An automated production line and production process for building wall materials
By designing a new type of automated production line for building wall materials, using multi-layer conveying equipment, shuttle trucks and lifting equipment to achieve automatic loading and unloading of molds and efficient production of molding materials, the problems of large labor intensity and low production capacity of existing production lines have been solved, and production has been significantly improved efficiency.
Patent Information
- Application Number
- CN202010218675.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-03-25
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2040-03-25
AI Technical Summary
The existing building wall material production lines have high labor intensity, low production capacity, low production efficiency, and lack the degree of automation.
A new type of automated production line for building wall materials was designed, including a crystallization furnace for multi-layer crystallization rollers, a conveying device for carrying molding molds, a fabric device and an automated working device, through multi-layer conveying equipment and a shuttle truck and lifting equipment realize automatic loading and unloading of molds and efficient production of molding materials.
It improves the mechanization and automation of building wall materials, reduces the intensity of manual labor, significantly improves production efficiency, and realizes the automated circular manufacturing of materials.
Smart Images

Figure CN111231096B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of new building wall materials, in particular to an automatic production line and production process of new building wall materials. Background Art
[0002] The existing production lines used for domestic building wall materials are all single-layer roller kiln production equipment. The materials on the production line, such as mold side plates, molding materials, mold bottom plates, raw materials and other assemblies, are all loaded and unloaded manually, which has high labor intensity, low production capacity and low production efficiency. Summary of the invention
[0003] The present invention aims to provide an automated production line and production process for a new type of building wall material, so as to improve the mechanization and automation degree of the new type of building wall material, reduce the intensity of manual labor and improve production efficiency.
[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a new type of building wall material automatic production line, including a crystallization molding furnace with a multi-layer crystallization molding roller, a conveying device for carrying the molding mold in and out of the crystallization molding furnace, a feeding device for injecting raw materials into the molding mold, and an automatic operation device for disassembling the molding mold and taking the molding material out of the molding mold;
[0005] The conveying device includes two first fixed multi-layer conveying devices respectively arranged at both ends of the crystallization molding furnace, two second fixed multi-layer conveying devices arranged on the same side of the crystallization molding furnace, and a single-layer conveying device arranged between the two second fixed multi-layer conveying devices; the conveying direction of the first fixed multi-layer conveying device coincides with the conveying direction of the crystallization molding furnace, the conveying directions of the second fixed multi-layer conveying device and the single-layer conveying device are consistent and parallel to the conveying direction of the crystallization molding furnace, a multi-layer ferry is slidably provided between the first fixed multi-layer conveying device and the second fixed multi-layer conveying device located at the same end of the crystallization molding furnace, and the molding mold can be ferried and transferred between the first fixed multi-layer conveying device and the second fixed multi-layer conveying device by the multi-layer ferry; lifting devices are provided between the single-layer conveying device and the second fixed multi-layer conveying devices located at both ends of the single-layer conveying device, so as to transfer the molding mold between each layer of the single-layer conveying device and the second fixed multi-layer conveying device at the corresponding position by the lifting devices;
[0006] The material distribution device is arranged on the single-layer conveying equipment and is close to the entrance of the crystallization molding furnace. The automatic operation device is arranged on the single-layer conveying equipment and is close to the exit of the crystallization molding furnace.
[0007] Preferably, the crystallization molding furnace has three layers of crystallization molding rollers, and the first fixed multi-layer conveying equipment, the second fixed multi-layer conveying equipment and the multi-layer shuttle bus all have three layers.
[0008] Preferably, the first fixed multi-layer conveying device, the second fixed multi-layer conveying device and the multi-layer shuttle bus all include a first frame composed of a first column and a crossbeam, on which a first conveying roller, a second conveying roller and a third conveying roller are arranged in sequence from bottom to top, and the first conveying roller, the second conveying roller and the third conveying roller respectively include a plurality of first conveying roller shafts distributed horizontally, and the ends of the first conveying roller shafts are rotatably arranged on the crossbeam and are provided with a first sprocket; a first motor for driving the first conveying roller through a first chain and a first sprocket structure and a second motor for driving the second conveying roller through the first chain and the first sprocket structure are provided at the bottom of the first frame, and a motor for driving the second conveying roller through the first chain and the first sprocket structure is provided at the top of the first frame The sprocket structure drives the third motor of the third conveyor roller, and a first tensioning mechanism for tensioning the three first chains is correspondingly provided on the first column; the first tensioning mechanism includes two fixed wheels rotatably arranged on the first column and a lifting wheel slidably arranged on the first column in a vertical direction, the two fixed wheels are horizontally spaced apart, the first chain is wound around the opposite surfaces of the two fixed wheels and then wound around the lifting wheel, the axle of the lifting wheel is fixed on a slide plate slidably arranged on the first column in a vertical direction, a screw is provided on the slide plate at a position opposite to one side of the two fixed wheels, one end of the screw opposite to the slide plate is penetrated in a support plate fixed on the first column, and nuts for fixing the screw are respectively provided on the screw at positions on the upper and lower sides of the support plate.
[0009] Preferably, the lower ends of the first columns of the first fixed multi-layer conveying equipment and the second fixed multi-layer conveying equipment are fixedly set on the ground, the lower end of the first column of the multi-layer ferry car is provided with rollers, and a rollerway for cooperating with the rollers on the corresponding multi-layer ferry car is provided between the first fixed multi-layer conveying equipment and the second fixed multi-layer conveying equipment.
[0010] Preferably, the single-layer conveying device comprises a second frame composed of a plurality of horizontal beams and vertical legs, a plurality of second conveying roller shafts rotatably arranged on the second frame, and a fourth motor for driving the second conveying roller shafts to rotate, the second conveying roller shafts are connected to the output shaft of the fourth motor by a second chain and a second sprocket structure, the horizontal beams and the vertical legs are both made of grooved profiles, the circumference of the grooved profiles has T-shaped grooves distributed along the length direction thereof, two horizontal beams located in the same direction are connected by a straight connecting piece, and the horizontal beams and the vertical legs are connected by a right-angle connecting piece;
[0011] The cross-sectional shape of the linear connector is T-shaped, and a plurality of threaded holes penetrating the thickness direction of the linear connector are arranged at intervals on the linear connector, and the linear connector can be fixed on the horizontal beam by screwing into the threaded holes and tightly contacting the bottom of the T-shaped slot;
[0012] A first bolt hole is provided on one right angle side of the right angle connector for the bolt head to be clamped in the T-shaped slot on the horizontal beam and for the bolt to be installed in cooperation, and a second bolt hole is provided on the other right angle side for the bolt head to be clamped in the T-shaped slot on the vertical leg and for the bolt to be installed in cooperation;
[0013] The fourth motor is liftably arranged on a base plate fixed on the second frame, and a strip hole is provided on the base plate for the fourth motor to slide in the vertical direction. The fourth motor is assembled in the strip hole by means of assembly bolts, and top screws for fixing the lifting position of the fourth motor on the base plate are respectively installed on the upper and lower sides of the base plate.
