A foam concrete conveying device and working method thereof

By designing a compact foam concrete delivery device, using a heat-dissipating aluminum base shell and arc-shaped heat-conducting strips to achieve a heat dissipation effect, and simplifying wire management through a winding structure, the problem of inconvenient operation of traditional equipment is solved, and construction efficiency and overall convenience are improved.

CN111270858BActive Publication Date: 2024-10-18GUANGDONG CONSTR CO LTD OF CHINA RAILWAY NO 3 ENG GRP CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010197956.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-03-19
Publication Date
2024-10-18
Estimated Expiration
2040-03-19

AI Technical Summary

Technical Problem

Traditional foam concrete construction equipment is inconvenient in process operation, which affects the construction progress. In particular, the movement of the control box and pouring pump and the recovery of wires are cumbersome and waste time.

Method used

A foam concrete conveying device is designed, including an integrally formed heat dissipation device and a control device. The heat dissipation effect is achieved through a heat dissipation aluminum base shell and arc-shaped heat conduction strips. A winding structure is used to simplify the winding and recycling of wires, reduce installation space, and improve Operational efficiency.

Benefits of technology

It improves the overall structural compactness of foam concrete construction equipment, enhances heat dissipation and dustproof effects, simplifies wire management, and improves construction efficiency and operational convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111270858B_ABST
    Figure CN111270858B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of foam concrete construction equipment, in particular to a foam concrete conveying device and a working method thereof, which mainly include a pouring and conveying structure, a heat dissipation device and a control device, wherein the heat dissipation device is formed as an inner hollow box structure; the control device is axially installed on the axial end surface of the heat dissipation device, and the control device includes a control box, a control circuit board, a wire connector and a side door, the control box is configured as a box body with a side opening, the side door is hingedly installed at the side opening of the control box, the control circuit board is installed inside the control box, and the wire connector is installed inside the control box; the pouring and conveying structure is installed at the bottom of the heat dissipation device, and includes a conveying pump, a bottom plate and a connecting pipe, the bottom plate is installed on the bottom surface of the heat dissipation device, and the conveying pump is installed in the heat dissipation device through the bottom plate support type. The overall structure of the present invention is compact and the space utilization rate is improved; the heat dissipation device improves the heat dissipation effect and dustproof effect of the foam concrete pouring and conveying pump; the winding structure realizes the winding of the control device and the external equipment wires, which is convenient for the placement of the wires, the installation is convenient, and the operation efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foam concrete construction equipment, in particular to a foam concrete conveying device and a working method thereof. Background Art

[0002] Bubble concrete is a new type of lightweight thermal insulation material with a large number of closed pores, which is formed by fully foaming the foaming agent mechanically through the foaming system of the bubble machine, and evenly mixing the foam with cement slurry, and then pouring it into place or forming it into a mold through the pumping system of the bubble machine, and then naturally curing it. Foam concrete is a material with the advantages of light weight, thermal insulation, fire insulation, sound insulation and frost resistance among concrete materials. Its slurry can be self-leveling and self-compacting, so it has good construction and workability, is easy to pump and level, has good compatibility with almost all other building materials, and its strength can be adjusted.

[0003] Bubble concrete is environmentally friendly. The raw materials needed for mixing bubbles with lightweight soil are cement and foaming agent. The foaming agent is neutral and does not contain harmful substances such as benzene and formaldehyde, which avoids environmental pollution and fire hazards, thus completing a green and environmentally friendly product. Therefore, bubble concrete has the advantages of economy and fast construction speed, which can make full use of waste materials, save arable land and energy, and reduce prices. In addition, a series of characteristics such as the use of simple machines in the production and preparation process to achieve automated operations make bubble concrete have excellent development prospects.

