is: a quick installation device for installing a bridge bearing, the quick installation device comprises an embedded steel plate, an anchoring device, a longitudinal limit tensile block, a transverse limit block and a transverse positioning block, the anchoring device is connected to the back of the embedded steel plate, the longitudinal limit tensile block is relatively connected to the left and right sides of the embedded steel plate installation surface, the transverse limit block is connected to the front side of the embedded steel plate installation surface, and the transverse positioning block is connected to the rear side of the embedded steel plate installation surface;

[0011] The longitudinal limit tensile blocks on the left and right sides have the same structure and are both "L"-shaped structures, including vertical sides and bottom sides that are perpendicular to each other. The distance between the vertical sides of the two longitudinal limit tensile blocks corresponds to the longitudinal width of the bearing top plate or the bearing bottom plate of the bridge bearing to be installed, and the height of the vertical sides is greater than the thickness of the bearing top plate or the bearing bottom plate; the transverse limit block is a strip-shaped flat block with an installation hole; the transverse positioning block is a "T"-shaped flat block, including a positioning edge and a positioning protrusion protruding from the positioning edge, and the shape of the positioning protrusion is square, trapezoidal or semicircular; the distance between the positioning edge of the transverse positioning block and the transverse limit block corresponds to the transverse width of the bearing top plate or the bearing bottom plate.

[0012] Its further technical solution is: the installation surface of the embedded steel plate is a plane, and its back side is either a plane or an inclined surface with a slope, a protruding limit platform is provided on the upper surface of the transverse limit block, and an installation screw hole and a limit groove corresponding to the limit platform are provided on the front side of the installation surface of the embedded steel plate where the transverse limit block is installed.

[0013] Furthermore: the longitudinal limit tensile block and the transverse positioning block are connected to the embedded steel plate by welding or bolts, or are connected to the embedded steel plate by integral processing, and the transverse limit block is connected to the embedded steel plate by bolts; the anchoring device is an anchoring steel bar or an anchoring sleeve, and the anchoring steel bar or the anchoring sleeve is fixedly connected to the embedded steel plate by welding.

[0014] Another technical solution is: a method for quickly installing a bridge bearing, the installation method is a method for installing a bridge bearing using the above-mentioned quick installation device for installing a bridge bearing, including upper installation and lower installation, the upper installation means that the quick installation device is installed at the bottom of the bridge beam body, and the bearing top plate of the bridge bearing is connected to the quick installation device, and the lower installation means that the quick installation device is installed on the top of the pier, and the bearing bottom plate of the bridge bearing is connected to the quick installation device;

[0015] (I) The upper installation comprises the following steps:

[0016] S1 Processing the support top plate: Processing a transverse alignment groove Ⅰ corresponding to the shape of the alignment protrusion of the transverse positioning block on the rear side of the transverse width of the support top plate;

[0017] S2 Install the quick installation device: The quick installation device is installed at the bottom of the bridge beam. When the beam is prefabricated, the embedded steel plate is embedded at the bottom of the bridge beam through the anchor device according to the designed position. The anchor device must be firmly connected to the steel bars of the bridge beam, and then the beam is cast;

[0018] S3 Install the bridge bearing: Place the bridge bearing flat on the bottom surface of the embedded steel plate, and clamp the two sides of the bearing top plate between the "L"-shaped longitudinal limit tensile blocks on the left and right sides, so that the front and rear sides of the bearing top plate fall between the transverse positioning block and the limiting groove of the embedded steel plate, and the transverse alignment groove Ⅰ of the bearing top plate is aligned with the alignment protrusion of the transverse positioning block of the embedded steel plate;

[0019] S4 Install the transverse limit block: insert the limit platform of the transverse limit block into the limit groove of the embedded steel plate, so that the transverse limit block limits the front side of the bearing top plate of the bridge bearing, and then use bolts to fix the transverse limit block to the embedded steel plate through the mounting holes and the mounting screw holes on the embedded steel plate;

[0020] S5: Fill in the adjustment block and fix it: fill in the adjustment block in the gap between the "L"-shaped longitudinal limit tensile block and the support top plate and fix it;