[0014] Preferably, the lifting equipment includes a third frame, a single-layer roller conveyor arranged in the third frame, and a lifting control device for controlling the single-layer roller conveyor to slide in a vertical direction; the lifting control device includes a fifth motor fixed on the top of the third frame and two steering gears located on both sides of the fifth motor, the input shafts of the two steering gears are both transmission-connected to the output shaft of the fifth motor, the output shafts of the two steering gears are parallel to each other, and are respectively connected to the single-layer roller conveyor at the axial ends of the two steering gear output shafts; the chain mechanism includes a driving sprocket fixed on the steering gear output shaft and a driven sprocket rotatably arranged at the bottom of the third frame and located directly below the driving sprocket, a third chain is wound around the driving sprocket, a fourth chain is wound around the driven sprocket, the corresponding ends on one side of the third chain and the fourth chain are both fixedly connected to the frame of the single-layer roller conveyor, and the corresponding ends on the other side are both fixed on the counterweight block, so that the third chain, the counterweight block, the fourth chain and the frame of the single-layer roller conveyor sequentially form a closed ring structure.
[0015] Preferably, the automated operating device includes a fourth frame, a trolley that can be slidably arranged on the fourth frame in a horizontal direction, and a third column that can be raised and lowered on the trolley in a vertical direction. The third column is distributed throughout the trolley, and a universal flange for connecting the operating mechanism is fixedly provided at the bottom end of the third column; a seventh motor and a cylinder for driving the third column to rise and fall are provided on the trolley, and a first gear is provided on the output shaft of the seventh motor. The first gear is meshed and connected with a first rack fixed on the third column in a vertical direction. The cylinder body of the cylinder is fixed on the trolley and is located on a side of the third column opposite to the first rack, and the piston rod of the cylinder is fixedly connected to the third column; a first linear guide distributed in a vertical direction is fixedly provided on the third column, and a first slider for sliding with the first linear guide is provided on the trolley.
[0016] Preferably, the cloth-distributing device has a cloth-distributing duckbill and a material-containing mold arranged below the cloth-distributing duckbill, the cloth-distributing duckbill is a horizontally arranged flat long strip structure, a feeding port and a discharging port are respectively arranged at the top and bottom ends of the cloth-distributing duckbill, and is characterized in that: an anti-impact component is arranged below the cloth-distributing duckbill, the anti-impact component comprises a cylindrical device shell, a mounting plate, a driving motor, a pulley and two bearing seats, the device shell is horizontally arranged below the cloth-distributing duckbill, and is butt-jointed with the discharging port of the cloth-distributing duckbill up and down, a sealing end cover is respectively arranged at the left and right ends of the device shell, the mounting plate is fixed on one of the sealing end covers, and a sealing end cover is symmetrically arranged on the mounting plate and the other sealing end cover Two bearing seats are arranged, and a central rotating shaft is arranged inside the cylindrical equipment shell along its axial direction. The two ends of the central rotating shaft are respectively mounted on the two bearing seats. The outer sleeve of the central rotating shaft is provided with an impeller for buffering falling materials. The impeller includes a sleeve fixed on the central rotating shaft and a plurality of blades evenly arranged along the circumference of the sleeve. The blades are rectangular and arranged perpendicular to the outer surface of the sleeve. The driving motor is fixed on one side of the mounting plate, and the driving motor drives the central rotating shaft to rotate through a pulley to realize the rotation of the impeller in the cylindrical equipment shell. A discharge pipe is docked at the bottom of the equipment shell, and the end of the discharge pipe is arranged just above the material holding mold.
[0017] A production process for producing new building wall materials by using the above-mentioned new building wall material automatic production line comprises the following steps:
[0018] 1) Place the mold bottom plate and mold side plate in the forming mold on the mold disassembly and assembly station on the single-layer conveying equipment, and the mold disassembly and assembly mechanism combines the mold bottom plate and mold side plate into a forming mold;
[0019] 2) The forming mold is transported to the material distribution station through the single-layer conveying equipment, and the powdered raw material to be crystallized and formed is placed in the forming mold by the material distribution device;
[0020] 3) The single-layer conveying device continues to convey the forming mold to the lifting device, and the lifting device distributes the forming mold to each layer of the second fixed multi-layer conveying device, and the multi-layer shuttle car ferries the forming mold in the second fixed multi-layer conveying device to the first fixed multi-layer conveying device, and finally the first fixed multi-layer conveying device conveys the forming mold into the crystallization molding furnace;
[0021] 3) The raw materials in the forming molds on the crystallization rollers in each layer are crystallized and sintered by the crystallization forming furnace, and the raw materials are crystallized and formed to form the forming material when the forming molds are transported to the position close to the exit of the crystallization forming furnace;
[0022] 4) The molding material after crystallization molding in step 3) enters the first fixed multi-layer conveying device located at the exit of the crystallization molding furnace along with the molding mold, and then is transported to the second fixed multi-layer conveying device at the corresponding position by the multi-layer shuttle bus. The molding molds on the second fixed multi-layer conveying device are successively transported to the single-layer conveying device by the lifting device. After the molding molds are transported to the mold disassembly station by the single-layer conveying device, the molding molds are disassembled by the mold disassembly mechanism, and the molding materials are removed by the unloading manipulator mechanism. After the molding molds are assembled again by the mold disassembly mechanism, the assembled molding molds are transported toward the material distribution station by the single-layer conveying device.
[0023] 5) Repeat the above steps 2) to 4).
[0024] Beneficial Effects
[0025] The present invention is mainly used in the production line of new building wall materials, and is an intelligent automatic manufacturing production line of new building wall materials. The production line can complete the automatic cycle manufacturing of materials on the production line, such as mold side plates, molding materials, mold bottom plates, raw materials, etc., in sequence through conveying equipment, crystallization molding equipment, automatic lifting equipment, automatic operation equipment, etc., to meet the needs of the automatic production process of the production line of new building wall materials, not only with a fast production cycle, but also with reduced labor intensity, thereby improving the production efficiency of the production line. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the main structure of the present invention;
[0027] Figure 2 It is a schematic diagram of the top view structure of the present invention;
[0028] Figure 3 It is a schematic diagram of the state of the molding die in the present invention before entering the crystallization molding furnace;
[0029] Figure 4 It is a schematic diagram of the state of the molding die in the present invention after passing through the crystallization molding furnace;
[0030] Figure 5 It is a three-dimensional structural schematic diagram of the first fixed multi-layer conveying equipment, the second fixed multi-layer conveying equipment or the multi-layer shuttle bus in the present invention;
[0031] Figure 6 It is a front view of the first fixed multi-layer conveying equipment, the second fixed multi-layer conveying equipment or the multi-layer shuttle bus in the present invention;
[0032] Figure 7 for Figure 5 A partially enlarged structural schematic diagram of the first tensioning mechanism part;
[0033] Figure 8 for Figure 5 A schematic diagram of a partial three-dimensional structure of the first tensioning mechanism;
[0034] Fig. 9 It is a front view of the single-layer conveying device in the present invention;
[0035] Fig.10 It is a schematic diagram of the end surface structure of the grooved profile in the single-layer conveying equipment;
[0036] Fig.11 It is a schematic diagram of the connection relationship between two horizontal beams in a single-layer conveying equipment;
[0037] Fig.12 for Fig.11 A partial enlarged schematic diagram of part A;
[0038] Fig.13 It is a schematic diagram of the connection relationship between the horizontal beam and the vertical legs in the single-layer conveying equipment;
[0039] Fig.14 A schematic diagram of the fourth motor arrangement in the single-layer conveying device;
[0040] Fig.15 It is a schematic diagram of the three-dimensional structure of the lifting device in the present invention;
[0041] Fig.16 It is a structural schematic diagram of the chain mechanism part in the lifting equipment;
[0042] Fig.17 for Fig.15 A partial enlarged schematic diagram of part B;
[0043] Fig.18 It is a schematic diagram of the three-dimensional structure of the automated operation device in the present invention;
[0044] Fig.19 for Fig.18 A partial enlarged schematic diagram of part C in the middle;
[0045] Fig. 20 It is a structural schematic diagram of the material distribution device in the present invention;
[0046] Fig.21 It is a schematic diagram of the longitudinal section structure of the material distribution device;
[0047] Fig. 22 The schematic diagram of the material distribution device structure is shown in FIG.
