An environmentally friendly semi-closed-loop deep-sea ore hydraulic lifting system

By adopting an environmentally friendly semi-closed-loop deep-sea ore hydraulic lifting system in the deep-sea mining system, using deep-sea multi-high-pressure silo feeding equipment and water injection pumps and dehydration equipment on mining ships, a semi-closed-loop circulation system is formed to solve the problem of deep-sea ore lifting pump reliability. The problem of low and seabed environmental disturbance has been achieved, and efficient, environmentally friendly ore hydraulic lifting and reliable system design have been achieved.

CN111119897BActive Publication Date: 2024-10-22CHINA MERCHANTS DEEPSEA RES INST SANYA CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010051551.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-01-17
Publication Date
2024-10-22
Estimated Expiration
2040-01-17

AI Technical Summary

Technical Problem

In existing deep-sea mining systems, deep-sea multi-stage lifting pumps are complex in design and low in reliability. Wear seriously affects the service life. Maintenance is difficult and costly. At the same time, it has an impact on the seabed ecological environment.

Method used

An environmentally friendly semi-closed-loop deep-sea ore hydraulic lifting system is adopted. The water injection pump and dehydration equipment on the mining ship are used to mix and lift the ore and seawater through deep-sea multi-high-pressure silo feeding equipment to form a semi-closed-loop circulation system to reduce seawater exchange and adopt redundant The high-pressure silo design improves reliability and separates seawater and minerals at the sea surface.

Benefits of technology

It achieves more efficient and environmentally friendly ore hydraulic lifting, reduces the system's disturbance to the seabed environment, improves the system's reliability and maintenance convenience, avoids the use of deep-sea ore lifting pumps, and reduces maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111119897B_ABST
    Figure CN111119897B_ABST
Patent Text Reader

Abstract

The present invention provides an environmentally friendly semi-closed loop deep-sea ore hydraulic lifting system, comprising a water injection pump, a water injection riser, a deep-sea multi-high pressure silo feeding device, a lifting riser, a dehydration device and a pipeline. The water injection pump and the dehydration device are fixed on a mining ship, the water injection pump is connected to the deep-sea multi-high pressure silo feeding device through the water injection riser, the deep-sea multi-high pressure silo feeding device is connected to the dehydration device through the lifting riser, and the water injection pump and the dehydration device are connected through a pipeline. The present invention uses a water injection pump to pump seawater into the water injection riser, and then uses the deep-sea multi-high pressure silo feeding device to send the ore into the high-pressure hydraulic pipeline to mix with the seawater, and lifts the ore and seawater mixture to the sea surface mining ship. The separated seawater is pumped back into the water injection riser by the dehydration equipment on the mining ship to form a semi-closed loop circulation system, which generates a very small amount of seawater exchange with the seabed environment, and achieves the minimum disturbance to the seabed ecological environment. The present invention has fewer moving parts, high reliability, is more environmentally friendly, has higher work efficiency and good reliability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of deep-sea mining, and in particular to an environmentally friendly semi-closed-loop deep-sea ore hydraulic lifting system. Background Art

[0002] The ocean floor is rich in high-grade mineral resources, but they are generally located in deep and ultra-deep sea areas. The hydraulic lifting system for deep-sea mining is the core technology of deep-sea mining. Deep-sea multi-stage lifting pumps are usually used to achieve high lift to meet the needs of deep-sea mining and lift the mixed slurry of ore and seawater onto the mining ship. The design of deep-sea multi-stage lifting pumps and pump control systems is complex, technically difficult, with many moving parts and low overall system reliability. When in use, the high-speed flow of the slurry will cause serious wear on the lifting pump, affecting the service life of the pump. Deep-sea lifting pumps are generally installed on the seabed or suspended on risers. After wear, it is difficult to repair and replace, and the cost is high. In addition, during the lifting process, the deep-sea lifting pump continuously extracts seawater from the seabed, which will also affect the ecological environment of the seabed. Summary of the invention

[0003] In order to solve the above-mentioned defects, the purpose of the present invention is to provide an environmentally friendly semi-closed-loop deep-sea ore hydraulic lifting system with a more environmentally friendly working process, higher efficiency and higher reliability.

