A method for on-site assembly of steel-concrete composite beams
By installing support frames on the ground and using embedded parts and hoisting technology, the steel box beams are assembled in a low-altitude environment, solving the problems of low accuracy, high safety risks and low efficiency caused by high-altitude assembly, and achieving more efficient and safe steel box girder construction.
Patent Information
- Application Number
- CN202010100803.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-02-18
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2040-02-18
AI Technical Summary
The assembly accuracy of steel box girders is low when assembled at high altitude, with high construction safety risks and low construction efficiency. The existing technology has failed to effectively solve these problems.
The method of installing a support frame on the ground is used to assemble multiple steel box girders below 100cm from the ground. Through the combined structure of buffer parts, support plates, columns and load-bearing parts of the frame, the steel box girder is ensured in a low-altitude environment. Assemble the lower part and lifting technology to adjust the height difference and pre-arch degree to achieve accurate splicing.
It improves the splicing accuracy of steel box girders, reduces construction safety risks, reduces the investment in support materials, improves construction efficiency, and achieves a safer and more efficient construction process.
Smart Images

Figure CN111188278B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of steel box girder cradles, and in particular, to a cradle structure, a cradle assembly and a construction method. Background Art
[0002] The steel beam part of the steel-concrete composite beam is a straight web open steel box, which is connected to a three-box structure through a cross-beam between the boxes. Shear nails are set on the top to effectively connect with the bridge deck. The installation method mainly adopts the construction method of setting up temporary piers, hoisting on the ground, and integrally cast-in-place concrete bridge deck. Since the steel-concrete composite beam is erected at high altitude, the assembly accuracy is difficult to control when assembling the high-altitude steel box beam, and the construction safety risk is high. In addition, multiple brackets need to be erected during high-altitude assembly, resulting in large investment in bracket materials and low construction efficiency.
[0003] Currently, no effective solution has been proposed to the problems of low assembly precision, high construction safety risks and low construction efficiency caused by high-altitude assembly of steel box girders in related technologies. Summary of the invention
[0004] The main purpose of the present application is to provide a tire frame structure, a tire frame assembly and a construction method to solve the problems of low assembly accuracy, high construction safety risks and low construction efficiency caused by high-altitude assembly of steel box girders in related technologies.
[0005] In order to achieve the above-mentioned purpose, the present application provides a tire frame structure, which includes: a frame body for supporting steel box girders so that multiple steel box girders can be assembled at a position below 100 cm from the ground, and the lower end of the frame body is used to be fixedly connected to a fixed surface.
[0006] Furthermore, a buffer is provided at the upper end of the frame, and the buffer is used to directly contact the steel box girder; the frame includes a support plate 1, a column, a support plate 2 and a load-bearing member arranged in sequence, the support plate 1 is used to be detachably fixedly connected to the fixing surface, and the buffer is provided at the upper end of the load-bearing member.
[0007] Furthermore, support plate one is configured as a steel plate flange, and the steel plate flange is fixedly connected to the fixing surface by anchor bolts; the column is configured as a steel pipe, and the upper and lower ends of the steel pipe are respectively fixedly connected to support plate one and support plate two; support plate two is configured as a circular steel plate welded to the upper end of the steel pipe; wherein the steel pipe is coaxially arranged with support plate one and support plate two.
[0008] Furthermore, the load-bearing member includes an I-beam arranged on the upper end surface of the second support plate and an adjusting steel plate arranged on the upper end surface of the I-beam, the I-beam is located in the middle of the second support plate, and the buffer member is arranged on the upper end surface of the adjusting steel plate.
[0009] A tire frame assembly comprises at least two tire frame structures, wherein at least two of the tire frame structures are fixedly connected via a connecting piece; wherein the connecting piece is configured as an I-beam cross-connection, and two ends of the I-beam cross-connection are respectively fixedly connected to adjacent frames.