[0048] Markings in the figure: 1. Second fixed multi-layer conveying equipment, 2. Lifting equipment, 3. Automated operation device, 4. Material distribution device, 5. Single-layer conveying equipment, 6. Roller, 7. Roller, 8. Multi-layer shuttle, 9. First fixed multi-layer conveying equipment, 10. Crystallization molding furnace, 11. First frame, 1101. Beam, 1102. First column, 12. First tensioning mechanism, 1201. Fixed wheel, 1202. Guide groove, 1203. Lifting wheel, 1204. Slide plate, 1205. Support plate, 1206. Screw, 1207. Nut, 13. Second motor, 14. First motor, 15. First conveying roller , 16, second conveyor roller, 17, third motor, 18, third conveyor roller, 19, first chain, 20, first sprocket, 21, fourth motor, 22, seat plate, 23, vertical leg, 24, right-angle connector, 2401, flange, 2402, base plate, 2403, second bolt hole, 2404, first bolt hole, 25, horizontal beam, 26, second sprocket, 27, second conveyor roller, 28, second chain, 29, idler, 30, T-slot, 31, threaded hole, 32, straight connector, 33, top screw, 34, strip hole, 35, third frame, 3501, second column, 36, fifth motor , 37, steering gear, 38, chain mechanism, 3801, driving sprocket, 3802, third chain, 3803, driven sprocket, 3804, fourth chain, 3805, counterweight, 39, single-layer roller, 3901, conveyor roller, 3902, frame, 3903, second tensioning mechanism, 3904, sixth motor, 40, guide wheel, 41, V-shaped guide roller, 42, trolley, 43, third column, 44, fourth frame, 45, universal flange, 46, anti-collision rod, 47, second slider, 48, first slider, 49, cylinder, 50, first linear guide rail, 51, first rack, 52, first gear, 53. The seventh motor, 54. The pulley, 55. The synchronous pulley structure, 56. The plane guide rail, 57. The eighth motor, 58. The transmission shaft, 59. The second gear, 60. The second rack, 61. The second linear guide rail, 62. The limit block, 63. The mold paper, 64. The mold bottom plate, 65. The mold side plate, 66. The raw material, 67. The molding material, 68. The molding mold, 69. The cloth duckbill, 70. The material holding mold, 71. The feed port, 72. The equipment shell, 73. The mounting plate, 74. The driving motor, 75. The pulley, 76. The bearing seat, 77. The sealing end cover, 78. The center shaft, 79. The impeller, 80. The discharge pipe. DETAILED DESCRIPTION
[0049] like Figure 1 and Figure 2As shown, a novel automatic production line for building wall materials of the present invention comprises a crystallization molding furnace 10 with three layers of crystallization molding rollers, a conveying device for carrying a molding mold 68 in and out of the crystallization molding furnace 10, a material distribution device 4 for injecting raw materials 66 into the molding mold 68, and an automatic operation device 3 for disassembling the molding mold 68 and taking the molding material 67 out of the molding mold 68. The crystallization molding furnace 10 is similar to the patent CN207716845U for a slow cooling roller kiln for firing foamed ceramics, and no specific description is given. Figure 3 As shown, the structure of the molding die 68 is a rectangular structure with an open top formed by a mold bottom plate 64 and four mold bottom plates 64, through which the powdered raw material 66 can be injected into the inner cavity of the molding die 68. Figure 4 As shown, the raw material 66 is crystallized, shaped and expanded to form the molding material 67 .
[0050] The conveying device includes two first fixed multi-layer conveying devices 9 respectively arranged at the two ends of the crystallization molding furnace 10, two second fixed multi-layer conveying devices 1 arranged at the same side of the crystallization molding furnace 10, and a single-layer conveying device 5 arranged between the two second fixed multi-layer conveying devices 1. The conveying direction of the first fixed multi-layer conveying device 9 coincides with the conveying direction of the crystallization molding furnace 10, and the conveying directions of the second fixed multi-layer conveying device 1 and the single-layer conveying device 5 are consistent and parallel to the conveying direction of the crystallization molding furnace 10. A multi-layer ferry 8 is slidably provided between the first fixed multi-layer conveying device 9 and the second fixed multi-layer conveying device 1 located at the same end of the crystallization molding furnace 10, and the forming mold 68 can be ferryed and transferred between the first fixed multi-layer conveying device 9 and the second fixed multi-layer conveying device 1 by the multi-layer ferry 8. A lifting device 2 is provided between the single-layer conveying device 5 and the second fixed multi-layer conveying device 1 located at both ends of the single-layer conveying device 5, so that the forming mold 68 can be transferred between the single-layer conveying device 5 and each layer of the second fixed multi-layer conveying device 1 at the corresponding position by the lifting device 2.
[0051] The material distribution device 4 is arranged on the single-layer conveying device 5 and is close to the entrance of the crystallization molding furnace 10. The automated operation device 3 is arranged on the single-layer conveying device 5 and is close to the exit of the crystallization molding furnace 10. The automated operation device 3 is provided with a mold disassembly and assembly mechanism and a discharge manipulator. The mold disassembly and assembly mechanism and the discharge manipulator structure are similar to the disclosed patent CN201920242004.9, a flexible gripping device for firing a foamed ceramic insulation board, and will not be described in detail here.
[0052] like Figure 5 and Figure 6As shown, the first fixed multi-layer conveying device 9, the second fixed multi-layer conveying device 1 and the multi-layer shuttle bus 8 in the present invention all include a first frame 11, a three-layer conveying roller set on the first frame 11 and three motors respectively used to drive the three-layer conveying rollers.
[0053] The first frame 11 is a rectangular frame structure, and is composed of a first column 1102 made of channel steel and a crossbeam 1101. The notches of the first column 1102 are distributed toward the middle of the first frame 11, and the notches of the crossbeam 1101 are distributed in a direction opposite to the middle of the first frame 11. The bottom and top positions of the first frame 11 are both provided with motor frames for fixing the motor.
