Integrated curb double-filtration drainage device and construction method
By setting up a double filter device with a lead wire gabion wall and a first reverse filter layer on the river embankment, combined with multiple drainage pipes, the problems of soil erosion and impurity blockage are solved, and the effects of river landscape protection and operating cost reduction are achieved.
Patent Information
- Application Number
- CN202010316581.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-04-21
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2040-04-21
AI Technical Summary
In the existing river embankment design, the intercepting ditch fails to effectively filter the water flow, leading to problems such as soil erosion, impurities blocking drainage pipes, affecting the landscape, and increasing operating costs.
An integrated curb stone double filter drainage device is adopted, including a lead wire gabion wall and a first reverse filter layer. The lead wire gabion wall filters large particles of soil and debris, and the first reverse filter layer filters sand, soil and impurities, combined with multiple inclined drainage pipes. To ensure smooth and clean water flow.
Effectively prevent water and soil erosion, reduce impurity clogging, improve drainage efficiency, protect river landscape, and reduce operating costs.
Smart Images

Figure CN111424495B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of river bank drainage, and in particular relates to an integrated curbstone double-filtration drainage device and a construction method. Background Art
[0002] Under the trend of ecological river channel design, more and more river embankments adopt compound slopes, and hydrophilic platforms are set above the normal water level. The slopes above the platform are mostly soft slopes such as ecological turf slope protection, and the slopes below the platform are hard slopes such as hard concrete and mortar masonry. The turf slope protection is generally gentle and the water flow is slow, but there are problems such as water scouring, soil erosion, and poor drainage.
[0003] The existing design mostly sets up intercepting ditches along the horse trail horizontally and vertically for centralized drainage. If no intercepting ditch is designed and the incoming water is allowed to directly flush the horse trail, it will cause soil erosion, muddy water pollution of the horse trail, affect the landscape effect, increase operating costs and other problems. If a special intercepting ditch is set up, both walls of the intercepting ditch are cast with concrete, and the collected water flow is not filtered. At present, the intercepting ditch collects all the water flow together and drains it through a drainage pipe, which will cause poor drainage of the water flow. At the same time, there are impurities in the water flow, which are easy to block the drainage pipe, form water accumulation, increase the workload of sanitation workers, and have a serious impact on the river landscape. Summary of the invention
[0004] The purpose of the present invention is to provide an integrated curbstone double-filtration drainage device and a construction method, so that the integrated curbstone also has the function of a water interception ditch. At the same time, a wire mesh gabion wall and a first filter layer are set to perform double filtration on the water flow. The wire mesh gabion wall filters large particles of soil and debris in the water flow, and the first filter layer filters sand and impurities in the water flow. This can solve the current problems of water flow scouring the turf slope, causing soil and water loss on the turf slope, impurities in the water flow, and poor water discharge. The use of multiple drainage pipes results in poor river landscape, a large workload for water and soil cleaning, and high costs for water and soil cleaning.
[0005] In order to achieve the above object, the technical solution adopted by the present invention includes:
[0006] An integrated curbstone double-filtration drainage device comprises a wire gabion wall vertically arranged at the foot of a grass slope, an integrated curbstone located between the wire gabion wall and the road surface, a drainage pipe located in the integrated curbstone, and a first anti-filtration layer covering the drainage pipe;
[0007] The wire gabion wall is higher in vertical height than the turf slope, and the wire gabion wall and the turf slope form a first filtering cavity;
[0008] The integrated curbstone includes an inclined member and a vertical member, one end of the inclined member is connected to the bottom of the wire gabion wall 1, and the other end is connected to the bottom of the vertical member, and the end of the inclined member connected to the bottom of the wire gabion wall 1 is higher than the end of the inclined member connected to the bottom of the vertical member;
[0009] The top of the vertical member is flush with the road surface, and the inclined member, the vertical member and the first filter layer form a second filter cavity.