[0010] A method for on-site assembly of a steel-concrete composite beam, characterized by comprising:
[0011] A fixed surface is preset, and a frame is installed on the fixed surface, the steel box beam to be assembled is hoisted on the frame, and the height of the steel box beam is below 100 cm from the ground, multiple steel box beams on the frame are assembled, and the assembled steel box beams are hoisted onto the beam frame; wherein,
[0012] (1) The preset fixing surface is used to install and position the embedded parts on the ground and cast the concrete floor;
[0013] (2) The installation frame is to select a column with strength that meets the load-bearing requirements, and weld support plate 1 and support plate 2 at both ends of the column respectively;
[0014] The end of the column welded with the support plate 1 is fixed to the embedded part, the load-bearing part is fixed on the support plate 2, and the height difference between the tire frames is adjusted by selecting load-bearing parts of different sizes. The height of the assembled tire frame is not more than 100cm;
[0015] Adjustable steel plates are installed on the load-bearing parts, and the pre-camber and longitudinal curve between each steel-concrete composite beam are adjusted by selecting steel plates of different thicknesses;
[0016] (3) Lifting the steel box beam is to lift the steel box beam to be assembled onto the load-bearing parts of the tire frame by a crane and adjust the spacing between adjacent steel box beams;
[0017] (4) The top of the steel box girder is connected to the bridge deck through shear nails, the adjacent bridge decks are connected through longitudinal wet joints to form an integral bridge deck, and the adjacent steel box girders are bolted together through crossbeams;
[0018] (5) The steel-concrete composite beam formed after splicing is hoisted onto the beam frame as a whole.
[0019] Furthermore, the specific method of step (1) is: cutting according to the design size of the anchor bolt, bending it into shape, threading the end, using steel plate as the embedded part, and punching 4 holes at corresponding positions on the steel plate with a punching machine, installing the anchor bolts and nuts to form a combined embedded part, and after the embedded part is installed and positioned, supporting the formwork and pouring the concrete floor.
[0020] Furthermore, in step (2), the column is made of Ф426x8 steel pipe, the material is Q235B, the support plate 1 is made of 50x50x2cm steel plate flange, the support plate 2 is made of φ50x2cm steel plate, and the support plate 1 is fixed to the embedded parts by anchor bolts.
[0021] Furthermore, step (2) also includes uniformly welding stiffening ribs along the four sides of the steel pipe, and the stiffening ribs are welded to the adjacent support plate 1 and support plate 2.
[0022] Furthermore, step (2) also includes that each steel box girder corresponds to at least two tire frames, adjacent tire frames are connected by a transverse connection, and the load-bearing parts are I-beams, and the height difference of each I-beam is set according to the designed pre-camber of the steel-concrete composite beam.
[0023] In the embodiment of the present application, a method of installing a frame for low-altitude assembly of steel box girders on the ground is adopted. By fixing the frame for supporting the steel box girders on a fixed surface, multiple steel box girders can be assembled at a position below 100 cm from the ground, thereby achieving the purpose of assembling the steel box girders at a position lower than the ground, thereby achieving the technical effect of improving the splicing accuracy of the steel box girders, reducing construction safety risks, reducing support investment, and improving construction efficiency, thereby solving the problems of low assembly accuracy, high construction safety risks, and low construction efficiency caused by high-altitude assembly of steel box girders in related technologies. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The drawings constituting a part of this application are used to provide a further understanding of this application, so that other features, purposes and advantages of this application become more obvious. The schematic embodiment drawings and their descriptions of this application are used to explain this application and do not constitute an improper limitation on this application. In the drawings:
[0025] Figure 1 is a schematic structural diagram according to an embodiment of the present application;
[0026] Figure 2 yes Figure 1 Schematic diagram of the cross-sectional structure of AA;
[0027] Figure 3 is a schematic diagram of the structure of the frame in an embodiment of the present application;
[0028] Among them, 1 is a fixing surface, 2 is an anchor bolt, 3 is a frame, 31 is a buffer, 32 is a load-bearing member, 33 is a second support plate, 34 is a column, 35 is a stiffening rib, 36 is a first support plate, 4 is a connecting member, and 5 is a steel box girder. DETAILED DESCRIPTION
[0029] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0030] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so as to describe the embodiments of the present application described herein.