[0054] There are three conveyor rollers, which are the first conveyor roller 15, the second conveyor roller 16 and the third conveyor roller 18 from bottom to top. The first conveyor roller 15, the second conveyor roller 16 and the third conveyor roller 18 each include a plurality of first conveyor roller shafts distributed horizontally. The ends of the first conveyor roller shafts are rotatably arranged on the crossbeam 1101, and the crossbeam 1101 is provided with bearing seats for the rotation of the first conveyor roller shafts at intervals. The ends of the first conveyor roller shafts are inserted into the groove body of the crossbeam 1101 and fixed with the first sprocket 20, and the first sprocket 20 is connected to the motor through the first chain 19, so that the conveying shaft is driven to rotate by the motor, so that the conveyor roller performs the conveying operation.
[0055] The first motor 14 for driving the first conveying roller 15 and the second motor 13 for driving the second conveying roller 16 are arranged on the motor frame at the bottom of the first frame 11. The third motor 17 for driving the third conveying roller 18 is arranged on the motor frame at the top of the first frame 11.
[0056] In order to keep each first chain 19 in a tensioned state during the transmission process and improve the stability of the transmission system, the present invention provides a first tensioning mechanism 12 in the first column 1102 corresponding to the end of each conveying roller away from the motor. Figure 7 As shown, the first tensioning mechanism 12 includes two fixed wheels 1201 rotatably arranged on the first column 1102 and a lifting wheel 1203 slidably arranged on the first column 1102 in the vertical direction. Like the first sprocket 20, the fixed wheels 1201 and the lifting wheel 1203 are provided with teeth for the first chain 19 to cooperate with on their circumferences. The two fixed wheels 1201 are arranged horizontally at intervals, and the lifting wheel 1203 is located on the mid-vertical line of the two fixed wheels 1201. After the first chain 19 passes around the first sprocket 20, it first winds around the opposite sides of the two fixed wheels 1201, and finally winds around the lifting wheel 1203. Thus, by placing Figure 7 The lifting wheel 1203 in the middle moves downward to tension the first chain 19.
[0057] Combination Figure 8 As shown, the axle of the lifting wheel 1203 is fixed on a slide plate 1204 which can be slidably arranged on the first column 1102 in the vertical direction, and a screw rod 1206 distributed in the vertical direction is provided in the middle of the lower end of the slide plate 1204. The lower end of the screw rod 1206 is inserted into a through hole provided on a support plate 1205, and the support plate 1205 is fixedly connected to the first column 1102. Nuts 1207 are respectively provided on the screw rod 1206 at the upper and lower sides of the support plate 1205. In order to limit the sliding direction of the slide plate 1204, guide grooves 1202 for sliding the slide plate 1204 are respectively provided on the two sides of the slide plate 1204 on the first column 1102. For the convenience of schematic description, only one guide groove 1202 is shown in the figure, and the other guide groove 1202 not shown is symmetrically distributed relative to the slide plate 1204.
[0058] Taking Figure 7 as an example, the tensioning process of the first chain 19 of the present invention is as follows: first, the first chain 19 is wound around the first sprocket 20, the fixed wheel 1201 and the lifting wheel 1203, and the nut 1207 at the bottom is loosened, and then the nut 1207 at the top is tightened with a wrench, and the screw 1206 drives the slide plate 1204 and the lifting wheel 1203 to descend through the tightening force generated between the upper nut 1207 and the screw 1206, until the first chain 19 reaches the tensioned state, and then the nut 1207 at the bottom is tightened.
[0059] In the present invention, the lower ends of the first columns 1102 of the first fixed multi-layer conveying equipment 9 and the second fixed multi-layer conveying equipment 1 are fixedly arranged on the ground, and the lower ends of the first columns 1102 of the multi-layer ferry vehicle 8 are provided with rollers 7. Between the first fixed multi-layer conveying equipment 9 and the second fixed multi-layer conveying equipment 1, there is provided a roller track 6 for the rollers 7 on the corresponding multi-layer ferry vehicle 8 to cooperate, so that the multi-layer ferry vehicle 8 can ferry between the first fixed multi-layer conveying equipment 9 and the second fixed multi-layer conveying equipment 1.
[0060] like Fig. 9 As shown, the single-layer conveying device 5 in the present invention includes a second frame composed of a plurality of horizontal beams 25 and vertical legs 23, a plurality of second conveying rollers 27 rotatably arranged on the second frame, and a fourth motor 21 for driving the second conveying rollers 27. The second conveying rollers 27 are connected to the output shaft of the fourth motor 21 through a second chain 28 and a second sprocket 26 structure, so that the plurality of second conveying rollers 27 convey and transfer the materials on the production line, such as the mold side plate 65, the molding material 67, the mold bottom plate 64, the mold paper 63 and the like.
[0061] The horizontal beam 25 and the vertical legs 23 are both made of Fig.10The grooved profile is made of aluminum alloy, which is light, high in strength and easy to process. The middle of the grooved profile has a through hole to reduce its own weight, and the peripheral surface has T-shaped grooves 30 distributed along its length. Fig.10 In the embodiment, a T-shaped groove 30 is provided at the top and bottom of the grooved profile, and two T-shaped grooves 30 are provided at the two sides of the grooved profile. The T-shaped grooves 30 are used to realize the rapid splicing and installation between the horizontal beams 25 and between the horizontal beams 25 and the vertical legs 23.
[0062] The connection between two horizontal beams 25 in the same direction is as follows: Fig.11 and Fig.12 As shown, after the straight connector 32 is inserted into the T-slot 30 on the side of the left horizontal beam 25 and fixed by screws, the right horizontal beam 25 is inserted into the fixed straight connector 32 through the T-slot 30 on the side, and finally the right horizontal beam 25 is fixed to the straight connector 32 by screws. The straight connector 32 is an aluminum alloy casting, and its cross-sectional shape is a T-shape corresponding to the shape of the T-slot 30. Four threaded holes 31 are opened along the length direction on the straight connector 32, and the threaded holes 31 are distributed in the thickness direction of the straight connector 32, so that the two screws are screwed into the two threaded holes 31 on the left side and tightly contact the bottom of the T-slot 30 on the left horizontal beam 25, so that the straight connector 32 is fixed to the left horizontal beam 25. The straight connector 32 is fixed to the right horizontal beam 25 by two screws in the same way.
[0063] In this embodiment, corresponding to the two T-shaped grooves 30 on the side of the grooved profile, a total of four linear connectors 32 are used to achieve fixed connection of two adjacent horizontal beams 25. This method can also be used to splice multiple single-layer conveying devices 5 and extend the conveying length according to actual use conditions.
[0064] The connection between the horizontal beam 25 and the vertical legs 23 is as follows: Fig.13 As shown, first slide the bolt heads of one set of T-bolts into the T-slot 30 at the bottom of the horizontal beam 25, slide the bolt heads of another set of T-bolts into the T-slot 30 on the side of the vertical leg 23, and then put the right-angle connector 24 on the studs of the two sets of T-bolts through the corresponding bolt holes, and finally tighten the nut 1207 to fix the right-angle connector 24 at the right-angle connection between the horizontal beam 25 and the vertical leg 23, thereby achieving fixed installation between the horizontal beam 25 and the vertical leg 23.
