An experimental device for simulating pile side grouting while drilling

By designing an experimental device for simulating side grouting of pipe piles while drilling, the problem of high sinking resistance of high-strength concrete pipe piles in the existing technology has been solved, and the grouting effect has been optimized and the application scope has been expanded.

CN111173049BActive Publication Date: 2024-10-22GUANGZHOU INSTITUTE OF BUILDING SCIENCE CO LTD +2
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN201911393033.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-30
Publication Date
2024-10-22
Estimated Expiration
2039-12-30

AI Technical Summary

Technical Problem

The existing pile driving methods for high-strength concrete pipe piles (PHC pipe piles) mainly use static pressure and hammering methods, which result in high pile driving resistance, easy damage to the pile body and noise pollution, and cannot effectively simulate large-scale grouting processes. Optimization limits its application scope.

Method used

An experimental device for simulating side grouting of pipe piles while drilling is designed, including a model box system, a loading system and a water supply system. By setting up a model box, a grout stopper, a grouting hole and a pressure detector, the real Formation environment, adjust grouting parameters, and measure bearing capacity and friction under different grouting processes.

Benefits of technology

It achieves a realistic simulation of the grouting effect, optimizes the grouting process, improves the bearing capacity and friction of the pipe pile while drilling, reduces pile sinking resistance and noise pollution, and expands its application scope.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111173049B_ABST
    Figure CN111173049B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of geotechnical engineering pile foundation model test, and specifically discloses an experimental device for simulating the lateral grouting of a pipe pile while drilling, including a model box system, a loading system, a water supply system, and a grouting system; the model box system includes a model box, a grouting plate, a model pile with a bottom seal, and a hole-forming barrel with a diameter larger than the model pile; the loading system includes a device for confining pressure distribution, an axial pressure distribution device, and a plurality of strain gauges; the water outlet of the water supply system is connected to the water inlet of the box; and the grouting outlet of the grouting system is connected to the grouting hole. The present invention simulates the pressure of the covering soil by setting a loading system, simulates underground water by a water supply system, and adjusts the grouting parameters of the grouting system, so as to obtain the grouting body under different grouting process parameters, obtain the pressure applied by the loading system on the model pile and the displacement relationship curve of the strain gauge, and calculate the bearing capacity and lateral friction of the pipe pile while drilling, so as to judge the grouting effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of geotechnical engineering pile foundation model test, and in particular relates to an experimental device for simulating pile side grouting while drilling. Background Art

[0002] Pile foundation, as the foundation of high-rise construction, plays an irreplaceable role in the rapid progress of urbanization. Economic and environmentally friendly high-strength concrete pipe piles (PHC pipe piles) overcome the problems of traditional steel piles, such as high cost and poor corrosion resistance. Drilled (punched) cast-in-place piles have problems such as difficult to control pile quality, easy hole collapse, and a large amount of mud generated during construction, which can easily cause environmental pollution. However, the current methods for sinking PHC pipe piles mainly use static pressure method and hammer method, which have large pile sinking resistance and are prone to pile damage and noise pollution. This limits the application range of high-strength PHC pipe piles (generally applicable to diameters of 300mm to 600mm, generally suitable for soft soil layers with small pile sinking resistance).

[0003] A drilling and pipe pile machine and a drilling and pipe pile construction method (ZL201210022133.X) solve the above problems. Drilling with PHC Pipe Cased Pile (DPC pile for short) is a non-squeezing large-diameter PHC pipe pile foundation (diameter 800mm-1400mm) that drills, sinks and discharges soil. The drilling radius is about 10mm larger than the radius of the pipe pile. The pipe wall does not directly contact the soil around the pile, but is filled by subsequent pouring of cement slurry or cement mortar to increase the friction resistance of the pile side, thereby increasing the bearing capacity. Therefore, the grouting effect is a key factor in the bearing capacity and seismic performance of such pile foundations. The optimization of the grouting process plays a decisive role in the grouting effect, which ultimately affects the performance of the friction resistance of the DPC pile side. However, it is unrealistic to carry out large-scale grouting tests on site to optimize the grouting process. Therefore, it is particularly important to carry out physical simulation tests for optimizing the grouting process of DPC piles. Summary of the invention