[0031] In this application, the terms "upper", "lower", "inner", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.
[0032] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in this application can be understood according to specific circumstances.
[0033] In addition, the terms "disposed", "provided with", "connected", "fixed" and the like should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements or components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to the specific circumstances.
[0034] In addition, the term "plurality" shall mean two or more.
[0035] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0036] like Figures 1 to 3 As shown, an embodiment of the present application provides a tire frame structure, including: a frame body 3 for supporting a steel box beam 5, so that a plurality of steel box beams 5 can be assembled at a position below 100 cm from the ground, and the lower end of the frame body 3 is used for fixed connection with a fixed surface 1.
[0037] In this embodiment, the steel box girder 5 is supported by the frame 3 so that the steel box girder 5 is assembled at a position 100 cm above the ground, including bridge deck fixation and wet joint construction, etc. The height of the steel box girder 5 from the ground is controlled by the height of the frame 3, preferably 40-80 cm or 60 cm, which is convenient for construction and reduces construction risks. Since the construction of the support is reduced, the construction efficiency is effectively improved, and the support materials are saved, reducing the construction cost. The lower end of the frame 3 is fixed to the fixed surface 1, and the fixed surface 1 can be a ground with higher hardness or a concrete ground after pouring, preferably a concrete ground with a hardness that meets the standard after pouring, to prevent the frame 3 from sinking.
[0038] like Figures 1 to 3 As shown, a buffer member 31 is provided at the upper end of the frame 3, and the buffer member 31 is used to directly contact the steel box girder 5. The frame 3 includes a support plate 1 36, a column 34, a support plate 2 33 and a load-bearing member 32 arranged in sequence. The support plate 1 36 is used to be detachably fixedly connected to the fixing surface 1, and the buffer member 31 is arranged at the upper end of the load-bearing member 32; wherein the buffer member 31 is set as a rubber pad.
[0039] Specifically, it should be noted that the frame 3 is composed of a support plate 1 36 and a column 34 arranged on the support plate 1 36, a support plate 2 33 arranged on the column 34 and a load-bearing member 32 arranged on the support plate 2 33. The support plate 1 36 is connected to the fixed surface 1, and the fixed surface 1 can be a concrete hardened ground, thereby providing good supporting capacity. The support plate 1 36 and the fixed surface 1 are detachably connected, which is convenient for the installation and disassembly of the entire frame 3 and makes the frame 3 reusable. The column 34 is arranged on the support plate 1 36 and can be welded to the support plate 1 36. The column 34 is welded to the support plate 2 33. The buffer member 31 at the upper end of the load-bearing member 32 is in direct contact with the lower end of the steel box girder 5. The impact force caused by the steel box girder 5 during installation is buffered by the buffer member 31 to ensure the integrity of the structure. The buffer member 31 can be set as a rubber pad, which is easy to obtain and has a good buffering effect. The load-bearing member 32 is used to distribute the gravity of the steel box girder 5 to the column 34. The load-bearing member 32 can adopt a structure with strong supporting force.
[0040] like Figures 1 to 3 As shown, support plate 1 36 is configured as a steel plate flange, which is fixedly connected to the fixing surface 1 by anchor bolts 2; column 34 is configured as a steel pipe, and the upper and lower ends of the steel pipe are respectively fixedly connected to support plate 1 36 and support plate 2 33; support plate 2 33 is configured as a circular steel plate welded to the upper end of the steel pipe; wherein the steel pipe is coaxially arranged with support plate 1 36 and support plate 2 33.
