A tower crane hopper and use method
By designing the tower crane hopper body with inverted right angle trapezoidal hopper body and multifunctional wire rope hook, the problem of frequent replacement of traditional tower crane hopper hoppers is solved, and the lifting needs of different materials is achieved, which improves safety and economy.
Patent Information
- Application Number
- CN202010145720.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-03-05
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2040-03-05
AI Technical Summary
Traditional tower crane hoppers need to be frequently replaced when hoisting different types of materials, which makes installation difficult, low safety and high economic cost.
A tower crane hopper is designed, which includes an inverted right-angle trapezoidal hopper body and four pairs of wire rope hooks. The front end of the hopper body is an arc surface and the bottom plate is an opening fan. It is connected by a rotating shaft to provide a variety of unloading methods to adapt to different materials. Volume and morphology.
It achieves the purpose of meeting lifting safety, adapting to the lifting needs of different types of materials, reducing the frequency of hopper replacement, improving the economic and safety of operation, and extending the service life of the hopper.
Smart Images

Figure CN111232823B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building construction, and in particular relates to a tower crane hopper and a use method thereof. Background Art
[0002] During the construction of the construction site structure, the traditional tower crane hopper is a frame hopper, which is inconvenient for workers to unload and takes too long. In addition, different hoppers need to be frequently replaced for different hoisting objects. Therefore, how to provide a tower crane hopper that is easy to install, safe and economical is a technical problem that technicians in this field need to solve urgently. There are many types of tower crane hoppers on the construction site, and the tower crane hoppers need to be frequently replaced when hoisting different types of materials. Summary of the invention
[0003] In view of the problem that there are many types of tower crane buckets on construction sites and that the tower crane buckets need to be frequently replaced when hoisting different types of materials, the present invention provides a tower crane bucket and a method of use, which can hoist large and small blocks, long and short wooden blocks, formwork, earth, sand and gravel, waterproof membranes and other materials on the basis of fully meeting the hoisting safety requirements, and has excellent economic effects, simple technical processes, strong operability for workers, and is extremely practical on site.
[0004] In order to solve the above technical problems, the present invention includes the following technical solutions:
[0005] A tower crane hopper, comprising:
[0006] An inverted right-angled trapezoidal hopper body, the front end of the hopper body is an arc surface, the bottom plate of the hopper body is an open fan, the front end is connected to the bottom plate by a rotating shaft, a pair of first steel wire rope hooks are provided at the upper mouth of the hopper body directly above the rotating shaft, a pair of second steel wire rope hooks are provided on the upper side of the back plate of the hopper body, a pair of third steel wire rope hooks are provided on the lower side of the back plate, and a pair of fourth steel wire rope hooks are provided at one end of the bottom plate away from the arc surface of the front end.
[0007] Compared with the prior art, the present invention has the following beneficial effects:
[0008] (1) The tower crane hopper of the present invention comprises an inverted right-angle trapezoidal hopper body and four pairs of wire rope hooks arranged in coordination. The front end of the hopper body is an arc surface, the bottom plate of the hopper body is an open fan, the front end is connected to the bottom plate through a rotating shaft, a pair of first wire rope hooks are arranged at the upper opening of the hopper body just above the rotating shaft, a pair of second wire rope hooks are arranged on the upper side of the back plate of the hopper body, a pair of third wire rope hooks are arranged on the lower side of the back plate, and a pair of fourth wire rope hooks are arranged at one end of the bottom plate away from the front end arc surface. When lifting, the first wire rope hook, the second wire rope hook and the fourth wire rope hook are started at the same time; when unloading, the A type of unloading method, the B type of unloading method or the combination of the A type of unloading method and the B type of unloading method can be selected according to the actual material volume and shape. Among them, the A type of unloading method includes: loosening the first wire rope hook, completing the material unloading from the arc surface, thereby realizing the single-side dumping type unloading. This unloading method makes the force of the entire hopper balanced, which can increase the service life of the hopper body. In addition, the unloading process is relatively smooth, which reduces the damage to the finished product of the material and also improves the safety factor of the lifting. Type B unloading method includes: loosening the fourth wire rope hook, lifting the first wire rope hook, the second wire rope hook and the third wire rope hook at the same time, completing the material unloading work from the bottom plate, thereby realizing unloading at the bottom of the hopper. This unloading method can unload quickly and can ensure unloading without residue.