[0004] In order to overcome the shortcomings of the prior art, the present invention provides an experimental device for simulating pile side grouting while drilling, which can simulate the real formation environment to test the influence of different grouting process parameters on the grouting effect.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] An experimental device for simulating pile side grouting while drilling, comprising a model box system, a loading system, a water supply system, and a grouting system; the model box system comprises a model box, a grouting plate, and a model pile with a sealed bottom end; a plurality of box water inlets and box water outlets are arranged on the side wall of the model box, and the water outlet of the water supply system is connected with the box water inlet; the model box is filled with soil, a simulated borehole is arranged in the soil, and the diameter of the simulated borehole is larger than the diameter of the model pile; the model pile is coaxially arranged in the simulated borehole, a plurality of grouting holes for grouting into the gap are arranged on the model pile, and the grouting outlet of the grouting system is connected with the grouting holes; a through hole adapted to the model pile is arranged on the grouting plate, and the grouting plate is sleeved on the upper end of the model pile through the through hole to seal the gap between the model pile and the soil;

[0007] The loading system includes a confining pressure distribution device for applying pressure to the soil, an axial pressure distribution device for applying pressure to the model pile, and a plurality of strain gauges; the confining pressure distribution device is arranged at the top of the model box and located on both sides of the model pile, the axial pressure distribution device is arranged at the top of the model pile, and the strain gauge is attached to the outer wall of the model pile.

[0008] Compared with the prior art, the present invention sets up a model box system to build a side grouting site for drilling and pipe piles, simulates the covering soil pressure by setting a loading system, and simulates underground water by a water supply system. The different pressures applied by the loading system and the water supply pressure provided by the water supply system can simulate the formation environment more realistically. The grouting parameters of the grouting system can be adjusted to obtain the grouting body under different grouting process parameters, and the relationship curve between the pressure applied by the loading system on the model pile and the strain of the model pile body collected by the strain gauge can be obtained, so as to calculate the bearing capacity and friction resistance of the drilling and pipe piles, thereby judging the grouting effect.

[0009] Preferably, the grouting system includes a slurry storage tank and a grouting machine for injecting the slurry in the slurry storage tank into the gap; and also includes a control valve, wherein the control valve is arranged on a grouting pipe connecting the outlet of the slurry storage tank and the grouting hole.

[0010] Preferably, the grouting system further comprises a pressure regulating valve and a pressure gauge, wherein the pressure regulating valve is arranged on the grouting pipe between the slurry storage tank and the control valve, and the pressure gauge is arranged on the grouting pipe between the pressure regulating valve and the control valve.

[0011] Preferably, the loading system also includes a first pressure detector for detecting the pressure value in the soil body and a second pressure detector for detecting the pressure value loaded on the model pile. The first pressure detector is arranged at the upper and lower ends of the soil body and facing the confining pressure distribution device, and the second pressure detector is arranged at the top and bottom ends of the model pile facing the axial pressure distribution device.

[0012] Preferably, a sensing hole is provided on the bottom plate of the model box, a sensing pad is provided under the bottom plate of the model box, and the second pressure detector is provided on the sensing pad and located in the sensing hole.

[0013] Preferably, the loading system also includes a reaction frame, the confining pressure distribution device includes a first jack, the axial pressure distribution device includes a second jack, the reaction frame is arranged at the top of the model box, the two ends of the first jack respectively abut the reaction frame and the model box, and the two ends of the second jack respectively abut the reaction frame and the model box.

[0014] Preferably, the model piles include a plurality of model piles, and the grouting holes on each model pile are different in number or diameter or at different distances from the top of the model pile.

[0015] Preferably, the hole-forming barrels include a plurality of barrels, each of which has a different diameter.

[0016] Preferably, the slurry stop plate includes a first sub-plate and a second sub-plate, the first sub-plate is provided with a first semi-circular arc, first threaded holes are provided on the first sub-plate and on both sides of the first semi-circular arc, the second sub-plate is provided with a second semi-circular arc and a second threaded hole corresponding to the first semi-circular arc and the first threaded hole, respectively, and the first sub-plate and the second sub-plate are fixed to the model pile by bolts.

