A formwork system and construction method suitable for large-diameter artificially dug ring-shaped foundation piles

By designing a formwork system and construction method suitable for large-diameter manually dug ring-type foundation piles, the problem of lack of formwork system was solved, stable installation and disassembly of formwork was achieved, the construction process was simplified, and construction efficiency and stability were improved.

CN111350187BActive Publication Date: 2024-10-25CHINA RAILWAY CONSTR GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201811590572.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-12-20
Publication Date
2024-10-25
Estimated Expiration
2038-12-20

AI Technical Summary

Technical Problem

The lack of formwork systems and construction methods suitable for large-diameter manually dug ring-type foundation piles limits their application in high-rise buildings and large bridge foundation projects.

Method used

A formwork system including datum columns, connectors, steel formwork horizontal supports, annular steel formwork, steel formwork longitudinal connecting holes and horizontal connecting holes was designed. Through the combination and adjustment of these components, the stability of the annular foundation pile formwork was achieved. Installation and disassembly, and there is no connecting device between the manually dug pile guard arm and the foundation pile formwork to ensure the overall lifting of the foundation pile steel cage.

Benefits of technology

It improves the overall stability of the formwork system, simplifies the use process, solves the problems of installing and dismantling the ring steel formwork, speeds up the construction progress, and ensures the smooth lifting of the foundation pile steel cage and concrete pouring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111350187B_ABST
    Figure CN111350187B_ABST
Patent Text Reader

Abstract

The present invention discloses a formwork system and construction method suitable for large-diameter artificially dug hole annular foundation piles, including a reference column, a connecting piece, a steel pin, a steel formwork horizontal support, an artificially dug pile arm guard, a steel formwork fixing rod, an annular steel formwork, a steel formwork longitudinal connection hole, a steel formwork horizontal connection hole, a steel formwork horizontal support length adjustment device, annular foundation pile concrete, annular foundation pile formwork system, a reference column connector, annular foundation pile pile top and annular foundation pile pile bottom. The present invention has the beneficial effects of providing good support for the annular steel formwork, thereby effectively improving the overall stability of the formwork system, effectively solving the problem of the annular steel formwork being difficult to install and disassemble while ensuring that the annular steel formwork is tightly connected, and there is no connection device between the annular foundation pile formwork system and the artificially dug pile arm guard, ensuring that the foundation pile reinforcement cage can be hoisted as a whole, thereby accelerating the construction progress.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a template for annular foundation piles, in particular to a template system and a construction method suitable for large-diameter manually-dug annular foundation piles, belonging to the technical field of civil engineering construction. Background Art

[0002] With the continuous construction of high-rise buildings, super high-rise buildings and large bridges, the bearing capacity requirements of the superstructure on the foundation are getting higher and higher. Ordinary medium and short piles can no longer meet their bearing capacity requirements. Large diameter cast-in-place piles are widely used in such large foundation projects because of their good bearing performance. In recent years, some areas in my country have designed large diameter artificial excavated piles into hollow piles. Compared with solid piles, it can save about 50% of concrete while keeping the mechanical properties unchanged, and at the same time solve the quality problems in the large-volume concrete pouring process of large diameter piles. However, due to the lack of supporting template systems and construction methods, the application of large diameter artificial excavated ring foundation piles is limited. Summary of the invention

[0003] The purpose of the present invention is to provide a template system and construction method suitable for large-diameter artificially dug ring-shaped foundation piles in order to solve the above-mentioned problems.