[0065] The right-angle connector 24 in this embodiment is an aluminum alloy casting, and its structure includes a right-angled triangle-shaped base plate 2402 and flanges 2401 arranged at the two right-angled sides of the base plate 2402. A first bolt hole 2404 for cooperating with a T-shaped bolt at the bottom of the horizontal beam 25 is provided on one of the flanges 2401, and a second bolt hole 2403 for cooperating with a T-shaped bolt on the vertical leg 23 is provided on the other flange 2401.
[0066] As shown in Figure 11, the right-angle connector 24 is also suitable for connecting and fixing the transverse beam and the longitudinal beam in the horizontal beam 25. The horizontal frame part of the second frame is reinforced by the right-angle connector 24 to increase the overall stability of the second frame.
[0067] Fig. 9 In the embodiment, a plurality of idler wheels 29 are rotatably provided on the second frame for the second chain 28 to coil around to increase the wrap angle of the second sprocket 26, so that the stability of the transmission structure between the fourth motor 21 and the second conveying roller shaft 27 is greatly improved. The fourth motor 21 is installed on a special form of the seat plate 22, and the fourth motor 21 is tensioned by its own weight and the top screw 33.
[0068] like Fig.14 As shown, the fourth motor 21 can be lifted and lowered on the seat plate 22 fixed on the second frame. The seat plate 22 is vertically distributed, and its four corner positions are fixed in the two T-shaped slots 30 on the side of the vertical leg 23 by T-shaped bolts and nuts 1207. Two strip holes 34 are provided on the seat plate 22 for the fourth motor 21 to slide in the vertical direction. The fourth motor 21 is assembled in the strip holes 34 by assembly bolts. The displacement of the fourth motor 21 in the horizontal direction is limited by the assembly bolts, and the fourth motor 21 can slide along the strip holes 34. The top screws 33 for fixing the lifting position of the fourth motor 21 on the seat plate 22 are respectively installed on the upper and lower sides of the fourth motor 21 on the seat plate 22. When the lifting position of the fourth motor 21 needs to be adjusted, it can be done by tightening or loosening the top screws 33 on the upper and lower sides.
[0069] like Fig.15 As shown, the lifting device 2 in the present invention includes a third frame 35, a single-layer roller conveyor 39 arranged in the third frame 35, and a lifting control device for controlling the single-layer roller conveyor 39 to slide in a vertical direction.
[0070] The third frame 35 is a rectangular frame structure, including four second columns 3501 and rectangular frames respectively arranged at the top and bottom ends of the four second columns 3501 .
[0071] The structure of the single-layer roller conveyor 39 is the same as the conventional roller conveyor equipment in the prior art, and is only shortened in length to meet the length of the maximum production materials involved in the production of new building walls. It includes a frame 3902, a plurality of conveyor rollers 3901 rotatably arranged on the frame 3902, and a sixth motor 3904 for driving the conveyor rollers 3901 to rotate synchronously. The sixth motor 3904 drives the conveyor rollers 3901 to rotate synchronously through the fifth chain and the conveyor sprocket arranged at the end of the conveyor roller 3901. The frame 3902 is also provided with a second tensioning mechanism 3903 for tensioning the fifth chain. When the single-layer roller conveyor 39 in the lifting device 2 is docked with a certain layer of the single-layer or multi-layer conveyor roller conveyors on both sides, the transfer and distribution of production materials between the single-layer or multi-layer conveyor roller conveyors can be realized.
[0072] like Fig.17 As shown, a V-shaped guide track 41 is provided at the position of the second column 3501 facing the single-layer roller 39, and guide wheels 40 that slide in the V-shaped guide track 41 are provided at corresponding positions of the frame 3902, thereby ensuring the stability of the single-layer roller 39 during the lifting process.
[0073] The lifting control device includes a fifth motor 36 fixed on the top of the third frame 35 and two diverters 37 located on both sides of the fifth motor 36. The output shafts of the fifth motor 36 and the diverter 37 are through shafts, and the input shafts of the two diverters 37 are respectively connected to the two ends of the output shaft of the fifth motor 36. The output shafts of the two diverters 37 are parallel to each other, and the chain mechanism 38 is connected to the single-layer roller 39 at the shaft ends of the output shafts of the two diverters 37.
[0074] like Fig.16 As shown, the endless chain mechanism 38 includes a driving sprocket 3801 fixed on the output shaft of the diverter 37 and a driven sprocket 3803 rotatably arranged at the bottom of the third frame 35 and located directly below the driving sprocket 3801, a third chain 3802 is wound around the driving sprocket 3801, and a fourth chain 3804 is wound around the driven sprocket 3803. The corresponding ends of the third chain 3802 and the fourth chain 3804 on one side are fixedly connected to the frame 3902 of the single-layer roller 39, and the corresponding ends on the other side are fixed to the counterweight 3805, so that the third chain 3802, the counterweight 3805, the fourth chain 3804 and the frame 3902 of the single-layer roller 39 sequentially form a closed ring structure. The two endless chain mechanisms 38 located on both sides of the conveying direction of the single-layer roller 39 are connected to the same counterweight 3805.
[0075] like Fig.18As shown, the automated operation device 3 in the present invention comprises a fourth frame 44 in a straight line, a plurality of trolleys 42 that can be slidably arranged on the fourth frame 44 in a horizontal direction, and a third column 43 that can be lifted and lowered on the corresponding trolley 42 in a vertical direction. The third column 43 is distributed in the vertical direction and penetrates the body of the trolley 42, and a universal flange 45 is fixedly arranged at the bottom end of the third column 43. Different universal flanges 45 are respectively used to connect with the aforementioned mold disassembly and assembly mechanism, unloading manipulator or paper laying mechanism, and the disassembly and assembly of the mold side plate 65, the laying of paper and the disassembly and assembly of the molding material 67 are realized by lifting and lowering the third column 43, and the disassembly and assembly position of the mold side plate 65 and the molding material 67 and the laying position of the mold paper 63 are controlled by sliding the trolley 42 along the fourth frame 44.
[0076] As shown in FIG. 19 , the third column 43 is rectangular, and a seventh motor 53 and a cylinder 49 are respectively provided on the left and right sides of the third column 43 on the trolley 42. The seventh motor 53 and the cylinder 49 are used to cooperate in controlling the lifting and lowering of the third column 43. A first gear 52 is provided on the output shaft of the seventh motor 53, and the first gear 52 is meshed and connected with a first rack 51 fixed on the left side of the third column 43 in the vertical direction. The cylinder body of the cylinder 49 is fixed on the trolley 42 and located on the right side of the third column 43, and the lower end of the piston rod of the cylinder 49 is fixedly connected to the universal flange 45. In the process of driving the third column 43 to rise, the seventh motor 53 rotates forward and maintains a consistent torque output, while the piston rod of the cylinder 49 retracts; in the process of driving the third column 43 to descend, the seventh motor 53 flips and the piston rod of the cylinder 49 extends synchronously. Through the cooperation of the cylinder 49 and the seventh motor 53, on the one hand, the specifications of the seventh motor 53 can be reduced due to the counterweight effect of the cylinder 49, thereby reducing the investment cost; on the other hand, the lifting range of the third column 43 can be limited by the inherent stroke of the piston rod of the cylinder 49 to avoid overshoot of the third column 43.