[0017] Preferably, a permeable stone layer is evenly laid between the side wall of the model box and the soil. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The present invention will be further described with reference to the accompanying drawings and specific embodiments:

[0019] Figure 1 It is a schematic diagram of the structure of the present invention;

[0020] Figure 2 It is a structural schematic diagram of the bottom plate of the model box of the present invention;

[0021] Figure 3 It is a structural schematic diagram of the side plate of the model box of the present invention;

[0022] Figure 4 It is a structural schematic diagram of a model pile and a grouting pipe of the present invention;

[0023] Figure 5 It is a structural schematic diagram of the hole-forming barrel of the present invention;

[0024] Figure 6 It is a structural schematic diagram of the pulp stop plate of the present invention.

[0025] In the figure:

[0026] 1. Grouting machine, 2. Slurry storage tank, 3. Pressure regulating valve, 4. Pressure gauge, 5. Control valve, 6. Grouting pipe, 7. First jack, 8. Upper pressure sensor, 9. Reaction frame, 10. Second jack, 11. Upper soil pressure box, 12. Stop plate, 13. Box water outlet, 14. Model pile, 15. Gap, 16. Slurry diffusion trajectory, 17. Lower grouting hole, 18. Lower soil pressure box, 19. Bottom plate, 20. Foam pad, 21. Lower pressure sensor, 22. Side plate, 23. Concrete sealing layer, 24. Middle grouting hole, 25. Grouting body, 26. Soil, 27. Pebble layer, 28. Strain gauge, 29. Box water inlet, 30. Sensing hole, 31. Drilling barrel, 32. Long screw, 33. Screw hole, 34. Semicircular hole. DETAILED DESCRIPTION

[0027] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0028] like Figures 1 to 6As shown, this embodiment discloses an experimental device for simulating the lateral grouting of pipe piles while drilling, comprising a model box system, a loading system, a water supply system, and a grouting system; the model box system comprises a model box, a grouting plate 12, and a model pile 14 sealed at the bottom; a plurality of box water inlets 29 and box water outlets 13 are arranged on the side wall of the model box, and the water outlet of the water supply system is connected to the box water inlet 29; the model box is filled with soil 22, and a simulated borehole is arranged in the soil 22, and the diameter of the simulated borehole is larger than the diameter of the model pile 14; the model pile 14 is coaxially arranged in the simulated borehole, and a plurality of grouting holes for grouting into the gap 15 are arranged on the model pile 14 grout hole; the grout outlet of the grouting system is connected with the grouting hole; the grouting plate 12 is provided with a through hole adapted to the model pile 14, and the grouting plate 12 is sleeved on the upper end of the model pile 14 through the through hole to seal the gap 15 between the model pile 14 and the soil 26; the loading system comprises a confining pressure dividing device for applying pressure to the soil 26, an axial pressure dividing device for applying pressure to the model pile 14, and a plurality of strain gauges 28; the confining pressure dividing device is arranged at the top of the model box and located on both sides of the model pile 14, the axial pressure dividing device is arranged at the top of the model pile 14, and the strain gauge 28 is attached to the outer wall of the model pile 14.

[0029] Wherein, the grouting system comprises a slurry storage tank 2, a grouting machine 1 for injecting the slurry in the slurry storage tank 2 into the gap 15, a control valve 5, a pressure regulating valve 3 and a pressure gauge 4; the control valve 5 is arranged on a grouting pipe 6 connected with the grouting hole at the outlet of the slurry storage tank 2, the pressure regulating valve 3 is arranged on the grouting pipe 6 between the slurry storage tank 2 and the control valve 5, and the pressure gauge 4 is arranged on the grouting pipe 6 between the pressure regulating valve 3 and the control valve 5; the grouting machine 1 is preferably an air compressor;

[0030] In this embodiment, a drilling barrel 31 having a diameter greater than that of the model pile 14 is also included; the model box is filled with soil 26, and the drilling barrel 31 is arranged in the model box when the model box is filled with soil so that the simulated borehole is formed in the soil 26 when the drilling barrel 31 is withdrawn;

[0031] The model piles 14 include a plurality of them, and the grouting holes on each of the model piles 14 have different diameters or are at different distances from the top of the model piles 14; the drilling barrels 31 include a plurality of them, and the diameters of each of the drilling barrels 31 are different;

[0032] In this embodiment, a sealing ring is provided between the stop plate 12 and the model pile 14. The sealing ring is provided with a plurality of tiny pinhole-like micropores. The pinhole-like micropores can discharge the air in the gap during grouting and hold the pressure on the cement slurry.