[0004] In the process of pouring foam concrete, the traditional transmission method is to use a foam concrete pouring and delivery pump to transport the foam concrete, and control the relevant equipment through the control equipment in the control box. The two are installed separately, but during the foam concrete pouring process, it is often necessary to move the control box and the foam concrete pouring and delivery pump, which increases the operating steps in the process and causes a waste of time. In addition, since the control box needs to be connected to the external equipment through wires, it is cumbersome to recover the wires each time. Therefore, the traditional delivery equipment is not convenient in the process operation, which affects the construction progress. Summary of the invention

[0005] In order to solve the above problems, the present invention aims to disclose a foam concrete construction equipment technology field, and in particular, a foam concrete conveying device and a working method thereof.

[0006] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a foam concrete conveying device, characterized in that the conveying device mainly includes a pouring and conveying structure, a heat dissipation device and a control device, wherein the heat dissipation device is integrally formed as an inner hollow box structure in which the pouring and conveying structure is installed; the control device is axially installed on the axial end face of the heat dissipation device, and the control device includes a control box, a control circuit board, a wire connector and a side door. The control box is set in a box shape with a side opening, and the side door is hingedly installed at the side opening of the control box to form a flip cover matching structure. The control circuit board is installed inside the control box, the wire connector is installed on the inner side of the control box and faces the side opening, and the wire connector is connected to an external device through a wire electric control; the pouring and conveying structure is installed at the bottom of the heat dissipation device, and includes a conveying pump, a bottom plate and a connecting pipe. The bottom plate is installed on the bottom surface of the heat dissipation device, and the conveying pump is installed in the heat dissipation device through the bottom plate support type. Two connecting pipes are provided, which are respectively installed on both sides of the conveying pump to connect the discharge pipe and the feed pipe.

[0007] Preferably, the heat dissipation device includes a heat dissipation shell and an arc-shaped thermal conductive strip, wherein the heat dissipation shell is a heat dissipation aluminum-based shell, and the arc-shaped thermal conductive strip is formed into a curved surface structure and is installed on the inner wall of the heat dissipation shell; a first through groove and a second through groove penetrating the side wall are provided at the bottom of the side wall of the heat dissipation shell, and are respectively provided at two opposite different side walls.

[0008] Preferably, the heat dissipation housing is assembled from two half shells, including a front shell and a rear shell that are butt-jointed in the same direction, the first through slot is arranged on the front shell, and the second through slot is arranged on the rear shell.

[0009] Preferably, a heat-conducting colloid is coated between the heat-dissipating housing and the arc-shaped heat-conducting strip, and the outer wall of the arc-shaped heat-conducting strip is in contact with the outer wall of the heating component of the delivery pump.

[0010] Preferably, the conveying device also includes a winding structure, which is axially installed on the end face of the control device, and the winding structure mainly includes a box cover, a winding piece and a dust cover, wherein the dust cover is arranged in a frame shape, the box cover is in a plate shape, and docking holes and screw holes are arranged on the surface, and the dust cover and the box cover are snap-fitted and connected as a whole to form an empty box structure with the winding piece installed inside, and a wire outlet groove is provided at the bottom of the empty box to lead out the wound wire of the winding piece.

[0011] Preferably, the winding member includes a first winding member, a second winding member and a third winding member, which are respectively formed into a winding disk structure and are respectively composed of a winding drum, a connecting column, a docking disk and a fixed disk. The docking disk and the connecting column are integrally arranged and are installed at the center of the winding drum through the connecting column. The other end of the connecting column is connected to the fixed disk, and the winding member is installed on the side of the box cover by bolts; at the same time, three wire outlet grooves are arranged, which are respectively arranged under the first winding member, the second winding member and the third winding member.

[0012] Preferably, the docking hole of the box cover is arranged at the installation position of the aligned winding member, and the docking hole is fixedly screwed to the box cover through the docking plate.

[0013] Preferably, the screw holes of the box cover are arranged at the four corners of the box cover, and the box cover is fixedly screwed to the control box of the control device from the outer side through the screw holes, and is buckled and connected to the dust cover from the inner side.

[0014] Preferably, the winding reel and the connecting column are connected through and then loosely matched to form a movable connection structure.