[0004] The present invention achieves the above-mentioned purpose through the following technical scheme: a formwork system suitable for large-diameter artificially dug ring-type foundation piles, comprising a reference column, a connecting piece, a steel pin, a steel formwork horizontal support, an artificially dug pile guard arm, a steel formwork fixing rod, an annular steel formwork, a steel formwork longitudinal connecting hole, a steel formwork horizontal connecting hole, a steel formwork horizontal support length adjustment device, annular foundation pile concrete, annular foundation pile formwork system, a reference column connector, annular foundation pile pile top and annular foundation pile pile bottom; a connecting piece is installed around the reference column, one end of the steel formwork horizontal support is installed in the connecting piece, the steel pin passes through the connecting piece to fix the connecting piece and the steel formwork horizontal support together, the other end of the steel formwork horizontal support is installed on the annular steel formwork, the steel formwork fixing rod fixes the steel formwork horizontal support and the annular steel formwork together, a plurality of steel formwork horizontal supports are evenly connected around the reference column to support the annular steel formwork, the annular steel formwork has multiple pieces assembled and installed together, the annular steel formwork has multiple and is connected through the steel formwork longitudinal connecting hole and the steel formwork horizontal support The circular steel templates are freely spliced ​​together in the connecting holes, the adjacent circular steel templates on the left and right are connected together through the horizontal connecting holes of the steel templates, and the adjacent circular steel templates on the upper and lower sides are connected together through the longitudinal connecting holes of the steel templates, a horizontal support length adjustment device for the steel template is installed in the middle of the horizontal support of the steel template, and the horizontal support length adjustment device for the steel template arranged in the middle of the horizontal support of the steel template can adjust the length of the horizontal support of the steel template according to the demand, the periphery of the circular pile template system is provided with an artificial bored pile guard arm, there is no connection device between the circular pile template system and the artificial bored pile guard arm, and the circular pile concrete is poured between the circular pile template system and the artificial bored pile guard arm, the circular pile template system is composed of a plurality of connected reference columns and a plurality of layers of connected circular steel templates, the reference columns are multiple and the plurality of reference columns are connected together through the reference column connector, the lowest end of the circular steel template is installed and fixed on the bottom of the circular pile and the upper end of the uppermost circular steel template is the top of the circular pile.

[0005] Furthermore, in order to effectively improve the overall stability of the formwork system, a plurality of steel formwork horizontal supports are evenly connected around the reference column to support the annular steel formwork.

[0006] Furthermore, in order to make the horizontal support of the steel formwork provide tighter support to the annular steel formwork, the horizontal support length adjustment device of the steel formwork provided in the middle of the horizontal support of the steel formwork can adjust the length of the horizontal support of the steel formwork according to demand.

[0007] Furthermore, in order to effectively solve the problem that the annular steel formwork is difficult to install and disassemble, the annular steel formwork has multiple and is freely spliced ​​together through the longitudinal connection holes of the steel formwork and the horizontal connection holes of the steel formwork.

[0008] Furthermore, in order to ensure that the foundation pile reinforcement cage can be hoisted as a whole, there is no connection device between the annular foundation pile template system and the bored pile guard arm.

[0009] Furthermore, the construction method and use method of the template system of the large-diameter artificially dug hole ring-shaped foundation pile consists of the following steps:

[0010] 1) As the bored pile is excavated, the guard arm of the bored pile is constructed to the bottom of the annular foundation pile;

[0011] 2) Excavate a cup-shaped section at the bottom of the annular foundation pile as the foundation of the reference column;

[0012] 3) Hang the first section of the reference column into the cup-shaped section and pour the cup-shaped foundation;

[0013] 4) Connect the horizontal support of the steel formwork and the annular steel formwork, and after the connection is completed, hang six annular steel formworks;

[0014] 5) Connect the reference column and the horizontal support of the steel formwork through the connector and the steel pin;

[0015] 6) Connect the annular steel formwork through the horizontal connection holes of the steel formwork to complete the first layer of formwork support;

[0016] 7) Repeat steps 4 to 6 to complete the second and third layer template support, and connect the upper and lower layers of annular steel templates through the longitudinal connection holes of the steel templates;

[0017] 8) Hang the second reference column, repeat steps 4 to 6, install the fourth and fifth layer formwork, and connect the two adjacent reference columns through the reference column connector;

[0018] 9) Install the third reference column, the sixth to ninth layers of annular steel formwork in sequence, and the top of the annular foundation piles to complete the installation of the annular foundation pile formwork system;

[0019] 10) At this time, the foundation pile is ready for hanging the foundation pile reinforcement cage. The reinforcement cage is located between the guard arm of the artificial bored pile and the circular foundation pile formwork system, and the concrete circular foundation pile concrete is poured;

[0020] 11) After the concrete solidifies, the process of removing the annular foundation pile formwork system is carried out, the annular steel formwork is removed, and the construction of the manually excavated annular foundation piles is completed.

