Construction formwork and construction method for integral casting of pier column tie beam
By setting up a horn column on the pier column formwork to form a tripod structure, the problems of ground environment limitations and bracket stability in the construction of pier column beams are solved, and the overall casting without embedded parts is achieved, which improves construction efficiency and safety.
Patent Information
- Application Number
- CN202010330477.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-04-23
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2040-04-23
AI Technical Summary
In the existing bridge construction process, the pier column beam is limited by the ground environment during the construction process, the construction process is cumbersome, the cycle is long, the cost is high, and the stability of the bracket is difficult to guarantee, which poses safety hazards.
Design a construction formwork for the integral casting of pier column beams, using the cow leg column and pier column formwork to fully weld the corner weld to form a tripod structure, omitting the bracket erection and embedded parts, and pouring concrete directly on the pier column formwork .
The overall pouring without embedded parts is achieved, resources and construction period are saved, construction efficiency is improved, construction costs are reduced, and construction safety is improved.
Smart Images

Figure CN111395193B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of bridge engineering construction, and in particular, to a construction template for integrally casting a pier column tie beam and a construction method thereof. Background Art
[0002] The pier tie beam is a common design in the bridge substructure, which aims to strengthen the connection between the piers and ensure the stability of the piers. In order to avoid excessive stress on the formwork caused by the construction load of the pier tie beam, which will cause the formwork to be damaged, the conventional construction process adopted during the construction process usually includes setting up brackets to transfer the stress generated during the construction of the pier tie beam to the ground and pre-embedding steel plates during the pier construction.
[0003] The scaffolding is set up to transfer the stress generated during the construction of the pier tie beam to the ground. This construction process has high requirements on the bearing capacity of the original ground, and the ground needs to be compacted. The scaffolding is time-consuming and labor-intensive, and cannot meet the progress requirements when the construction period is tight. In addition, when the pier tie beam is designed to be at a high position, the stability of the scaffolding itself is difficult to guarantee, and there are certain safety hazards.
[0004] During the construction of piers, steel plates are embedded. After the formwork is removed, corbel piles are welded as the load-bearing support for the tie beam construction, and then the middle tie beam construction is carried out. Although this method avoids the adverse effects of the ground environment on the tie beam construction, different pier diameters have high requirements on the size and curvature of the embedded steel plates, and the steel plates need to be shaped and processed; and the embedded steel plates are prone to rust in the later stage, affecting the appearance quality of the piers; the pouring of the piers must be stopped at the middle tie beam, and it can only be used as the load-bearing support for the middle tie beam construction when the strength of the lower concrete reaches the design strength. During this period, a lot of waiting time affects the construction progress.
[0005] Therefore, it is necessary to provide a new integral tie beam casting process which is not restricted by the ground environment and does not require pier column embedded parts. Summary of the invention
[0006] The main purpose of the present invention application is to provide a construction template and a construction method for integral casting of pier tie beams, so as to solve the technical problems that the conventional construction process is restricted by the ground environment, the construction process is cumbersome, and the requirements for the workpiece are high, resulting in a cumbersome construction process, a long construction period and high construction costs.
[0007] In order to achieve the above-mentioned object, according to one aspect of the present application, a construction template for integrally casting a pier tie beam is provided.
[0008] The construction formwork for integrally casting the pier tie beam according to the present invention comprises:
[0009] Corbel column;
[0010] The pier column formwork comprises a base steel plate, formwork vertical ribs, formwork transverse ribs and formwork transverse hoops, wherein the formwork vertical ribs, the formwork transverse ribs and the formwork transverse hoops are arranged on the base steel plate;
[0011] The corbel column is arranged at the intersection of the template vertical rib, template transverse rib and template transverse hoop.
[0012] Furthermore, the corbel column and the pier column formwork are connected by full-welding with fillet welds.
[0013] Furthermore, the corbel column is formed by combining two I14 I-beams into a tripod structure.
[0014] Furthermore, the corbel column includes a structural groove for connecting with the pier column formwork.
[0015] Furthermore, it comprises at least two corbel columns, and the at least two corbel columns are symmetrically arranged on the pier column formwork along the same horizontal axis.
[0016] In order to achieve the above-mentioned object, according to another aspect of the present application, a construction method for integrally casting a pier tie beam is provided.
[0017] The construction method for integral casting of pier tie beams according to the present invention comprises any one of the above-mentioned construction templates for integral casting of pier tie beams, and the steps include:
[0018] According to the designed elevation position of the pier column tie beam, the position of the corbel column is calculated, and the corbel column is welded to the intersection of the template vertical rib, the template transverse rib and the template transverse hoop of the pier column template;
[0019] Placing crossbeams on the corbels, and connecting the crossbeams via tie rods;
[0020] Evenly placing square timbers on the crossbeams;
[0021] Check the elevation of the corbel column, install the bottom formwork of the pier column tie beam formwork after confirming that it is correct, and tie the steel bars;
[0022] Pour concrete to complete the overall pouring of the pier tie beam.