[0033] Compared with the prior art, the present invention sets up a model box system to build a side grouting site for the while-drilling pipe pile, simulates the covering pressure by setting up a loading system, and simulates underground water by a water supply system. The different pressures applied by the loading system and the water supply pressure provided by the water supply system can simulate the formation environment more realistically. In this embodiment, the grouting pressure is adjusted by the pressure regulating valve 3, the pressure gauge 4 and the stop plate 12; the control valve 5 is controlled to open normally or to be turned on and off at a certain frequency to simulate static pressure grouting or pulsating grouting, etc.; and the grouting parameters of the grouting system are adjusted. By obtaining the grouting body 25 under different grouting process parameters, the relationship curve between the pressure applied by the loading system on the model pile 14 and the strain of the model pile 14 collected by the strain gauge 28 is obtained, and the bearing capacity and friction resistance of the while-drilling pipe pile can be calculated, thereby judging the grouting effect.

[0034] In this embodiment, the loading system also includes a first pressure detector for detecting the pressure value in the soil body 26 and a second pressure detector for detecting the pressure value loaded on the model pile 14. The first pressure detector is arranged at the upper and lower ends of the soil body 26 and is opposite to the confining pressure distribution device, and the second pressure detector is arranged at the top and bottom ends of the model pile 14 and is opposite to the axial pressure distribution device.

[0035] In this embodiment, the loading system further includes a reaction frame 9, the confining pressure dividing device includes a first jack 7, the axial pressure dividing device includes a second jack 10, the reaction frame 9 is arranged at the top of the model box, the two ends of the first jack 7 respectively abut the reaction frame 9 and the model box, and the two ends of the second jack 10 respectively abut the reaction frame 9 and the model box. Wherein, the first jack 7 and the second jack 10 are both high-precision jacks.

[0036] In this embodiment, the first pressure detector is a pressure box, and the second pressure detector is a pressure sensor. The pressure boxes are respectively arranged in the upper soil 26 and the lower soil 26 of the model box, and face the first jack 7. A sensing hole 30 is arranged on the bottom plate 19 of the model box, and a sensing pad is arranged under the bottom plate 19 of the model box. The second pressure detector is arranged on the sensing pad and located in the sensing hole 30. The second pressure detector is also arranged between the second jack 10 and the model pile 14. The sensing pad is preferably a circular foam pad 20, and the second pressure detector is preferably a circular pressure sensor.

[0037] In this embodiment, a permeable stone layer is evenly laid between the side wall of the model box and the soil 26 . Furthermore, the permeable stone layer is a pebble layer 27 .

[0038] In this embodiment, the slurry stop plate 12 includes a first sub-plate and a second sub-plate, the first sub-plate is provided with a first semi-circular arc, the first sub-plate and on both sides of the first semi-circular arc are provided with first threaded holes, the second sub-plate is provided with second semi-circular arcs and second threaded holes corresponding to the first semi-circular arc and the first threaded holes respectively, and the first sub-plate and the second sub-plate are fixed to the model pile 14 by bolts.

[0039] The model box in this embodiment is rectangular, with a length, width and height of 1m, 1m and 1.2m respectively. The bottom of the model box is a 3cm thick steel plate, i.e., a bottom plate 19. A sensing hole 30 with a diameter of 22cm is drilled in the center of the bottom plate 19 to place a circular foam pad 20 and a circular pressure sensor (i.e., a lower pressure sensor 21).