[0009] (2) The tower crane hopper of the present invention has a simple structure, low labor and material input, simple manufacture, convenient operation, and can effectively utilize construction site materials such as scrap steel plates, angle steels, channel steels, square tubes, etc., with unlimited turnover, and can hoist any solid materials on the construction site, and the loading and unloading are simple, which can effectively reduce labor. Moreover, it can overcome the defects of conventional tower crane hoppers such as long unloading time, and has a promoting effect on the safety, quality and progress control of engineering projects, and a small hopper can play a big role.
[0010] (3) The method for using the tower crane bucket of the present invention has simple process, is easy for workers to use, has a high safety factor, is very practical in tower crane hoisting, and has excellent economic and social effects. It has low installation difficulty, good economic effect, high safety factor, stable maintenance performance, and has good promotion value.
[0011] Furthermore, in order to facilitate material acquisition and save costs, the arc surface of the front end is made of an arc steel plate with a thickness of 4 mm.
[0012] Furthermore, in order to improve the stress strength of the lifting point and increase the safety of lifting, a pad is provided at the connection between each wire rope hook and the hopper body.
[0013] Furthermore, the hopper body frame is formed by splicing and fixing angle steel, channel steel, square tube and steel plate, so that only inexpensive common construction components are needed, which has low cost and good effect.
[0014] Furthermore, considering that the bottom plate of the hopper body is an open window, the bottom plate of the hopper is kept in a closed state by lifting with the fourth wire rope hook during lifting. When unloading from the lower mouth of the hopper body, the fourth wire rope hook is released. In order to achieve the above-mentioned functions, the bottom plate of the hopper body is connected to the arc surface of the front end through a rotating shaft, and the rotating shaft is made of steel pipe, thereby saving costs and facilitating installation.
[0015] The present invention also provides a method for using a tower crane hopper, which comprises the following steps:
[0016] Step 1, providing the aforementioned tower crane hopper for standby;
[0017] Step 2, fully loading the tower crane hopper with materials;
[0018] Step 3: hoist the first wire rope hook, the second wire rope hook and the fourth wire rope hook at the same time, and hoist the tower crane hopper fully loaded with materials in step 2 to the construction work surface;
[0019] Step 4: Release the first wire rope hook and complete the material unloading work from the arc surface of the front end.
[0020] Furthermore, since the front end of the hopper body is an arc surface, it can buffer the material during unloading, and compared with conventional hoppers, it can reduce the damage to the material caused by unloading, thereby ensuring the quality of the material. At the same time, considering that this one-sided dumping method may cause unloading residue, the material described here is a long or cylindrical material.
[0021] Furthermore, the material includes blocks, coils, wood or steel pipes.
[0022] The present invention also provides a method for using a tower crane hopper, comprising the following steps:
[0023] Step 1, providing the aforementioned tower crane hopper for standby;
[0024] Step 2, fully loading the tower crane hopper with materials;
[0025] Step 3: hoist the first wire rope hook, the second wire rope hook and the fourth wire rope hook at the same time, and hoist the tower crane hopper fully loaded with materials in step 2 to the construction work surface;
[0026] Step 4: loosen the fourth wire rope hook, and simultaneously lift the first wire rope hook, the second wire rope hook and the third wire rope hook to complete the material unloading work from the bottom plate.
[0027] Furthermore, in order to ensure that there is no residue when unloading, the fourth wire rope hook arranged at the end of the bottom plate away from the rotating shaft is loosened, and the material can be unloaded through the lower opening of the hopper. The material is granular or small in size. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a plan view of the tower crane hopper in the first embodiment of the present invention;
[0029] Figure 2 It is a side view of the tower crane hopper in the first embodiment of the present invention;
[0030] Figure 3 It is a rear view of the tower crane hopper in the first embodiment of the present invention;
[0031] Figures 4 to 6 It is a schematic diagram of a method for using a tower crane hopper in Embodiment 2 of the present invention;
[0032] Figures 7 to 9 It is a schematic diagram of the method for using the tower crane bucket in the second embodiment of the present invention.
[0033] In the figure:
[0034] 10- hopper body, 11- front end, 12- bottom plate, 13- back plate; 21- first wire rope hook, 22- second wire rope hook, 23- third wire rope hook, 24- fourth wire rope hook. DETAILED DESCRIPTION
[0035] The following is a further detailed description of a tower crane bucket and a method of use provided by the present invention in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become clearer in conjunction with the following description and claims. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention. For the convenience of description, the "upper" and "lower" described below are consistent with the upper and lower directions of the accompanying drawings, but this cannot be a limitation of the technical solution of the present invention.