[0021] The beneficial effects of the present invention are as follows: the template system structure of the large-diameter artificially dug ring-type foundation pile is compactly connected, easy to use, and reasonably designed. A plurality of steel template horizontal supports are evenly connected around the reference column to support the ring-shaped steel template, which can provide good support for the ring-shaped steel template, thereby effectively improving the overall stability of the template system. The steel template horizontal support length adjustment device arranged in the middle of the steel template horizontal support can adjust the length of the steel template horizontal support according to needs, and can freely adjust the length of the steel template horizontal support according to needs so that the steel template horizontal support provides tighter support to the ring-shaped steel template, effectively preventing the ring-shaped steel template from being deformed and damaged due to insufficient support. There are multiple ring-shaped steel templates and they are freely spliced ​​together through the longitudinal connecting holes of the steel templates and the horizontal connecting holes of the steel templates. While ensuring that the ring-shaped steel templates are tightly connected, the problem that the ring-shaped steel templates are difficult to install and disassemble is effectively solved. There is no connection device between the ring-shaped foundation pile template system and the artificially dug pile guard arm, ensuring that the foundation pile steel cage can be hoisted as a whole, thereby speeding up the construction progress. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0023] Figure 2 It is a schematic diagram of the top view structure of the present invention;

[0024] Figure 3 This is a schematic diagram of the annular pile template system structure of the present invention;

[0025] Figure 4 This is a schematic diagram of the bottom structure of the annular foundation pile of the present invention;

[0026] Figure 5 This is a schematic diagram of the structure of the reference column connector of the present invention;

[0027] In the figure: 1. reference column, 2. connecting piece, 3. steel pin, 4. horizontal support of steel formwork, 5. bored pile guard arm, 6. steel formwork fixing rod, 7. annular steel formwork, 8. longitudinal connecting hole of steel formwork, 9. horizontal connecting hole of steel formwork, 10. length adjustment device of horizontal support of steel formwork, 11. annular foundation pile concrete, 12. annular foundation pile formwork system, 13. reference column connector, 14. top of annular foundation pile, 15. bottom of annular foundation pile. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] See also Figure 1-5 A formwork system suitable for large-diameter artificially dug ring-shaped foundation piles, comprising a reference column 1, a connector 2, a steel pin 3, a steel template horizontal support 4, an artificially dug pile arm 5, a steel template fixing rod 6, an annular steel template 7, a steel template longitudinal connection hole 8, a steel template horizontal connection hole 9, a steel template horizontal support length adjustment device 10, annular foundation pile concrete 11, annular foundation pile formwork system 12, a reference column connector 13, annular foundation pile top 14 and annular foundation pile bottom 15; the reference column 1 is installed with a connector 2 around it, and one end of the steel template horizontal support 4 is provided with a connector 2. Installed in the connecting member 2, the steel pin 3 passes through the connecting member 2 to fix the connecting member 2 and the steel template horizontal support 4 together, the other end of the steel template horizontal support 4 is installed on the annular steel template 7, the steel template fixing rod 6 fixes the steel template horizontal support 4 and the annular steel template 7 together, a plurality of steel template horizontal supports 4 are evenly connected around the reference column 1 to support the annular steel template 7, the annular steel template 7 has multiple pieces assembled and installed together, the annular steel template 7 has multiple and is freely spliced ​​together through the steel template longitudinal connection hole 8 and the steel template horizontal connection hole 9, the left and right adjacent annular steel templates 7 are connected together through the steel template horizontal connection hole 9 and the upper and lower adjacent annular steel templates 7 are connected together through the steel template longitudinal connection hole 8, the middle of the steel template horizontal support 4 is installed with a steel template horizontal support length adjustment device 10, the steel template horizontal support length adjustment device 10 set in the middle of the steel template horizontal support 4 can adjust the length of the steel template horizontal support 4 according to demand, the periphery of the annular pile template system 12 is provided with an artificial bored pile guard arm 5, the annular pile template system 1 2 and the bored pile guard arm 5 are not connected by any connecting device, and an annular pile concrete 11 is poured between the annular pile formwork system 12 and the bored pile guard arm 5. The annular pile formwork system 12 is composed of a plurality of reference columns 1 connected together and a plurality of layers of annular steel formworks 7 connected together. There are a plurality of reference columns 1 and the plurality of reference columns 1 are connected together by a reference column connector 13. The lowest annular steel formwork 7 is installed and fixed on the annular pile bottom 15, and the upper end of the uppermost annular steel formwork 7 is the annular pile top 14.