[0040] The model box is surrounded by four 3cm thick steel plates, namely four side plates 22, and six box water outlets 13 / box water inlets 29 with a diameter of 3cm are symmetrically arranged on each side plate 22. A layer of pebbles 27 with a thickness of 3-5cm and a diameter of 1-2cm is laid along the side plates 22 around the model box to evenly disperse the water pressure of the box water inlet 29 and the box water outlet 13. By adjusting the water pressure at the box water inlet 29, the water flow velocity in the real stratum is simulated;

[0041] The top of the model box is a cross reaction frame 9, so as to cooperate with the first jack 7 to apply an axial reverse load, and the magnitude of the reverse load is controlled to simulate the overburden pressure of different depths of strata;

[0042] The model pile 14 is a polyvinyl chloride tube (i.e., a Polyvinylchlorid tube, PVC tube for short) with an outer diameter of 18 cm and an inner diameter of 16 cm, and a tube length of 0.8 m. Circular holes (circular hole diameter 1-3 cm) are drilled at different positions on the pile side of the model pile 14 to simulate grouting holes. Silicone tubes with the same aperture as the grouting holes are respectively lowered from the pile core of the model pile 14, and the silicone tubes are bonded to the grouting holes to simulate the grouting pipe 6. The diameter, number, and position of the grouting holes are changed to simulate the number, diameter, and position of the slurry outlets in the real grouting process.

[0043] Strain gauges 28 (preferably 120-1AA strain gauges) are attached to the model pile 14 at 0 cm, 10 cm, 20 cm, 30 cm, 40 cm, 50 cm, 60 cm, 70 cm, and 80 cm from the lower end. Circular foam and circular pressure sensors are placed in a 22 cm circular hole at the bottom of the model box. Layered compaction and filling are performed in the model box. When the filling thickness reaches 10 cm, two lower soil pressure boxes 18 are symmetrically arranged at 25 cm and 30 cm from the side of the model box to facilitate the later measurement of the pressure of the soil 26 at the bottom position. Subsequently, a hole-forming barrel 31 (diameter 18-20 cm) is placed directly above the lower pressure sensor 21, and the filling is continued. When the filling thickness reaches 80 cm, two lower soil pressure boxes 18 are symmetrically arranged at 25 cm and 30 cm from the side of the model box in the same way to facilitate the later measurement of the pressure of the soil 26 at the upper position of the soil 26.

[0044] Pull out the drilling barrel 31, so that a simulated borehole with a diameter of 18-20 cm is formed in the soil 26, and then the model pile 14 (diameter 18 cm) is placed in the simulated borehole. By changing the diameter of the drilling barrel 31, the distance between the model pile 14 and the soil 26 in the hole can be 0-10 mm. In this way, the shrinkage phenomenon caused by lateral soil pressure can be simulated;

[0045] Connect the stop plate 12 at a distance of 10 cm from the top of the pile body, and then continue to fill the soil. The filling is stopped when the total thickness of the fill reaches 88 cm. The stop plate 12 is composed of two steel plates with lengths, widths and heights of 40 cm, 20 cm and 2 cm respectively. Each steel plate has a semicircular hole 34 with a diameter of 18.2 cm drilled on one side with a side length of 40 cm, which is slightly larger than the diameter (18 cm) of the model pile 14. The circular hole and the model pile 14 are sealed with a sealing ring. There are several tiny pinhole-like micropores on the sealing ring to discharge air during grouting and to hold back the pressure of the cement slurry to simulate the effects of different grouting pressures.

[0046] After the filling work is completed, the load is applied through the cross reaction frame 9 and the first jack 7 at the top, and the load size is controlled by the readings of the upper soil pressure box 11 and the lower soil pressure box 18 to simulate the overburden pressure of strata at different depths; water flows with different pressures and flow rates are provided through a plurality of water inlets 29 and water outlets 13 provided on the side walls of the model box and the water supply system to simulate the water environment in the stratum;

[0047] The grouting pipe 6 is externally connected to the control valve 5, the pressure gauge 4, the pressure regulating valve 3, the slurry storage tank 2 and the air compressor. The air compressor provides pressure for grouting. The grouting pressure is controlled by the pressure regulating valve 3 to simulate the static pressure grouting process. The frequency of opening and closing of the control valve 5 is adjusted to simulate the grouting frequency and realize the simulated pulsating grouting process. After the slurry is completely solidified, a circular upper pressure sensor 8 is placed on the top of the pile, and an axial load is applied through the second jack 10 to carry out a static load test of the pile while drilling and pipe pile to obtain the axial force-displacement curve, thereby evaluating the grouting effect.