[0015] A working method of a foam concrete conveying device, characterized in that the working method comprises the following steps:

[0016] S1. Assemble the winding structure: First, assemble the first winding member, the second winding member and the third winding member respectively, prepare a winding drum, a connecting column, a docking plate and a fixed plate for each winding member, then fix the connecting column with the docking plate, and then the end of the connecting column passes through the center of the winding drum to the outside, and the end is connected to the fixed plate, and the connecting column and the winding drum are clearance-matched to form a rotatable connection structure; secondly, after the winding members are assembled and formed, they are arranged in a triangle and installed on the side of the box cover, and the installation position of each winding member is located through the docking hole, and finally the box cover is connected with the dust cover by snapping, and three outlet grooves for each winding member are provided at the bottom of the dust cover;

[0017] S2. Assemble the control device: assemble the control box and the side door, after installing the control circuit board inside the control box, hinge the side door from the side opening, flip the control side door, and install the wire connector at the side opening of the control box, open a through slot on the side door to extend the wire connected to the wire connector from the through slot, and after the assembly is completed, connect the wire to the winding structure from one side of the control box;

[0018] S3. Assemble the pouring and conveying structure: install the control box of the control device on the upper edge of the bottom plate of the pouring and conveying structure from the bottom surface, install the control box and the winding structure together through the bottom plate support, and at the same time, the conveying pump is also installed on the upper surface of the bottom plate to be supported by the bottom plate, and connecting pipes are arranged on both sides of the conveying pump, which extend outwards through the connecting pipes and are connected to the inlet / outlet pipes;

[0019] S4, assembling the heat dissipation device: installing the arc-shaped heat-conducting strip on the inner side wall of the heat dissipation housing, and then installing the heat dissipation housing as a whole on the outside of the delivery pump. When the housing is installed, the first and second through grooves provided in the heat dissipation housing are aligned with the connecting pipes on both sides of the delivery pump, the connecting pipes extend from the through grooves, and the bottom surface of the heat dissipation housing is connected to the bottom plate;

[0020] S5. Work control: wind the wire around the first winding member, the second winding member and the third winding member, the wire heads at both ends of the wire extend from the wire outlet slot under the dust cover, pulling the wire head can lengthen the wire, one end of the wire head is connected to the wire connector of the control device, and the other end is connected to the external device; after the work is completed, remove the wire head connected to the external device, open the dust cover, and continuously rotate the winding drums provided in the first winding member, the second winding member and the third winding member to realize the winding and recovery of the wire.

[0021] The beneficial effects of the present invention are as follows: the present invention is applied to foam concrete pouring construction, and the positional relationship between the control device of the foam concrete pouring equipment and the foam concrete pouring and delivery pump is adjusted to reduce the overall installation space, and the overall structure is compact, thereby improving the space utilization rate; at the same time, the heat dissipation device provided by the present invention plays the heat dissipation role of the foam concrete pouring and delivery pump through the heat dissipation aluminum base shell and the arc-shaped heat conductive strip, thereby improving the heat dissipation effect and dustproof effect of the foam concrete pouring and delivery pump; at the same time, the present invention realizes the winding of the control device and the external equipment wires through the provided winding structure, thereby facilitating the placement of the wires, facilitating installation, and improving operating efficiency; the overall foam concrete pouring equipment of the present invention has a simple structure, is easy to operate, and achieves a significantly improved construction effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0023] Figure 2 It is a schematic diagram of the overall structure decomposition of the present invention.

[0024] Figure 3 It is an external cross-sectional schematic diagram of the heat dissipation device of the present invention.

[0025] Figure 4 It is a structural schematic diagram of the control device of the present invention.

[0026] Figure 5 It is an exploded view of the winding structure of the present invention.

[0027] Figure 6 It is an exploded view of the winding component of the present invention.