[0004] To achieve the above-mentioned purpose, the present invention provides an environmentally friendly semi-closed-loop deep-sea ore hydraulic lifting system, comprising a water injection pump, a water injection riser, a deep-sea multi-high-pressure silo feeding device, a lifting riser, a dehydration device and a pipeline. The water injection pump and the dehydration device are fixed on a mining ship, the water injection pump is connected to the deep-sea multi-high-pressure silo feeding device through the water injection riser, the deep-sea multi-high-pressure silo feeding device is connected to the dehydration device through the lifting riser, and the water injection pump is connected to the dehydration device through the pipeline.

[0005] The water injection riser and the lifting riser can be a hard pipe, a soft pipe, or a mixed riser consisting of a hard pipe and a soft pipe.

[0006] The deep-sea multi-high-pressure silo feeding equipment includes a storage silo, a high-pressure silo and a feeding silo that are sequentially connected from top to bottom. The number of the high-pressure silos is two or more. The outlet of the feeding silo is connected to a high-pressure pipeline, one end of the high-pressure pipeline is connected to a water injection riser, and the other end of the high-pressure pipeline is connected to a lifting riser.

[0007] A filling valve is provided between the storage bin and the high-pressure bin, and a discharge valve is provided between the high-pressure bin and the feeding bin.

[0008] The high-pressure silo is connected to the high-pressure pipeline through a boosting pipeline, and a boosting valve is provided on the boosting pipeline.

[0009] The high-pressure silo is provided with a pressure relief valve.

[0010] A feeding device is provided between the feeding bin and the high-pressure pipeline.

[0011] The feeding equipment is a screw feeder or an impeller feeder.

[0012] The beneficial effects of the present invention are as follows: the water injection pump on the mining ship is used to pump seawater into the water injection riser according to the pressure and flow required by the ore hydraulic lifting system, and then the deep-sea multi-high-pressure silo feeding equipment is used to send the ore into the high-pressure hydraulic pipeline to mix with the seawater, and then the ore and seawater mixture is lifted to the sea surface mining ship. The dehydration equipment on the mining ship is used to separate the seawater from the minerals. The sea surface water injection pump re-pumps the separated seawater into the water injection riser to form a semi-closed loop circulation system. The present invention produces a very small amount of seawater exchange with the seabed environment, achieving the minimum disturbance to the seabed ecological environment; the high-pressure silos of the deep-sea multi-high-pressure silo feeding equipment are redundant with each other, and work alternately with the cooperation of the control valve, achieving uninterrupted feeding and high reliability; avoiding the use of deep-sea ore lifting pumps; the sea surface water injection pump has a high head, a large flow, and is easy to maintain and repair, and has low cost. The hydraulic lifting system of the present invention is more environmentally friendly, more efficient, has a high head, a large flow, good reliability, and is easy to maintain and repair. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural schematic diagram of the present invention.

[0014] Figure 2 It is a structural schematic diagram of the deep-sea multi-high-pressure silo feeding equipment of the present invention (the schematic diagram is a deep-sea dual-high-pressure silo feeding equipment).

[0015] Among them: 1. water injection pump, 2. water injection riser, 3. deep-sea multi-high-pressure silo feeding equipment, 4. lifting riser, 5. dehydration equipment, 6. pipeline, 7. mining ship, 8. seawater inlet connected with high-pressure pipeline and water injection riser, 9. slurry outlet connected with high-pressure pipeline and lifting riser, 10. high-pressure pipeline, 11. storage silo, 12. high-pressure silo A, 13. high-pressure silo B, 14. feeding silo, 15. feeding equipment, 16. boosting pipeline, 17. filling valve A, 18. discharge valve A, 19. filling valve B, 20. discharge valve B, 21. pressure relief valve A, 22. boosting valve A, 23. pressure relief valve B, 24. boosting valve B, 25. mixed slurry. DETAILED DESCRIPTION

[0016] The specific implementation of the present invention will be described below with reference to the accompanying drawings.

