Temporary steel pipe pile with arc partition and construction method

By designing temporary steel pipe piles with arc-shaped partitions on the lock-mouth steel pipe pile cofferdam, and using the combined structure of auxiliary positioning supports and arc-shaped steel plates, the hole collapse, deviation and hole forming quality during the pilot hole operation are solved. It solves the problem of poor quality and improves construction efficiency and hole-forming quality.

CN111270694BActive Publication Date: 2024-10-15CHINA GEZHOUBA GROUP NO 5 ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010202130.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-03-20
Publication Date
2024-10-15
Estimated Expiration
2040-03-20

AI Technical Summary

Technical Problem

Locked steel pipe pile cofferdams are prone to hole collapse, buried drilling and drilling deviation during the lead-in operation, resulting in poor hole quality and affecting construction efficiency and progress, especially under complex geological conditions.

Method used

A temporary steel pipe pile with arc partitions is designed. It adopts a combined structure of main steel pipe, C-shaped lock, T-shaped lock, auxiliary positioning support and arc steel plate. The position and position of the drilling plane are controlled by the auxiliary positioning support. Verticality, and the arc-shaped steel plate is used to reduce the depth of the guide hole and prevent the hole from collapsing.

Benefits of technology

It effectively controls the plane position and verticality of drilling holes under complex geological conditions, reduces the depth of lead holes, prevents hole collapse and buried drilling, and improves hole formation quality and construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111270694B_ABST
    Figure CN111270694B_ABST
Patent Text Reader

Abstract

The present invention provides a temporary steel pipe pile with an arc-shaped partition and a construction method, which comprises a main steel pipe, a C-shaped lock buckle is fixed on the side wall of the main steel pipe, a T-shaped lock mouth is installed on the main steel pipe at a symmetrical position of the C-shaped lock mouth, auxiliary positioning supports are symmetrically fixed on both sides of the T-shaped lock mouth, a steel casing for drilling is installed between the auxiliary positioning supports, and an arc-shaped steel plate is installed at the bottom of the steel casing for drilling and between the auxiliary positioning supports. By using the lock mouth steel pipe pile cofferdam as a temporary construction device when constructing a deep-water foundation of a large bridge, a temporary construction device is specially designed for situations such as collapse of the drilling hole and buried drill caused by a thick pebble layer during the drilling operation of the lock mouth steel pipe pile cofferdam, complex geological conditions, deviation of the drilling hole, poor verticality of the drilling hole, and poor hole quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of steel pipe piles, in particular to a temporary steel pipe pile with an arc-shaped partition. Background Art

[0002] At present, the lock-mouth steel pipe pile cofferdam is widely used in the construction of high pile caps and low pile caps in water depths of less than 20m, water flow velocity less than 3m / s, and riverbeds of sandy soil, clay, crushed (pebble) stone soil, and weathered rock. However, during the hole-guiding operation, the cofferdam is affected by the thick pebble layer, and the hole collapse and buried drill are prone to occur during the hole-guiding process. At the same time, affected by the geological conditions and the clay backfill of the previous root hole, the hole deviation and the verticality of the hole are poor, and the hole quality is poor, which seriously affects the construction efficiency and overall progress. Summary of the invention

[0003] In order to solve the above technical problems, the present invention provides temporary steel pipe piles with arc-shaped partitions. By using the locking steel pipe pile cofferdam as a temporary construction device when building a deep-water foundation of a large bridge, the present invention is specifically designed for the locking steel pipe pile cofferdam during the hole-guiding operation, where a thick pebble layer causes the hole to collapse, the drill is buried, and there are complex geological conditions, the hole is offset, the verticality of the hole is poor, and the hole quality is poor.

[0004] In order to realize the above-mentioned technical features, the purpose of the present invention is achieved as follows: a temporary steel pipe pile with an arc-shaped partition, which includes a main steel pipe, a C-shaped lock buckle is fixed on the side wall of the main steel pipe, a T-shaped lock mouth is installed on the main steel pipe at a symmetrical position of the C-shaped lock buckle, auxiliary positioning supports are symmetrically fixed on both sides of the T-shaped lock mouth, a guide hole steel casing is installed between the auxiliary positioning supports, and an arc-shaped steel plate is installed at the bottom of the guide hole steel casing and between the auxiliary positioning supports.

[0005] The auxiliary positioning support is made of I-beam material.

[0006] The hole-guiding steel casing and the arc-shaped steel plate are arranged concentrically, and the inner and outer diameters of the two are equal.

[0007] The auxiliary positioning supports are arranged along the entire length of the main steel pipe.

[0008] The arc-shaped steel plate is arranged at the bottom of the lead-hole steel casing and along the entire length of the bottom of the main steel pipe.

[0009] The hole-guiding steel casing is arranged at a certain height from the top of the main steel pipe, and the bottom end of the hole-guiding steel casing is flush with the bottom end of the T-shaped lock.

