Performance testing device and system for full heat exchange membrane

By designing a full heat exchange membrane performance test device, combined with the temperature and humidity adjustment of the cold box and the hot box, the test problem of the impact of heat transfer and mass transfer coupling of the full heat exchange membrane is solved, and the accurate evaluation of the performance of the full heat exchange membrane is achieved. , suitable for the design and manufacturing of full heat exchangers.

CN111458370BActive Publication Date: 2024-11-26SHANDONG XUESHENG ELECTRIC APPLIANCE CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010472326.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-29
Publication Date
2024-11-26
Estimated Expiration
2040-05-29

AI Technical Summary

Technical Problem

The prior art fails to effectively combine the coupling effect of the heat transfer and mass transfer process of the full heat exchange membrane, resulting in defects in the performance testing method of the full heat exchange membrane and the thermal and humidity performance of the full heat exchange membrane cannot be accurately evaluated.

Method used

A full heat exchange membrane performance testing device was designed, including a cold box, a hot box, a full heat exchange membrane fixture, a test working condition adjustment unit, a temperature self-recording instrument and a humidity self-recording instrument. By adjusting the temperature and humidity, the actual work is simulated. Conditions, measure the heat transfer and mass transfer properties of the full heat exchange membrane.

Benefits of technology

This device considers the coupling effect between heat transfer and humidity transfer of the material, adapts to the size of the full heat exchange membrane, has a short test time, is simple to operate, and is low in cost, and can accurately evaluate the thermal and humidity performance of the full heat exchange membrane.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111458370B_ABST
    Figure CN111458370B_ABST
Patent Text Reader

Abstract

The present invention provides a performance test device and system for a total heat exchange membrane, the performance test device for the total heat exchange membrane comprising: a cold box and a hot box; a total heat exchange membrane fixture, which is disposed between the cold box and the hot box, fixedly connected to the cold box and the hot box, and snap-connected to the total heat exchange membrane specimen; a test condition adjustment unit, which is fixedly connected to the cold box and the hot box, and is used to adjust the temperature and humidity in the cold box and the hot box; a temperature recorder, which is fixedly connected to the cold box and the hot box, and is used to record the temperature in the cold box and the hot box; a first humidity recorder, which is fixedly connected to the cold box and the hot box, and is used to record the humidity in the cold box and the hot box. The present invention takes into account the coupling effect between heat transfer and moisture transfer of materials, and fills the technical gap in the coupled test of heat and moisture performance of total heat exchange membranes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of full heat exchange membrane performance testing, and in particular to a full heat exchange membrane performance testing device and system. Background Art

[0002] As energy and health issues become increasingly severe, the use of total heat exchangers has become an effective way to take both into account. Static total heat exchangers are a type of total heat exchanger that has no transmission parts and is mainly encapsulated by total heat exchange membranes, partitions, fins and other components. It directly relies on the temperature and humidity differences between the fresh and exhaust air to transfer heat and moisture through the total heat exchange membrane.

[0003] At present, the research on static total heat exchangers is divided into three main aspects: research and development of exchange materials, optimization of core structure and shape, and analysis of the influence of operating conditions. Studies have shown that the heat exchange efficiency of total heat exchangers is related to the thickness of the total heat exchange membrane, the water vapor permeability, and the moisture content of the material. Therefore, for static total heat exchangers, the heat and moisture exchange performance of the total heat exchange membrane is the key to achieving heat and mass exchange.

[0004] At present, my country, the United States, Europe and Japan have all formulated corresponding full heat exchanger specifications, and the emphases of each specification are different. Due to the climate differences in the standard-setting regions, there are differences in the experimental conditions for testing full heat exchangers in the corresponding specifications. In addition, ANRI 1060-2013 does not consider condensation and noise experiments; EN308 does not propose testing requirements for the full thermal efficiency of the device; JISB8628 lacks testing of the box and internal air leakage; GB / T 21087-2007 does not propose requirements for latent heat efficiency, but it is more complete in terms of scope of application, device category, and operating condition settings. However, the testing requirements proposed by each standard are all for the whole machine, and do not involve the test indicators and test methods for the thermal and wet performance of the full heat exchange membrane.

[0005] The total heat exchanger uses the total heat exchange membrane as a medium to recover sensible heat and total heat, so the material is required to have good heat transfer performance and high permeability to water vapor. In view of the above two properties, Japan has currently formulated corresponding total heat exchanger material evaluation indicators, but my country has not yet issued a heat and moisture exchange material performance evaluation standard.