[0021] S6 Fixing the bridge bearing: Connect and fix the bearing bottom plate of the bridge bearing to the bridge pier to complete the installation of the bridge bearing;

[0022] (ii) The lower installation comprises the following steps:

[0023] S1 Processing the support base plate: Processing the transverse alignment groove II corresponding to the shape of the alignment protrusion of the transverse positioning block on the rear side of the transverse width of the support base plate;

[0024] S2 Install the quick installation device: The quick installation device is installed on the top of the pier. When the pier is cast, the embedded steel plate is embedded on the pad stone on the top of the pier through the anchor device according to the designed position. The anchor device must be firmly connected to the main steel bar of the pier, and then the pier is cast;

[0025] S3 Install the bridge bearing: Place the bridge bearing flat on the embedded steel plate, and clamp the two sides of the bearing bottom plate between the "L"-shaped longitudinal limit tensile blocks on the left and right sides, so that the front and rear sides of the bearing bottom plate fall between the transverse positioning block and the limiting groove of the embedded steel plate, and the transverse alignment groove II of the bearing bottom plate is aligned with the alignment protrusion of the transverse positioning block of the embedded steel plate;

[0026] S4 installs the transverse limit block: insert the limit platform of the transverse limit block into the limit groove of the embedded steel plate, so that the transverse limit block limits the front side of the bearing bottom plate of the bridge bearing, and then fixes the transverse limit block to the embedded steel plate with bolts through the mounting holes and the mounting screw holes on the embedded steel plate;

[0027] S5: Fill in the adjustment block and fix it: fill in the adjustment block in the gap between the "L"-shaped longitudinal limit tensile block and the support top plate and fix it;

[0028] S6 Fix the bridge bearing: Connect and fix the bearing top plate of the bridge bearing to the bridge beam to complete the installation of the bridge bearing.

[0029] Further: the regulating block is one or more blocks.

[0030] Further: the bridge bearing is a friction pendulum bearing, a seismic isolation rubber bearing, a pot bearing or a spherical bearing, and the bridge bearing is either a fixed bearing, a one-way sliding bearing or a two-way sliding bearing.

[0031] Due to the adoption of the above scheme, a quick installation device for installing a bridge bearing and an installation and use method thereof of the present invention have the following beneficial effects:

[0032] 1. When installing the bridge bearing by using the quick installation device of the present invention, the horizontal alignment groove on the bearing top plate or the bearing bottom plate can be directly aligned with the alignment protrusion of the embedded steel plate horizontal positioning block, so that the bearing top plate or the bottom plate falls between the two longitudinal limit tensile blocks, and the bridge bearing can quickly enter the designed position. Since there is an adjustable gap between the longitudinal limit tensile block and the bearing top plate or the bottom plate, even if there is an error in the beam drop position, the installation requirements can be met. The installation method is simple, the installation process is simplified, fast, and efficient;

[0033] 2. The embedded steel plate of the quick installation device of the present invention is anchored and connected to the beam body or bridge pier through the anchor device. The bearing is reliably and firmly limited in the horizontal and vertical directions. The bearing top plate or the bearing bottom plate is sleeved between the longitudinal limit tensile blocks to achieve the longitudinal limit of the bearing. The transverse limit blocks and the transverse positioning blocks can be fixed to achieve the transverse limit of the bearing. Even in the event of an earthquake, the vertical tensile force can be effectively resisted, ensuring the safe and reliable connection between the bearing and the bridge and preventing the occurrence of falling beams.

[0034] 3. The quick installation device of the present invention can be used to install bridge bearings, which can meet the use requirements of fixed bearings, one-way bearings and two-way bearings. When the bridge beam has a slope, a pre-buried steel plate with a slope on the back can be used, which has a wide range of applications;

[0035] 4. The quick installation device of the present invention has a simple structure, low manufacturing cost, is economical and practical, and is easy to promote.