[0010] The intercepting ditch used in the prior art has both walls cast with concrete, and the collected water flow is not filtered, which easily causes debris in the water flow to clog the intercepting ditch; this solution sets a wire mesh gabion wall at the foot of the turf slope. The wire mesh gabion wall filters large particles of soil and debris in the turf when the water flows through the turf slope, which can ensure that the water flows smoothly into the integrated curbstone, ensuring that there will be no large particles of soil and debris in the curbstone, which will cause a large workload for sanitation workers and affect their work efficiency; at the same time, it also reduces soil erosion on the turf slope.
[0011] In this solution, the vertical height of the wire mesh gabion wall is set higher than the vertical height of the turf slope, which can effectively prevent the water from directly flowing over the wire mesh gabion wall when the water flow on the turf slope is large, causing the water carrying debris to directly enter the integrated curb.
[0012] Secondly, in this solution, a first filter layer is also set in the integrated curbstone. The first filter layer performs secondary filtration on the water flow entering the integrated curbstone, filtering out finer sand and impurities in the water flow, ensuring that when the water flow enters the drain pipe, it will not cause blockage of the drain pipe, and also ensuring that the water flow entering the river will not pollute the river water.
[0013] Finally, this scheme sets the inclination direction of the inclined component of the integrated curbstone, so that when the flow rate of water flowing into the integrated curbstone is small, it can also flow smoothly into the first filter layer, ensuring the smoothness of the water flow; water accumulation in the integrated curbstone will not occur, which will have a serious impact on the river landscape.
[0014] Furthermore, the first filter layer includes non-woven geotextile and crushed stone; the diameter of the crushed stone is less than or equal to 5 cm; the first filter layer formed by the combination of the non-woven geotextile and crushed stone can filter fine sand and impurities to ensure the clarity of the water flow.
[0015] Furthermore, the wire mesh gabion wall includes a gabion woven by a wire machine and stones of inconsistent shapes and sizes filled in the gabion; the use of stones of inconsistent shapes and sizes can increase the contact area of the stones in the gabion, increase the contact area between the water flow and the stones, reduce the circulation area of the water flow, and ensure better filtration of the water flow.
[0016] Furthermore, the drain pipe is arranged at the bottom of the vertical component, and the drain pipe is arranged at an angle; the drain pipe is arranged at the bottom of the vertical component, and the first filter layer covers the drain pipe, which wraps the drain pipe well, and at the same time, the bottom surface of the first filter layer is in close contact with the top surface of the inclined component without any gap; it can ensure that when the flow rate of water flowing into the integrated curb is small, it can also pass through the first filter layer and the drain pipe and flow into the river.
[0017] Furthermore, the inclination direction of the drainage pipe is the same as the inclination direction of the turf slope 4 .
[0018] Furthermore, the drainage pipe is a PVC pipe of φ5 or φ10;
[0019] Furthermore, the number of the drainage pipes is no less than one, and they are arranged at intervals along the river channel.
[0020] In the prior art, a drainage pipe is set in the intercepting ditch, which may easily cause the water flow to spread to the road surface and form waterlogging when the water flow is large; therefore, in this solution, multiple drainage pipes are set to better drain the water flow collected in the integrated curbstone, thereby solving the problem that only one drainage pipe is set in the existing intercepting ditch, resulting in poor drainage, which may cause the water flow to spread to the road surface and form waterlogging.
[0021] Furthermore, the drainage pipes are spaced apart at a distance of 100 cm.
[0022] Furthermore, the integrated curbstone is made of precast concrete; the use of precast concrete can reduce the construction cost and is simple to manufacture.
[0023] The second object of the present invention is to provide a construction method of an integrated curbstone double-filtration drainage device, which is characterized by comprising the following steps:
[0024] S1: Excavation of the second filter cavity and drainage pipe: reserve a road surface with the same width as the wire mesh gabion wall at the foot of the turf slope, and excavate the second filter cavity that matches the integrated curbstone at one end of the road surface away from the foot of the turf slope; excavate the drainage pipe channel on the side wall where the second filter cavity fits the road surface;
[0025] S2: Casting the integrated curbstone, using formwork to support the inclined components and vertical components and the drainage pipe shape at the bottom of the vertical components that pass through the integrated curbstone;
[0026] When pouring concrete, each layer of concrete needs to be vibrated and compacted using a vibrator, and this process should be repeated until the concrete filled in the vertical components is basically the same height as the road surface.