[0006] The Japanese specification only involves the test methods of material moisture permeability, air permeability and flame retardancy, and does not involve the test of material heat transfer performance. Since the heat transfer resistance in the heat transfer process of the full heat exchange membrane is mainly the convective heat transfer resistance, the heat transfer performance of the material is judged according to the overall heat transfer process on both sides of the full heat exchange membrane, that is, the heat transfer coefficient. The laboratory heat transfer coefficient test method is mainly the static hot box method, which is generally divided into the calibrated hot box method and the protective hot box method. The hot box method is generally used to determine the heat transfer coefficient of building components or enclosure structures. The detection principle is to put the test piece into the cold box and the hot box. Under stable conditions, when the temperature of the cold and hot boxes remains basically unchanged, measure the power input to the hot box and the air temperature of the cold box and the hot box to obtain the heat transfer coefficient of the test piece. The basic principle of the hot box method is also applied to the thermal insulation performance test of greenhouse covering materials. In terms of determining the heat transfer coefficient of building components and greenhouse covering materials, the application of the hot box method has been very mature, but the specifications and heat transfer characteristics of the full heat exchanger full heat exchange membrane are different from the above two, and the existing specifications are suitable for laboratory measurement of large-size specimens. Therefore, the conditions and equipment required by the specification cannot be used to test the heat transfer coefficient of the full heat exchange membrane of the full heat exchanger.

[0007] For the test of material moisture permeability, the test methods can be divided into weighing method and sensor method according to the principle. The weighing method uses the humidity difference on both sides of the moisture permeability cup to test the moisture permeability of the test piece; the sensor method mainly includes electrolysis method and infrared detection method. The electrolysis method uses the relationship between the electrolysis current and water vapor to calculate the water vapor content passing through the test piece, thereby obtaining the moisture permeability of the test piece; the basic principle of the infrared detection method is that nitrogen with constant humidity and dry nitrogen flow through both sides of the test piece respectively. Due to the humidity difference, water vapor flows from the wet side to the dry side, and is finally transmitted to the infrared detector by the carrier gas to generate an electrical signal, and the water vapor transmission rate of the test piece is calculated by the electrical signal. The three test methods have their own advantages and disadvantages. The weighing method takes a long time to test, is easily interfered by external factors, and has low accuracy; but its principle and test equipment are simple. The electrolysis method and sensor method are costly, and the instrument needs to be calibrated regularly, but the test accuracy is high.

[0008] It is not difficult to see from the above-mentioned relevant specifications that the above-mentioned relevant specifications for full heat exchangers focus on the performance evaluation of the whole machine, and do not involve the performance test of the full heat exchange membrane. The performance of the full heat exchange membrane can directly affect the efficiency of the static full heat exchanger. However, in the current heat transfer and moisture permeability performance test specifications for materials such as sheets and paper, it can be found that the two performance test methods are independent of each other and are carried out separately. However, in the actual work of static full heat exchangers, the full heat exchange membrane simultaneously carries out heat transfer and mass transfer processes, and the two interact and influence each other. Evaluating the full heat exchange membrane based on a single indicator often ignores the coupling effect, which also makes it difficult to compare the advantages and disadvantages of the full heat exchange membrane.

[0009] Therefore, how to provide a performance testing device and system for a full heat exchange membrane to solve the defects of the prior art that a performance testing device for a full heat exchange membrane is not proposed in combination with the coupling effects of heat transfer and mass transfer has become a technical problem that needs to be urgently solved by technical personnel in this field. Summary of the invention

[0010] In view of the above-mentioned shortcomings of the prior art, the purpose of the present invention is to provide a performance testing device and system for a full heat exchange membrane, so as to solve the problem that the prior art does not propose a performance testing device for a full heat exchange membrane in combination with the coupling effects of heat transfer and mass transfer.

[0011] To achieve the above-mentioned purpose and other related purposes, the present invention provides, on the one hand, a performance testing device for a full heat exchange membrane, wherein a full heat exchange membrane specimen is placed in the performance testing device for a full heat exchange membrane for performance testing, and the performance testing device for a full heat exchange membrane comprises: a cold box and a hot box; a full heat exchange membrane clamp, which is arranged between the cold box and the hot box, is fixedly connected to the cold box and the hot box, and is snap-connected to the full heat exchange membrane specimen; a test condition adjustment unit, which is fixedly connected to the cold box and the hot box, and is used to adjust the temperature and humidity in the cold box and the hot box; a temperature recorder, which is fixedly connected to the cold box and the hot box, and is used to record the temperature in the cold box and the hot box; a first humidity recorder, which is fixedly connected to the cold box and the hot box, and is used to record the humidity in the cold box and the hot box.

[0012] In one embodiment of the present invention, the full heat exchange membrane fixture is provided with specimen slits around it for inserting the full heat exchange membrane specimen; the full heat exchange membrane fixture is provided with a full heat exchange membrane fixing clamp for fixing the full heat exchange membrane specimen.

[0013] In one embodiment of the present invention, an air supply port and an air return port are respectively arranged on the upper sides of the box bodies of the cold box and the hot box, and the air supply port and the return air port enable the air to flow from the air supply port to the full heat exchange membrane specimen at a set speed and direction through the operation of the test condition adjustment unit; the air supply port is provided with a guide vane, and the guide vane is used to control the direction of air flowing into the cold box and the hot box.