[0048] This embodiment can be used to simulate the influence of different grouting processes and parameters such as groundwater flow velocity, overburden pressure, location, number and diameter of grouting outlets, shrinkage phenomenon, static pressure grouting, pulsation grouting on the grouting effect, and can simulate the formation environment more realistically, thereby improving the practicality of the present invention; the present invention controls the grouting pressure by setting a stop plate 12 and other methods, thereby realizing high-pressure grouting and constant-pressure grouting, and providing strong support for the optimization of grouting materials and grouting processes for drilling and pipe piles; the present invention is not only suitable for grouting simulation of natural soil 26, but also can be used for other artificial filling projects, thus solving the problem that it is currently impossible to finely simulate the grouting process related to drilling and pipe piles. The device of the present invention has low processing cost, is easy to use, has simple processing technology, simple structure, good safety performance, and is relatively light and easy to carry.

[0049] The device of this embodiment can realize the construction process simulation of simultaneous pulsating grouting at the bottom and the middle, and the specific steps are as follows:

[0050] (1) Make a model box. Make the model box into a rectangular shape. The length, width and height of the model box are 1m, 1m and 1.2m respectively. The bottom plate 19 of the model box is a 3cm thick steel plate. A sensing hole 30 with a diameter of 22cm is drilled in the center of the bottom plate 19. The model box is surrounded by four 3cm thick steel plates 22, i.e., four side plates 22. Six mold water outlets / mold water inlets with a diameter of 3cm are symmetrically arranged on each side plate 2222. A layer of pebbles 27 with a thickness of 3-5cm and a diameter of 1-2cm is laid around the side plates 22. The cross reaction frame 9 on the top of the model box is set aside for use.

[0051] (2) A model pile 14 is selected. A polyvinylchlorid tube (PVC tube) with an outer diameter of 18 cm, an inner diameter of 16 cm, and a length of 0.8 m is selected as the model pile 14. Grouting holes with a diameter of 1.5 cm are drilled at 5 cm and 35 cm from the bottom of the pile to simulate the lower grouting hole 17 and the middle grouting hole 24 for grouting the lower and middle parts of the model pile 14 at the same time. The grouting holes are connected to a grouting pipe 6 (silicone tube) with the same diameter. The grouting pipe 6 is passed through the pile core. In order to prevent the grouting liquid from flowing into the pile core from the bottom of the model pile 14, thereby reducing the grouting pressure and causing grouting failure, the model pile 14 is connected to the grouting pipe 6 (silicone tube) with the same diameter. The bottom of the pile 14 is sealed with concrete (i.e., concrete sealing layer 23). After the concrete sealing layer 23 solidifies, strain gauges 28 (preferably 120-1AA strain gauges) are attached to the model pile 14 at 0 cm, 10 cm, 20 cm, 30 cm, 40 cm, 50 cm, 60 cm, 70 cm, and 80 cm from the lower end, and AB glue is used for sealing. The treated model pile 14 is placed aside for use; the grouting holes on the model pile 14 allow cement slurry to fill the surrounding soil 26 in the best combination of penetration, compaction, and splitting to increase the lateral friction resistance; the slurry diffusion trajectory 16 is indicated by arrows in the figure.

[0052] (3) Filling: Place the circular lower pressure sensor 21 in the circular hole in the bottom plate 19 of the model box and place it on the circular foam pad 20, then fill the soil. When the filling thickness reaches 10 cm, two lower soil pressure boxes 18 are symmetrically arranged at 25 cm and 30 cm away from the side of the model box. Then, place a drilling barrel 31 with an outer diameter of 20 cm just above the circular lower pressure sensor 21. Continue filling the soil. When the filling thickness reaches 80 cm (the height of the soil layer from the pile bottom is 70 cm at this time), two upper soil pressure boxes 11 are symmetrically arranged at 25 cm and 30 cm away from the side of the model box in the same way.

