Bridge device and construction method based on combination of concrete box girder and steel box girder

By introducing V-shaped piers and equilateral triangle cross-section support structures into the bridge device, combined with the combination of concrete box girders and steel box girders, the problem of pier support affecting bridge stability is solved, and higher bridge stability performance and construction quality are achieved.

CN111335135BActive Publication Date: 2024-10-25ZHONG STEEL SHIBAJU GRP NO 3 ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010206035.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-03-23
Publication Date
2024-10-25
Estimated Expiration
2040-03-23

AI Technical Summary

Technical Problem

In the existing bridge installations and construction methods based on a combination of concrete box girder and steel box girder, the bridge pier serves as a point support, which affects the stability performance of the bridge across the railway business line.

Method used

A bridge device and construction method are designed. The divergent surface support of the bridge device body and the V-shaped pier replaces the traditional plane support of the bridge pier. It uses a combination of concrete box girder and steel box girder, combined with pile columns, cap platform and steel tower. and stay cable groups to form an equilateral triangular cross-section support structure to improve the stability of the bridge.

Benefits of technology

The stability performance of the bridge across the railway business line is improved. Through the four-point pier support and cable-stayed support, the stability and construction quality of the bridge are enhanced, and the overall installation accuracy and connection strength of the structure are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111335135B_ABST
    Figure CN111335135B_ABST
Patent Text Reader

Abstract

A bridge device and construction method based on a combination of a concrete box girder and a steel box girder, comprising a bridge device body having a concrete box girder (6) and a steel box girder (7), and a V-shaped pier (3) arranged to be connected to the concrete box girder (6) or the steel box girder (7) and having a supporting oblique strip portion with bifurcated distribution. The bridge device body is used to achieve crossing of a railway operating line, and the V-shaped pier (3) is used to achieve divergent surface support for the bridge device body, and no longer requires a plane support through the bridge pier, thereby improving the stability of the bridge crossing the railway operating line.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a bridge device and a construction method, in particular to a bridge device and a construction method based on a combination of a concrete box girder and a steel box girder. Background Art

[0002] Generally, steel box girders are used as overhead bridges to meet the requirements of interchanges between urban railway operating lines and urban roads. Therefore, bridge devices and construction methods based on the combination of concrete box girders and steel box girders are important civil engineering components. In the existing bridge devices and construction methods based on the combination of concrete box girders and steel box girders, a plane support is provided by piers. Since the piers are point supports, the stability of the bridge across the railway operating line is affected. Summary of the invention

[0003] The object of the present invention is a bridge device based on a combination of a concrete box girder and a steel box girder.

[0004] The object of the present invention is a bridge construction method based on the combination of concrete box beam and steel box beam.

[0005] In order to overcome the above technical shortcomings, the purpose of the present invention is to provide a bridge device and construction method based on a combination of concrete box girders and steel box girders, thereby improving the stability of the bridge across the operating railway line.

[0006] In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a bridge device based on a combination of concrete box girders and steel box girders, comprising a bridge device body having concrete box girders and steel box girders, and a V-shaped pier arranged to be connected to the concrete box girder or the steel box girder and having a supporting diagonal strip portion with a branched distribution.

[0007] Due to the design of the bridge device body and V-shaped piers, the crossing of the railway operating line is achieved through the bridge device body, and the divergent surface support of the bridge device body is achieved through the V-shaped piers, and a plane support is no longer required through the bridge piers, thereby improving the stability of the bridge crossing the railway operating line.

[0008] The present invention is designed to connect the bridge device body and the V-shaped pier to each other in a manner of forming a divergent surface support.

[0009] The present invention is designed to connect the V-shaped pier with the bridge device body in a manner of forming an equilateral triangle cross-section support edge.

[0010] The present invention designs that the bridge device body is configured to further include piles, a cap, a first end pier, a second end pier and side piers.

[0011] The present invention is designed to further include a first accessory device, and the first accessory device is arranged on the bridge device body, and the first accessory device is arranged to include a steel tower, a first inclined cable group and a second inclined cable group.

[0012] The present invention is designed that a concrete box girder is arranged to be connected with a steel box girder, a V-shaped pier, a steel tower and a first end pier are respectively arranged on the concrete box girder, and a cap is arranged between the pile column and the V-shaped pier, a second end pier and a side pier are respectively arranged on the steel box girder, a second inclined cable group is arranged between the concrete box girder and the steel tower, and a first inclined cable group is arranged between the steel box girder and the steel tower.

[0013] The present invention is designed that the inner end of the concrete box girder is arranged to be butt-connected with the steel box girder and the lower end face portion of the inner end of the concrete box girder is arranged to be connected with the V-shaped pier, the upper end face portion of the inner end of the concrete box girder is arranged to be connected with the steel tower and the lower end face portion of the outer end of the concrete box girder is arranged to be connected with the first end pier, and the inner side portion of the outer end of the concrete box girder is arranged to be connected with the second inclined cable group.

[0014] The present invention is designed that the inner end of the steel box girder is arranged to be butt-connected to the concrete box girder and the upper end surface portion of the steel box girder is arranged to be connected to the first inclined cable group, the lower end surface portion of the outer end of the steel box girder is arranged to be connected to the second end pier and the lower end surface portion inside the outer end of the steel box girder is arranged to be connected to the side pier.

[0015] The present invention designs that the piles are arranged in a circular columnar body, the upper end surface portion of the piles is arranged to be connected to the cap, the lower end of the piles is arranged to be connected to the foundation in an implanted manner, and the piles are arranged to be distributed in rows.

[0016] The present invention is designed that a V-shaped pier is configured to include a platform portion, a first oblique strip portion and a second oblique strip portion, and one of the side portions of the upper end surface of the platform portion is configured to be connected to the lower end surface portion of the first oblique strip portion, another side portion of the upper end surface of the platform portion is configured to be connected to the lower end surface portion of the second oblique strip portion, and an open upper trough body is provided between the first oblique strip portion and the second oblique strip portion, the upper end surface portion of the first oblique strip portion and the upper end surface portion of the second oblique strip portion are respectively configured to be connected to the concrete box girder, and the lower end surface portion of the platform portion is configured to be connected to the pedestal, the platform portion, the first oblique strip portion and the second oblique strip portion are respectively configured to be strip-shaped bodies, and a contour line formed by the open upper trough body and the lower end surface portion of the concrete box girder is configured to be an equilateral triangle with arcs at the corners.

[0017] The present invention is designed that a steel tower is configured to include a tower head, a first supporting claw portion and a second supporting claw portion, and one side portion of the lower end face of the tower head portion is configured to be connected to the upper end face portion of the first supporting claw portion, and the other side portion of the lower end face portion of the tower head portion is configured to be connected to the upper end face portion of the second supporting claw portion, and an open lower trough body is provided between the first supporting claw portion and the second supporting claw portion, the lower end face portion of the first supporting claw portion and the lower end face portion of the second supporting claw portion are respectively configured to be connected to a concrete box girder, and the upper end face portion of the tower head portion is respectively configured to be connected to a first inclined cable group and a second inclined cable group, the tower head portion, the first supporting claw portion and the second supporting claw portion are respectively configured to be strip-shaped bodies, and the tower head portion and the first supporting claw portion and the second supporting claw portion are configured to be distributed in a Y shape, the contour line of the outer side surface composed of the tower head portion and the first supporting claw portion and the contour line of the outer side surface composed of the tower head portion and the second supporting claw portion are respectively configured to be parts of a circular line, and the contour line composed of the open lower trough body and the upper end face portion of the concrete box girder is configured to be a triangle with an arc at the corner.

[0018] The present invention designs that the upper end of one of the cables in the first cable-stayed cable group is arranged to be connected to the steel tower and the lower end of one of the cables in the first cable-stayed cable group is arranged to be connected to the steel box girder, and one of the cables in the first cable-stayed cable group is arranged to be a steel wire rope.

[0019] The present invention designs that the upper end of one of the cables in the second cable-stayed cable group is arranged to be connected to the steel tower and the lower end of one of the cables in the second cable-stayed cable group is arranged to be connected to the concrete box girder, and one of the cables in the second cable-stayed cable group is arranged to be a steel wire rope.

[0020] The present invention is designed that the first end pier and the second end pier are respectively configured to include a supporting portion and a column portion, and the lower end surface portion of the supporting portion is configured to be connected to the upper end surface portion of the column portion, the lower end head of the column portion is configured to be implanted in the foundation, and the upper end surface portion of the horizontal portion of the supporting portion of the first end pier is configured to be connected to the concrete box girder, the upper end surface portion of the horizontal portion of the supporting portion of the second end pier is configured to be connected to the steel box girder, and the supporting portion is configured to be an L-shaped strip body having a clamping plate body on the side of the vertical portion, the clamping plate body of the first end pier is configured to be connected to the side portion of the concrete box girder, and the clamping plate body of the second end pier is configured to be connected to the side portion of the steel box girder, the column portion is configured to be a circular columnar body, and the column portions are configured to be arranged and distributed at intervals along the vertical center line of the supporting portion.

[0021] The present invention is designed that the side pier is configured to include a beam portion and a pile body portion, and the lower end surface portion of the beam portion is configured to be connected to the upper end surface portion of the pile body portion, the lower end head of the pile body portion is configured to be embedded in the foundation and the upper end surface portion of the beam portion is configured to be connected to the steel box beam, the beam portion is configured to be a T-shaped strip body and a rib plate is configured between the vertical portion and the horizontal portion of the end head of the beam portion, the rib plate is configured to be an eight-shaped sheet body, the pile body portion is configured to be a circular columnar body and the pile body portions are configured to be arranged and distributed at intervals along the vertical center line of the beam portion.