[0017] like Figure 1As shown, an environmentally friendly semi-closed loop deep-sea ore hydraulic lifting system includes a water injection pump 1, a water injection riser 2, a deep-sea multi-high pressure silo feeding device 3, a lifting riser 4, a dehydration device 5 and a pipeline 6. The water injection pump 1 and the dehydration device 5 are fixed on a mining ship 7. The water injection pump 1 is connected to the deep-sea multi-high pressure silo feeding device 3 through the water injection riser 2, and the deep-sea multi-high pressure silo feeding device 3 is connected to the dehydration device 5 through the lifting riser 4. The water injection pump 1 is connected to the dehydration device 5 through the pipeline 6. The water injection pump 1 pumps seawater of the required pressure and flow rate into the deep-sea ore hydraulic lifting system, and a semi-closed loop circulation system is established through the water injection riser 2, the deep-sea multi-high pressure silo feeding device 3, the lifting riser 4, the dehydration device 5 and the pipeline 6, so as to achieve the minimum disturbance to the seabed ecological environment. The water injection riser 2 and the lifting riser 4 can be a hard pipe, a soft pipe, or a mixed riser composed of a hard pipe and a soft pipe.

[0018] like Figure 2 As shown, the deep-sea multi-high-pressure silo feeding equipment 3 of the present invention can be two or more. Multiple high-pressure silos are redundant with each other. In the event of failure of one high-pressure silo, the remaining high-pressure silos can continue to work, thereby improving the reliability of the system. In this embodiment, a deep-sea dual high-pressure silo feeding equipment is used, which specifically includes a storage silo 11, a dual high-pressure silo and a feeding silo 14 that are connected and arranged in sequence from top to bottom. Among them, the dual high-pressure silo includes a high-pressure silo A 12 and a high-pressure silo B 13. The outlet of the feeding silo 14 is connected to the high-pressure pipeline 10, one end of the high-pressure pipeline 10 is connected to the water injection riser 2, and the other end of the high-pressure pipeline 10 is connected to the lifting riser 4. A filling valve A17 and a filling valve B 19 are respectively provided between the storage silo 11 and the high-pressure silo A 12 and the high-pressure silo B 13, and a discharge valve A18 and a discharge valve B 20 are respectively provided between the high-pressure silo A 12 and the high-pressure silo B 13 and the feeding silo 14. The high-pressure silo A 12 and the high-pressure silo B 13 are respectively connected to the high-pressure pipeline 10 through the boosting pipeline 16, and the boosting pipeline 16 is respectively provided with a boosting valve A 22 and a boosting valve B 24. The high-pressure silo A 12 and the high-pressure silo B 13 are respectively provided with a pressure relief valve A 21 and a pressure relief valve B 23. A feeding device 15 is provided between the feeding silo 14 and the high-pressure pipeline 10. The feeding device 15 is a screw feeder or an impeller feeder. By adjusting the feeding speed of the feeding device 15, the concentration of ore in the slurry is adjusted in real time according to demand, reducing the risk of pipeline blockage. By controlling various valves on the deep-sea multi-high-pressure silo feeding equipment 3, uninterrupted feeding is achieved, and the ore is transferred from the storage silo 11 to the feeding silo 14 through the high-pressure silo A 12 and the high-pressure silo B 13. The feeding equipment 15 feeds the ore into the high-pressure pipeline 10 according to the specified amount to mix with seawater, so that the mineral is lifted to the mining ship 7 through the lifting riser 4.