[0053] (4) Pull out the drilling barrel 31. At this time, a simulated borehole with a diameter of 20 cm is formed in the soil 26. The diameter of the simulated borehole is larger than the diameter of the model pile 14 (18 cm). Then, the model pile 14 is placed in the circular hole. After calculation, the distance between the model pile 14 and the surrounding soil 26 is 1 cm. At this time, the distance between the soil 26 and the top of the model pile 14 is 10 cm.

[0054] (5) Place the stop plate 12, which consists of two steel plates with length, width and height of 40 cm, 20 cm and 2 cm respectively, as well as a long screw 32, a screw hole 33 and a semicircular hole 34. A semicircular hole 34 with a diameter of 18.2 cm is drilled on one side of each steel plate with a side length of 40 cm, which is slightly larger than the diameter of the model pile 14 (18 cm). The stop plate 12 is connected to the model pile 14 and sealed with a sealing ring. The sealing ring is provided with tiny pinhole-like micro-holes to discharge air during grouting and to hold back the pressure of cement slurry to simulate the effects of different grouting pressures. Then, fill the soil to the top of the model pile 14.

[0055] (6) applying confining pressure to the soil 26 through the first jack 7, and controlling the magnitude of the pressure applied by the first jack 7 to the soil 26 through the reading of the soil pressure box, in order to simulate the formation pressure (about 0.8 MPa) at a depth of 60 meters;

[0056] (7) Simulate groundwater, connect the water inlet 29 of the box to an external water source, and after the water flow rate at the water outlet 13 of the box reaches a stable state, the next step can be carried out;

[0057] (8) Connecting the grouting pipes 6, connecting two grouting pipes 6 to two grouting machines 1 respectively, that is, connecting the grouting pipes 6 to the control valve 5, the pressure gauge 4, the pressure regulating valve 3, the grouting tank 2 and the multifunctional cement grouting machine 1 in sequence, and connecting another grouting pipe 6 in the same way;

[0058] (9) Carry out grouting test, start the multifunctional cement grouting machine 1, open the pressure regulating valve 3, and when the pressure of the pressure gauge 4 reaches 1 MPa, open the control valve 5 to carry out grouting. In order to simulate the pulsating grouting process, the control valve 5 is opened and closed every 20 seconds. When the pressure of the grouting pressure gauge 4 no longer decreases, the grouting is completed, and the remaining slurry in the slurry storage tank 2 is prepared into a 70*70*70 concrete test block for standby use;

[0059] (10) Grouting body 25 curing: after grouting, the grouting body 25 and the above-mentioned 70*70*70 concrete test block are naturally cured for 28 days, and then the concrete test block strength test is carried out. After reaching the specified strength, the next step of the test is carried out, otherwise the curing is continued;

[0060] (11) Static load test of the pile while drilling. After the grouting body 25 reaches a certain strength, the static load test of the pile while drilling is carried out. The axial load is applied by the second axial jack 10. The loads on the upper and lower parts of the model pile 14 are collected by the upper pressure sensor 8 and the lower pressure sensor 21. The pile body strain is collected by the pile body strain gauge 28. The load displacement curve (QS curve) of the static load test of the pile while drilling is obtained. The bearing capacity and lateral friction resistance of the pile while drilling are obtained by calculation, so as to judge the grouting effect.

[0061] The present invention can realize a multifunctional grouting model box, and provides a specific grouting method, and by changing the type of soil layer 26, it can simulate the real stratum environment, making it possible to optimize the pile side grouting process of drilling and pipe piles, saving grouting costs, and improving grouting quality, thereby guiding on-site grouting through indoor experiments and promoting the promotion of large-diameter drilling and pipe piles. The present invention has clear steps, is simple and easy to implement, has low cost, and is highly efficient.

[0062] The present invention is not limited to the above-mentioned embodiments. If various changes or modifications to the present invention do not depart from the spirit and scope of the present invention, and if these changes and modifications fall within the scope of the claims and equivalent technologies of the present invention, the present invention is also intended to include these changes and modifications.