[0028] Explanation of the accompanying drawings: 1-control device, 2-heat dissipation device, 3-winding structure, 4-bottom plate, 5-delivery pump, 6-connecting pipe, 101-control box, 102-wire connector, 103-side door, 201-heat dissipation shell, 202-first through slot, 203-second through slot, 204-arc-shaped thermal conductive strip, 301-box cover, 302-screw hole, 303-docking hole, 304-first winding piece, 305-second winding piece, 306-third winding piece, 307-dust cover, 3061-winding reel, 3062-connecting column, 3063-docking plate, 3064-fixing plate. DETAILED DESCRIPTION

[0029] The specific implementation of the present invention is described in detail below with reference to the accompanying drawings:

[0030] A foam concrete conveying device, the conveying device mainly comprises a pouring conveying structure, a heat dissipation device 2 and a control device 1, wherein the heat dissipation device 2 is integrally formed into an inner hollow box structure in which the pouring conveying structure is installed; further, the heat dissipation device 2 comprises a heat dissipation shell 201 and an arc-shaped heat-conducting strip 204, wherein the heat dissipation shell 201 is a heat dissipation aluminum-based shell, and the arc-shaped heat-conducting strip 204 is formed into a curved surface structure and is installed on the inner side wall of the heat dissipation shell 201; a first through groove 202 and a second through groove 203 penetrating the side wall are provided at the bottom of the side wall of the heat dissipation shell 201, and are respectively provided at two opposite side walls; the heat dissipation shell 201 is assembled from two half-shells, including a front shell and a rear shell connected in the same direction, the first through groove 202 is provided on the front shell, and the second through groove 203 is provided on the rear shell; a heat-conducting colloid is coated between the heat dissipation shell 201 and the arc-shaped heat-conducting strip 204, and the outer wall of the arc-shaped heat-conducting strip 204 is provided in contact with the outer wall of the heating component of the conveying pump 5;

[0031] The control device 1 is axially mounted on the axial end face of the heat sink 2. The control device 1 includes a control box 101, a control circuit board, a wire connector 102 and a side door 103. The control box 101 is configured as a box body with a side opening. The side door 103 is hingedly mounted at the side opening of the control box 101 to form a flip cover matching structure. The control circuit board is mounted inside the control box 101. The wire connector 102 is mounted on the inner side of the control box 101 and faces the side opening. The wire connector 102 is electrically connected to an external device through a wire. The pouring and conveying structure is mounted on the bottom of the heat sink 2 and includes a conveying pump 5, a bottom plate 4 and a connecting pipe 6. The bottom plate 4 is mounted on the bottom surface of the heat sink 2. The conveying pump 5 is supported and mounted inside the heat sink 2 through the bottom plate 4. Two connecting pipes 6 are provided and are mounted on both sides of the conveying pump 5 to connect the discharge pipe and the feed pipe.

[0032] Furthermore, the conveying device also includes a winding structure 3, which is axially installed on the end face of the control device 1. The winding structure 3 mainly includes a box cover 301, a winding member and a dust cover 307, wherein the dust cover 307 is set in a frame shape, the box cover 301 is a plate-shaped, and a docking hole 303 and a screw hole 302 are set on the surface. The dust cover 307 and the box cover 301 are snap-connected to form an empty box structure with the winding member installed inside, and a wire outlet groove is opened at the bottom of the empty box to lead out the wound wire of the winding member; the winding member includes a first winding member 304, a second winding member 305 and a third winding member The wire parts 306 are formed into winding disc structures, and are respectively composed of a winding drum 3061, a connecting column 3062, a docking disc 3063 and a fixed disc 3064. The docking disc 3063 and the connecting column 3062 are integrally arranged, and are installed at the center of the winding drum 3061 through the connecting column 3062. The other end of the connecting column 3062 is connected to the fixed disc 3064, and the winding parts are installed on the side of the box cover 301 by bolts; at the same time, three wire outlet grooves are provided, which are respectively arranged below the first winding part 304, the second winding part 305 and the third winding part 306. The first The winding member 304, the second winding member 305 and the third winding member 306 are arranged in a triangle in the empty box, wherein the first winding member 304 and the third winding member 306 are installed above the second winding member 305; the first winding member 304, the second winding member 305 and the third winding member 306 are compactly arranged in the dust cover 307, so that the overall volume of the control device 1 is smaller, and the external device wires can also be wound on the first winding member 304, the second winding member 305 and the third winding member 306 respectively, avoiding the disordered crossing of the wires, and being suitable for a variety of different external device wires , and the limited space in the dust cover 307 can be fully utilized; the docking hole 303 of the box cover 301 is set at the installation position of the aligned winding component, and is fixedly screwed with the box cover 301 through the docking plate 3063 from the docking hole 303; the screw holes 302 of the box cover 301 are set at the four corners of the box cover 301, and are fixedly screwed with the control box 101 of the control device 1 from the outer side of the box cover 301 through the screw holes 302, and are snap-connected with the dust cover 307 from the inner side; the winding drum 3061 and the connecting column 3062 are connected through and clearance-matched to form a movable connection structure.