[0036] The technical features of a quick installation device for installing a bridge bearing and an installation and use method thereof according to the present invention are further described below in conjunction with the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 to Figure 3This is a structural diagram of a quick installation device for bridge bearings according to the present invention (the back of the embedded steel plate has a slope):

[0038] Figure 1 For the main view, Figure 2 is a top view, Figure 3 for Figure 2 Left view;

[0039] Figure 4-5 Schematic diagram of the horizontal limit block structure:

[0040] Figure 4 For the main view (top view), Figure 5 for Figure 4 AA section view;

[0041] Figure 6-7 Schematic diagram of the longitudinal limit tensile block structure:

[0042] Figure 6 For the main view, Figure 7 It is the left view;

[0043] Figure 8 to Figure 10 Schematic diagram of the structure of the lateral positioning block with a square alignment protrusion:

[0044] Figure 8 For the main view, Fig. 9 is a top view, Fig.10 It is the left view;

[0045] Fig.11 Schematic diagram of the structure of the lateral positioning block with the alignment protrusion being a semicircular block (front view);

[0046] Fig.12 The schematic diagram of the structure of the embedded steel plate with limited grooves (the back side is a sloped surface);

[0047] Figure 13-14 It is a schematic diagram of the support top plate structure with a square transverse alignment groove Ⅰ;

[0048] Fig.13 For the main view, Fig.14 for Fig.13 BB cross-sectional view;

[0049] Figure 15-16 It is a schematic diagram of the support base plate structure with a square transverse alignment groove II;

[0050] Fig.15 For the main view, Fig.16 for Fig.15 CC section view;

[0051] Figure 17 to Figure 19 Schematic diagram of installing a bridge bearing using a bridge bearing quick installation device of the present invention:

[0052] Fig.17 For upper installation (the quick installation device is installed on the bottom surface of the bridge beam), Fig.18 for Fig.17 DD direction view,

[0053] Fig.19 For lower installation (the quick installation device is installed on the bridge pier);

[0054] In the figure:

[0055] 1-beam body, 2-quick installation device, 21-anchoring device, 22-embedded steel plate, 221-limiting groove, 23-longitudinal limiting tensile block, 231-vertical edge, 232-bottom edge, 24-transverse limiting block, 241-limiting platform, 242-installation hole, 25-bolt, 26-transverse positioning block, 261-positioning edge, 262-aligning protrusion (square), 263-aligning protrusion (semicircular), 3-support, 31-support top plate, 311-transverse alignment groove I, 32-support bottom plate, 321-transverse alignment groove II, 4-adjustment block, 5-pier. DETAILED DESCRIPTION

[0056] Embodiment 1

[0057] A quick installation device for installing bridge bearings (see attached Figure 1 ~Attached Figure 3 ), the quick installation device 2 includes an embedded steel plate 22, an anchoring device 21, a longitudinal limit tensile block 23, a transverse limit block 24 and a transverse positioning block 26, the anchoring device is connected to the back of the embedded steel plate, the longitudinal limit tensile block 23, the transverse limit block 24 and the transverse positioning block 26 are connected to the installation surface of the embedded steel plate, the longitudinal limit tensile block 23 is located on the left and right sides of the installation surface of the embedded steel plate, the transverse limit block 24 is located on the front side of the installation surface of the embedded steel plate, and the transverse positioning block 26 is located on the rear side of the installation surface of the embedded steel plate;

[0058] The longitudinal limit tensile blocks 23 on the left and right sides have the same structure and are both "L"-shaped structures, including vertical sides 231 and bottom sides 232 that are perpendicular to each other. The distance between the vertical sides of the two longitudinal limit tensile blocks corresponds to the longitudinal width of the support top plate or support bottom plate of the bridge support to be installed (the longitudinal width refers to the left and right width facing the attached figure), and the height of the vertical sides is greater than the thickness of the support top plate or support bottom plate to ensure that when the bridge support is installed, the support top plate or support bottom plate can be stuck in the "L"-shaped longitudinal limit tensile blocks on both sides (see attached figure). Figure 6 , Attachment Figure 7 , Attachment Fig.17 and attached Fig.19 ), (the height of the vertical side refers to the total height of the longitudinal limit tensile block minus the height of the bottom side);

[0059] The transverse limit block 24 is a strip-shaped flat block, and a mounting hole 242 is opened on the transverse limit block; the transverse positioning block 26 is a "T"-shaped flat block, including a positioning edge 261 and a positioning protrusion protruding from the positioning edge, and the shape of the positioning protrusion is either square, trapezoidal or semicircular (see attached Figure 8 ~Attached Fig.11 ); The distance between the positioning edge 261 of the lateral positioning block and the lateral limit block 24 corresponds to the lateral width of the support top plate or the support bottom plate (the lateral width refers to the front and rear width facing the attached figure).