[0027] S3: Laying a first layer of cement mortar, and evenly laying a layer of cement mortar on the bottom of the second filter cavity;
[0028] S4: Install the integrated curbstone, install the cast integrated curbstone into the excavated second filter cavity, and the drainage holes of the vertical components of the integrated curbstone correspond to the excavated drainage pipe channel, and reserve a gap between the integrated curbstone and the second filter cavity, and lay a second filter layer on the gap; the second filter layer is made of the same material as the first filter layer; then roll the integrated curbstone so that the bottom of the integrated curbstone is tightly combined with the first layer of cement mortar, and the top of the vertical components of the integrated curbstone is flush with the road surface;
[0029] S5: Install the wire gabion wall on the road surface reserved at the foot of the turf slope; the wire gabion wall is fixed with anchor rods on both side walls; one end of the right wall anchor rod is fixedly connected to the right side of the wire gabion wall, and the other end is fixedly connected to the inclined component of the integrated curbstone; one end of the left wall anchor rod is fixedly connected to the left side of the wire gabion wall, and the other end is fixedly set on the slope surface of the turf slope;
[0030] S6: Fill the second layer of cement mortar. After the first layer of cement mortar is maintained through the reserved gap, the second filter layer is moved to the position where the first filter layer is not set, and the gap between the reserved integrated curbstone and the second filter cavity is filled with the second layer of cement mortar. The top of the second layer of cement mortar is flush with the bottom of the wire mesh gabion wall.
[0031] The existing pouring method generally adopts cast-in-place concrete, which may cause slag inclusion, honeycomb, holes or insufficient concrete strength. In addition, the construction of cast-in-place concrete is complicated and has strict requirements on construction weather. This scheme adopts precast concrete to effectively avoid the above problems. At the same time, the construction of precast concrete is very simple, which can reduce the workload of construction workers.
[0032] Secondly, when installing the integrated curbstone, we reserve gaps and lay a second filter layer on the gaps; when the water flows through the wire mesh gabion wall to filter the large particles of soil and debris in the water, when the water reaches the second filter layer, the second filter layer filters the sand and impurities in the water, and then the water flows along the gaps to the first layer of cement mortar, completing the maintenance of the first layer of cement mortar and improving the quality of the cement mortar; and after the maintenance of the first layer of cement mortar is completed, we move the second filter layer to a place where the first filter layer is not set, saving material consumption of the filter layer and preventing waste of resources.
[0033] At the same time, we rolled the integrated curbstone to make the bottom of the integrated curbstone tightly bonded with the first layer of cement mortar to avoid the formation of bubbles in the cement mortar, which would affect the stability and service life of the cement mortar.
[0034] After completing the maintenance of the first layer of cement mortar, we filled the reserved gaps to ensure that during subsequent use, water will not flow into the cured first layer of cement mortar through the gaps, causing countless tiny pores in the cured first layer of cement mortar, reducing the strength of the mortar. It will also shrink when evaporating, easily causing cracks and greatly reducing the durability of the integrated curbstone.
[0035] Finally, we set anchor rods on the double side walls of the wire mesh gabion wall, and one end of the right wall anchor rod is set on the inclined component of the integrated curb. The right wall anchor rod can support and stabilize the wire mesh gabion wall, and also block impurities in the water flow entering the second filter cavity, which can reduce the impurities accumulated on the first filter layer after being filtered by the first filter layer, thereby more effectively improving the flow rate of water; one end of the left wall anchor rod is fixedly connected to the slope surface of the turf slope, and when it rains, the rainwater can generate downward pressure and fall onto the slope surface of the turf slope during the process of falling, so that the left wall anchor rod can generate better pulling force on the wire mesh gabion wall, and better ensure the stability of the wire mesh gabion wall.