[0022] The present invention designs that the concrete box girder, the steel box girder, the first end pier, the second end pier and the side piers and the piles, the pedestals, the V-shaped piers, the steel towers, the first inclined cable group and the second inclined cable group are arranged to be distributed in a manner of being obliquely fixed in the middle, the first inclined cable group is provided with at least twelve inclined cables and the second inclined cable group is provided with at least one inclined cable, the first supporting claw portion is arranged to be distributed corresponding to the first oblique bar portion, the second supporting claw portion is arranged to be distributed corresponding to the second oblique bar portion, the open lower trough body is arranged to be distributed corresponding to the open upper trough body and the open lower trough body is arranged to be arranged to be arranged up and down with the open upper trough body along the transverse center line of the concrete box girder.

[0023] The present invention is designed to also include a temporary support beam and a cushion layer, and the upper end surface portion of the temporary support beam is arranged to be connected to the lower end surface portion of the cushion layer, the lower end surface portion of the temporary support beam is arranged to be connected to the upper end surface portion of the pedestal, and the upper end surface portion of the cushion layer is respectively arranged to be connected to the outer side surface portions of the first oblique strip portion and the outer side surface portions of the second oblique strip portion.

[0024] The present invention is designed that the temporary support beam is set as a concrete trapezoidal bar with a built-in steel mesh and the temporary support beam is arranged and distributed at intervals along the vertical center line of the pedestal, the width of the temporary support beam is set to 68-72cm and the trapezoidal inner angle α of the temporary support beam is set to 80-86°.

[0025] The present invention designs that the cushion layer is set as a condensate of high-strength grouting material, and the cushion layer is set between the temporary support beam and the first oblique strip part, and the cushion layer is set between the temporary support beam and the second oblique strip part.

[0026] The present invention is designed to further include an anchor plate device and the anchor plate device is arranged between the inclined cables in the first inclined cable group and the steel box girder.

[0027] The present invention is designed that the anchor plate device is configured to include a core segment, a cap segment, an outer cylinder shell, an inner lining shell, a pad, an anchor ring and a pressure plate, and the core segment is arranged on a steel box girder, the outer cylinder shell and the inner lining shell are respectively arranged on the core segment and a cap segment is arranged between the outer cylinder shell and the inner lining shell, pads are arranged on the cap segment, the outer cylinder shell and the inner lining shell and a pressure plate is arranged on the pad, an anchor ring is arranged on the pressure plate, and the cap segment, the pad, the anchor ring and the pressure plate are respectively arranged to be connected to the inclined cables in the first inclined cable group.

[0028] The present invention is designed that the core segment is set as a concrete solid column and the outer side surface of the core segment is set to be connected with the cap segment, the upper end surface of the core segment is respectively set to be connected with the cap segment and the inner lining shell and the lower end surface of the core segment is set to be connected with the steel box girder, and the center line of the core segment is set to be distributed at an acute angle with the transverse center line of the steel box girder.

[0029] The present invention is designed that the cap section is configured to include a filling body, shear nails, steel strands and a rib plate, and one of the end surfaces of the rib plate is configured to be connected to the inner wall of the outer cylinder shell, the other end surface of the rib plate is configured to be connected to the outer side surface of the lining shell, and the outer ends of the shear nails are respectively configured to be connected to the inner wall of the outer cylinder shell, the outer side surface of the lining shell and the side surface of the rib plate, the steel strands are configured to be arranged and distributed at intervals along the periphery of the inner wall of the outer cylinder shell, and the filling bodies are respectively arranged between the outer cylinder shell and the core section, and between the outer cylinder shell and the inner lining shell, the lower end surface of the filling body is configured to be connected to the steel box girder, and the upper end surface of the filling body is configured to be connected to the pad, the filling body is configured to be inclusively connected to the inclined cables in the first inclined cable group, and the filling body is configured to be a solidified body of concrete mortar, the shear nails are configured to be T-shaped rod-shaped bodies, and two adjacent shear nails are configured to be arranged and distributed at intervals, the steel strands are configured to be steel wires, and the rib plate is configured to be rectangular sheet-shaped bodies.

[0030] The present invention designs that the outer cylinder shell is set as a rectangular tubular body and the inner wall of the outer cylinder shell is set to be connected to the cap section, the upper end port portion of the outer cylinder shell is set to be connected to the pad and the lower end port portion of the outer cylinder shell is set to be connected to the steel box beam.

[0031] The present invention designs that the lining shell is configured as a rectangular box-shaped body with a trapezoidal bottom end face and the outer end face portion of the lining shell is configured to be connected to the cap segment, the upper end face portion of the lining shell is configured to be connected to the pad and the lower end face portion of the lining shell is configured to be connected to the core segment.

[0032] The present invention is designed that a through hole body is provided in the middle part of the plate portion 601 of the pad and an open hole body is provided in the plate portion 601, the inner port portion of the open hole body is arranged to be connected to the peripheral line of the through hole body and the inner port portion of the open hole body is arranged to be connected to the peripheral line of the plate portion 601, the outer side surface portion of the plate portion 601 is arranged to be connected to the outer cylinder shell and the inner side surface portion of the plate portion 601 is arranged to be connected to the inner liner shell, the upper end surface portion of the plate portion 601 is arranged to be connected to the pressure plate and the lower end surface portion of the plate portion 601 is arranged to be connected to the cap segment, the through hole body is arranged to be connected to the inclined cable in the first inclined cable group, the plate portion 601 is arranged to be a rectangular sheet body and the through hole body is arranged to be a circular hole body, and the open hole body is arranged to be a long strip hole body.

[0033] The present invention is designed that the pressure plate is configured as a rectangular annular body with a leaky circular hole and the outer side surface of the pressure plate is configured to be connected to the outer cylinder shell and the inner side surface of the pressure plate is configured to be connected to the inner liner shell, the upper end surface of the pressure plate is configured to be connected to the anchor ring and the lower end surface of the pressure plate is configured to be connected to the cap segment and the pad respectively, and the leaky circular hole of the pressure plate is configured to be connected to the inclined cable in the first inclined cable group.

[0034] The present invention designs that the anchor ring is configured as a circular ring-shaped body and the lower end surface portion of the anchor ring is configured to be connected to the pressure plate, and the anchor ring is configured to be connected to the inclined cable in the first inclined cable group in a sleeve-type manner.

[0035] The present invention is designed that the lower end of the inclined cable in the first inclined cable group is arranged to be connected to the upper end of the tensioning screw and the tensioning screw is arranged to be connected in series with the steel box girder, the lower end of the tensioning screw is arranged to extend to the lower end surface of the steel box girder and the tensioning nut is arranged to be threadedly connected to the tensioning screw, and the upper end surface of the tensioning nut is arranged to be contact-connected with the lower end surface of the steel box girder.

[0036] The present invention designs a bridge construction method based on a combination of a concrete box girder and a steel box girder, the steps of which are:

[0037] Piles are driven into the foundation on one side of the urban railway operating line, a cap is installed on the pile, concrete mortar is poured on the cap to form a platform, a template of a first oblique strip and a template of a second oblique strip are installed on the upper end surface of the platform, concrete mortar is poured on the first section of the first oblique strip and the first section of the second oblique strip, so that the ratio of the overall length of the first oblique strip to the length of the first section of the first oblique strip is set to 1:0.58-0.67, and the ratio of the overall length of the second oblique strip to the length of the first section of the second oblique strip is set to 1:0.58-0.67, and after the first section of the first oblique strip and the first section of the second oblique strip are formed, the first oblique strip is removed. The template of the second oblique strip part and the template of the second oblique strip part are respectively installed between the first section of the first oblique strip part and the pedestal, and between the first section of the second oblique strip part and the pedestal, and high-strength grouting materials are respectively injected between the first section of the first oblique strip part and the temporary support beam, and between the first section of the second oblique strip part and the temporary support beam to form a cushion layer, so as to support the first section of the first oblique strip part and the first section of the second oblique strip part, and then the template of the second section of the first oblique strip part is installed on the first section of the first oblique strip part, and the template of the second section of the second oblique strip part is installed on the first section of the second oblique strip part, and concrete mortar is poured on the second section of the first oblique strip part and the second section of the second oblique strip part, so as to complete the forming of the V-shaped pier.

[0038] Install the core segment skeleton on the steel box girder, install the core segment template on the skeleton, and pour concrete mortar on the core segment to complete the installation of the core segment and the steel box girder.

[0039] The column parts of the first end pier are driven into the outside of the pile column respectively, and the support part of the first end pier is installed on the column part of the first end pier, thereby completing the installation of the first end pier.

[0040] The pile bodies are driven into the foundation on the other side of the urban railway operating line, and the beams are installed on the pile bodies, thus completing the installation of the side piers.

[0041] The column parts of the second end pier are driven into the outside of the pile body respectively, and the support parts of the second end pier are installed on the column parts of the second end pier, thereby completing the installation of the second end pier.

[0042] Install one end of the concrete box beam on the support portion of the first end pier, connect the clamping plate of the first end pier to the concrete box beam, and install the other end of the concrete box beam on the first supporting claw portion and the second supporting claw portion.

[0043] Install one end of the steel box girder on the supporting part of the second end pier, connect the clamping plate of the second end pier to the steel box girder, and butt the other end of the steel box girder to the other end of the concrete box girder.

[0044] The first supporting claw and the second supporting claw are respectively installed on the concrete box beam, so that the first supporting claw corresponds to the first oblique strip, the second supporting claw corresponds to the second oblique strip, the open lower trough corresponds to the open upper trough, and the steel tower is installed on the concrete box beam.

[0045] Connect the upper end of the cable of the second cable group to the tower head, and connect the lower end of the cable of the second cable group to the middle part of the concrete box girder.