[0030] As a technical optimization solution of the present invention: a plurality of steel formwork horizontal supports 4 are evenly connected around the reference column 1 to support the annular steel formwork 7; a steel formwork horizontal support length adjustment device 10 arranged in the middle of the steel formwork horizontal support 4 can adjust the length of the steel formwork horizontal support 4 according to needs; the annular steel formwork 7 has multiple and is freely spliced ​​together through the steel formwork longitudinal connecting holes 8 and the steel formwork horizontal connecting holes 9; there is no connection device between the annular pile formwork system 12 and the bored pile guard arm 5.

[0031] The construction method and use method of the template system of the large-diameter artificially dug hole ring-shaped foundation pile consists of the following steps:

[0032] 1) As the bored pile is excavated, the guard arm 5 of the bored pile is constructed to the bottom 15 of the annular foundation pile;

[0033] 2) Excavate a cup-shaped section at the bottom 15 of the annular foundation pile as the foundation of the reference column 1;

[0034] 3) Hang the first section of the reference column 1 into the cup-shaped section and cast the cup-shaped foundation;

[0035] 4) Connect the steel formwork horizontal support 4 and the 7 annular steel formworks, and after the connection is completed, hang six annular steel formworks 7;

[0036] 5) Connect the reference column 1 and the steel formwork horizontal support 4 through the connecting piece 2 and the steel pin 3;

[0037] 6) Connect the annular steel formwork 7 through the horizontal connection hole 9 of the steel formwork to complete the first layer of formwork support;

[0038] 7) Repeat steps 4 to 6 to complete the second and third layer template support, and the upper and lower layers of annular steel templates 7 are connected through the longitudinal connection holes 8 of the steel templates;

[0039] 8) Hang the second reference column 1, repeat steps 4 to 6, install the fourth and fifth layer formwork, and connect the two adjacent reference columns 1 through the reference column connector 13;

[0040] 9) Install the third reference column 1, the sixth to ninth layers of annular steel formwork 7, and the top of the annular foundation pile 14 in sequence to complete the installation of the annular foundation pile formwork system 12;

[0041] 10) At this time, the foundation pile is ready for hanging the foundation pile reinforcement cage, the reinforcement cage is located between the manual bored pile guard arm 5 and the annular foundation pile formwork system 12, and the concrete annular foundation pile concrete 11 is poured;

[0042] 11) After the concrete solidifies, the process of removing the annular foundation pile formwork system 12 is carried out, the annular steel formwork 7 is removed, and the construction of the manually excavated annular foundation pile is completed.

[0043] When the present invention is used, firstly, the artificial bored pile guard arm is made to the bottom of the annular foundation pile, a cup-shaped section is excavated at the bottom of the annular foundation pile as the foundation of the reference column, the first section of the reference column is hoisted into the cup-shaped section, the cup-shaped foundation is cast, the horizontal support of the steel formwork is connected to the annular steel formwork, and after the connection is completed, six annular steel formworks are hoisted, the reference column and the horizontal support of the steel formwork are connected through the connecting piece and the steel pin, the annular steel formwork is connected through the horizontal connecting hole of the steel formwork, the first layer of formwork support is completed, and then the second and third layers of formwork support are completed, and the upper and lower layers of annular steel formworks are connected through the longitudinal connecting holes of the steel formworks. , hoist the second reference column, and then install the fourth and fifth layers of formwork. The two adjacent reference columns are connected by the reference column connectors. The third reference column, the sixth to ninth layers of annular steel formworks are installed in sequence, to the top of the annular foundation piles, to complete the installation of the annular foundation pile formwork system. At this time, the foundation piles are ready for hoisting the foundation pile steel cages. The steel cages are located between the guard arms of the manually excavated piles and the annular foundation pile formwork system. Concrete is poured for the annular foundation piles. After the concrete solidifies, the annular foundation pile formwork system is removed, the annular steel formworks are removed, and the construction of the manually excavated annular foundation piles is completed.