[0060] The mounting surface of the embedded steel plate is a plane, and the back surface thereof is either a plane or an inclined surface with a slope. The upper surface of the transverse limit block 24 is provided with a protruding limit platform 241 (see attached Figure 4 ~Attached Figure 5 ), the part of the embedded steel plate installation surface on the side surface where the transverse limit block 24 is installed is provided with a mounting screw hole and a limit groove 221 corresponding to the limit platform 241 (see attached Fig.12 ).

[0061] The longitudinal limit tensile block 23 and the transverse positioning block 26 are connected to the embedded steel plate by welding or bolts, or are connected to the embedded steel plate by integral processing (welding is generally more economical), and the transverse limit block 24 is connected to the embedded steel plate by bolts; the anchoring device is an anchoring steel bar or an anchoring sleeve, and the anchoring steel bar or the anchoring sleeve is fixedly connected to the embedded steel plate by welding.

[0062] Embodiment 2

[0063] A method for quickly installing a bridge bearing, the method for installing the bridge bearing using a quick installation device for installing a bridge bearing according to the first embodiment, upper installation, the upper installation means that the quick installation device is installed at the bottom of the bridge beam, and the bearing top plate of the bridge bearing is connected to the quick installation device (see attached Fig.17 ~Attached Fig.18 ), including the following steps:

[0064] S1 Processing the support top plate: Processing a transverse alignment groove I 311 corresponding to the shape of the alignment protrusion of the transverse positioning block 26 on the rear side of the transverse width of the support top plate 31;

[0065] S2 installs the quick installation device: the quick installation device is installed at the bottom of the bridge beam. When the beam 1 is prefabricated, the embedded steel plate 22 is embedded at the bottom of the bridge beam through the anchor device 21 according to the designed position. The anchor device must be firmly connected to the steel bars of the bridge beam, and then the beam is cast;

[0066] S3 Install the bridge bearing: Place the bridge bearing flat on the bottom surface of the embedded steel plate 22, and clamp the two sides of the bearing top plate 31 between the "L"-shaped longitudinal limiting tensile blocks 23 on the left and right sides, so that the front and rear sides of the bearing top plate fall between the transverse positioning block 26 and the limiting groove 221 of the embedded steel plate, and the transverse alignment groove I 311 of the bearing top plate is aligned with the alignment protrusion of the transverse positioning block 26 of the embedded steel plate;

[0067] S4 installs the transverse limit block: insert the limit platform 241 of the transverse limit block 24 into the limit groove 221 of the embedded steel plate, so that the transverse limit block limits the front side of the support top plate of the bridge support, and then fix the transverse limit block to the embedded steel plate with bolts through the mounting holes 242 and the mounting screw holes on the embedded steel plate;

[0068] S5: Fill in the adjustment block and fix it: fill in the adjustment block 4 in the gap between the "L"-shaped longitudinal limit tensile block and the support top plate and fix it;

[0069] S6 Fixing the bridge bearing: Connect and fix the bearing base plate of the bridge bearing to the bridge pier to complete the installation of the bridge bearing.

[0070] Embodiment 3

[0071] A method for quickly installing a bridge bearing, the method for installing the bridge bearing using a quick installation device for installing a bridge bearing according to the first embodiment, the lower installation means that the quick installation device is installed on the top of the pier, and the bearing bottom plate of the bridge bearing is connected to the quick installation device (see the attached Fig.19 ); comprising the following steps:

[0072] S1 Processing the support base plate: Processing a transverse alignment groove II 321 corresponding to the shape of the alignment protrusion of the transverse positioning block 26 on the rear side of the transverse width of the support base plate 32;

[0073] S2: Install the quick installation device: The quick installation device is installed on the top of the pier. When the pier 5 is cast, the embedded steel plate 22 is embedded on the pad stone on the top of the pier through the anchor device 21 according to the designed position. The anchor device must be firmly connected with the main steel bar of the pier, and then the pier is cast.