[0041] Specifically, it should be noted that the support plate 36 is made of a steel plate flange, the fixing surface 1 is made of a concrete hardened ground, and a pre-buried steel plate matching the steel plate flange can be buried in the fixing surface 1, and the steel plate flange is connected to the pre-buried steel plate through the anchor bolt 2 flange to further improve the connection strength, and the column 34 is set with a steel pipe, and the size of the steel pipe is set to The material of the steel pipe is Q235B, so [σ] = 170MPa, [τ] = 117MPa;
[0042] The calculated cross-sectional area of the steel pipe is A = 105.055 cm 2 =0.0105055m 2 ;
[0043] The turning radius of the steel pipe: i = 14.781 cm;
[0044] The support height H of this steel beam is 50cm, then L 0 =H=50cm;
[0045] Therefore, the slenderness ratio is: Satisfies stability.
[0046] According to the Code for Design of Steel Structures GB 50017-2017, steel columns belong to Class B cross-section members. According to the stability coefficient of Class B cross-section, we can get:
[0047] Allowable support force of a single steel pipe:
[0048]
[0049] Force calculation of steel pipe column support: N=1.2×265 / 26T=12.2T<143.2T, which meets the requirements.
[0050] Furthermore, the steel pipe, the support plate 1 36 and the support plate 2 33 are coaxially arranged so that the forces on the three are more evenly distributed, thus ensuring the stability of the frame 3 in use.
[0051] like Figures 1 to 3 As shown, a plurality of stiffening ribs 35 are provided between the steel pipe and the first support plate 36 and between the steel pipe and the second support plate 33, and the stiffening ribs 35 are evenly distributed along the circumference of the steel pipe.
[0052] Specifically, it should be noted that the stiffening ribs 35 further improve the connection strength between the steel pipe and the support plate 1 36 , and between the steel pipe and the support plate 2 33 , thereby improving the overall structural strength of the frame 3 .
[0053] like Figures 1 to 3As shown, the load-bearing member 32 includes an I-beam disposed on the upper end surface of the second support plate 33 and an adjusting steel plate disposed on the upper end surface of the I-beam. The I-beam is located in the middle of the second support plate 33, and the buffer member 31 is disposed on the upper end surface of the adjusting steel plate.
[0054] Specifically, it should be noted that the I-beam has good load-bearing capacity and is light in weight. In order to further improve the load-bearing capacity, the I-beam can be a double-piece I-beam. The I-beam is located in the middle of the support plate 33, so that the I-beam and the support plate 33 are coaxially arranged, so that the force is more uniform. An adjusting steel plate is placed on the I-beam to finely adjust the elevation of the steel box girder 5. The number and size of the adjusting steel plates can be determined according to the construction conditions and are not limited here.
[0055] like Figures 1 to 3 As shown, an embodiment of the present application provides a tire frame assembly, including at least two tire frame structures, and the at least two tire frame structures are fixedly connected by a connecting member 4.
[0056] In this embodiment, the tire frame assembly is composed of at least two tire frame structures, each tire frame assembly supports a steel box girder 5, so that the steel box girder 5 is loaded by at least two tire frame structures to ensure stability during use, and the tire frame structures are fixed by connecting members 4 to prevent the tire frame structures from overturning during use.
[0057] like Figures 1 to 3 As shown, the connecting member 4 is configured as an I-beam cross-connection, and the two ends of the I-beam cross-connection are respectively fixedly connected to the adjacent frames 3.
[0058] Specifically, it should be noted that the I-beam cross-connection has a strong structural strength, and both ends are respectively fixed to the corresponding frame body 3 to prevent the tire frame structure from overturning during use.
[0059] like Figures 1 to 3 As shown, an embodiment of the present application provides an assembly structure, including a plurality of steel box girders 5 arranged in sequence, each of the steel box girders 5 having at least one tire frame structure at the lower end, the upper end of the tire frame structure being connected to the lower end of the steel box girder 5, at least two tire frame structures being provided, at least two tire frame structures being fixedly connected by a connecting member 4, the tire frame structure being provided below the cross-diaphragm of the steel box girder 5, and adjacent steel box girders 5 being bolted together by cross beams.