[0044] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0045] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A construction method for a formwork system suitable for large-diameter artificially dug ring-shaped pile foundations, characterized in that: The template system suitable for large-diameter artificially dug ring-shaped foundation piles comprises a reference column (1), a connecting piece (2), a steel pin (3), a steel template horizontal support (4), an artificially dug pile arm (5), a steel template fixing rod (6), an annular steel template (7), a steel template longitudinal connection hole (8), a steel template horizontal connection hole (9), a steel template horizontal support length adjustment device (10), annular foundation pile concrete (11), annular foundation pile template system (12), a reference column connector (13), annular foundation pile top (14) and annular foundation pile bottom (15); A connecting piece (2) is installed around the reference column (1), one end of the steel template horizontal support (4) is installed in the connecting piece (2), the steel pin (3) passes through the connecting piece (2) to fix the connecting piece (2) and the steel template horizontal support (4) together, the other end of the steel template horizontal support (4) is installed on the annular steel template (7), the steel template fixing rod (6) fixes the steel template horizontal support (4) and the annular steel template (7) together, the annular steel template (7) has multiple pieces assembled and installed together, the adjacent annular steel templates (7) on the left and right are connected together through the steel template horizontal connection holes (9) and the adjacent annular steel templates (7) on the top and bottom are connected together through the steel template longitudinal connection holes (8), the steel template horizontal support (4) is connected to the steel template horizontal support (4) and the steel template horizontal support (4) is connected to the steel template horizontal support (4). A steel template horizontal support length adjustment device (10) is installed in the middle of the support (4), and an artificial bored pile guard arm (5) is arranged on the periphery of the annular foundation pile template system (12). An annular foundation pile concrete (11) is poured between the annular foundation pile template system (12) and the artificial bored pile guard arm (5). The annular foundation pile template system (12) is composed of a plurality of reference columns (1) connected together and a plurality of layers of annular steel templates (7) connected together. The reference columns (1) have a plurality of reference columns (1) and the plurality of reference columns (1) are connected together through a reference column connector (13). The lowest annular steel template (7) is installed and fixed on the bottom of the annular foundation pile (15), and the upper end of the uppermost annular steel template (7) is the top of the annular foundation pile (14). The base column (1) is evenly connected to a plurality of steel template horizontal supports (4) around the periphery to support the annular steel template (7); a steel template horizontal support length adjustment device (10) provided in the middle of the steel template horizontal support (4) can adjust the length of the steel template horizontal support (4) according to demand; the annular steel template (7) has a plurality of steel template longitudinal connection holes (8) and steel template horizontal connection holes (9) that can be freely spliced ​​together; the annular pile template system (12) and the bored pile guard arm (5) are not connected by any connection device; The construction method and use method of the template system of the large-diameter artificially dug hole ring-shaped foundation pile consists of the following steps: 1) As the bored pile is excavated, the bored pile guard arm (5) is installed to the bottom of the annular foundation pile (15); 2) Excavating a cup-shaped section at the bottom of the annular foundation pile (15) as the foundation of the reference column (1); 3) Hang the first section of the reference column (1) into the cup-shaped section and cast the cup-shaped foundation; 4) Connect the steel formwork horizontal support (4) and (7) annular steel formwork, and after the connection is completed, hang six annular steel formworks (7); 5) Connecting the reference column (1) and the steel formwork horizontal support (4) through the connecting piece (2) and the steel pin (3); 6) Connect the annular steel formwork (7) through the horizontal connection holes (9) of the steel formwork to complete the first layer of formwork support; 7) Repeat steps 4 to 6 to complete the second and third layer template support, and connect the upper and lower layers of annular steel templates (7) through the longitudinal connection holes (8) of the steel templates; 8) Hanging the second reference column (1), repeating steps 4 to 6, installing the fourth and fifth layer formwork, and connecting two adjacent reference columns (1) via the reference column connector (13); 9) sequentially installing the third reference column (1), the sixth to ninth layers of annular steel formwork (7), and the top of the annular foundation pile (14), thereby completing the installation of the annular foundation pile formwork system (12); 10) At this time, the foundation pile is ready for hanging the foundation pile reinforcement cage, the reinforcement cage is located between the manual bored pile guard arm (5) and the annular foundation pile formwork system (12), and the concrete annular foundation pile concrete (11) is poured; 11) After the concrete solidifies, the process of removing the annular foundation pile formwork system (12) is carried out, the annular steel formwork (7) is removed, and the construction of the manually excavated annular foundation pile is completed.