[0077] First linear guide rails 50 distributed in the vertical direction are fixedly provided at the front and rear sides of the third column 43, and first sliders 48 are provided on the trolley 42 for sliding cooperation with the two first linear guide rails 50. The lifting and lowering of the third column 43 is precisely limited by the sliding cooperation between the two sets of first linear guide rails 50 and the first sliders 48.
[0078] An eighth motor 57 is provided on the trolley 42 for driving the trolley 42 to slide along the fourth frame 44. The output shaft of the eighth motor 57 is connected to a transmission shaft 58 through a synchronous pulley structure 55. The transmission shaft 58 is distributed in the horizontal direction and a second gear 59 is provided at both ends of the transmission shaft 58. The two second gears 59 are respectively engaged with two second racks 60 provided at both sides of the fourth frame 44. Second linear guide rails 61 and planar guide rails 56 are respectively provided at both sides of the sliding direction of the trolley 42 on the fourth frame 44. A second slider 47 slidingly cooperating with the second linear guide rail 61 and a pulley 54 rollingly cooperating with the planar guide rail 56 are provided at the bottom of the trolley 42.
[0079] The sliding transmission between the trolley 42 and the fourth frame 44 uses a two-stage transmission mode, the first stage is the synchronous pulley structure 55 transmission, and the second stage is the gear rack structure transmission. The synchronous pulley structure 55 transmission can achieve lossless transmission during normal power transmission. When encountering sudden acceleration or deceleration, it can effectively compensate for kinetic energy loss and prevent equipment overshoot or damage caused by vibration of the equipment in an emergency state. After the first stage transmission, the transmission shaft 58 transmits the power to the meshing transmission between the second gear 59 and the second rack 60 at both ends. This design can effectively distribute the power to both ends, effectively guaranteeing the transmission stability of the equipment; the advantages of the second gear 59 and the second rack 60 transmission are high transmission accuracy and stable transmission, which can ensure the precise positioning of the equipment.
[0080] In this embodiment, anti-collision rods 46 made of flexible material are provided at both ends of the sliding direction of the trolley 42, and correspondingly, limit blocks 62 for the anti-collision rods 46 to cooperate with are provided on the fourth frame 44. The cooperation between the anti-collision rods 46 and the limit blocks 62 can prevent the trolley 42 from overshooting under the driving action of the eighth motor 57, and can also be used to protect the trolley 42 from damage caused by severe impact during the sliding movement.
[0081] like Figure 20-22As shown, the material dispensing device includes a material dispensing duckbill 69 and a material holding mold 70 arranged below the material dispensing duckbill 69. The material dispensing duckbill 69 is a flat long strip structure arranged horizontally. A material inlet 71 and a material outlet are arranged at the top and bottom of the material dispensing duckbill 69, respectively. An anti-impact component is arranged below the material dispensing duckbill 69. The anti-impact component includes a cylindrical device shell 72, a mounting plate 73, a driving motor 74, a pulley 75 and two seat bearings 76. The device shell 72 is horizontally arranged below the material dispensing duckbill 69 and The device shell 72 is connected to the outlet of the fabric duckbill 69 up and down, and a sealing end cover 77 is respectively provided at the left and right ends of the device shell 72 to realize the sealed unloading of the material. The mounting plate 73 is fixed on one of the sealing end covers 77, and two bearings with seats 76 are symmetrically arranged on the mounting plate 73 and the other sealing end cover 77. A central rotating shaft 78 is arranged inside the cylindrical device shell 72 along its axial direction, and the two ends of the central rotating shaft 78 are respectively mounted on the two bearings with seats 76, and the outer sleeve of the central rotating shaft 78 An impeller 79 is provided for buffering falling materials. The impeller 79 includes a sleeve fixed on the central rotating shaft 78 and a plurality of blades uniformly arranged along the circumference of the sleeve. The blades are rectangular and arranged perpendicular to the outer surface of the sleeve. The length of the rectangular blades is consistent with the horizontal length of the cylindrical device shell 72, and a gap is reserved between the rectangular blades and the inner side wall of the cylindrical device shell 72. The driving motor 74 is fixedly arranged on one side of the mounting plate 73, and the driving motor 74 drives the central rotating shaft 78 to rotate through the pulley 75, so as to To realize the rotation of the impeller 79 in the cylindrical equipment shell 72, the pulley 75 is also fixedly set on the mounting plate 73, and a discharge pipe 80 is docked at the bottom of the equipment shell 72. The end of the discharge pipe 80 is set directly above the material holding mold 70. The discharge pipe 80 is also a horizontally arranged flat long strip structure, and the inner diameter of the discharge pipe 80 is smaller than the inner diameter of the cloth duckbill 69. The cylindrical equipment shell 72 is provided with material through-holes on the upper and lower sides thereof for docking with the discharge port of the cloth duckbill 69 and the discharge pipe 80 respectively.
[0082] When the material distributing device 4 is in use, the driving motor 74 on the mounting plate 73 drives the central shaft 78 in the device housing 72 to rotate through the pulley 75, and the rotation of the central shaft 78 drives the impeller 79 to rotate. In this case, when the loose materials fall into the material holding mold 70 along the material distributing duckbill 69, they first fall onto the blades of the impeller 79 to be buffered, and then fall into the material holding mold 70 through the discharge pipe 80 as the impeller 79 rotates, thereby reducing the impact.
[0083] The production process of the new building wall material produced by the automatic production line of the present invention comprises the following steps:
[0084] 1) Place the mold bottom plate 64 and the mold side plate 65 in the forming mold 68 on the mold disassembly station on the single-layer conveying device 5, and use the mold disassembly mechanism to combine the mold bottom plate 64 and the mold side plate 65 into the forming mold 68;
[0085] 2) The forming mold 68 is transported to the material distributing station by the single-layer conveying device 5, and the powdered raw material 66 to be crystallized and formed is placed in the forming mold 68 by the material distributing device 4;
[0086] 3) The single-layer conveying device 5 further conveys the forming mold 68 to the lifting device 2, and the lifting device 2 distributes the forming mold 68 to each layer of the second fixed multi-layer conveying device 1, and the multi-layer ferry vehicle 8 transfers the forming mold 68 in the second fixed multi-layer conveying device 1 to the first fixed multi-layer conveying device 9, and finally the first fixed multi-layer conveying device 9 delivers the forming mold 68 into the crystallization molding furnace 10;
[0087] 3) The raw material 66 in the forming mold 68 on each layer of the crystallization roller in the crystallization forming furnace 10 is crystallized and sintered, and the forming mold 68 is transported to a position close to the exit of the crystallization forming furnace 10 to crystallize and form the raw material 66 to form a forming material 67;
[0088] 4) The molding material 67 after crystallization molding in step 3) enters the first fixed multi-layer conveying device 9 located at the exit position of the crystallization molding furnace 10 along with the molding mold 68, and then is ferried by the multi-layer shuttle bus 8 to the second fixed multi-layer conveying device 1 at the corresponding position, and the molding molds 68 on the second fixed multi-layer conveying device 1 are successively sent to the single-layer conveying device 5 by the lifting device, and after the molding molds 68 are sent to the mold disassembly station by the single-layer conveying device 5, the molding molds 68 are disassembled by the mold disassembly mechanism, and the molding material 67 is removed by the unloading manipulator mechanism, and the molding molds 68 are assembled again by the mold disassembly mechanism, and then the assembled molding molds 68 are transported toward the material distribution station through the single-layer conveying device 5;
[0089] 5) Repeat the above steps 2) to 4).