[0033] A working method of a foam concrete conveying device, the working method comprising the following steps:

[0034] S1. Assemble the winding structure 3: First, assemble the first winding member 304, the second winding member 305 and the third winding member 306 respectively, and prepare a winding drum 3061, a connecting post 3062, a docking plate 3063 and a fixed plate 3064 for each winding member. Then, after the connecting post 3062 is fixedly connected to the docking plate 3063, the end of the connecting post 3062 passes through the center of the winding drum 3061 to the outside, and the end is connected to the fixed plate 3064, and the connecting post 3062 and the winding drum 3061 are clearance-matched to form a rotatable connection structure; secondly, after the winding members are assembled and formed, they are arranged in a triangle and installed on the side of the box cover 301, and the installation position of each winding member is located through the docking hole. Finally, the box cover 301 and the dust cover 307 are connected by snaps, and three outlet grooves for each winding member are provided at the bottom of the dust cover 307;

[0035] S2, assembling the control device 1: assembling the control box 101 and the side door 103, after installing the control circuit board inside the control box 101, hinge the side door 103 from the side opening, flip the control side door 103, and install the wire connector 102 at the side opening of the control box 101, open a through slot on the side door 103 so that the wire connected at the wire connector 102 can extend out from the through slot, and after the assembly is completed, connect the control box 101 with the winding structure 3 from one side;

[0036] S3, assembling the pouring and conveying structure: installing the control box 101 of the control device 1 on the upper edge of the bottom plate 4 of the pouring and conveying structure from the bottom surface, supporting the installation of the control box 101 and the winding structure 3 through the bottom plate 4, and at the same time, the conveying pump 5 is also installed on the upper surface of the bottom plate 4 to be supported by the bottom plate 4, and connecting pipes 6 are arranged on both sides of the conveying pump 5, which extend outwards through the connecting pipes 6 and are connected to the inlet / outlet pipes;

[0037] S4, assembling the heat dissipation device 2: installing the arc-shaped heat-conducting strip 204 on the inner side wall of the heat dissipation housing 201, and then the heat dissipation housing 201 is installed as a whole on the outside of the delivery pump 5. When the heat dissipation housing 201 is installed, the first and second through grooves provided in the heat dissipation housing 201 are aligned with the connecting pipes 6 on both sides of the delivery pump 5, and the connecting pipes 6 extend from the through grooves, and the bottom surface of the heat dissipation housing 201 is connected to the bottom plate 4;

[0038] S5. Work control: wind the wire around the first winding member 304, the second winding member 305 and the third winding member 306, and the wire ends at both ends of the wire extend from the wire outlet groove under the dust cover 307. Pulling the wire end can lengthen the wire. One end of the wire end is connected to the wire connector 102 of the control device 1, and the other end is connected to the external device. After the work is completed, remove the wire end connected to the external device, open the dust cover 307, and continuously rotate the winding drum 3061 provided on the first winding member 304, the second winding member 305 and the third winding member 306 to realize the winding and recycling of the wire.