[0036] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0037] 1. The integrated curb double-filtration drainage device and construction method of the present invention make good use of the characteristics of gentle grass slope and slow water flow, and can quickly drain water and prevent the road surface from being polluted.
[0038] 2. At the same time, the present invention adopts a double filtration combination of a wire mesh gabion wall and a first filter layer, which can effectively filter large particles of soil and debris in the water flow, prevent soil and water loss on the turf slope, and prevent large particles of soil and debris in the water flow from clogging the drainage pipe, thereby improving drainage efficiency and eliminating road surface waterlogging. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:
[0040] Figure 1 It is a structural schematic diagram of an integrated curbstone double-filtration drainage device.
[0041] Reference numerals and corresponding component names:
[0042] 1-wire gabion wall; 101-stone; 2-integrated curbstone; 201-inclined member; 202-vertical member; 3-pavement; 4-turf slope; 5-first filter layer; 6-drainage pipe. DETAILED DESCRIPTION
[0043] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0044] In the following description, a large number of specific details are set forth in order to provide a thorough understanding of the present invention. However, it is apparent to one of ordinary skill in the art that these specific details need not be employed to practice the present invention. In other instances, in order to avoid obscuring the present invention, well-known structures, materials, or methods are not specifically described.
[0045] Throughout the specification, references to "one embodiment," "an embodiment," "an example," or "an example" mean that a particular feature, structure, or characteristic described in conjunction with the embodiment or example is included in at least one embodiment of the present invention. Therefore, the phrases "one embodiment," "an embodiment," "an example," or "an example" appearing in various places throughout the specification do not necessarily all refer to the same embodiment or example. In addition, particular features, structures, or characteristics may be combined in one or more embodiments or examples in any suitable combination and / or sub-combination. In addition, it will be appreciated by those of ordinary skill in the art that the figures provided herein are for illustrative purposes and that the figures are not necessarily drawn to scale. The term "and / or" as used herein includes any and all combinations of one or more of the associated listed items.
[0046] [Example]
[0047] like Figure 1 As shown, an integrated curb double-filtration drainage device comprises a wire gabion wall 1 vertically arranged at the foot of a grass slope 4, an integrated curb 2 located between the wire gabion wall 1 and a road surface 3, a drainage pipe 6 located in the integrated curb 2, and a first anti-filter layer 5 covering the drainage pipe 6;
[0048] The vertical height of the wire gabion wall 1 is higher than the vertical height of the turf slope 4, and the wire gabion wall 1 and the turf slope 4 form a first filtering cavity;
[0049] The integrated curbstone 2 includes an inclined member 201 and a vertical member 202, one end of the inclined member 201 is connected to the bottom of the wire gabion wall 1, and the other end is connected to the bottom of the vertical member 202, and the end of the inclined member 201 connected to the bottom of the wire gabion wall 1 is higher than the end of the inclined member 201 connected to the bottom of the vertical member 202;
[0050] The top of the vertical member 202 is flush with the road surface 3 , and the inclined member 201 , the vertical member 202 and the first filter layer 5 form a second filter cavity.
[0051] Furthermore, the first filter layer 5 comprises non-woven geotextile and crushed stones; the diameter of the crushed stones is less than or equal to 5 cm.
[0052] Furthermore, the wire gabion wall 1 includes a gabion mechanically woven with wires and stones 101 of inconsistent shapes and sizes filled in the gabion.
[0053] Furthermore, the drain pipe 6 is disposed at the bottom of the vertical member 202 , and the drain pipe 6 is disposed at an angle.
[0054] Furthermore, the inclination direction of the drainage pipe 6 is the same as the inclination direction of the turf slope 4 .
[0055] Furthermore, the drainage pipe 6 is a PVC pipe of φ5 or φ10;
[0056] Furthermore, the number of the drainage pipes 6 is not less than one, and they are arranged at intervals along the river channel.
[0057] Furthermore, the interval between the drainage pipes 6 is 100 cm.
[0058] Furthermore, the integrated curbstone 2 is made of precast concrete.