[0046] The shear nails are installed on the outer cylinder shell, the inner liner shell and the ribbed plate, the ribbed plate is installed on the outer cylinder shell and the inner liner shell, the lower end of the steel strand is welded to the steel box beam, the outer cylinder shell and the inner liner shell are installed on the core segment, the inclined cables of the first inclined cable group are connected through the anchor ring, the pressure plate and the through hole body, the inclined cables of the first inclined cable group pass through the gap between the outer cylinder shell and the inner liner shell, the lower end of the inclined cables of the first inclined cable group is welded to the upper end of the tensioning screw, the upper end of the inclined cables of the first inclined cable group is connected to the tower head, and the through hole body is connected to the tower head. By rotating the tensioning nut on the tensioning screw, the inclined cables of the first inclined cable group are tightened, the upper ends of the steel strands are placed on the upper end ports of the outer cylinder shell and the inner lining shell, and concrete mortar is injected into the gap between the outer cylinder shell and the inner lining shell to form a filling body, thereby realizing the connection between the filling body and the core segment, the outer side surface of the pressure plate is welded to the outer cylinder shell, the inner side surface of the pressure plate is welded to the inner lining shell, and the lower end surface of the pressure plate is connected to the filling body, thereby completing the connection between the inclined cables of the first inclined cable group and the steel box girder.

[0047] The technical effect of the present invention is that: the cable-stayed bridge is a tower-pier-beam consolidation system, in which the V-shaped pier body, the prestressed concrete box beam, and the main tower are anchored and connected as one. According to the "guiding construction steps" in the design drawings, the consolidation system needs to be completed in one go. However, considering that the steel bars (three arranged side by side) and the steel strands are densely packed in the system, and the concrete grade is C60, the construction is extremely difficult, and the concrete is difficult to fall. During the construction, the V-shaped pier body, the prestressed concrete box beam, and the tower foot are constructed separately and in sequence, which can effectively solve the above-mentioned construction difficulties. However, this construction method changes the "inverted triangle" structure formed by the original V-shaped pier body and the beam body into a V-shaped pier body with two ends suspended. If the construction of the cantilever component is improper, it will cause the danger of cracking in the middle of the V-shaped pier. During the construction, the V-shaped pier is cast twice. In order to ensure the correct size of the pier and the overall appearance of the pier, all the standard steel formwork is used. After the pier concrete is cured for 14 days, the formwork is removed and the temporary support is constructed. The temporary support is a reinforced concrete component. C40 concrete is used with a layer of φ16 steel mesh inside. The root support is on the pedestal, and the top support is in the middle of the V-shaped pier. At the same time, in order to prevent concrete shrinkage and creep, a 2cm space is left at the junction of the temporary support top and the V-shaped pier, and the gap will be filled with high-strength grouting material later. The steel main tower The design consists of two towers, each with a front limb and a hind limb, with a total of 4 tower feet. A steel-concrete joint section is set at the tower foot. The joint section is 12.74 meters long. The lower return length from the pressure plate (the tensioning end of the steel strand) is 4.5 meters. The tower is filled with concrete. The lower return length from the pressure plate (the tensioning end of the steel strand in the tower) is 4.5 meters. The middle is hollowed out, and the surrounding compartments are filled with concrete. The steel strands pass through the main tower from the tower root, are laid in the compartments along the four sides, and pass out from the pressure plate. The pressure plate is a 5cm thick steel plate with a round hole in the middle. In conventional construction, ordinary cast iron anchor pads need to be buried in concrete at the tensioning end of the steel strand, and grouting is left in one corner of the anchor pad. However, in reality, the tensioning end of the tower foot is a steel pressure plate as shown in the design drawings, and ordinary anchor pads cannot be buried here at all. Moreover, after tensioning, the anchor ring and the pressure plate are pressed tightly, and there is no vent during the later grouting, which leads to the inability to grout in the corrugated pipe. During construction, a 3cm steel square pad is welded on the outside of the pressure plate. The size is slightly smaller than the pressure plate, and a circular hole is left in the middle of the pad. The size of the circular hole is smaller than the diameter of the anchor ring, and a 3cm wide and long hole is opened on one side of the pad as an air outlet. Grouting is injected from the hard pipe reserved at the root of the tower foot; when the steel strand is tensioned, the anchor ring is close to the pad, and the pad is close to the pressure plate, the three become one, and the anchor is sealed after the tensioning is completed.

[0048] In the present technical scheme, the V-shaped pier is a basic component and also a necessary technical feature of the present invention; the concrete box girder, steel box girder, pile column, pedestal, steel tower, first inclined cable group, second inclined cable group, first end pier, second end pier and side pier are functional components and are features for realizing other technical effects of the present invention; the design of the platform part, first inclined bar part, second inclined bar part, open upper trough body, tower head part, first supporting claw part, second supporting claw part, open lower trough body, clamping plate body, supporting part, column part, rib plate, beam part, pile body part, temporary supporting beam, cushion layer, core segment, cap segment, outer cylinder shell, inner lining shell, pad, anchor ring and pressure plate, filling body, shear nails, steel strand, ribbed plate, plate part 601, through hole body and open hole body are technical features that comply with the Patent Law and its implementing rules.

[0049] In the present technical scheme, the bridge device body and V-shaped piers that form divergent surface supports are important technical features. In the technical field of bridge devices and construction methods based on a combination of concrete box girders and steel box girders, it has novelty, creativity and practicality. The terms in the present technical scheme can be explained and understood using patent documents in this technical field. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0051] Figure 1 is a schematic diagram of one of the first embodiments of the present invention,

[0052] Figure 2 is a schematic diagram of the second embodiment of the first embodiment of the present invention,

[0053] Figure 3 is a schematic diagram of the third embodiment of the present invention,

[0054] Figure 4 Schematic diagram of the connection relationship between the cap segment 30, the outer cylinder shell 40, the liner shell 50, the backing plate 60, the anchor ring 70 and the pressure plate 801 of the present invention.

[0055] Figure 5 is a schematic structural diagram of the pad 60 of the present invention,

[0056] Concrete box girder-6, steel box girder-7, pile column-1, cap-2, V-shaped pier-3, steel tower-4, first inclined cable group-5, second inclined cable group-90, first end pier-8, second end pier-9, side pier-91, platform-31, first oblique bar part-32, second oblique bar part-33, open upper trough-34, tower head-41, first support claw part-42, second support claw part-43, open lower trough-44, clamping plate-80, support part-81, column part-82,

[0057] Rib plate-910, beam part-911, pile body part-912, temporary support beam-101, cushion layer-102, core segment-20, cap segment-30, outer cylinder shell-40, inner lining shell-50, pad-60, anchor ring-70, pressure plate-801, filling body-301, shear nail-302, steel strand-303, rib plate-304, plate part-601, through hole body-602, open hole body-603. DETAILED DESCRIPTION

[0058] According to the Examination Guidelines, terms such as “having”, “including” and “comprising” used in the present invention should be understood as not dispensing with the existence or addition of one or more other elements or combinations thereof.

[0059] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0060] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0061] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other. In addition, unless otherwise specified, the equipment and materials used in the following examples are commercially available. If the processing conditions are not clearly stated, please refer to the purchased product manual or proceed according to conventional methods in the art.

[0062] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0063] A bridge device based on a combination of concrete box beams and steel box beams, Figure 1 This is one of the first embodiments of the present invention, and this embodiment is specifically described in conjunction with the accompanying drawings. It includes a concrete box girder 6, a steel box girder 7, a pile column 1, a cap 2, a V-shaped pier 3, a steel tower 4, a first inclined cable group 5, a second inclined cable group 90, a first end pier 8, a second end pier 9 and a side pier 91, and the concrete box girder 6 is configured to be connected to the steel box girder 7, the V-shaped pier 3, the steel tower 4 and the first end pier 8 are respectively arranged on the concrete box girder 6, and the cap 2 is arranged between the pile column 1 and the V-shaped pier 3, the second end pier 9 and the side pier 91 are respectively arranged on the steel box girder 7, and the second inclined cable group 90 is arranged between the concrete box girder 6 and the steel tower 4, and the first inclined cable group 5 is arranged between the steel box girder 7 and the steel tower 4.

[0064] In this embodiment, the inner end of the concrete box girder 6 is arranged to be butt-connected to the steel box girder 7 and the lower end face portion of the inner end of the concrete box girder 6 is arranged to be connected to the V-shaped pier 3, the upper end face portion of the inner end of the concrete box girder 6 is arranged to be connected to the steel tower 4 and the lower end face portion of the outer end of the concrete box girder 6 is arranged to be connected to the first end pier 8, and the inner side portion of the outer end of the concrete box girder 6 is arranged to be connected to the second inclined cable group 90.

[0065] The concrete box girder 6 forms support connection points for the V-shaped pier 3, the steel tower 4, the steel box girder 7, the second inclined cable group 90 and the first end pier 8. The concrete box girder 6 realizes connection with the V-shaped pier 3, the steel tower 4, the steel box girder 7, the second inclined cable group 90 and the first end pier 8. Its technical purpose is to serve as an extended beam body of the steel box girder 7.

[0066] In this embodiment, the inner end of the steel box girder 7 is arranged to be butt-connected to the concrete box girder 6 and the upper end surface portion of the steel box girder 7 is arranged to be connected to the first inclined cable group 5, the lower end surface portion of the outer end of the steel box girder 7 is arranged to be connected to the second end pier 9 and the lower end surface portion inside the outer end of the steel box girder 7 is arranged to be connected to the side pier 91.

[0067] The steel box girder 7 forms support connection points for the first inclined cable group 5, the concrete box girder 6, the second end pier 9 and the side pier 91. The steel box girder 7 realizes connection with the first inclined cable group 5, the concrete box girder 6, the second end pier 9 and the side pier 91. The technical purpose is to be used for an overhead beam body that crosses the railway operating line.

[0068] In this embodiment, the pile column 1 is configured as a circular column and the upper end surface portion of the pile column 1 is configured to be connected to the base 2, the lower end of the pile column 1 is configured to be implanted in the foundation and the pile columns 1 are configured to be distributed in rows.

[0069] A supporting connection point for the cap 2 is formed by the pile column 1 , and the connection with the cap 2 is realized by the pile column 1 . Its technical purpose is to serve as a supporting carrier for the cap 2 .