[0039] The specific method of this embodiment is as follows:

[0040] When first assembling the control device 1 and the winding structure 3, the first winding member 304, the second winding member 305 and the third winding member 306 of the winding structure 3 are assembled, and the connecting post 3062 provided in the third winding member 306 is inserted into the central hole opened on one side of the winding drum 3061 until the docking plate 3063 at one end of the connecting post 3062 contacts the winding drum 3061, and the other end of the connecting post 3062 then passes through the hole opened in the winding drum 3061, and the fixing plate 3064 is inserted into the other end of the connecting post 3062, and the fixing plate 3064 is fixed to the connecting post 3062 by a thread, so as to realize the assembly of the third winding member 306, and the first winding member 304, the second winding member 305 and the third winding member 306 are assembled. The structure of 05 is the same as that of the third winding member 306. One end of the docking plate 3063 provided on the third winding member 306 is tightly attached to the end face of the box cover 301. A threaded hole is provided on the edge of one end of the docking plate 3063 and is aligned with the docking hole 303 provided on the box cover 301, so that the bolt can be inserted into the docking hole 303 provided on the box cover 301. The bolt penetrates the box cover 301 and is inserted into the threaded hole provided on the docking plate 3063, so that the third winding member 306 is fixedly connected to the box cover 301. The installation method between the first winding member 304, the second winding member 305 and the box cover 301 is the same as the installation method between the third winding member 306 and the box cover 301. After the installation between the winding member and the box cover 301 is realized, The wire is wound in the winding drum 3061 provided in the first winding member 304, the second winding member 305 and the third winding member 306, and the two ends of the wire of the winding drum 3061 of the first winding member 304, the second winding member 305 and the third winding member 306 are pulled out, and the two ends of the wire wound by the first winding member 304, the second winding member 305 and the third winding member 306 are inserted into the outlet groove opened at the lower end of the dust cover 307, and one end of the wire wound by the first winding member 304, the second winding member 305 and the third winding member 306 is inserted into the groove opened in the side door 103 of the control device 1, and one end of the wire wound by the first winding member 304, the second winding member 305 and the third winding member 306 is connected to the wire in the side door 103. The first winding member 304, the second winding member 305 and the third winding member 306 are connected to each other, and the other end of the wire wound by the first winding member 304, the second winding member 305 and the third winding member 306 is connected to an external device to realize the connection between the control device 1 and the external device. One end of the box cover 301 is aligned with the control box of the control device 1, and the screw holes 302 opened at the four corners of the box cover 301 are aligned with the threaded holes opened in the control box 101. Bolts are inserted into the screw holes 302 opened at the four corners of the box cover 301, and the bolts penetrate the box cover 301 and are inserted into the threaded holes opened in the control box 101 to realize the fixed connection between the control box 101 and the box cover 301. The dust cover 307 is connected to the box cover 301 by snapping, and the fixed installation between the entire winding structure 3 and the control device 1 is completed;

[0041] Then, the bottom plate 4 and the control device 1 are installed, the lower end of the control device 1 is aligned with one side of the upper surface of the bottom plate 4, and bolts are used to fix the bottom plate 4 and the control box of the control device 1. The upper end of the bottom plate 4 supports the installation of the delivery pump 5, and the bottom plate 4 and the delivery pump 5 are fixed with bolts. The upper end of the arc-shaped thermal conductive strip 204 provided in the heat dissipation device 2 is tightly attached to the heat dissipation aluminum base shell, and bolts are inserted into the fixation between the arc-shaped thermal conductive strip 204 and the heat dissipation aluminum base shell. The arc-shaped thermal conductive strip 204 can be moved to adjust the position of the arc-shaped thermal conductive strip 204, and the heat dissipation outside The shell 2 is entirely covered on the outside of the delivery pump 5, and the connecting pipe 6 is aligned with the first through groove 202 and the second through groove 203 on both sides of the heat dissipation aluminum base shell to penetrate, and the connecting pipe 6 is connected to the pipeline provided with the delivery pump 5, and the connecting pipe 6 is used to connect with the external foam concrete mixing and discharging equipment, and the connecting pipe 6 provided on the other side of the delivery pump 5 is connected to the discharging pipeline to realize the installation of the entire device. During the installation of the heat dissipation shell 2, the arc-shaped heat-conducting strip 204 is closely attached to the outer wall of the delivery pump 5, and the inner wall of the arc-shaped heat-conducting strip 204 can be coated with a heat-conducting colloid to facilitate the heat conduction of the delivery pump 5;