Claims

1. An experimental device for simulating the side grouting of piles while drilling. It is characterized in that Including model box system, loading system, water supply system, grouting system; The model box system comprises a model box, a grout-stopping plate, and a model pile with a sealed bottom end; a plurality of box water inlets and box water outlets are arranged on the side wall of the model box, and the water outlet of the water supply system is communicated with the box water inlet; the model box is filled with soil, and a simulated borehole is arranged in the soil, and the diameter of the simulated borehole is larger than the diameter of the model pile; the model pile is coaxially arranged in the simulated borehole, and a plurality of grouting holes are arranged on the model pile, and the grouting outlet of the grouting system is communicated with the grouting holes; a through hole adapted to the model pile is arranged on the grout-stopping plate, and the grout-stopping plate is sleeved on the upper end of the model pile through the through hole to seal the gap between the model pile and the soil, and the grouting system grouts the gap through the grouting holes; The loading system includes a confining pressure dividing device for applying pressure to the soil, an axial pressure dividing device for applying pressure to the model pile, a plurality of strain gauges, a first pressure detector for detecting the pressure value in the soil, a second pressure detector for detecting the pressure value loaded on the model pile, and a reaction frame; the confining pressure dividing device is arranged at the top of the model box and located on both sides of the model pile, the axial pressure dividing device is arranged at the top of the model pile, the strain gauge is attached to the outer side wall of the model pile, the first pressure detector is arranged at the upper and lower ends of the soil and faces the confining pressure dividing device, the second pressure detector is arranged at the top and bottom ends of the model pile and faces the axial pressure dividing device, the confining pressure dividing device includes a first jack, the axial pressure dividing device includes a second jack, and the reaction frame is arranged at the top of the model box, the two ends of the first jack respectively abut the reaction frame and the model box, and the two ends of the second jack respectively abut the reaction frame and the model box.

2. The experimental device according to claim 1, It is characterized in that The grouting system includes a slurry storage tank, a grouting machine for injecting the slurry in the slurry storage tank into the gap, and a control valve, which is arranged on a grouting pipe connected between the outlet of the slurry storage tank and the grouting hole.

3. The experimental device according to claim 2, It is characterized in that The grouting system also includes a pressure regulating valve and a pressure gauge. The pressure regulating valve is arranged on the grouting pipe between the slurry storage tank and the control valve, and the pressure gauge is arranged on the grouting pipe between the pressure regulating valve and the control valve.

4. The experimental device according to claim 1, It is characterized in that A sensing hole is arranged on the bottom plate of the model box, a sensing pad is arranged under the bottom plate of the model box, and the second pressure detector is arranged on the sensing pad and located in the sensing hole.

5. The experimental device according to claim 1, It is characterized in that The model piles include a plurality of them, and the number of the grouting holes on each of the model piles is different or the hole diameter is different or the distance from the top of the model pile is different.

6. The experimental device according to claim 1, It is characterized in that It also includes a drilling barrel, which is arranged in the model box when the model box is filled with soil so that the simulated borehole is formed in the soil when the drilling barrel is withdrawn. The drilling barrels include several barrels, and each barrel has a different diameter.

7. The experimental device according to claim 1, It is characterized in that The slurry-stopping plate includes a first sub-plate and a second sub-plate, the first sub-plate is provided with a first semicircular arc, the first sub-plate is provided with first threaded holes on both sides of the first semicircular arc, the second sub-plate is provided with second semicircular arcs and second threaded holes corresponding to the first semicircular arc and the first threaded holes, respectively, and the first sub-plate and the second sub-plate are fixed to the model pile by bolts.

8. The experimental device according to claim 1, It is characterized in that A permeable stone layer is evenly laid between the side wall of the model box and the soil body.

Citation Information

Patent Citations

  • Drilling rig with following pipe pile and construction method for following pipe pile

    CN102561946A

  • Test system and method for detecting cement content of pile body of cement stirring pile in real time

    CN105113499A

  • Test device and test method for testing bearing performance of pile-end expanded head of statically-drilled rooted pile

    CN110331743A

  • Experimental device for simulating while-drilling pipe-following pile side grouting

    CN213741253U

  • The apparatus for bi-directional pile load test and the method of bi-directional pile load test therewith

    KR101101054B1