[0070] In this embodiment, the V-shaped pier 3 is configured to include a platform 31, a first oblique strip portion 32 and a second oblique strip portion 33, and one of the side portions of the upper end surface of the platform 31 is configured to be connected to the lower end surface portion of the first oblique strip portion 32, another side portion of the upper end surface of the platform 31 is configured to be connected to the lower end surface portion of the second oblique strip portion 33, and an open upper trough body 34 is provided between the first oblique strip portion 32 and the second oblique strip portion 33, the upper end surface portion of the first oblique strip portion 32 and the upper end surface portion of the second oblique strip portion 33 are respectively configured to be connected to the concrete box girder 6, and the lower end surface portion of the platform 31 is configured to be connected to the pedestal 2, the platform 31, the first oblique strip portion 32 and the second oblique strip portion 33 are respectively configured to be strip-shaped bodies, and the contour line formed by the open upper trough body 34 and the lower end surface portion of the concrete box girder 6 is set to be an equilateral triangle with arcs at the corners.

[0071] The V-shaped pier 3 forms a supporting connection point for the pedestal 2 and the concrete box girder 6. The platform portion 31 realizes connection with the pedestal 2. The first oblique bar portion 32 and the second oblique bar portion 33 realize connection with the concrete box girder 6. The open upper trough 34 realizes release of the torsional force between the concrete box girder 6 and the first oblique bar portion 32 and the second oblique bar portion 33. The technical purpose is to serve as a supporting carrier for the concrete box girder 6.

[0072] In this embodiment, the steel tower 4 is configured to include a tower head 41, a first supporting claw portion 42 and a second supporting claw portion 43, and one of the side portions of the lower end surface of the tower head 41 is configured to be connected to the upper end surface portion of the first supporting claw portion 42, and the other side portion of the lower end surface of the tower head 41 is configured to be connected to the upper end surface portion of the second supporting claw portion 43, and an open lower trough 44 is provided between the first supporting claw portion 42 and the second supporting claw portion 43, and the lower end surface portion of the first supporting claw portion 42 and the lower end surface portion of the second supporting claw portion 43 are respectively configured to be connected to the concrete box girder 6, and the tower head 41 The upper end surface portions are respectively arranged to be connected to the first inclined cable group 5 and the second inclined cable group 90, the tower head portion 41, the first supporting claw portion 42 and the second supporting claw portion 43 are respectively arranged to be strip-shaped bodies, and the tower head portion 41 and the first supporting claw portion 42 and the second supporting claw portion 43 are arranged to be distributed in a Y shape, the contour line of the outer side surface composed of the tower head portion 41 and the first supporting claw portion 42 and the contour line of the outer side surface composed of the tower head portion 41 and the second supporting claw portion 43 are respectively arranged to be a part of a circular line, and the contour line composed of the open lower trough body 44 and the upper end surface portion of the concrete box girder 6 is arranged to be a triangle with an arc at the corner.

[0073] The steel tower 4 forms supporting connection points for the first inclined cable group 5, the second inclined cable group 90 and the concrete box girder 6. The tower head 41 realizes connection with the first inclined cable group 5 and the second inclined cable group 90. The first supporting claw 42 and the second supporting claw 43 realize connection with the concrete box girder 6. The open lower trough 44 realizes release of the torsional force between the concrete box girder 6 and the first supporting claw 42 and the second supporting claw 43. The technical purpose is to serve as a supporting carrier for the first inclined cable group 5 and the second inclined cable group 90.

[0074] In this embodiment, the upper end of one of the inclined cables in the first inclined cable group 5 is set to be connected to the steel tower 4 and the lower end of one of the inclined cables in the first inclined cable group 5 is set to be connected to the steel box girder 7, and one of the inclined cables in the first inclined cable group 5 is set to be a steel wire rope.

[0075] The first inclined cable group 5 forms a support connection point for the steel tower 4 and the steel box girder 7. The first inclined cable group 5 realizes connection with the steel tower 4 and the steel box girder 7. Its technical purpose is to serve as a support carrier for the steel box girder 7.

[0076] In this embodiment, the upper end of one of the inclined cables in the second inclined cable group 90 is set to be connected to the steel tower 4 and the lower end of one of the inclined cables in the second inclined cable group 90 is set to be connected to the concrete box girder 6, and one of the inclined cables in the second inclined cable group 90 is set to be a steel wire rope.

[0077] A supporting connection point for the steel tower 4 and the concrete box girder 6 is formed by the second inclined cable group 90. The second inclined cable group 90 realizes connection with the steel tower 4 and the concrete box girder 6. Its technical purpose is to serve as a supporting carrier for the concrete box girder 6.

[0078] In this embodiment, the first end pier 8 and the second end pier 9 are respectively configured to include a support portion 81 and a column portion 82, and the lower end surface portion of the support portion 81 is configured to be connected to the upper end surface portion of the column portion 82, the lower end head of the column portion 82 is configured to be implanted in the foundation, and the upper end surface portion of the transverse portion of the support portion 81 of the first end pier 8 is configured to be connected to the concrete box girder 6, the upper end surface portion of the transverse portion of the support portion 81 of the second end pier 9 is configured to be connected to the steel box girder 7, and the support portion 8 is configured to be an L-shaped strip body having a clamping plate body 80 on the side of the vertical portion, the clamping plate body 80 of the first end pier 8 is configured to be connected to the side portion of the concrete box girder 6, and the clamping plate body 80 of the second end pier 9 is configured to be connected to the side portion of the steel box girder 7, the column portion 82 is configured to be a circular columnar body, and the column portions 82 are configured to be arranged and distributed at intervals along the vertical center line of the support portion 81.

[0079] A supporting connection point for the steel box girder 7 and the concrete box girder 6 is formed by the first end pier 8 and the second end pier 9. The connection with the steel box girder 7 is realized by the clamping plate 80 and the supporting portion 81 of the second end pier 9. The connection with the concrete box girder 6 is realized by the clamping plate 80 and the supporting portion 81 of the first end pier 8. The connection with the supporting portion 81 is realized by the column 82. The technical purpose is to be used as a supporting carrier for the concrete box girder 6 and the steel box girder 7.

[0080] In this embodiment, the side pier 91 is configured to include a beam portion 911 and a pile body portion 912, and the lower end surface portion of the beam portion 911 is configured to be connected to the upper end surface portion of the pile body portion 912, the lower end head of the pile body portion 912 is configured to be implanted in the foundation and the upper end surface portion of the beam portion 911 is configured to be connected to the steel box girder 7, the beam portion 911 is configured to be a T-shaped strip body and a rib plate 910 is provided between the vertical portion and the horizontal portion of the end head of the beam portion 911, the rib plate 910 is configured to be an eight-shaped sheet body, the pile body portion 912 is configured to be a circular columnar body and the pile body portion 912 is configured to be arranged and distributed at intervals along the vertical center line of the beam portion 911.

[0081] A supporting connection point for the steel box girder 7 is formed through the side pier 91, the connection with the steel box girder 7 is achieved through the beam portion 911, the reinforcement treatment of the beam portion 911 is achieved through the rib plate 910, and the connection to the beam portion 911 is achieved through the pile body portion 912. The technical purpose is to serve as a supporting carrier for the steel box girder 7.

[0082] In this embodiment, the concrete box girder 6, the steel box girder 7, the first end pier 8, the second end pier 9 and the side pier 91 are arranged to be distributed in a middle oblique fixed manner with the pile column 1, the pedestal 2, the V-shaped pier 3, the steel tower 4, the first inclined cable group 5 and the second inclined cable group 90, the first inclined cable group 5 is provided with at least twelve inclined cables and the second inclined cable group 90 is provided with at least one inclined cable, the first supporting claw portion 42 is arranged to be distributed corresponding to the first oblique bar portion 32, the second supporting claw portion 43 is arranged to be distributed corresponding to the second oblique bar portion 33, the open lower trough body 44 is arranged to be distributed corresponding to the open upper trough body 34 and the open lower trough body 44 is arranged to be arranged in an upper and lower arrangement with the open upper trough body 34 along the transverse center line of the concrete box girder 6.

[0083] Figure 2 This is the second embodiment of the first embodiment of the present invention, which is specifically described in conjunction with the accompanying drawings. It also includes a temporary support beam 101 and a cushion layer 102, and the upper end surface portion of the temporary support beam 101 is arranged to be connected to the lower end surface portion of the cushion layer 102, the lower end surface portion of the temporary support beam 101 is arranged to be connected to the upper end surface portion of the pedestal 2, and the upper end surface portion of the cushion layer 102 is respectively arranged to be connected to the outer side surface portions of the first oblique bar portion 32 and the outer side surface portions of the second oblique bar portion 33.

[0084] In this embodiment, the temporary support beam 101 is set as a concrete trapezoidal bar with a built-in steel mesh and the temporary support beam 101 is set to be arranged at intervals along the vertical center line of the base 2. The width of the temporary support beam 101 is set to 68-72 cm and the trapezoidal internal angle α of the temporary support beam 101 is set to 80-86°.

[0085] A supporting connection point for the pedestal 2 and the V-shaped pier 3 is formed by the temporary support beam 101. The temporary support beam 101 realizes the connection with the pedestal 2 and the V-shaped pier 3. Its technical purpose is to serve as one of the supporting carrier parts for the first oblique strip portion 32 and the second oblique strip portion 33.

[0086] In this embodiment, the cushion layer 102 is set as a condensate of high-strength grouting material, and the cushion layer 102 is arranged between the temporary support beam 101 and the first oblique bar portion 32 and between the temporary support beam 101 and the second oblique bar portion 33.

[0087] The cushion layer 102 forms a supporting connection point for the temporary support beam 101 and the V-shaped pier 3. The cushion layer 102 realizes the connection with the temporary support beam 101 and the connection with the V-shaped pier 3. Its technical purpose is to serve as one of the supporting carrier components for the first oblique bar portion 32 and the second oblique bar portion 33.