[0059] The present invention also provides a construction method of an integrated curbstone double-filtration and drainage device, comprising the following steps:
[0060] S1: Excavation of the second filter cavity and the drainage pipe 6. A road surface with the same width as the wire mesh gabion wall 1 is reserved at the foot of the turf slope 4. A second filter cavity adapted to the integrated curbstone 2 is excavated at one end of the road surface away from the foot of the turf slope 4. A drainage pipe 6 channel is excavated on the side wall where the second filter cavity is in contact with the road surface;
[0061] S2: Casting the integrated curbstone 2, using a template to support the shape of the inclined member 201 and the vertical member 202 and the drainage pipe 6 at the bottom of the vertical member 202 that passes through the integrated curbstone 2;
[0062] When pouring concrete, each layer of concrete needs to be vibrated and compacted using a vibrator, and this process is repeated until the concrete filled in the vertical member 202 is substantially consistent with the road surface height;
[0063] S3: Laying a first layer of cement mortar, and evenly laying a layer of cement mortar on the bottom of the second filter cavity;
[0064] S4: Install the integrated curbstone 2, install the cast integrated curbstone 2 into the excavated second filter cavity, and the drainage hole of the vertical component 202 penetrating the integrated curbstone 2 corresponds to the excavated drainage pipe 6 channel, and reserve a gap between the integrated curbstone 2 and the second filter cavity, and lay a second filter layer on the gap; the second filter layer is made of the same material as the first filter layer 5; then roll the integrated curbstone 2 so that the bottom of the integrated curbstone 2 is tightly combined with the first layer of cement mortar, and the top of the vertical component 202 of the integrated curbstone 2 is flush with the road surface;
[0065] S5: Install the wire gabion wall 1 on the road surface reserved at the foot of the turf slope 4; the wire gabion wall 1 is fixed on both side walls using anchor rods; one end of the right wall anchor rod is fixedly connected to the right side of the wire gabion wall 1, and the other end is fixedly connected to the inclined member 201 of the integrated curbstone 2; one end of the left wall anchor rod is fixedly connected to the left side of the wire gabion wall 1, and the other end is fixedly set on the slope surface of the turf slope 4;
[0066] S6: Fill the second layer of cement mortar. After the first layer of cement mortar is maintained through the reserved gap, the second filter layer is moved to a position where the first filter layer 5 is not set, and the gap between the reserved integrated curbstone 2 and the second filter cavity is filled with the second layer of cement mortar, and the top of the second layer of cement mortar is flush with the bottom of the wire mesh gabion wall.
[0067] Curbstone: Curbstone is a marking stone installed between the road surface and other structures. Curbstones are often required between the road divider and the road surface, and between the sidewalk and the road surface.
[0068] The working principle of this embodiment is: water flows from the grass slope 4 to the wire gabion wall 1, the wire gabion wall 1 first filters the large particles of soil and debris in the water flow, and the filtered water flows into the integrated curb 2. According to the drainage method of the integrated curb 2 with a slope, the water flow is gathered to the bottom of the vertical member 202. Since the drain pipe 6 is arranged at the bottom of the vertical member, the sand in the water flow is filtered by the first filter layer 5 covering the drain pipe 6, and finally the filtered water flows into the river through the drain pipe 6.