[0036] Embodiment 1
[0037] Combine the following Figures 1 to 9 The structural composition of the tower crane hopper of the present invention is described in detail.
[0038] Please refer to Figures 1 to 3A tower crane hopper comprises: an inverted right-angled trapezoidal hopper body 10, a front end 11 of the hopper body being an arc surface, a bottom plate 12 of the hopper body being an open fan, the front end 11 being connected to the bottom plate 12 by a rotating shaft, a pair of first steel wire rope hooks 21 being provided at the upper opening of the hopper body 10 directly above the rotating shaft, a pair of second steel wire rope hooks 22 being provided on the upper side of a back plate 13 of the hopper body 10, a pair of third steel wire rope hooks 23 being provided on the lower side of the back plate 13, and a pair of fourth steel wire rope hooks 24 being provided at one end of the bottom plate 12 away from the arc surface.
[0039] Specifically, the tower crane hopper of this embodiment includes an inverted right-angle trapezoidal hopper body 10 and four pairs of wire rope hooks arranged in cooperation. The front end 11 of the hopper body is an arc surface, the bottom plate 12 of the hopper body is an open fan, the front end 11 and the bottom plate 12 are connected by a rotating shaft, a pair of first wire rope hooks 21 are arranged at the upper opening of the hopper body 10 just above the rotating shaft, a pair of second wire rope hooks 22 are arranged on the upper side of the back plate 13 of the hopper body, a pair of third wire rope hooks 23 are arranged on the lower side of the back plate 13, and a pair of fourth wire rope hooks 24 are arranged at one end of the bottom plate 12 away from the arc surface of the front end 11. When lifting, the first wire rope hook 21, the second wire rope hook 22 and the fourth wire rope hook 2 are started at the same time; when unloading, the A type of unloading method, the B type of unloading method or the combination of the A type of unloading method and the B type of unloading method can be selected according to the actual material volume and form. Among them, the A type of unloading method includes: loosening the first wire rope hook 21, completing the material unloading from the arc surface of the front end 11, thereby realizing single-side dumping unloading. This unloading method makes the entire hopper force balanced, which can increase the service life of the hopper body 10. Moreover, the unloading process is relatively smooth, which reduces the damage to the finished product of the material, and also improves the safety factor of the lifting. The B type of unloading method includes: loosening the fourth wire rope hook 24, lifting the first wire rope hook 21, the second wire rope hook 22 and the third wire rope hook 23 at the same time, completing the material unloading work from the bottom plate 12, thereby realizing unloading at the bottom of the hopper. This unloading method can unload quickly and can ensure no residual unloading. The tower crane hopper can overcome the defects of the conventional tower crane hopper such as long unloading time, and has a promoting effect on the safety, quality and progress control of the project. It has a simple process, is easy for workers to use, has a high safety factor, and has stable maintenance performance, and has a good promotion value.
[0040] In this embodiment, more preferably, in order to facilitate material acquisition and save costs, the arc surface of the front end 10 is made of an arc steel plate with a thickness of 4 mm.
[0041] In this embodiment, more preferably, in order to improve the force strength of the lifting point and increase the safety of lifting, a pad is provided at the connection between each wire rope hook and the hopper body.
[0042] In this embodiment, more preferably, the hopper body frame is formed by splicing and fixing angle steel, channel steel, square tube and steel plate, so that only inexpensive common construction components are needed, which has low cost and good effect.
[0043] In the present embodiment, it is more preferred that, considering that the bottom plate of the hopper body is an open window, the bottom plate of the hopper is kept in a closed state by lifting through the fourth wire rope hook during lifting, and when unloading from the lower mouth of the hopper body, the fourth wire rope hook is released. In order to achieve the above-mentioned functions, the bottom plate of the hopper body is connected to the arc surface through a rotating shaft, and the rotating shaft is made of a steel pipe, thereby saving costs and facilitating installation.