[0042] When in use, pull the wire head at the lower end of the dust cover 307, the wire head extends out and is connected to the external device, and the other wire head is connected to the wire connector 102 of the control device 1 to achieve the connection between the control device 1 and the external device. The heat dissipated by the delivery pump 5 when working is transferred to the heat dissipation shell 2 through the arc-shaped heat conductive strip 204, and the heat is dissipated through the heat dissipation aluminum base shell. The heat can also be dissipated by opening holes in the first through groove 202 and the second through groove 203, which improves the dustproof and heat dissipation effects of the delivery pump 5 to a certain extent. After the work is completed, remove the wire head connected to the external device, open the dust cover 307, and continuously rotate the winding drum 3061 set in the first winding member 304, the second winding member 305 and the third winding member 306 to achieve the winding of the wire and facilitate the recovery of the wire.

[0043] The above description is only a preferred embodiment of the present invention and does not limit the technical scope of the present invention. Technical personnel in this industry can make some deformation and modifications under the inspiration of this technical solution. Any modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. A foam concrete conveying device, characterized in that: The conveying device mainly includes a casting conveying structure, a heat dissipation device and a control device, wherein the heat dissipation device is integrally formed into an inner hollow box structure in which the casting conveying structure is installed; the control device is axially installed on the axial end face of the heat dissipation device, and the control device includes a control box, a control circuit board, a wire connector and a side door. The control box is set in a box shape with a side opening, and the side door is hingedly installed at the side opening of the control box to form a flip cover matching structure. The control circuit board is installed inside the control box, the wire connector is installed on the inner side of the control box and faces the side opening, and the wire connector is connected to an external device through a wire electric control; the casting conveying structure is installed at the bottom of the heat dissipation device, and includes a conveying pump, a bottom plate and a connecting pipe. The bottom plate is installed on the bottom surface of the heat dissipation device, and the conveying pump is installed in the heat dissipation device through the bottom plate support type. Two connecting pipes are provided, which are respectively installed on both sides of the conveying pump to connect the discharge pipe and the feed pipe; The heat dissipation device comprises a heat dissipation shell and an arc-shaped heat-conducting strip, wherein the heat dissipation shell is a heat dissipation aluminum-based shell, and the arc-shaped heat-conducting strip is formed into a curved surface structure and installed on the inner side wall of the heat dissipation shell; a first through groove and a second through groove penetrating the side wall are provided at the bottom of the side wall of the heat dissipation shell, and are respectively provided at two opposite side walls; The conveying device also includes a winding structure, which is axially installed on the end surface of the control device. The winding structure mainly includes a box cover, a winding piece and a dust cover, wherein the dust cover is set in a frame shape, the box cover is in a plate shape, and a docking hole and a screw hole are set on the surface. The dust cover and the box cover are snap-fitted and connected as a whole to form an empty box structure in which the winding piece is installed, and a wire outlet groove is opened at the bottom of the empty box to lead out the wound wire of the winding piece; The winding components include a first winding component, a second winding component and a third winding component, which are respectively formed into a winding disk structure and respectively consist of a winding drum, a connecting column, a docking disk and a fixed disk. The docking disk and the connecting column are integrally arranged and are installed at the center of the winding drum through the connecting column. The other end of the connecting column is connected to the fixed disk, and the winding component is installed on the side of the box cover by bolts; at the same time, three wire outlet grooves are arranged, which are respectively arranged below the first winding component, the second winding component and the third winding component.