[0069] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A construction method for an integrated curbstone double-filtration drainage device, characterized in that: The following steps are involved: S1: excavating a second filtering cavity and a drainage pipe (6), reserving a road surface with the same width as the wire mesh gabion wall (1) at the foot of the turf slope (4), and excavating a second filtering cavity adapted to the integrated curb (2) at one end of the road surface away from the foot of the turf slope (4); A drainage pipe (6) channel is excavated on the side wall of the second filtering cavity that is in contact with the road surface; S2: Casting the integrated curbstone (2), using a template to support the shape of the inclined member (201) and the vertical member (202) and the drainage pipe (6) at the bottom of the vertical member (202) that passes through the integrated curbstone (2); During the concrete pouring, each layer of concrete needs to be vibrated and compacted using a vibrator, and this process is repeated until the concrete filled in the vertical member (202) is substantially the same height as the road surface. S3: Laying a first layer of cement mortar, and evenly laying a layer of cement mortar on the bottom of the second filter cavity; S4: installing the integrated curbstone (2), installing the cast integrated curbstone (2) into the excavated second filter cavity, and making the drainage hole of the vertical component (202) passing through the integrated curbstone (2) correspond to the excavated drainage pipe (6) channel, and reserving a gap between the integrated curbstone (2) and the second filter cavity, and laying a second filter layer on the gap; The second filter layer is made of the same material as the first filter layer (5); Then, the integrated curbstone (2) is rolled so that the bottom of the integrated curbstone (2) is tightly combined with the bottom of the second filtering cavity, and the top of the vertical component (202) of the integrated curbstone (2) is flush with the road surface; S5: Installing the wire gabion wall (1) on the road surface reserved at the foot of the turf slope (4); fixing the wire gabion wall (1) on both side walls with anchor rods; one end of the right wall anchor rod is fixedly connected to the right side of the wire gabion wall (1), and the other end is fixedly connected to the inclined component (201) of the integrated curbstone (2); one end of the left wall anchor rod is fixedly connected to the left side of the wire gabion wall (1), and the other end is fixedly arranged on the slope surface of the turf slope (4); S6: Filling a second layer of cement mortar, after the first layer of cement mortar is cured through the reserved gap, the second filter layer is moved to a position where the first filter layer (5) is not set, and the second layer of cement mortar is filled in the gap between the reserved integrated curbstone (2) and the second filter cavity, and the top of the second layer of cement mortar is flush with the bottom of the wire mesh gabion wall.
2. The construction method of the integrated curbstone double-filtration drainage device according to claim 1 is characterized in that: The double-filtration drainage device comprises a wire gabion wall (1) vertically arranged at the foot of a grass slope (4), an integrated curbstone (2) located between the wire gabion wall (1) and a road surface (3), a drainage pipe (6) located in the integrated curbstone (2), and a first anti-filtration layer (5) covering the drainage pipe (6); The vertical height of the wire gabion wall (1) is higher than the vertical height of the turf slope (4), and the wire gabion wall (1) and the turf slope (4) form a first filtering cavity; The integrated curbstone (2) comprises an inclined member (201) and a vertical member (202), one end of the inclined member (201) is connected to the bottom of the wire gabion wall (1), and the other end is connected to the bottom of the vertical member (202), and the end of the inclined member (201) connected to the bottom of the wire gabion wall (1) is higher than the end of the inclined member (201) connected to the bottom of the vertical member (202); The top of the vertical member (202) is flush with the road surface (3), and the inclined member (201), the vertical member (202) and the first filter layer (5) form a second filter cavity; The first filter layer (5) comprises a non-woven geotextile and crushed stones; the diameter of the crushed stones is less than or equal to 5 cm; The wire gabion wall (1) comprises a gabion mechanically woven with wires and stones (101) of different shapes and sizes filled in the gabion.
3. The construction method of the integrated curbstone double-filtration drainage device according to claim 2 is characterized in that: The drainage pipe (6) is arranged at the bottom of the vertical component (202), and the drainage pipe (6) is arranged at an angle.
4. The construction method of the integrated curbstone double-filtration drainage device according to claim 3 is characterized by: The inclination direction of the drainage pipe (6) is the same as the inclination direction of the turf slope (4).
5. The construction method of the integrated curbstone double-filtration drainage device according to claim 2 is characterized in that: The drainage pipe (6) adopts or PVC pipes.
6. The construction method of the integrated curbstone double-filtration drainage device according to claim 2 is characterized by: The number of the drainage pipes (6) is no less than one, and they are arranged at intervals along the river channel.
7. The construction method of the integrated curbstone double-filtration and drainage device according to claim 6 is characterized by: The interval between the drainage pipes (6) is 100 cm.
8. The construction method of the integrated curbstone double-filtration drainage device according to claim 2 is characterized by: The integrated curbstone (2) is made of precast concrete.