[0019] The working principle of the present invention is as follows: the water injection pump 1 on the mining ship 7 is turned on, and seawater is pumped into the water injection riser 2 according to the flow rate required by the ore hydraulic lifting system. The seawater passes through the water injection riser 2, passes through the high-pressure pipeline 10 of the deep-sea multi-high-pressure silo feeding equipment 3, and then returns to the lifting riser 4 to reach the dehydration equipment 5 on the mining ship 7. Then the seawater returns to the water injection pump 1 through the pipeline 6 to form a seawater circulation system.

[0020] Working process of the present invention:

[0021] Before starting, the filling valve A17, discharge valve A18, pressure relief valve A21, boost valve A22 of the high pressure silo A12 and the filling valve B19, discharge valve B20, pressure relief valve B23 and boost valve B24 of the high pressure silo B13 in the deep sea multi-high pressure silo feeding equipment 3 are in a closed state. Then the mining vehicle transports the ore to the storage silo 11.

[0022] The water injection pump 1 on the mining ship 7 is turned on, and seawater is pumped into the water injection riser 2 according to the flow rate required by the ore hydraulic lifting system. The seawater passes through the water injection riser 2, passes through the high-pressure pipeline 10 of the deep-sea multi-high-pressure silo feeding equipment 3, and then returns to the lifting riser 4 to reach the dehydration equipment 5 on the mining ship 7. Then the seawater returns to the water injection pump 1 through the pipeline 6, forming a seawater circulation system.

[0023] Then, the pressure relief valve A21 of the high-pressure silo A12 is opened, and after the internal and external pressures of the high-pressure silo A12 are balanced, the filling valve A17 is opened, and the ore in the storage silo 11 falls into the high-pressure silo A12 under the action of gravity. When the ore in the high-pressure silo A12 reaches the set position, the filling valve A17 and the pressure relief valve A21 are closed in sequence to complete the filling operation of the high-pressure silo A12.

[0024] The boost valve A22 is opened to balance the pressure between the high-pressure silo A12 and the high-pressure pipeline 10. Then the discharge valve A18 is opened, and the ore in the high-pressure silo A12 enters the feed silo 14 under the action of gravity.

[0025] The feeding device 15 feeds the ore in the feeding bin 14 into the high-pressure pipeline 10 and mixes it with seawater at a set feeding speed to form a mixed ore slurry 25. Under the action of the high-pressure water flow, the mixed ore slurry 25 is lifted to the dewatering device 5 on the mining ship 7 through the lifting riser 4. The seawater and the ore are separated by the dewatering device 5. The water injection pump 1 pumps the separated seawater back into the water injection riser 2, thereby forming a semi-closed loop circulation system to realize the recycling of seawater.

[0026] After all the ore in the high-pressure silo A12 falls into the feeding silo 14, the unloading valve A21 and the boost valve A22 are closed in sequence to complete the unloading operation of the high-pressure silo A12.

[0027] While the high-pressure silo A 12 is unloading, the filling operation of the high-pressure silo B 13 is being carried out. The pressure relief valve B 23 of the high-pressure silo B 13 is opened, and after the internal and external pressures of the high-pressure silo B 13 are balanced, the filling valve B 19 is opened, and the ore in the storage silo 11 falls into the high-pressure silo B 12 under the action of gravity. When the ore pile height of the high-pressure silo B 13 reaches the set position, the filling valve B 19 and the pressure relief valve B 23 are closed in sequence to complete the filling operation of the high-pressure silo B 13.

[0028] After the high-pressure silo A 12 completes the unloading operation, the high-pressure silo B 13 is unloaded. The booster valve B24 is opened to balance the pressure between the high-pressure silo B 13 and the high-pressure pipeline 10. Then the unloading valve B 20 is opened, and the ore in the high-pressure silo B 13 enters the feed silo 14 under the action of gravity. After all the ore in the high-pressure silo B 13 falls into the feed silo 14, the unloading valve B 20 and the booster valve B 24 are closed in sequence to complete the unloading operation of the high-pressure silo B 13.