[0060] Specifically, it should be noted that the steel box girder 5 is sequentially erected on the tire frame structure along the horizontal direction, that is, erected on the frame 3, and there are at least two tire frame structures, so that the load of the steel box girder 5 is distributed on at least two tire frame structures to ensure stability in use. The tire frame structure is fixed by a connecting piece 4 to avoid overturning during use. Adjacent steel box girders 5 are bolted by cross beams to increase the structural strength of the steel box girder 5 after assembly.
[0061] like Figures 1 to 3As shown, a method for on-site assembly of a steel-concrete composite beam comprises:
[0062] A fixed surface 1 is preset, and a frame 3 is installed on the fixed surface 1, and the steel box beam 5 to be assembled is hoisted on the frame 3, and the height of the steel box beam 5 from the ground is less than 100 cm, and multiple steel box beams 5 on the frame 3 are assembled, and the assembled steel box beams 5 are hoisted onto the beam frame; wherein,
[0063] (1) The preset fixing surface 1 is used to install and position the embedded parts on the ground and to support the formwork and cast the concrete floor;
[0064] (2) The mounting frame 3 is a column 34 whose strength meets the load-bearing requirements, and a support plate 1 36 and a support plate 2 33 are welded to both ends of the column 34;
[0065] One end of the column 34 welded with the support plate 1 36 is fixed to the embedded part, the load-bearing member 32 is fixed on the support plate 2 33, and the height difference between the tire frames is adjusted by selecting the load-bearing members 32 of different sizes, and the height of the assembled tire frame is not more than 100 cm;
[0066] An adjustable steel plate is installed on the load-bearing member 32, and the pre-camber and longitudinal curve between each steel-concrete composite beam are adjusted by selecting steel plates of different thicknesses;
[0067] (3) Hoisting the steel box beam 5 is to hoist the steel box beam 5 to be assembled onto the load-bearing member 32 of the tire frame by a crane and adjust the distance between adjacent steel box beams 5;
[0068] (4) The top of the steel box girder 5 is connected to the bridge deck through shear nails, the adjacent bridge decks are connected through longitudinal wet joints to form an integral bridge deck, and the adjacent steel box girders 5 are bolted together through cross beams;
[0069] (5) The steel-concrete composite beam formed after splicing is hoisted onto the beam frame as a whole.
[0070] The specific method of step (1) is as follows: cutting according to the design size of the anchor bolt 2, bending into shape, threading the end, using steel plates as embedded parts, and punching 4 holes at corresponding positions on the steel plates with a punching machine, installing the anchor bolts 2 and nuts to form a combined embedded part, and after the embedded parts are installed and positioned, supporting the formwork and pouring the concrete floor.
[0071] In step (2), the column 34 is made of a 426x8cm steel pipe made of Q235B, the support plate 1 36 is made of a 50x50x2cm steel plate flange, and the support plate 2 33 is made of The steel plate, support plate 36 is fixed to the embedded parts through anchor bolts 2.
[0072] Step (2) also includes uniformly welding stiffening ribs 35 around the steel pipe, and the stiffening ribs 35 are welded to the adjacent support plate 1 36 and support plate 2 33 .
[0073] Step (2) also includes that each steel box girder 5 corresponds to at least two tire frames, adjacent tire frames are connected by a transverse connection, and the load-bearing member 32 is an I-beam, and the height difference of each I-beam is set according to the designed pre-camber of the steel-concrete composite beam.