2. A foam concrete conveying device according to claim 1, characterized in that: The heat dissipation housing is assembled from two half-shells, including a front shell and a rear shell that are butt-jointed in the same direction. The first through slot is arranged on the front shell, and the second through slot is arranged on the rear shell.

3. A foam concrete conveying device according to claim 2, characterized in that: A heat-conducting colloid is coated between the heat-dissipating shell and the arc-shaped heat-conducting strip, and the outer wall of the arc-shaped heat-conducting strip is in contact with the outer wall of the heating component of the delivery pump.

4. A foam concrete conveying device according to claim 1, characterized in that: The docking hole of the box cover is arranged at the installation position aligned with the winding member, and the docking hole is fixedly screwed with the box cover through the docking plate.

5. A foam concrete conveying device according to claim 4, characterized in that: The screw holes of the box cover are arranged at the four corners of the box cover, and the box cover is fixedly screwed to the control box of the control device from the outer side through the screw holes, and is buckled and connected to the dust cover from the inner side.

6. A foam concrete conveying device according to claim 1, characterized in that: After the winding drum and the connecting column are connected through, they are loosely matched to form a movable connection structure.

7. A working method using a foam concrete conveying device according to any one of claims 1 to 6, characterized in that: The working method comprises the following steps: S1. Assemble the winding structure: First, assemble the first winding member, the second winding member and the third winding member respectively, prepare a winding drum, a connecting column, a docking plate and a fixed plate for each winding member, then fix the connecting column with the docking plate, and then the end of the connecting column passes through the center of the winding drum to the outside, and the end is connected to the fixed plate, and the connecting column and the winding drum are clearance-matched to form a rotatable connection structure; secondly, after the winding members are assembled and formed, they are arranged in a triangle and installed on the side of the box cover, and the installation position of each winding member is located through the docking hole, and finally the box cover is connected with the dust cover by snapping, and three outlet grooves for each winding member are provided at the bottom of the dust cover; S2. Assemble the control device: assemble the control box and the side door, after installing the control circuit board inside the control box, hinge the side door from the side opening, flip the control side door, and install the wire connector at the side opening of the control box, open a through slot on the side door to extend the wire connected to the wire connector from the through slot, and after the assembly is completed, connect the wire to the winding structure from one side of the control box; S3. Assemble the pouring and conveying structure: install the control box of the control device on the upper edge of the bottom plate of the pouring and conveying structure from the bottom surface, install the control box and the winding structure together through the bottom plate support, and at the same time, the conveying pump is also installed on the upper surface of the bottom plate to be supported by the bottom plate, and connecting pipes are arranged on both sides of the conveying pump, which extend outwards through the connecting pipes and are connected to the inlet / outlet pipes; S4, assembling the heat dissipation device: installing the arc-shaped heat-conducting strip on the inner side wall of the heat dissipation housing, and then installing the heat dissipation housing as a whole on the outside of the delivery pump. When the housing is installed, the first and second through grooves provided in the heat dissipation housing are aligned with the connecting pipes on both sides of the delivery pump, the connecting pipes extend from the through grooves, and the bottom surface of the heat dissipation housing is connected to the bottom plate; S5. Work control: wind the wire around the first winding member, the second winding member and the third winding member, the wire heads at both ends of the wire extend from the wire outlet slot under the dust cover, pulling the wire head can lengthen the wire, one end of the wire head is connected to the wire connector of the control device, and the other end is connected to the external device; after the work is completed, remove the wire head connected to the external device, open the dust cover, and continuously rotate the winding drums provided in the first winding member, the second winding member and the third winding member to realize the winding and recovery of the wire.

Citation Information

Patent Citations

  • Foam concrete conveying device

    CN212176598U