[0029] In this way, the high-pressure silo A 12 and the high-pressure silo B 13 work alternately with the cooperation of the valves to realize uninterrupted filling and unloading operations, and realize uninterrupted feeding through the feeding device 15, and lift the ore onto the mining ship. In addition, the high-pressure silo A and the high-pressure silo B are redundant to each other. In the event of failure of one high-pressure silo, the other high-pressure silo can continue to work, thereby improving the reliability of the system.

[0030] The same principle applies to systems with more than two high-pressure silos. Multiple high-pressure silos can also work alternately with valves to achieve uninterrupted filling and unloading. Multiple high-pressure silos provide greater redundancy for the system.

[0031] During the entire process, only a very small amount of seawater exchange will be produced with the surrounding environment during the pressure relief and filling process, thus achieving the minimum disturbance to the seabed ecological environment.

[0032] The present invention utilizes the water injection pump on the mining ship to pump seawater into the water injection riser according to the pressure and flow required by the ore hydraulic lifting system, and then utilizes the deep-sea multi-high-pressure silo feeding equipment to send the ore into the high-pressure hydraulic pipeline to mix with the seawater, and then lifts the ore and seawater mixture to the sea surface mining ship. The dehydration equipment on the mining ship is used to separate the seawater from the minerals. The sea surface water injection pump pumps the separated seawater back into the water injection riser to form a semi-closed loop circulation system. The present invention generates a very small amount of seawater exchange with the seabed environment, achieving the minimum disturbance to the seabed ecological environment; the high-pressure silos of the deep-sea multi-high-pressure silo feeding equipment are mutually redundant, and work alternately under the cooperation of the control valve, achieving uninterrupted feeding and high reliability; avoiding the use of deep-sea ore lifting pumps; the sea surface water injection pump has a high head, a large flow, and is easy to maintain and repair, and has low cost. The hydraulic lifting system of the present invention is more environmentally friendly, more efficient, has a high head, a large flow, good reliability, and is easy to maintain and repair.

Claims

1. An environmentally friendly semi-closed loop deep-sea ore hydraulic lifting system, comprising a water injection pump, a water injection riser, a deep-sea multi-high pressure silo feeding device, a lifting riser, a dehydration device and a pipeline, characterized in that: The water injection pump and the dehydration equipment are fixed on the mining ship, the water injection pump is connected to the deep-sea multi-high-pressure silo feeding equipment through the water injection riser, the deep-sea multi-high-pressure silo feeding equipment is connected to the dehydration equipment through the lifting riser, and the water injection pump is connected to the dehydration equipment through a pipeline; The deep-sea multi-high-pressure silo feeding equipment comprises a storage silo, a high-pressure silo and a feeding silo which are sequentially connected from top to bottom. The number of the high-pressure silos is two or more. The outlet of the feeding silo is connected to a high-pressure pipeline, one end of the high-pressure pipeline is connected to a water injection riser, and the other end of the high-pressure pipeline is connected to a lifting riser. A filling valve is provided between the storage bin and the high-pressure bin, and a discharge valve is provided between the high-pressure bin and the feeding bin; The water injection riser and the lifting riser are any one of a hard pipe, a soft pipe, or a mixed riser consisting of a hard pipe and a soft pipe.

2. The environmentally friendly semi-closed loop deep-sea ore hydraulic lifting system according to claim 1 is characterized by: The high-pressure silo is connected to the high-pressure pipeline through a boosting pipeline, and a boosting valve is provided on the boosting pipeline.

3. The environmentally friendly semi-closed loop deep-sea ore hydraulic lifting system according to claim 1 is characterized by: The high-pressure silo is provided with a pressure relief valve.

4. The environmentally friendly semi-closed loop deep-sea ore hydraulic lifting system according to claim 1 is characterized by: A feeding device is provided between the feeding bin and the high-pressure pipeline.

5. The environmentally friendly semi-closed loop deep-sea ore hydraulic lifting system according to claim 4 is characterized by: The feeding equipment is a screw feeder or an impeller feeder.