Claims
1. An automated production line for building wall materials, characterized in that: It comprises a crystallization molding furnace (10) having a multi-layer crystallization molding roller, a conveying device for carrying a molding mold (68) in and out of the crystallization molding furnace (10), a material distribution device (4) for injecting a raw material (66) into the molding mold (68), and an automated operation device (3) for disassembling the molding mold (68) and taking the molding material (67) out of the molding mold (68); The conveying device comprises two first fixed multi-layer conveying devices (9) respectively arranged at two ends of the crystallization molding furnace (10), two second fixed multi-layer conveying devices (1) arranged on the same side of the crystallization molding furnace (10), and a single-layer conveying device (5) arranged between the two second fixed multi-layer conveying devices (1); the conveying direction of the first fixed multi-layer conveying device (9) coincides with the conveying direction of the crystallization molding furnace (10), the conveying directions of the second fixed multi-layer conveying device (1) and the single-layer conveying device (5) are consistent and parallel to the conveying direction of the crystallization molding furnace (10), and are located at the same end of the crystallization molding furnace (10). A multi-layer shuttle bus (8) is slidably provided between the first fixed multi-layer conveying device (9) and the second fixed multi-layer conveying device (1), and the forming mold (68) can be transferred between the first fixed multi-layer conveying device (9) and the second fixed multi-layer conveying device (1) by the multi-layer shuttle bus (8); a lifting device (2) is provided between the single-layer conveying device (5) and the second fixed multi-layer conveying device (1) located at both ends of the single-layer conveying device (5), so that the forming mold (68) can be transferred between each layer of the single-layer conveying device (5) and the second fixed multi-layer conveying device (1) at the corresponding position by the lifting device (2); The material distribution device (4) is arranged on the single-layer conveying device (5) and is close to the entrance of the crystallization molding furnace (10), and the automatic operation device (3) is arranged on the single-layer conveying device (5) and is close to the exit of the crystallization molding furnace (10).
2. The automatic production line for building wall materials according to claim 1 is characterized in that: The crystallization molding furnace (10) has three layers of crystallization molding rollers, and the first fixed multi-layer conveying device (9), the second fixed multi-layer conveying device (1) and the multi-layer shuttle vehicle (8) all have three layers.
3. The automatic production line for building wall materials according to claim 2 is characterized in that: The first fixed multi-layer conveying device (9), the second fixed multi-layer conveying device (1) and the multi-layer shuttle bus (8) all include a first frame (11) composed of a first column (1102) and a crossbeam (1101), and a first conveying roller (15), a second conveying roller (16) and a third conveying roller (18) are arranged on the first frame (11) from bottom to top, and the first conveying roller (15), the second conveying roller (16) and the third conveying roller (18) all include a plurality of first conveying roller shafts distributed horizontally, and the ends of the first conveying roller shafts are respectively A first motor (14) is provided at the bottom of the first frame (11) for driving the first conveying roller (15) through the structure of the first chain (19) and the first sprocket (20), and a second motor (13) is provided at the bottom of the first frame (11) for driving the second conveying roller (16) through the structure of the first chain (19) and the first sprocket (20), and a third motor (17) is provided at the top of the first frame (11) for driving the third conveying roller (18) through the structure of the first chain (19) and the first sprocket (20). ), a first tensioning mechanism (12) for tensioning three first chains (19) is correspondingly provided on the first column (1102); the first tensioning mechanism (12) comprises two fixed rotating wheels (1201) rotatably arranged on the first column (1102) and a lifting rotating wheel (1203) slidably arranged on the first column (1102) in a vertical direction, the two fixed rotating wheels (1201) are horizontally spaced apart, the first chain (19) is wound around the opposite surfaces of the two fixed rotating wheels (1201) and then wound around the lifting rotating wheel (1203), the lifting rotating wheel The wheel axle (1203) is fixed on a slide plate (1204) which is slidably arranged on the first column (1102) in the vertical direction. A screw rod (1206) is provided on the slide plate (1204) at a position opposite to the two fixed rotating wheels (1201). One end of the screw rod (1206) opposite to the slide plate (1204) is inserted into a support plate (1205) fixed on the first column (1102). Nuts (1207) for fixing the screw rod (1206) are respectively provided on the screw rod (1206) at positions on the upper and lower sides of the support plate (1205).
4. The automatic production line for building wall materials according to claim 3 is characterized in that: The lower ends of the first columns (1102) of the first fixed multi-layer conveying device (9) and the second fixed multi-layer conveying device (1) are fixedly arranged on the ground, the lower end of the first column (1102) of the multi-layer shuttle bus (8) is provided with a roller (7), and a roller track (6) for cooperating with the roller (7) on the corresponding multi-layer shuttle bus (8) is provided between the first fixed multi-layer conveying device (9) and the second fixed multi-layer conveying device (1).
5. The automatic production line for building wall materials according to claim 1 is characterized in that: The single-layer conveying device (5) comprises a second frame composed of a plurality of horizontal beams (25) and vertical legs (23), a plurality of second conveying roller shafts (27) rotatably arranged on the second frame, and a fourth motor (21) for driving the second conveying roller shafts (27) to rotate, the second conveying roller shafts (27) and the output shaft of the fourth motor (21) are connected to each other by a second chain (28) and a second sprocket (26) structure, the horizontal beams (25) and the vertical legs (23) are both made of grooved profiles, the circumference of the grooved profiles has T-shaped grooves (30) distributed along the length direction thereof, two horizontal beams (25) located in the same direction are connected by a straight connecting piece (32), and the horizontal beams (25) and the vertical legs (23) are connected by a right-angle connecting piece (24); The cross-sectional shape of the linear connector (32) is T-shaped, and a plurality of threaded holes (31) penetrating the thickness direction of the linear connector (32) are provided at intervals on the linear connector (32). The linear connector (32) can be fixed to the horizontal beam (25) by screwing into the threaded holes (31) and tightly contacting the bottom of the T-shaped slot (30); A first bolt hole (2404) is provided on one right-angle side of the right-angle connector (24) for the bolt head to be clamped in the T-shaped slot (30) on the horizontal beam (25) and for fitting therein, and a second bolt hole (2403) is provided on the other right-angle side for the bolt head to be clamped in the T-shaped slot (30) on the vertical leg (23) and for fitting therein; The fourth motor (21) is escalably arranged on a seat plate (22) fixed to the second frame, and a strip hole (34) is provided on the seat plate (22) for the fourth motor (21) to slide in a vertical direction. The fourth motor (21) is assembled in the strip hole (34) by means of an assembly bolt, and top screws (33) for fixing the elevating position of the fourth motor (21) on the seat plate (22) are respectively mounted on the upper and lower sides of the fourth motor (21) on the seat plate (22).