[0074] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A method for on-site assembly of steel-concrete composite beams, characterized in that: include: A fixed surface is preset, and a frame is installed on the fixed surface, the steel box beam to be assembled is hoisted on the frame, and the height of the steel box beam is below 100 cm from the ground, multiple steel box beams on the frame are assembled, and the assembled steel box beams are hoisted onto the beam frame; wherein, (1) The preset fixing surface is used to install and position the embedded parts on the ground and cast the concrete floor with formwork; (2) The installation frame is to select a column with strength that meets the load-bearing requirements, and weld support plate 1 and support plate 2 at both ends of the column respectively; The end of the column welded with the support plate 1 is fixed to the embedded part, the load-bearing part is fixed on the support plate 2, and the height difference between the tire frames is adjusted by selecting load-bearing parts of different sizes. The height of the assembled tire frame is not more than 100cm; Adjustable steel plates are installed on the load-bearing parts, and the pre-camber and longitudinal curve between each steel-concrete composite beam are adjusted by selecting steel plates of different thicknesses; (3) Lifting the steel box beam is to lift the steel box beam to be assembled onto the load-bearing parts of the tire frame by a crane and adjust the spacing between adjacent steel box beams; (4) The top of the steel box girder is connected to the bridge deck through shear nails, the adjacent bridge decks are connected through longitudinal wet joints to form an integral bridge deck, and the adjacent steel box girders are bolted together through crossbeams; (5) hoisting the steel-concrete composite beam formed after splicing onto the beam frame as a whole; The tire frame comprises at least two tire frame structures, and at least two of the tire frame structures are fixedly connected by a connecting piece; wherein the connecting piece is an I-beam cross-connection, and the two ends of the I-beam cross-connection are respectively fixedly connected to adjacent frames; The tire frame structure includes: a frame body for supporting the steel box beam, so that multiple steel box beams can be assembled at a position below 100 cm from the ground, and the lower end of the frame body is used for fixed connection with the fixing surface; A buffer is provided at the upper end of the frame, and the buffer is used to directly contact the steel box girder; The frame body comprises a support plate 1, a column, a support plate 2 and a load-bearing member arranged in sequence, the support plate 1 is used to be detachably fixedly connected to the fixing surface, and the buffer member is arranged at the upper end of the load-bearing member; The support plate 1 is configured as a steel plate flange, and the steel plate flange is fixedly connected to the fixing surface by anchor bolts; The column is configured as a steel pipe, and the upper and lower ends of the steel pipe are fixedly connected to the support plate 1 and the support plate 2 respectively; The second support plate is a circular steel plate welded to the upper end of the steel pipe; wherein, The steel pipe is coaxially arranged with the support plate 1 and the support plate 2; The load-bearing member includes an I-beam disposed on the upper end surface of the second support plate and an adjusting steel plate disposed on the upper end surface of the I-beam, the I-beam is located in the middle of the second support plate, and the buffer member is disposed on the upper end surface of the adjusting steel plate; The impact force caused by the installation of the steel box girder is buffered by buffer parts to ensure the integrity of the structure.
2. The on-site assembly construction method of steel-concrete composite beams according to claim 1 is characterized in that: The specific method of step (1) is as follows: cutting according to the design size of the anchor bolt, bending and forming, threading the end, using steel plate as the embedded part, punching 4 holes at corresponding positions on the steel plate with a punching machine, installing the anchor bolts and nuts to form a combined embedded part, and after the embedded part is installed and positioned, supporting the formwork and pouring the concrete floor.
3. The on-site assembly construction method of steel-concrete composite beams according to claim 2 is characterized in that: In the step (2), the column is made of a Ф426×8cm steel pipe made of Q235B, the support plate 1 is made of a 50×50×2cm steel plate flange, the support plate 2 is made of a φ50×2cm steel plate, and the support plate 1 is fixed to the embedded parts by anchor bolts.
4. The on-site assembly construction method of steel-concrete composite beams according to claim 3 is characterized in that: The step (2) also includes uniformly welding stiffening ribs along the periphery of the steel pipe, wherein the stiffening ribs are welded to adjacent support plates 1 and 2.
5. The on-site assembly construction method of steel-concrete composite beams according to claim 4 is characterized in that: The step (2) also includes that each steel box girder corresponds to at least two tire frames, adjacent tire frames are connected by a transverse connection, and the load-bearing parts are I-beams, and the height difference of each I-beam is set according to the designed pre-camber of the steel-concrete composite beam.