[0010] The length of the T-shaped lock opening is shorter than that of the C-shaped lock buckle.

[0011] During the construction of the cofferdam lock-mouth steel pipe piles, the drilling method is advanced by one hole position, and the T-shaped lock and two auxiliary positioning supports are set on both sides along the main steel pipe wall symmetrically to the T-shaped lock to form auxiliary positioning supports for the installation of the hole-guiding steel casing. After the hole-guiding steel casing is lowered into place, the hole-guiding steel casing is temporarily welded to the auxiliary positioning support, which effectively controls the plane position and verticality of the borehole under complex geological conditions and improves the quality of the hole.

[0012] Then, an arc-shaped steel plate is welded on the outside of the auxiliary positioning support at the bottom of the main steel pipe as a barrier support, which reduces the depth of the steel casing hole and prevents the collapse of the hole and the buried drill due to the backfill of clay in the early drilling process;

[0013] During the drilling process, the drill bit of the rotary drill collides with the curved steel plate, which acts as a buffer and barrier to prevent the drill bit from directly hitting the main steel pipe when rotating.

[0014] The present invention has the following beneficial effects:

[0015] 1. The temporary steel pipe piles of the present invention can adapt to the construction of locking steel pipe pile cofferdams under various complex geological conditions.

[0016] 2. The auxiliary positioning support provided on the temporary steel pipe pile of the present invention can effectively control the plane position and verticality of the drilling hole of the locking steel pipe pile cofferdam under complex geological conditions.

[0017] 3. The arc-shaped steel plate provided on the temporary steel pipe pile of the present invention can reduce the depth of the steel casing hole and effectively prevent the problems of hole collapse, buried drill and the like when affected by a thick pebble layer.

[0018] 4. In the process of drilling holes, the drill bit of the rotary drill collides with the arc-shaped steel plate, which plays a role of buffering and barrier support, thereby preventing the drill bit from directly hitting the steel pipe pile when rotating, causing the steel pipe pile to deviate.

[0019] 5. The use of the temporary steel pipe piles of the present invention can effectively improve the hole quality and construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0021] Figure 1 It is the front view of the present invention.

[0022] Figure 2 For the present invention Figure 1 Medium B 上 -B 上 view.

[0023] Figure 3 For the present invention Figure 1Medium B 下 -B 下 view.

[0024] Figure 4 For the present invention Figure 1 Medium CC view.

[0025] Figure 5 For the present invention Figure 1 Medium DD view.

[0026] In the figure: main steel pipe 1, C-shaped lock buckle 2, T-shaped lock 3, auxiliary positioning support 4, arc-shaped steel plate 5, and guide hole steel casing 6. DETAILED DESCRIPTION

[0027] The embodiments of the present invention are further described below in conjunction with the accompanying drawings.

[0028] See also Figure 1-5 , a temporary steel pipe pile with an arc-shaped partition, which includes a main steel pipe 1, a C-shaped lock 2 is fixed on the side wall of the main steel pipe 1, a T-shaped lock 3 is installed on the main steel pipe 1 at a symmetrical position of the C-shaped lock 2, auxiliary positioning supports 4 are symmetrically fixed on both sides of the T-shaped lock 3, a hole-guiding steel casing 6 is installed between the auxiliary positioning supports 4, and an arc-shaped steel plate 5 is installed at the bottom of the hole-guiding steel casing 6 and located between the auxiliary positioning supports 4. By adopting the temporary steel pipe pile with the above structure, during the hole-guiding period, the cofferdam forms an auxiliary positioning support for the installation of the steel casing through the T-shaped lock and two steel bars symmetrically arranged on both sides along the length of the main steel pipe wall. After the hole-guiding steel casing 6 is lowered into place, the hole-guiding steel casing 6 is temporarily welded to the auxiliary positioning support, which effectively controls the verticality of the plane position of the borehole under complex geological conditions and improves the quality of the borehole. The arc-shaped steel plate welded on the outer side of the positioning steel at the lower part of the main steel pipe is used as a barrier support to reduce the hole-guiding depth of the guide hole steel casing 6, and prevent the collapse of the hole and the burial of the drill due to the backfill of clay in the early drill hole during the drilling process; the rotary drilling bit collides with the arc-shaped steel plate, which plays a buffering and barrier support role, avoiding the direct impact of the drill bit on the steel pipe pile when rotating.

[0029] Furthermore, the auxiliary positioning support 4 is made of I-beam material. The auxiliary positioning support 4 is easy to install and can temporarily install the lead hole steel casing 6.

[0030] Furthermore, the hole-guiding steel casing 6 and the arc-shaped steel plate 5 are arranged concentrically, and the inner and outer diameters of the two are equal.