[0088] In one of the other supporting methods of the second embodiment of the first embodiment of the present invention, the width of the temporary support beam 101 is set to 68 cm and the trapezoidal inner angle α of the temporary support beam 101 is set to 80°.

[0089] In the other supporting method of the second embodiment of the first embodiment of the present invention, the width of the temporary support beam 101 is set to 72 cm and the trapezoidal inner angle α of the temporary support beam 101 is set to 80°.

[0090] In the third other supporting method of the second first embodiment of the present invention, the width of the temporary support beam 101 is set to 70 cm and the trapezoidal inner angle α of the temporary support beam 101 is set to 83°.

[0091] Figure 3 This is the third embodiment of the first embodiment of the present invention, which is specifically described in conjunction with the drawings. It also includes an anchor plate device and an anchor plate device is arranged between the inclined cables in the first inclined cable group 5 and the steel box girder 7.

[0092] In this embodiment, the anchor plate device is configured to include a core segment 20, a cap segment 30, an outer cylinder shell 40, an inner lining shell 50, a pad 60, an anchor ring 70 and a pressure plate 801, and the core segment 20 is arranged on the steel box girder 7, the outer cylinder shell 40 and the inner lining shell 50 are respectively arranged on the core segment 20, and the cap segment 30 is arranged between the outer cylinder shell 40 and the inner lining shell 50, the pad 60 is arranged on the cap segment 30, the outer cylinder shell 40 and the inner lining shell 50, and the pressure plate 801 is arranged on the pad 60, the anchor ring 70 is arranged on the pressure plate 801, and the cap segment 30, the pad 60, the anchor ring 70 and the pressure plate 801 are respectively arranged to be connected to the inclined cables in the first inclined cable group 5.

[0093] In this embodiment, the core segment 20 is set to be a solid concrete column and the outer side surface of the core segment 20 is set to be connected to the cap segment 30, the upper end surface of the core segment 20 is respectively set to be connected to the cap segment 30 and the inner lining shell 50 and the lower end surface of the core segment 20 is set to be connected to the steel box girder 7, and the center line of the core segment 20 is set to be distributed at an acute angle to the transverse center line of the steel box girder 7.

[0094] The core segment 20 forms a supporting connection point for the cap segment 30 and the inner lining shell 50. The core segment 20 realizes connection with the cap segment 30 and the inner lining shell 50. Its technical purpose is to serve as one of the intermediate connecting components with the steel box girder 7.

[0095] In this embodiment, the cap segment 30 is configured to include a filling body 301, a shear nail 302, a steel strand 303 and a rib plate 304, and one end surface of the rib plate 304 is configured to be connected to the inner wall of the outer cylinder shell 40, and the other end surface of the rib plate 304 is configured to be connected to the outer surface of the liner shell 50.

[0096] The outer ends of the shear nails 302 are respectively arranged to be connected to the inner wall of the outer cylinder shell 40, the outer side surface of the lining shell 50 and the side surface of the sandwich rib plate 304, the steel strands 303 are arranged to be spaced and distributed along the periphery of the inner wall of the outer cylinder shell 40 and the filling bodies 301 are respectively arranged between the outer cylinder shell 40 and the core segment 20, and between the outer cylinder shell 40 and the lining shell 50, the lower end surface of the filling body 301 is arranged to be connected to the steel box girder 7 and the upper end surface of the filling body 301 is arranged to be connected to the pad 60, the filling body 301 is arranged to be inclusively connected to the inclined cables in the first inclined cable group 5 and the filling body 301 is arranged as a condensation body of concrete mortar, the shear nails 302 are arranged to be T-shaped rod-shaped bodies and two adjacent shear nails 302 are arranged to be spaced and distributed, the steel strands 303 are arranged to be steel wires and the sandwich rib plate 304 is arranged to be rectangular sheets.

[0097] Through the cap segment 30, a supporting connection point for the core segment 20, the outer cylinder shell 40, the inner lining shell 50 and the pad 60 is formed. The filling body 301 realizes the connection with the core segment 20, the connection with the outer cylinder shell 40, the connection with the inner lining shell 50, and the connection with the pad 60. The filling body 301 is reinforced by the shear nails 302, the steel strands 303 and the rib plates 304. The technical purpose is to serve as the second intermediate connecting component with the steel box girder 7 and the first inclined cable group 5.

[0098] In this embodiment, the outer cylinder shell 40 is set to be a rectangular tubular body and the inner wall of the outer cylinder shell 40 is set to be connected to the cap segment 30, the upper end port portion of the outer cylinder shell 40 is set to be connected to the pad 60 and the lower end port portion of the outer cylinder shell 40 is set to be connected to the steel box girder 7.

[0099] A supporting connection point for the cap segment 30 and the pad 60 is formed through the outer cylinder shell 40. The outer cylinder shell 40 realizes the connection with the cap segment 30 and the pad 60. Its technical purpose is to serve as the third intermediate connecting component with the steel box girder 7.

[0100] In this embodiment, the lining shell 50 is configured as a rectangular box-shaped body having a trapezoidal bottom end face and the outer side face portion of the lining shell 50 is configured to be connected to the cap segment 30, the upper end face portion of the lining shell 50 is configured to be connected to the pad 60 and the lower end face portion of the lining shell 50 is configured to be connected to the core segment 20.

[0101] The inner lining shell 50 forms supporting connection points for the core segment 20, the cap segment 30 and the pad 60. The inner lining shell 50 realizes connection with the core segment 20, the cap segment 30 and the pad 60. Its technical purpose is to serve as a component for accommodating the cap segment 30 formed with the outer cylinder shell 40.

[0102] In the present embodiment, a through hole body 602 is provided in the middle portion of the plate portion 601 of the pad 60 and an open hole body 603 is provided in the plate portion 601, the inner port portion of the open hole body 603 is arranged to be connected to the peripheral line of the through hole body 602 and the inner port portion of the open hole body 603 is arranged to be connected to the peripheral line of the plate portion 601, the outer side surface portion of the plate portion 601 is arranged to be connected to the outer cylinder shell 40 and the inner side surface portion of the plate portion 601 is arranged to be connected to the inner liner shell 50, the upper end surface portion of the plate portion 601 is arranged to be connected to the pressure plate 801 and the lower end surface portion of the plate portion 601 is arranged to be connected to the cap segment 30, the through hole body 602 is arranged to be connected to the inclined cable in the first inclined cable group 5, the plate portion 601 is arranged to be a rectangular sheet-shaped body and the through hole body 602 is arranged to be a circular hole-shaped body, and the open hole body 603 is arranged to be a long strip hole body.

[0103] Through the pad 60, support connection points for the cap segment 30, the outer cylinder shell 40, the inner liner shell 50 and the pressure plate 801 are formed. The plate portion 601 realizes connection with the cap segment 30, the outer cylinder shell 40, the inner liner shell 50, and the pressure plate 801. The through-hole body 602 realizes connection with the inclined cables in the first inclined cable group 5. The open hole body 603 prevents the inner wall of the through-hole body 602 from generating shear force on the inclined cables in the first inclined cable group 5. The technical purpose is to serve as the fourth intermediate connecting component for the first inclined cable group 5.

[0104] In the present embodiment, the pressure plate 801 is configured as a rectangular annular body having a circular hole for leakage and the outer side surface of the pressure plate 801 is configured to be connected to the outer cylinder shell 40 and the inner side surface of the pressure plate 801 is configured to be connected to the inner liner shell 50, the upper end surface of the pressure plate 801 is configured to be connected to the anchor ring 70 and the lower end surface of the pressure plate 801 is configured to be connected to the cap segment 30 and the pad 60 respectively, and the circular hole for leakage of the pressure plate 801 is configured to be connected to the inclined cable in the first inclined cable group 5.

[0105] The pressure-bearing plate 801 forms supporting connection points for the cap segment 30, the outer cylinder shell 40, the inner liner shell 50 and the anchor ring 70. The pressure-bearing plate 801 realizes connection with the cap segment 30, connection with the outer cylinder shell 40, connection with the inner liner shell 50 and connection with the anchor ring 70. Its technical purpose is to serve as a sealing component for the outer end surface portion of the cap segment 30.

[0106] In this embodiment, the anchor ring 70 is configured as a circular ring and the lower end surface portion of the anchor ring 70 is configured to be connected to the pressure plate 801 , and the anchor ring 70 is configured to be connected to the inclined cables in the first inclined cable group 5 in a sleeve-type manner.

[0107] A supporting connection point for the pressure plate 801 is formed by the anchor ring 70 , and the connection with the pressure plate 801 is realized by the anchor ring 70 . The technical purpose of the anchor ring 70 is to serve as a protective sleeve for the inclined cables in the first inclined cable group 5 .

[0108] In this embodiment, the lower end of the inclined cable in the first inclined cable group 5 is arranged to be connected to the upper end of the tensioning screw and the tensioning screw is arranged to be connected in series with the steel box girder 7, the lower end of the tensioning screw is arranged to extend to the lower end surface of the steel box girder 7 and the tensioning nut is arranged to be threadedly connected to the tensioning screw, and the upper end surface of the tensioning nut is arranged to be contact-connected with the lower end surface of the steel box girder 7.

[0109] In the second embodiment of the present invention, the bridge device body and the V-shaped pier 3 are connected to each other in a manner of forming a divergent surface support.

[0110] In this embodiment, the V-shaped pier 3 is connected to the bridge device body in a manner of forming an equilateral triangle cross-section support edge.

[0111] In this embodiment, the bridge device body is configured to further include a pile column 1 , a cap 2 , a first end pier 8 , a second end pier 9 and a side pier 91 .

[0112] In this embodiment, a first accessory device is also included and is arranged on the bridge device body. The first accessory device is arranged to include a steel tower 4, a first inclined cable group 5 and a second inclined cable group 90.