[0074] S3 Install the bridge bearing: Place the bridge bearing flat on the embedded steel plate 22, and clamp the two sides of the bearing bottom plate 32 between the "L"-shaped longitudinal limit tensile blocks on the left and right sides, so that the front and rear sides of the bearing bottom plate fall between the transverse positioning block 26 and the limiting groove 221 of the embedded steel plate, and the transverse alignment groove II 321 of the bearing bottom plate is aligned with the alignment protrusion of the transverse positioning block 26 of the embedded steel plate;

[0075] S4 installs the transverse limit block: insert the limit platform 241 of the transverse limit block 24 into the limit groove 221 of the embedded steel plate, so that the transverse limit block limits the front side of the bearing bottom plate of the bridge bearing, and then fix the transverse limit block to the embedded steel plate with bolts through the mounting holes 242 and the mounting screw holes on the embedded steel plate;

[0076] S5: Fill in the adjustment block and fix it: fill in the adjustment block 4 in the gap between the "L"-shaped longitudinal limit tensile block and the support top plate and fix it;

[0077] S6 Fix the bridge bearing: Connect and fix the bearing top plate of the bridge bearing to the bridge beam to complete the installation of the bridge bearing.

[0078] In the above-mentioned Embodiment 2 and Embodiment 3, the regulating block is one or more blocks.

[0079] The installed bridge bearings may be friction pendulum bearings, shock-absorbing and isolating rubber bearings, pot-type bearings or spherical bearings, and the bridge bearings may be fixed bearings, one-way sliding bearings or two-way sliding bearings.

Claims

1. A quick installation device for installing a bridge bearing, characterized in that: The quick installation device (2) comprises an embedded steel plate (22), an anchoring device (21), a longitudinal limit tensile block (23), a transverse limit block (24) and a transverse positioning block (26), wherein the anchoring device (21) is connected to the back of the embedded steel plate (22), the longitudinal limit tensile block (23) is relatively connected to the left and right sides of the embedded steel plate installation surface, the transverse limit block (24) is connected to the front side of the embedded steel plate installation surface, and the transverse positioning block (26) is connected to the rear side of the embedded steel plate installation surface; The longitudinal limit tensile blocks (23) on the left and right sides have the same structure and are both "L"-shaped structures, including vertical sides (231) and bottom sides (232) perpendicular to each other, the distance between the vertical sides of the two longitudinal limit tensile blocks corresponds to the longitudinal width of the bearing top plate or bearing bottom plate of the bridge bearing to be installed, and the height of the vertical sides is greater than the thickness of the bearing top plate or bearing bottom plate; The transverse limit block (24) is a strip-shaped flat block, and a mounting hole (242) is formed on the transverse limit block. The transverse positioning block (26) is a "T"-shaped flat block, and includes a positioning edge (261) and a positioning protrusion protruding from the positioning edge. The positioning protrusion is in the shape of a square, a trapezoid or a semicircle. The distance between the positioning edge (261) of the transverse positioning block and the transverse limit block (24) corresponds to the transverse width of the support top plate or the support bottom plate. The mounting surface of the embedded steel plate (22) is a plane, and the back surface thereof is either a plane or an inclined surface with a slope. A protruding limiting platform (241) is provided on the upper surface of the transverse limiting block (24). A mounting screw hole and a limiting groove (221) corresponding to the limiting platform (241) are provided on the front side of the mounting surface of the embedded steel plate where the transverse limiting block (24) is mounted.

2. A quick installation device for installing a bridge support according to claim 1, characterized in that: The longitudinal limit tensile block (23) and the transverse positioning block (26) are connected to the embedded steel plate by welding or bolts, or are integrally connected to the embedded steel plate by integral processing, and the transverse limit block (24) is connected to the embedded steel plate by bolts; the anchoring device is an anchoring steel bar or an anchoring sleeve, and the anchoring steel bar or the anchoring sleeve is fixedly connected to the embedded steel plate by welding.