[0031] Furthermore, the auxiliary positioning support 4 is arranged along the entire length of the main steel pipe 1. By adopting the auxiliary positioning support 4, the entire main steel pipe 1 can be auxiliary positioned and supported.

[0032] Furthermore, the arc steel plate 5 is arranged at the bottom of the lead hole steel casing 6 and along the entire length of the bottom of the main steel pipe 1. The arc steel plate is used as a barrier support to reduce the lead hole depth of the lead hole steel casing 6, and prevent the backfill clay in the early drill hole from collapsing and burying the drill during the drilling process.

[0033] Further, the hole-introducing steel casing 6 is arranged at a certain height from the top of the main steel pipe 1, and the bottom end of the hole-introducing steel casing 6 is flush with the bottom end of the T-shaped lock 3. By adopting the above length arrangement, the hole-forming quality can be guaranteed.

[0034] Furthermore, the length of the T-shaped locking opening 3 is shorter than the length of the C-shaped locking buckle 2. By adopting the above-mentioned length matching relationship, the connection strength and reliability between the two adjacent main steel pipes 1 are ensured.

[0035] Embodiment 2:

[0036] During the construction of the cofferdam lock-mouth steel pipe pile boring and inserting, by drilling one hole ahead of the other, the T-shaped lock 3 and two auxiliary positioning supports 4 respectively arranged along the length of the main steel pipe 1 on both sides symmetrical to the T-shaped lock 3 are used to form auxiliary positioning supports for the installation of the boring steel casing 6. After the boring steel casing 6 is lowered into place, the boring steel casing 6 is temporarily welded to the auxiliary positioning supports, which effectively controls the plane position and verticality of the borehole under complex geological conditions and improves the quality of the borehole.

[0037] Then, the arc steel plate 5 is welded on the outside of the auxiliary positioning support 4 at the lower part of the main steel pipe 1 as a barrier support, which reduces the depth of the steel casing hole and prevents the collapse of the hole and the buried drill due to the backfilling of clay in the early drilling process;

[0038] During the drilling process, the drill bit of the rotary drill collides with the arc-shaped steel plate 5, which plays a role of buffering and blocking support, thereby preventing the drill bit from directly hitting the main steel pipe 1 when rotating.

Claims

1. A method for inserting and constructing a cofferdam guide hole using temporary steel pipe piles with arc-shaped partitions, the temporary steel pipe piles with arc-shaped partitions comprising a main steel pipe (1), a C-shaped lock buckle (2) being fixed on the side wall of the main steel pipe (1), a T-shaped lock mouth (3) being installed on the main steel pipe (1) at a symmetrical position to the C-shaped lock buckle (2), auxiliary positioning supports (4) being symmetrically fixed on both sides of the T-shaped lock mouth (3), a guide hole steel casing (6) being installed between the auxiliary positioning supports (4), and a curved steel plate (5) being installed at the bottom of the guide hole steel casing (6) and located between the auxiliary positioning supports (4); The hole-guiding steel casing (6) and the arc-shaped steel plate (5) are arranged concentrically, and the inner and outer diameters of the two are equal; The auxiliary positioning support (4) is arranged along the entire length of the main steel pipe (1); The arc-shaped steel plate (5) is at the bottom of the lead-hole steel casing (6) and is arranged along the entire length of the bottom of the main steel pipe (1); During the construction of the cofferdam lock-mouth steel pipe pile boring and pile insertion, a hole is drilled one hole ahead of the other, and two auxiliary positioning supports (4) are respectively arranged on both sides along the entire length of the main steel pipe (1) symmetrically to the T-shaped lock (3) to form auxiliary positioning supports when installing the boring steel casing (6). After the boring steel casing (6) is lowered into place, the boring steel casing (6) is temporarily welded to the auxiliary positioning supports, thereby effectively controlling the plane position and verticality of the borehole under complex geological conditions and improving the quality of the borehole. Then, an arc-shaped steel plate (5) is welded on the outside of the auxiliary positioning support (4) at the lower part of the main steel pipe (1) as a barrier support, thereby reducing the depth of the steel casing hole, and preventing the hole from collapsing and the drill from being buried due to the backfilling of clay in the early stage of the drilling process; During the drilling process, the drill bit of the rotary drill collides with the arc-shaped steel plate (5), which plays a buffering and barrier support role, thereby preventing the drill bit from directly colliding with the main steel pipe (1) when rotating.

2. The method for inserting and constructing the cofferdam guide hole by using temporary steel pipe piles with arc-shaped partitions according to claim 1 is characterized in that: The auxiliary positioning support (4) is made of I-beam material.

3. The method for inserting and constructing the cofferdam guide hole by using temporary steel pipe piles with arc-shaped partitions according to claim 1 is characterized in that: The hole-guiding steel casing (6) is arranged at a certain height from the top of the main steel pipe (1), and the bottom end of the hole-guiding steel casing (6) is flush with the bottom end of the T-shaped locking mouth (3).