[0113] The second embodiment of the present invention is based on the first embodiment.

[0114] The present invention is further described below in conjunction with examples. The following examples are intended to illustrate the present invention rather than to further limit the present invention.

[0115] A bridge construction method based on a combination of a concrete box girder and a steel box girder, one of the first embodiments of the present invention, the steps are:

[0116] The piles 1 are driven into the foundation on one side of the urban railway operating line, and the cap 2 is installed on the pile 1. The concrete mortar is poured on the cap 2 to form the platform 31. The template of the first oblique strip part 32 and the template of the second oblique strip part 33 are installed on the upper end surface of the platform 31. The first section of the first oblique strip part 32 and the first section of the second oblique strip part 33 are poured with concrete mortar, so that the ratio of the overall length of the first oblique strip part 32 to the length of the first section of the first oblique strip part 32 is set to 1:0.58-0.67, and the ratio of the overall length of the second oblique strip part 33 to the length of the first section of the second oblique strip part 33 is set to 1:0.58-0.67. After the first section of the first oblique strip part 32 and the first section of the second oblique strip part 33 are formed, the templates of the first oblique strip part 32 and the first section of the second oblique strip part 33 are removed. The template of the second oblique strip part 33 is respectively installed between the first section of the first oblique strip part 32 and the pedestal 2, and between the first section of the second oblique strip part 33 and the pedestal 2. High-strength grouting material is respectively injected between the first section of the first oblique strip part 32 and the temporary support beam 101, and between the first section of the second oblique strip part 33 and the temporary support beam 101 to form a cushion layer 102, so as to support the first section of the first oblique strip part 32 and the first section of the second oblique strip part 33. Then, the template of the second section of the first oblique strip part 32 is installed on the first section of the first oblique strip part 32, and the template of the second section of the second oblique strip part 33 is installed on the first section of the second oblique strip part 33. Concrete mortar is poured on the second section of the first oblique strip part 32 and the second section of the second oblique strip part 33, so as to complete the forming of the V-shaped pier 3.

[0117] The skeleton of the core segment 20 is installed on the steel box girder 7, the template of the core segment 20 is installed on the skeleton, and the core segment 20 is poured with concrete mortar, thereby completing the installation of the core segment 20 and the steel box girder 7.

[0118] The column parts 82 of the first end pier 8 are driven into the outside of the pile column 1 respectively, and the support parts 81 of the first end pier 8 are installed on the column parts 82 of the first end pier 8, thereby completing the installation of the first end pier 8.

[0119] The pile bodies 912 are driven into the foundation on the other side of the urban railway operating line, and the beams 911 are installed on the pile bodies 912, thereby completing the installation of the side piers 91.

[0120] The column parts 82 of the second end pier 9 are driven into the outside of the pile body 912 respectively, and the support parts 81 of the second end pier 9 are installed on the column parts 82 of the second end pier 9, thereby completing the installation of the second end pier 9.

[0121] One end of the concrete box beam 6 is mounted on the support portion 81 of the first end pier 8, the clamping plate 80 of the first end pier 8 is connected to the concrete box beam 6, and the other end of the concrete box beam 6 is mounted on the first supporting claw portion 42 and the second supporting claw portion 43.

[0122] One end of the steel box girder 7 is mounted on the support portion 81 of the second end pier 9, the clamping plate 80 of the second end pier 9 is connected to the steel box girder 7, and the other end of the steel box girder 7 is butted against the other end of the concrete box girder 6.

[0123] The first supporting claw 42 and the second supporting claw 43 are respectively installed on the concrete box girder 6, so that the first supporting claw 42 corresponds to the first oblique bar 32, the second supporting claw 43 corresponds to the second oblique bar 33, the open lower trough 44 corresponds to the open upper trough 34, and the steel tower 4 is installed on the concrete box girder 6.

[0124] The upper ends of the inclined cables of the second inclined cable group 90 are connected to the tower head 41, and the lower ends of the inclined cables of the second inclined cable group 90 are connected to the middle part of the concrete box girder 6.

[0125] The shear nails 302 are installed on the outer cylinder shell 40, the inner liner shell 50 and the rib plate 304, the rib plate 304 is installed on the outer cylinder shell 40 and the inner liner shell 50, the lower end of the steel strand 303 is welded to the steel box girder 7, the outer cylinder shell 40 and the inner liner shell 50 are installed on the core segment 20, the inclined cables of the first inclined cable group 5 are connected through the anchor ring 70, the pressure plate 801 and the through hole body 602, the inclined cables of the first inclined cable group 5 pass through the gap between the outer cylinder shell 40 and the inner liner shell 50, the lower end of the inclined cables of the first inclined cable group 5 is welded to the upper end of the tensioning screw, and the upper end of the inclined cables of the first inclined cable group 5 is connected to the tower head 41. Next, the inclined cables of the first inclined cable group 5 are tightened by rotating the tensioning nut on the tensioning screw, the upper end of the steel strand 303 is placed on the upper end ports of the outer cylinder shell 40 and the inner lining shell 50, and concrete mortar is injected into the gap between the outer cylinder shell 40 and the inner lining shell 50 to form a filling body 301, thereby realizing the connection between the filling body 301 and the core segment 20, the outer side surface of the pressure plate 801 is welded to the outer cylinder shell 40, the inner side surface of the pressure plate 801 is welded to the inner lining shell 50, and the lower end surface of the pressure plate 801 is connected to the filling body 301, thereby completing the connection between the inclined cables of the first inclined cable group 5 and the steel box girder 7.

[0126] The second embodiment of the present invention comprises the following steps:

[0127] The ratio of the overall length of the first oblique stripe portion 32 to the length of the first segment of the first oblique stripe portion 32 is set to 1:0.58, and the ratio of the overall length of the second oblique stripe portion 33 to the length of the first segment of the second oblique stripe portion 33 is set to 1:0.58.

[0128] The third embodiment of the present invention comprises the following steps:

[0129] The ratio of the overall length of the first oblique stripe portion 32 to the length of the first segment of the first oblique stripe portion 32 is set to 1:0.67, and the ratio of the overall length of the second oblique stripe portion 33 to the length of the first segment of the second oblique stripe portion 33 is set to 1:0.67.

[0130] The fourth embodiment of the first embodiment of the present invention comprises the following steps:

[0131] The ratio of the overall length of the first oblique stripe portion 32 to the length of the first segment of the first oblique stripe portion 32 is set to 1:0.62, and the ratio of the overall length of the second oblique stripe portion 33 to the length of the first segment of the second oblique stripe portion 33 is set to 1:0.62.

[0132] When verifying the present invention, the simultaneous installation of the concrete box girder 6 and the steel box girder 7 is achieved, and the integrated installation accuracy is guaranteed. The construction of the supporting pier is guaranteed by the construction of the pile column 1, the pedestal 2, the V-shaped pier 3, the first end pier 8, the second end pier 9 and the side pier 91. The pouring construction of the platform part 31, the first oblique bar part 32 and the second oblique bar part 33 is solved by the temporary support beam 101 and the cushion layer 102, and the dimensional accuracy requirement between the first oblique bar part 32 and the second oblique bar part 33 is guaranteed. The on-site installation of the oblique cables of the first oblique cable group 5 and the steel box girder 7 is solved by the core segment 20, the cap segment 30, the outer cylinder shell 40, the inner liner shell 50, the pad 60, the anchor ring 70 and the pressure plate 801, and the installation accuracy of each oblique cable in the first oblique cable group 5 and the steel box girder 7 is guaranteed, and the connection strength between the cap segment 30 and the core segment 20 is improved.

[0133] The present invention has the following characteristics:

[0134] 1. Due to the design of the bridge device body and the V-shaped pier 3, the crossing of the railway operating line is realized through the bridge device body, and the divergent surface support of the bridge device body is realized through the V-shaped pier 3, and a plane support is no longer performed through the bridge pier, thereby improving the stability of the bridge crossing the railway operating line.

[0135] 2. Due to the design of the pile column 1, the cap 2, the first end pier 8, the second end pier 9 and the side pier 91, four-point pier support is achieved.

[0136] 3. Due to the design of the steel tower 4, the first inclined cable group 5 and the second inclined cable group 90, the inclined support is realized and the span length is increased.

[0137] 4. Due to the design of the temporary support beam 101 and the cushion layer 102, the construction of the first support claw portion 42 and the second support claw portion 43 is realized, and the construction quality is guaranteed.

[0138] 5. Due to the design of the core segment 20, the cap segment 30, the outer cylinder shell 40, the inner liner shell 50, the pad 60, the anchor ring 70 and the pressure plate 801, the embedding fixation of the first inclined cable group 5 is achieved.

[0139] 6. Since the design limits the numerical range of the structural shape, the numerical range is the technical feature in the technical solution of the present invention, rather than a technical feature calculated by a formula or obtained through a limited number of tests. Tests have shown that the technical feature of this numerical range has achieved good technical effects.

[0140] 7. Due to the design of the technical features of the present invention, the effects of the individual and combined technical features have been shown through experiments to have various performance indicators of the present invention that are at least 1.7 times the existing performance indicators, and have been evaluated to have good market value.

[0141] There are other technical features that are connected with the bridge device body and the V-shaped pier 3 that form the divergent surface support, which are all embodiments of the present invention, and the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to meet the requirements of the Patent Law, Patent Implementation Rules and Examination Guidelines, all possible combinations of the technical features in the above-mentioned embodiments will no longer be described.

[0142] Therefore, in the technical field of bridge devices and construction methods based on a combination of concrete box girders and steel box girders, all technical contents including an inner layer 1 configured as a mixture formed by high pressure of chemical fertilizers and plant straw or plant leaves are within the protection scope of the present invention.

[0143] The above-mentioned embodiment is only one implementation form of the bridge device and construction method based on the combination of concrete box girder and steel box girder provided by the present invention. Other variations of the scheme provided by the present invention, adding or reducing the components or steps therein, or applying the present invention to other technical fields close to the present invention, all fall within the protection scope of the present invention.