6. The automatic production line for building wall materials according to claim 1 is characterized in that: The lifting device (2) comprises a third frame (35), a single-layer roller conveyor (39) arranged in the third frame (35), and a lifting control device for controlling the single-layer roller conveyor (39) to slide in a vertical direction; the lifting control device comprises a fifth motor (36) fixed on the top of the third frame (35) and two steering gears (37) located on both sides of the fifth motor (36); the input shafts of the two steering gears (37) are both drivingly connected to the output shaft of the fifth motor (36); the output shafts of the two steering gears (37) are parallel to each other, and the shaft ends of the output shafts of the two steering gears (37) are respectively connected to the single-layer roller conveyor (39); the chain mechanism (38) comprises a driving sprocket fixed on the output shaft of the steering gear (37); (3801) and a driven sprocket (3803) rotatably arranged at the bottom of the third frame (35) and located directly below the driving sprocket (3801), a third chain (3802) is wound around the driving sprocket (3801), a fourth chain (3804) is wound around the driven sprocket (3803), corresponding ends of the third chain (3802) and the fourth chain (3804) on one side are fixedly connected to the frame (3902) of the single-layer roller conveyor (39), and corresponding ends on the other side are fixed to the counterweight (3805), so that the third chain (3802), the counterweight (3805), the fourth chain (3804) and the frame (3902) of the single-layer roller conveyor (39) sequentially form a closed ring structure.
7. The automated production line for building wall materials according to claim 1, characterized in that: The automated operation device (3) comprises a fourth frame (44), a trolley (42) slidably arranged on the fourth frame (44) in a horizontal direction, and a third column (43) arranged on the trolley (42) in a vertical direction, wherein the third column (43) runs through the trolley (42), and a universal flange (45) for connecting an operation mechanism is fixedly provided at the bottom end of the third column (43); a seventh motor (53) and a cylinder (49) for driving the third column (43) to rise and fall are provided on the trolley (42), and a third column (43) is provided on the output shaft thereof. A first gear (52) is meshed with a first rack (51) fixed on a third column (43) in a vertical direction. The cylinder body of the cylinder (49) is fixed on the trolley (42) and is located on a side of the third column (43) opposite to the first rack (51). The piston rod of the cylinder (49) is fixedly connected to the third column (43). A first linear guide rail (50) distributed in a vertical direction is fixedly provided on the third column (43). A first sliding block (48) for sliding with the first linear guide rail (50) is provided on the trolley (42).
8. The automated production line for building wall materials according to claim 1, characterized in that: The material dispensing device (4) comprises a material dispensing duckbill (69) and a material holding mold (70) arranged below the material dispensing duckbill (69). The material dispensing duckbill (69) is a flat long strip structure arranged horizontally. A material inlet (71) and a material outlet are arranged at the top and bottom of the material dispensing duckbill (69), respectively. An impact-proof component is arranged below the material dispensing duckbill (69), and the impact-proof component comprises a cylindrical device shell (72), a mounting plate (73), a driving motor (74), a pulley (75) and two seat bearings (76). The device shell (72) is arranged horizontally below the material dispensing duckbill (69) and is arranged to be connected to the material outlet of the material dispensing duckbill (69) up and down. A sealing end cover (77) is arranged at the left and right ends of the device shell (72), respectively. The mounting plate (73) is fixed on one of the sealing end covers (77). The mounting plate (73) and the other sealing end cover (77) are symmetrically arranged on the left and right sides. Two bearing seats (76) are arranged, a central rotating shaft (78) is arranged inside the cylindrical equipment shell (72) along its axial direction, and the two ends of the central rotating shaft (78) are respectively mounted on the two bearing seats (76). An impeller (79) for buffering falling materials is sleeved on the outside of the central rotating shaft (78), and the impeller (79) includes a sleeve fixed on the central rotating shaft (78) and a plurality of blades evenly arranged along the circumference of the sleeve, the blades are rectangular and arranged perpendicular to the outer surface of the sleeve, the driving motor (74) is fixedly arranged on one side of the mounting plate (73), and the driving motor (74) drives the central rotating shaft (78) to rotate through a pulley (75) to realize the rotation of the impeller (79) in the cylindrical equipment shell (72), and a discharge pipe (80) is arranged at the bottom of the equipment shell (72) and docked, and the end of the discharge pipe (80) is arranged just above the material holding mold (70).
9. A production process for producing building wall materials by using the automated production line for building wall materials according to claim 1, characterized in that: The following steps are involved: 1) placing the mold bottom plate (64) and the mold side plate (65) in the molding mold (68) on a mold disassembly station on the single-layer conveying device (5), and using a mold disassembly mechanism to assemble the mold bottom plate (64) and the mold side plate (65) into the molding mold (68); 2) The forming mold (68) is transported to the material distribution station by the single-layer conveying device (5), and the powdered raw material (66) to be crystallized and formed is distributed in the forming mold (68) by the material distribution device (4); 3) The single-layer conveying device (5) further conveys the molding mold (68) to the lifting device (2), and the lifting device (2) distributes the molding mold (68) to each layer of the second fixed multi-layer conveying device (1), and the multi-layer ferry vehicle (8) ferries and transfers the molding mold (68) in the second fixed multi-layer conveying device (1) to the first fixed multi-layer conveying device (9), and finally the first fixed multi-layer conveying device (9) conveys the molding mold (68) into the crystallization molding furnace (10); 3) crystallizing and sintering the raw material (66) in the forming mold (68) on each layer of the crystallization roller in the crystallization forming furnace (10), and crystallizing and forming the raw material (66) to form a forming material (67) when the forming mold (68) is transported to a position close to the exit of the crystallization forming furnace (10); 4) The molding material (67) after crystallization molding in step 3) enters the first fixed multi-layer conveying device (9) located at the exit position of the crystallization molding furnace (10) along with the molding mold (68), and then is ferried by the multi-layer shuttle vehicle (8) to the second fixed multi-layer conveying device (1) at the corresponding position, and the molding mold (68) on the second fixed multi-layer conveying device (1) is successively sent to the single-layer conveying device (5) by the lifting device, and the molding mold (68) is sent to the mold disassembly station by the single-layer conveying device (5), and then the molding mold (68) is disassembled by the mold disassembly mechanism, and the molding material (67) is removed by the unloading robot mechanism, and the molding mold (68) is assembled again by the mold disassembly mechanism, and then the assembled molding mold (68) is transported to the material distribution station by the single-layer conveying device (5); 5) Repeat the above steps 2) to 4).