[0044] Embodiment 2
[0045] Please continue to refer to Figures 4 to 6 This embodiment also provides a method for using a tower crane hopper, the method comprising the following steps:
[0046] Step 1: The tower crane hopper provided is ready for use;
[0047] Step 2: Fully load the tower crane hopper with materials;
[0048] Step 3: hoist the first wire rope hook 21, the second wire rope hook 22 and the fourth wire rope hook 24 at the same time, and hoist the tower crane hopper fully loaded with materials in step 2 to the construction work surface;
[0049] Step 4: Release the first wire rope hook 21 and complete the material unloading work from the arc surface of the front end 10.
[0050] In this embodiment, it is more preferred that the front end 10 of the hopper body is a circular arc surface, which can buffer the material during unloading, and compared with conventional hoppers, it can reduce the damage to the material caused by unloading, thereby ensuring the quality of the material. At the same time, considering that this one-sided dumping method may cause unloading residue, the material here is a long or cylindrical material.
[0051] In this embodiment, more preferably, the material includes blocks, coils, wood or steel pipes.
[0052] Embodiment 3
[0053] Please continue to refer to Figures 7 to 9 This embodiment also provides a method for using a tower crane hopper, comprising the following steps:
[0054] Step 1: The tower crane hopper provided is ready for use;
[0055] Step 2: Fully load the hopper with materials;
[0056] Step 3: hoist the first wire rope hook 21, the second wire rope hook 22 and the fourth wire rope hook 24 at the same time, and hoist the tower crane hopper fully loaded with materials in step 2 to the construction work surface;
[0057] Step 4: Release the fourth wire rope hook 24 , and simultaneously lift the first wire rope hook 21 , the second wire rope hook 22 and the third wire rope hook 23 to complete the material unloading work from the bottom plate 12 .
[0058] In this embodiment, more preferably, in order to ensure that there is no residue after unloading, the fourth wire rope hook 24 arranged at the end of the bottom plate 12 away from the rotating shaft is loosened, and the material can be unloaded through the lower opening of the hopper. The material is granular or small in volume.
[0059] The above-mentioned embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.
Claims
1. A method for using a tower crane hopper, characterized in that: The tower crane hoppers used include: An inverted right-angled trapezoidal hopper body, wherein the front end of the hopper body is an arc surface, the bottom plate of the hopper body is an open fan, the front end is connected to the bottom plate by a rotating shaft, a pair of first wire rope hooks are provided at the upper opening of the hopper body just above the rotating shaft, a pair of second wire rope hooks are provided on the upper side of the back plate of the hopper body, a pair of third wire rope hooks are provided on the lower side of the back plate, and a pair of fourth wire rope hooks are provided at one end of the bottom plate away from the front end arc surface; When unloading, select type A unloading method, type B unloading method, or a combination of type A and type B unloading methods according to the actual material volume and shape; among them, type A unloading method includes: fully loading the tower crane hopper with materials; simultaneously lifting the first wire rope hook, the second wire rope hook and the fourth wire rope hook, and lifting the tower crane hopper fully loaded with materials to the construction work surface; loosening the first wire rope hook, and completing the material unloading work from the arc surface of the front end; type B unloading method includes: fully loading the tower crane hopper with materials; simultaneously lifting the first wire rope hook, the second wire rope hook and the fourth wire rope hook, and lifting the tower crane hopper fully loaded with materials to the construction work surface; loosening the fourth wire rope hook, and simultaneously lifting the first wire rope hook, the second wire rope hook and the third wire rope hook, and completing the material unloading work from the bottom plate.
2. The method of use according to claim 1, characterized in that: The front end is made of a circular arc steel plate with a thickness of 4 mm.
3. The method of use according to claim 1, characterized in that: A pad is provided at the connection between each wire rope hook and the hopper body.
4. The method of use according to claim 1, characterized in that: The hopper body frame is formed by splicing and fixing angle steel, channel steel, square tube and steel plate.
5. The method of use according to claim 1, characterized in that: The rotating shaft is made of a steel pipe.
6. The method of use according to claim 1, characterized in that: The material in the A type of unloading method is cylindrical material.
7. The method of use according to claim 1, characterized in that: The materials used in the above-mentioned unloading method A include blocks, coils, wood or steel pipes.
8. The method of use according to claim 1, characterized in that: The material in the B type unloading method is granular material.
Citation Information
Patent Citations
Double-point shifting type hopper easy to hoist and unload
CN203753701U
Bottom-opening cargo hopper lifting appliance for bulk cargo loading operation
CN203889909U
Tower crane hopper
CN212127251U