[0023] Furthermore, the corbel column and the pier column formwork are connected by full-welding with fillet welds.
[0024] Furthermore, the corbel column is formed by combining two I14 I-beams into a tripod structure.
[0025] Furthermore, the crossbeam is an I45a I-beam, and the size of the square timbers placed on the crossbeam is 100mm×100mm, with a spacing of 25cm.
[0026] Furthermore, it comprises at least two corbel columns, and the at least two corbel columns are symmetrically arranged on the pier column formwork along the same horizontal axis.
[0027] In the application embodiment of the present invention, a construction formwork for integrally casting the pier tie beam is designed. By arranging the structural design of corbel columns at the intersection of the foundation steel plate of the pier formwork and the vertical ribs, transverse ribs and transverse hoops of the formwork, the purpose of omitting the work of erecting and dismantling the support and strengthening the bearing capacity of the foundation is achieved, thereby saving resources and construction period, eliminating the need to set embedded parts on the pier body, and greatly improving the technical effect of construction efficiency, thereby solving the technical problems of complicated construction process, long construction period and high construction cost caused by the conventional construction process being restricted by the ground environment, complicated construction process and high requirements on workpieces. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The drawings constituting a part of the present invention are used to provide a further understanding of the present invention, so that other features, purposes and advantages of the present invention become more obvious. The drawings and descriptions of the schematic embodiments of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:
[0029] Figure 1 It is a schematic diagram of a construction template structure for integrally casting a pier tie beam according to an embodiment of the present invention.
[0030] Figure 2 It is a structural schematic diagram of a specific application of a construction template for integrally casting a pier tie beam according to an embodiment of the present invention.
[0031] Reference numerals
[0032] 1: corbel column; 2: pier column formwork; 201: foundation steel plate; 202: formwork vertical rib; 203: formwork horizontal rib; 204: formwork horizontal hoop; 3: crossbeam; 4: square timber. DETAILED DESCRIPTION
[0033] In order to enable those skilled in the art to better understand the present invention, the technical solutions in the embodiments of the present invention will be described clearly and completely in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only embodiments of a part of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0034] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0035] In the present application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.
[0036] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those skilled in the art, the specific meanings of these terms in the present application can be understood according to the specific circumstances.
[0037] In addition, the terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to specific circumstances.
[0038] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present invention can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0039] In the technical solutions related to this field, in order to overcome the shortcomings of the existing solutions, technical improvements are made according to specific construction applications, involving improvements in the formwork. It is often believed that the corbel column setting and the connection with the pier formwork are not feasible for supporting the construction of the overall pouring of the pier tie beam and dispersing and bearing the construction force of the superstructure structure. The technical solution applied for in this invention is based on actual engineering, through multiple calculations and specific implementation and application in the project. It is not something that can be achieved or ensured to be implemented by those skilled in the art through conventional structural settings or expectations. It is obtained after the inventor has conducted multiple calculations and force analysis, combined with the on-site construction conditions and final verification. A lot of labor has been devoted during this period. It is a technical improvement made to promote the development of related technologies in this field.
[0040] like Figure 1 As shown, the present application relates to a construction formwork for integral casting of pier column tie beams, the construction formwork for integral casting of pier column tie beams comprises a corbel column 1 and a pier column formwork 2, the pier column formwork 2 comprises a base steel plate 201, formwork vertical ribs 202, formwork transverse ribs 203 and formwork transverse hoops 204, the formwork vertical ribs 202, formwork transverse ribs 203 and formwork transverse hoops 204 are arranged on the base steel plate 201; the corbel column 1 is arranged at the intersection of the formwork vertical ribs 202, the formwork transverse ribs 203 and the formwork transverse hoops 204 to enhance the load-bearing strength of the construction formwork for integral casting of the pier column tie beams and the stability of the overall structure.
[0041] In a preferred embodiment of the present invention, the corbel column 1 is connected to the pier column formwork 2 by full-welding of fillet welds to ensure that the construction formwork for integrally casting the pier column tie beam meets the bearing capacity requirements of the pier column tie beam construction. In a further preferred embodiment, the corbel column 1 is a tripod structure formed by combining two I14 I-beams, and the corbel column 1 includes a structural groove for connecting with the pier column formwork 2, and the structural groove is respectively arranged corresponding to the formwork vertical ribs 202, the formwork transverse ribs 203 and the formwork transverse hoop 204.
[0042] In a preferred embodiment of the present invention, at least two corbels 1 are included, and the at least two corbels 1 are symmetrically arranged on the pier column formwork 2 along the same horizontal axis; the number of the corbels 1 is twice the number of the pier columns.
[0043] In order to achieve the above-mentioned object, according to another aspect of the present application, a construction method for integrally casting a pier tie beam is provided.