Claims

1. A bridge construction method based on a combination of concrete box beams and steel box beams, characterized in that: The bridge device is configured to include a bridge device body having a concrete box girder (6) and a steel box girder (7), a V-shaped pier (3) connected to the concrete box girder (6) or the steel box girder (7) and having a supporting diagonal strip portion distributed in a bifurcated manner, The bridge device body and the V-shaped pier (3) are connected to each other in a manner of forming a divergent surface support. The V-shaped pier (3) is connected to the bridge device body in a manner of forming an equilateral triangle cross-section support edge. The bridge device body is configured to further include a pile column (1), a cap (2), a first end pier (8), a second end pier (9) and a side pier (91). The device also includes a first accessory device, and the first accessory device is arranged on the bridge device body, and the first accessory device is arranged to include a steel tower (4), a first inclined cable group (5) and a second inclined cable group (90). A concrete box girder (6) is arranged to be connected to a steel box girder (7); a V-shaped pier (3), a steel tower (4) and a first end pier (8) are respectively arranged on the concrete box girder (6); a cap (2) is arranged between the pile column (1) and the V-shaped pier (3); a second end pier (9) and a side pier (91) are respectively arranged on the steel box girder (7); a second inclined cable group (90) is arranged between the concrete box girder (6) and the steel tower (4); and a first inclined cable group (5) is arranged between the steel box girder (7) and the steel tower (4). It also includes a temporary support beam (101) and a cushion layer (102), wherein the upper end surface of the temporary support beam (101) is arranged to be connected to the lower end surface of the cushion layer (102), the lower end surface of the temporary support beam (101) is arranged to be connected to the upper end surface of the pedestal (2), and the upper end surface of the cushion layer (102) is arranged to be connected to the outer side surface of the first oblique strip portion (32) and the outer side surface of the second oblique strip portion (33), respectively. It also includes an anchor plate device and is arranged between the inclined cables in the first inclined cable group (5) and the steel box girder (7). The V-shaped pier (3) is configured to include a platform (31), a first oblique strip portion (32) and a second oblique strip portion (33), and one side portion of the upper end surface of the platform (31) is configured to be connected to the lower end surface portion of the first oblique strip portion (32), and the other side portion of the upper end surface of the platform (31) is configured to be connected to the lower end surface portion of the second oblique strip portion (33), and an open upper trough (34) is provided between the first oblique strip portion (32) and the second oblique strip portion (33), and the upper end surface portion of the first oblique strip portion (32) and the upper end surface portion of the second oblique strip portion (33) are respectively configured to be connected to the concrete box beam (6), and the lower end surface portion of the platform (31) is configured to be connected to the pedestal (2), and the platform (31), the first oblique strip portion (32) and the second oblique strip portion (33) are respectively configured to be strip-shaped bodies, and the contour line formed by the open upper trough (34) and the lower end surface portion of the concrete box beam (6) is configured to be an equilateral triangle with an arc at the corner. The inner end of the concrete box girder (6) is arranged to be butt-connected to the steel box girder (7) and the lower end face portion of the inner end of the concrete box girder (6) is arranged to be connected to the V-shaped pier (3), the upper end face portion of the inner end of the concrete box girder (6) is arranged to be connected to the steel tower (4) and the lower end face portion of the outer end of the concrete box girder (6) is arranged to be connected to the first end pier (8), and the inner side portion of the outer end of the concrete box girder (6) is arranged to be connected to the second inclined cable group (90). The inner end of the steel box girder (7) is arranged to be butt-connected to the concrete box girder (6), and the upper end face portion of the steel box girder (7) is arranged to be connected to the first inclined cable group (5), the lower end face portion of the outer end of the steel box girder (7) is arranged to be connected to the second end pier (9), and the lower end face portion inside the outer end of the steel box girder (7) is arranged to be connected to the side pier (91), The pile column (1) is configured as a circular column and the upper end surface of the pile column (1) is configured to be connected to the cap (2), the lower end of the pile column (1) is configured to be connected to the foundation in an implanted manner, and the pile column (1) is configured to be distributed in rows. The steel tower (4) is configured to include a tower head (41), a first supporting claw (42) and a second supporting claw (43), and one side portion of the lower end surface of the tower head (41) is configured to be connected to the upper end surface portion of the first supporting claw (42), and another side portion of the lower end surface of the tower head (41) is configured to be connected to the upper end surface portion of the second supporting claw (43), and an open lower trough (44) is provided between the first supporting claw (42) and the second supporting claw (43), and the lower end surface portion of the first supporting claw (42) and the lower end surface portion of the second supporting claw (43) are respectively configured to be connected to the concrete box girder (6), and the upper end surface portion of the tower head (41) The end face portions are respectively arranged to be connected to the first inclined cable group (5) and the second inclined cable group (90); the tower head portion (41), the first supporting claw portion (42) and the second supporting claw portion (43) are respectively arranged to be strip-shaped bodies, and the tower head portion (41) and the first supporting claw portion (42) and the second supporting claw portion (43) are arranged to be distributed in a Y shape; the contour line of the outer side surface formed by the tower head portion (41) and the first supporting claw portion (42) and the contour line of the outer side surface formed by the tower head portion (41) and the second supporting claw portion (43) are respectively arranged to be a part of a circumferential line; the contour line formed by the open lower trough body (44) and the upper end face portion of the concrete box beam (6) is arranged to be a triangle with an arc at the corner; The upper end of one of the inclined cables in the first inclined cable group (5) is arranged to be connected to the steel tower (4) and the lower end of one of the inclined cables in the first inclined cable group (5) is arranged to be connected to the steel box girder (7), and one of the inclined cables in the first inclined cable group (5) is arranged to be a steel wire rope, The upper end of one of the inclined cables in the second inclined cable group (90) is arranged to be connected to the steel tower (4) and the lower end of one of the inclined cables in the second inclined cable group (90) is arranged to be connected to the concrete box girder (6), and one of the inclined cables in the second inclined cable group (90) is arranged to be a steel wire rope. The first end pier (8) and the second end pier (9) are respectively configured to include a support portion (81) and a column portion (82), and the lower end face portion of the support portion (81) is configured to be connected to the upper end face portion of the column portion (82), the lower end head of the column portion (82) is configured to be connected to the foundation in an embedded manner, and the upper end face portion of the transverse portion of the support portion (81) of the first end pier (8) is configured to be connected to the concrete box girder (6), and the upper end face portion of the transverse portion of the support portion (81) of the second end pier (9) is configured to be connected to the steel box girder (6). The box beam (7) is connected and the support portion (81) is configured as an L-shaped strip having a clamping plate (80) on the side of the vertical portion, the clamping plate (80) of the first end pier (8) is configured to be connected to the side portion of the concrete box beam (6) and the clamping plate (80) of the second end pier (9) is configured to be connected to the side portion of the steel box beam (7), the column portion (82) is configured to be a circular columnar body and the column portion (82) is configured to be arranged and distributed at intervals along the vertical center line of the support portion (81), The side pier (91) is configured to include a beam portion (911) and a pile portion (912), and the lower end face portion of the beam portion (911) is configured to be connected to the upper end face portion of the pile portion (912), the lower end head of the pile portion (912) is configured to be connected to the foundation in an implanted manner, and the upper end face portion of the beam portion (911) is configured to be connected to the steel box beam (7), the beam portion (911) is configured to be a T-shaped strip body, and a rib plate (910) is configured to be an eight-shaped sheet body, the pile portion (912) is configured to be a circular columnar body, and the pile portion (912) is configured to be arranged and distributed at intervals along the vertical center line of the beam portion (911), The steps of bridge construction method are: The piles (1) are driven into the foundation on one side of the urban railway operating line, a cap (2) is installed on the piles (1), concrete mortar is poured on the cap (2) to form a platform (31), a template of a first oblique strip (32) and a template of a second oblique strip (33) are installed on the upper end surface of the platform (31), concrete mortar is poured on the first section of the first oblique strip (32) and the first section of the second oblique strip (33), so that the ratio of the overall length of the first oblique strip (32) to the length of the first section of the first oblique strip (32) is set to 1:0.58-0.67, and the ratio of the overall length of the second oblique strip (33) to the length of the first section of the second oblique strip (33) is set to 1:0.58-0.67, and after the first section of the first oblique strip (32) and the first section of the second oblique strip (33) are formed, the template of the first oblique strip (32) and the second oblique strip (33) are removed. The template of the first oblique strip part (33) is installed, temporary support beams (101) are installed between the first section of the first oblique strip part (32) and the pedestal (2), and between the first section of the second oblique strip part (33) and the pedestal (2), respectively, high-strength grouting material is injected between the first section of the first oblique strip part (32) and the temporary support beam (101), and between the first section of the second oblique strip part (33) and the temporary support beam (101) to form a cushion layer (102), so as to support the first section of the first oblique strip part (32) and the first section of the second oblique strip part (33), and then the template of the second section of the first oblique strip part (32) is installed on the first section of the first oblique strip part (32), and the template of the second section of the second oblique strip part (33) is installed on the first section of the second oblique strip part (33), and concrete mortar is poured on the second section of the first oblique strip part (32) and the second section of the second oblique strip part (33), thereby completing the formation of the V-shaped pier (3), The skeleton of the core segment (20) is installed on the steel box girder (7), the template of the core segment (20) is installed on the skeleton, and concrete mortar is poured on the core segment (20), thereby completing the installation of the core segment (20) and the steel box girder (7). The column parts (82) of the first end pier (8) are driven into the outside of the pile column (1), and the support parts (81) of the first end pier (8) are installed on the column parts (82) of the first end pier (8), thereby completing the installation of the first end pier (8). The pile bodies (912) are driven into the foundation on the other side of the urban railway operating line, and the beams (911) are installed on the pile bodies (912), thereby completing the installation of the side piers (91). The column parts (82) of the second end pier (9) are driven into the outside of the pile body (912), and the support parts (81) of the second end pier (9) are installed on the column parts (82) of the second end pier (9), thereby completing the installation of the second end pier (9). One end of the concrete box beam (6) is mounted on the support portion (81) of the first end pier (8), the clamping plate (80) of the first end pier (8) is connected to the concrete box beam (6), and the other end of the concrete box beam (6) is mounted on the first supporting claw portion (42) and the second supporting claw portion (43). One end of the steel box girder (7) is mounted on the support portion (81) of the second end pier (9), the clamping plate (80) of the second end pier (9) is connected to the steel box girder (7), and the other end of the steel box girder (7) is butted against the other end of the concrete box girder (6). The first supporting claw part (42) and the second supporting claw part (43) are respectively installed on the concrete box girder (6), so that the first supporting claw part (42) corresponds to the first oblique bar part (32), the second supporting claw part (43) corresponds to the second oblique bar part (33), and the open lower trough body (44) corresponds to the open upper trough body (34), and the steel tower (4) is installed on the concrete box girder (6). The upper ends of the inclined cables of the second inclined cable group (90) are connected to the tower head (41), and the lower ends of the inclined cables of the second inclined cable group (90) are connected to the middle part of the concrete box girder (6). The shear nails (302) are installed on the outer cylinder shell (40), the inner lining shell (50) and the rib plate (304), the rib plate (304) is installed on the outer cylinder shell (40) and the inner lining shell (50), the lower end of the steel strand (303) is welded to the steel box girder (7), the outer cylinder shell (40) and the inner lining shell (50) are installed on the core segment (20), the inclined cables of the first inclined cable group (5) are penetrated through the anchor ring (70), the pressure plate (801) and the through hole body (602), the inclined cables of the first inclined cable group (5) pass through the gap between the outer cylinder shell (40) and the inner lining shell (50), the lower end of the inclined cables of the first inclined cable group (5) is welded to the upper end of the tensioning screw, and the upper end of the inclined cables of the first inclined cable group (5) is welded to the tower head. (41) connection, the inclined cables of the first inclined cable group (5) are tightened by rotating the tensioning nut on the tensioning screw, the upper end of the steel strand (303) is placed on the upper end ports of the outer cylinder shell (40) and the inner lining shell (50), and concrete mortar is injected into the gap between the outer cylinder shell (40) and the inner lining shell (50) to form a filling body (301), thereby realizing the connection between the filling body (301) and the core segment (20), the outer side surface of the pressure plate (801) is welded to the outer cylinder shell (40), the inner side surface of the pressure plate (801) is welded to the inner lining shell (50), and the lower end surface of the pressure plate (801) is connected to the filling body (301), thereby completing the connection between the inclined cables of the first inclined cable group (5) and the steel box girder (7).