3. A rapid installation method for a bridge bearing, characterized in that: The installation method is a method for installing a bridge bearing using a quick installation device for installing a bridge bearing as described in claim 2, including upper installation and lower installation, wherein the upper installation refers to the quick installation device being installed at the bottom of the bridge beam body, and the bearing top plate of the bridge bearing is connected to the quick installation device, and the lower installation refers to the quick installation device being installed at the top of the pier, and the bearing bottom plate of the bridge bearing is connected to the quick installation device; (I) The upper installation comprises the following steps: S1 Processing the support top plate: processing a transverse alignment groove I (311) corresponding to the shape of the alignment protrusion of the transverse positioning block (26) on the rear side of the transverse width of the support top plate; S2 Install the quick installation device: The quick installation device is installed at the bottom of the bridge beam. When the beam is prefabricated, the embedded steel plate is embedded at the bottom of the bridge beam through the anchor device according to the designed position. The anchor device must be firmly connected to the steel bars of the bridge beam, and then the beam is cast; S3 Install the bridge bearing: Place the bridge bearing flat on the bottom surface of the embedded steel plate, and clamp the two sides of the bearing top plate (31) between the "L"-shaped longitudinal limit tensile blocks on the left and right sides, so that the front and rear sides of the bearing top plate fall between the transverse positioning block (26) and the limiting groove (221) of the embedded steel plate, and the transverse alignment groove I (311) of the bearing top plate is aligned with the alignment protrusion of the transverse positioning block (26) of the embedded steel plate; S4: installing the transverse limit block: inserting the limit platform (241) of the transverse limit block (24) into the limit groove (221) of the embedded steel plate, so that the transverse limit block limits the front side of the bearing top plate of the bridge bearing, and then fixing the transverse limit block to the embedded steel plate with bolts through the mounting holes (242) and the mounting screw holes on the embedded steel plate; S5: Fill in the adjustment block and fix it: fill in the adjustment block (4) in the gap between the "L"-shaped longitudinal limit tensile block and the support top plate and fix it; S6 Fixing the bridge bearing: Connect and fix the bearing bottom plate of the bridge bearing to the bridge pier to complete the installation of the bridge bearing; (ii) The lower installation comprises the following steps: S1 Processing the support base plate: processing a transverse alignment groove II (321) corresponding to the shape of the alignment protrusion of the transverse positioning block (26) on the rear side of the transverse width of the support base plate; S2 Install the quick installation device: The quick installation device is installed on the top of the pier. When the pier is cast, the embedded steel plate is embedded on the pad stone on the top of the pier through the anchor device according to the designed position. The anchor device must be firmly connected to the main steel bar of the pier, and then the pier is cast; S3 Install the bridge bearing: Place the bridge bearing flat on the embedded steel plate, and clamp the two sides of the bearing bottom plate (32) between the "L"-shaped longitudinal limit tensile blocks on the left and right sides, so that the front and rear sides of the bearing bottom plate fall between the transverse positioning block (26) and the limiting groove (221) of the embedded steel plate, and the transverse alignment groove II (321) of the bearing bottom plate is aligned with the alignment protrusion of the transverse positioning block (26) of the embedded steel plate; S4 installing the transverse limit block: inserting the limit platform (241) of the transverse limit block (24) into the limit groove (221) of the embedded steel plate, so that the transverse limit block limits the front side of the bearing bottom plate of the bridge bearing, and then fixing the transverse limit block to the embedded steel plate with bolts through the mounting holes (242) and the mounting screw holes on the embedded steel plate; S5: Fill in the adjustment block and fix it: fill in the adjustment block (4) in the gap between the "L"-shaped longitudinal limit tensile block and the support top plate and fix it; S6 Fix the bridge bearing: Connect and fix the bearing top plate of the bridge bearing to the bridge beam to complete the installation of the bridge bearing.

4. A rapid installation method for a bridge bearing according to claim 3, characterized in that: The regulating block (4) is one or more blocks.

5. A rapid installation method for a bridge bearing according to claim 4, characterized in that: The bridge bearing is a friction pendulum bearing, a shock-absorbing and isolating rubber bearing, a pot-type bearing or a spherical bearing. The bridge bearing is either a fixed bearing, a one-way sliding bearing or a two-way sliding bearing.