[0044] The construction method for integral casting of pier tie beams according to the present invention comprises any one of the above-mentioned construction templates for integral casting of pier tie beams, and the steps include:
[0045] According to the designed elevation of the pier tie beam, the thickness of the formwork, the height of the upper square wood and the crossbeam are subtracted to calculate the position of the corbel column 1, as shown in Figure 1 As shown, the corbel column 1 is welded to the intersection of the template vertical rib 202, the template transverse rib 203 and the template transverse hoop 204 of the pier column template 2 to enhance the load-bearing strength and overall stability of the structure;
[0046] like Figure 2 As shown, a crossbeam 3 is placed on the corbel column 1. This structural arrangement facilitates the dispersion and conduction of force, transferring the upper load during construction to the corbel column; the crossbeams are connected by tie rods to ensure their overall stability;
[0047] Evenly lay square timbers 4 on the crossbeam 3;
[0048] Check the elevation of the corbel column 1, and after confirming that it is correct, install the bottom formwork of the pier column tie beam formwork and tie the steel bars;
[0049] Pour concrete to complete the overall pouring of the pier tie beam.
[0050] In a preferred embodiment of the present invention, the corbel column 1 and the pier column formwork 2 are connected by full-welding of fillet welds to ensure that the bearing capacity requirements of the pier column tie beam construction are met; the corbel column 1 is a tripod structure composed of two I14 I-beams; the crossbeam 3 is an I45a I-beam, and the size of the square timber 4 erected on the crossbeam 3 is 100mm×100mm, with a spacing of 25cm.
[0051] In a preferred embodiment of the present invention, at least two of the corbels are welded on the same pier, and the at least two corbels 1 are symmetrically arranged on the pier formwork along the same horizontal axis; in a preferred embodiment of the present invention, the number of the corbels 1 is twice the number of the piers.
[0052] Compared with the conventional column-beam construction method, the technical solution in the present invention omits the work of erecting and dismantling the support and strengthening the bearing capacity of the foundation, saving resources and construction period, and does not require the installation of embedded parts on the pier body, which greatly improves the construction efficiency. The structural force can be verified by midas Civil to meet the specification requirements, which greatly improves the safety during the construction process. The purpose of improving construction efficiency, economic benefits and construction safety is achieved.
[0053] In the application embodiment of the present invention, a construction formwork for integrally casting the pier tie beam is designed. By arranging the structural design of corbel columns at the intersection of the foundation steel plate of the pier formwork and the vertical ribs, transverse ribs and transverse hoops of the formwork, the purpose of omitting the work of erecting and dismantling the support and strengthening the bearing capacity of the foundation is achieved, thereby saving resources and construction period, eliminating the need to set embedded parts on the pier body, and greatly improving the technical effect of construction efficiency, thereby solving the technical problems of complicated construction process, long construction period and high construction cost caused by the conventional construction process being restricted by the ground environment, complicated construction process and high requirements on workpieces.
[0054] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A construction formwork for integral casting of pier column tie beams, It is characterized in that include: Corbel columns, carrying beams; The pier column formwork comprises a base steel plate, formwork vertical ribs, formwork transverse ribs and formwork transverse hoops, wherein the formwork vertical ribs, the formwork transverse ribs and the formwork transverse hoops are arranged on the base steel plate; The corbel column is arranged at the intersection of the template vertical rib, the template transverse rib and the template transverse hoop; The corbel column and the pier column formwork are connected by full-welding of fillet welds; The corbel column is a tripod structure formed by combining two I14 I-beams; The corbel column includes a structural groove for connecting with the pier column template; It comprises at least two said corbels, and said at least two said corbels are symmetrically arranged on said pier column formwork along the same horizontal axis; The number of the corbel columns is twice the number of the pier columns.
2. A construction method for integral casting of pier tie beams, It is characterized in that The construction formwork for integrally casting the pier tie beam according to claim 1 comprises the following steps: According to the designed elevation position of the pier column tie beam, the position of the corbel column is calculated, and the corbel column is welded to the intersection of the template vertical rib, the template transverse rib and the template transverse hoop of the pier column template; Placing crossbeams on the corbels, and connecting the crossbeams via tie rods; Evenly placing square timbers on the crossbeams; Check the elevation of the corbel column, install the bottom formwork of the pier column tie beam formwork after confirming that it is correct, and tie the steel bars; Pour concrete to complete the overall pouring of the pier tie beam.
3. The construction method for integrally casting the pier tie beam according to claim 2, It is characterized in that The corbel column and the pier column formwork are connected by full-welding with fillet welds.
4. The construction method for integrally casting the pier tie beam according to claim 2, It is characterized in that The corbel column is a tripod structure formed by combining two I14 I-beams.
5. The construction method for integrally casting the pier tie beam according to claim 3, It is characterized in that The crossbeam is an I45a I-beam, and the size of the square timbers placed on the crossbeam is 100mm×100mm, with a spacing of 25cm.
6. The construction method for integrally casting the pier tie beam according to any one of claims 2 to 5, It is characterized in that It comprises at least two corbel columns, and the at least two corbel columns are symmetrically arranged on the pier column formwork along the same horizontal axis.