2. The bridge construction method according to claim 1 is characterized in that: concrete The box girder (6), the steel box girder (7), the first end pier (8), the second end pier (9) and the side pier (91) are arranged to be distributed in a middle obliquely fixed manner with the pile column (1), the pedestal (2), the V-shaped pier (3), the steel tower (4), the first inclined cable group (5) and the second inclined cable group (90), the first inclined cable group (5) is provided with at least twelve inclined cables and the second inclined cable group (90) is provided with at least one inclined cable, the first supporting claw portion (42) is arranged to be distributed corresponding to the first oblique bar portion (32), the second supporting claw portion (43) is arranged to be distributed corresponding to the second oblique bar portion (33), the open lower trough body (44) is arranged to be distributed corresponding to the open upper trough body (34) and the open lower trough body (44) is arranged to be arranged in an upper and lower arrangement with the open upper trough body (34) along the transverse center line of the concrete box girder (6).

3. The bridge construction method according to claim 1 is characterized in that: The temporary support beam (101) is configured as a concrete trapezoidal bar with a built-in steel mesh, and the temporary support beam (101) is configured to be arranged and distributed at intervals along the vertical center line of the cap (2), the width of the temporary support beam (101) is configured to be 68-72 cm, and the trapezoidal inner angle α of the temporary support beam (101) is configured to be 80-86°, The cushion layer (102) is set as a condensate of high-strength grouting material, and the cushion layer (102) is set between the temporary support beam (101) and the first oblique strip part (32), and the cushion layer (102) is set between the temporary support beam (101) and the second oblique strip part (33).

4. The bridge construction method according to claim 1 is characterized in that: The anchor plate device is configured to include a core segment (20), a cap segment (30), an outer cylinder shell (40), an inner liner shell (50), a pad (60), an anchor ring (70) and a pressure plate (801), and the core segment (20) is arranged on a steel box girder (7), the outer cylinder shell (40) and the inner liner shell (50) are respectively arranged on the core segment (20), and a cap segment (30) is arranged between the outer cylinder shell (40) and the inner liner shell (50), a pad (60) is arranged on the cap segment (30), the outer cylinder shell (40) and the inner liner shell (50), and a pressure plate (801) is arranged on the pad (60), and an anchor ring (70) is arranged on the pressure plate (801), and the cap segment (30), the pad (60), the anchor ring (70) and the pressure plate (801) are respectively configured to be connected to the inclined cables in the first inclined cable group (5), The core segment (20) is configured as a concrete solid columnar body, and the outer side surface of the core segment (20) is configured to be connected to the cap segment (30), the upper end surface of the core segment (20) is configured to be connected to the cap segment (30) and the inner liner shell (50), and the lower end surface of the core segment (20) is configured to be connected to the steel box girder (7), and the center line of the core segment (20) is configured to be distributed at an acute angle to the transverse center line of the steel box girder (7). The cap section (30) is configured to include a filling body (301), a shear nail (302), a steel strand (303) and a rib plate (304), and one end surface of the rib plate (304) is configured to be connected to the inner wall of the outer cylinder shell (40), and the other end surface of the rib plate (304) is configured to be connected to the outer side surface of the liner shell (50), and the outer end of the shear nail (302) is configured to be connected to the inner wall of the outer cylinder shell (40), the outer side surface of the liner shell (50) and the side surface of the rib plate (304), respectively, and the steel strand (303) is configured to be arranged and distributed at intervals along the periphery of the inner wall of the outer cylinder shell (40), and the filling body (301) is respectively arranged Between the outer cylinder shell (40) and the core segment (20), and between the outer cylinder shell (40) and the inner liner shell (50), the lower end surface portion of the filling body (301) is arranged to be connected to the steel box girder (7), and the upper end surface portion of the filling body (301) is arranged to be connected to the pad (60), the filling body (301) is arranged to be inclusively connected to the inclined cables in the first inclined cable group (5), and the filling body (301) is arranged to be a condensed body of concrete mortar, the shear nails (302) are arranged to be T-shaped rod-shaped bodies, and two adjacent shear nails (302) are arranged to be arranged and distributed at intervals, the steel strands (303) are arranged to be steel wires, and the rib plates (304) are arranged to be rectangular sheets. The outer cylinder shell (40) is configured as a rectangular tubular body and the inner wall of the outer cylinder shell (40) is configured to be connected to the cap segment (30), the upper end port portion of the outer cylinder shell (40) is configured to be connected to the pad (60) and the lower end port portion of the outer cylinder shell (40) is configured to be connected to the steel box girder (7), The liner shell (50) is configured as a rectangular box-shaped body having a trapezoidal bottom end surface, and the outer side surface of the liner shell (50) is configured to be connected to the cap segment (30), the upper end surface of the liner shell (50) is configured to be connected to the pad (60), and the lower end surface of the liner shell (50) is configured to be connected to the core segment (20). A through hole body (602) is provided in the middle part of the plate portion (601) of the backing plate (60), and an open hole body (603) is provided in the plate portion (601), the inner end portion of the open hole body (603) is arranged to be connected to the peripheral line of the through hole body (602) and the inner end portion of the open hole body (603) is arranged to be connected to the peripheral line of the plate portion (601), the outer side surface portion of the plate portion (601) is arranged to be connected to the outer cylinder shell (40) and the plate portion (601) is arranged to be connected to the outer cylinder shell (40). ) is configured to be connected to the inner liner shell (50), the upper end surface of the plate portion (601) is configured to be connected to the pressure plate (801) and the lower end surface of the plate portion (601) is configured to be connected to the cap segment (30), the through hole body (602) is configured to be connected to the inclined cable in the first inclined cable group (5), the plate portion (601) is configured to be a rectangular sheet body and the through hole body (602) is configured to be a circular hole body, and the open hole body (603) is configured to be a long strip hole body, The pressure plate (801) is configured as a rectangular annular body having a circular hole for leakage, and the outer side surface of the pressure plate (801) is configured to be connected to the outer cylinder shell (40), and the inner side surface of the pressure plate (801) is configured to be connected to the inner liner shell (50), the upper end surface of the pressure plate (801) is configured to be connected to the anchor ring (70), and the lower end surface of the pressure plate (801) is configured to be connected to the cap segment (30) and the pad (60), respectively, and the circular hole for leakage of the pressure plate (801) is configured to be connected to the inclined cable in the first inclined cable group (5), The anchor ring (70) is configured as a circular ring-shaped body and the lower end surface portion of the anchor ring (70) is configured to be connected to the pressure bearing plate (801). The anchor ring (70) is configured to be connected to the inclined cables in the first inclined cable group (5) in a sleeve-type manner. The lower end of the inclined cable in the first inclined cable group (5) is arranged to be connected to the upper end of the tensioning screw and the tensioning screw is arranged to be connected in series with the steel box girder (7), the lower end of the tensioning screw is arranged to extend to the lower end surface of the steel box girder (7) and the tensioning nut is arranged to be threadedly connected to the tensioning screw, and the upper end surface of the tensioning nut is arranged to be contact-connected with the lower end surface of the steel box girder (7).