[0014] In one embodiment of the present invention, the test condition adjustment unit includes a temperature adjustment unit, a humidity adjustment unit and a circulating air duct unit; one of the temperature adjustment units is fixedly connected to the cold box, and is used to adjust the temperature of the cold box before the test officially starts; the other temperature adjustment unit is fixedly connected to the hot box, and is used to adjust the temperature of the hot box before the test officially starts; one of the humidity adjustment units is fixedly connected to the cold box, and is used to adjust the humidity of the cold box before the test officially starts; the other humidity adjustment unit is fixedly connected to the hot box, and is used to adjust the humidity of the hot box before the test officially starts; one of the circulating air duct units is fixedly connected to the cold box, and is used to make the air of the cold box flow from the air supply port to the full heat exchange membrane specimen at a set speed and direction; the other circulating air duct unit is fixedly connected to the hot box, and is used to make the air of the hot box flow from the air supply port to the full heat exchange membrane specimen at a set speed and direction.

[0015] In one embodiment of the present invention, the temperature adjustment unit includes: a heater device; the heater device is fixedly connected to the cold box and the hot box, and is used to adjust the air temperature in the cold box and the hot box to reach the preset temperature of the cold box and the hot box before the test officially starts.

[0016] In one embodiment of the present invention, the humidity regulating unit includes: an air supply pipe, an air inlet pipe, an exhaust pipe, a humidity regulating air valve, a second humidity recorder and a test kit; the air supply pipe includes a humidity regulating axial flow fan; an air supply pipe interface is provided on the side of the cold box and the hot box, one end of the air supply pipe is fixedly connected to the air supply pipe interface, and the other end is movably connected to the test kit, and the air humidity in the cold box and the hot box is adjusted before the test starts; the air inlet pipe and the exhaust pipe are fixedly connected to the branch pipe of the air supply pipe, and the air inlet pipe and the exhaust pipe are respectively provided with a humidity regulating air valve and a second humidity recorder, the second humidity recorder is used to monitor the air humidity in the test kit, and the air inlet pipe is used to adjust the insertion depth of the test kit according to the data of the second humidity recorder to control the humidification amount or the moisture absorption amount; the humidity regulating air valve is used to make the air of the cold box and the hot box flow between the box body and the test kit before the test starts.

[0017] In one embodiment of the present invention, the test kits are divided into two spaces by a partition, one side is a desiccant test kit, and the other side is a water test kit; the desiccant test kit is movably connected to the intake pipe and the exhaust pipe, and the water test kit is movably connected to the intake pipe and the exhaust pipe.

[0018] In one embodiment of the present invention, the circulating air duct unit includes: a circulating air duct, an air duct flexible joint, an axial flow fan and a circulating air valve; the air supply port and the return air port are connected to the circulating air duct through the air duct flexible joint; the axial flow fan is fixedly arranged in the circulating air duct, and is used to make the air flow from the air supply port to the total heat exchange membrane specimen at a set speed and direction; the circulating air valve is fixedly arranged in the circulating air duct, and is used to control the opening and closing of the circulating air duct.

[0019] In one embodiment of the present invention, the performance testing device of the full heat exchange membrane also includes: an insulation layer, the insulation layer is wrapped around the outside of the cold box and the hot box to prevent the outside from interfering with the temperature inside the box; an insulation plate, the insulation plate can be movably attached to both sides of the full heat exchange membrane clamp; a traction rope is arranged on the insulation plate, and traction rope holes are respectively arranged on the cold box and the hot box, so that when the traction rope passes through the traction rope hole and is subjected to traction force, it leaves the two sides of the full heat exchange membrane clamp, so that the full heat exchange membrane specimen starts heat and moisture transfer.

[0020] On the other hand, the present invention provides a performance testing system for a total heat exchange membrane, the performance testing system for a total heat exchange membrane comprising: a performance testing device for a total heat exchange membrane and a performance evaluation device for a total heat exchange membrane; the performance testing device for a total heat exchange membrane is communicatively connected to the performance evaluation device for a total heat exchange membrane; the performance testing device for a total heat exchange membrane comprises: a cold box and a hot box; a total heat exchange membrane fixture, disposed between the cold box and the hot box, fixedly connected to the cold box and the hot box, and snap-connected to the total heat exchange membrane specimen; a test condition adjustment unit, fixedly connected to the cold box and the hot box, for adjusting the temperature and humidity in the cold box and the hot box; a temperature recorder, fixedly connected to the cold box and the hot box, for recording the temperature in the cold box and the hot box; a first humidity recorder, fixedly connected to the cold box and the hot box, for recording the humidity in the cold box and the hot box; the performance evaluation device for a total heat exchange membrane is used to evaluate the thermal and hygroscopic performance of the total heat exchange membrane specimen.

[0021] As described above, the performance testing device and system of the total heat exchange membrane of the present invention have the following beneficial effects:

[0022] (1) The coupling effect between heat transfer and moisture transfer of materials is taken into account, filling the gap in the coupled test of thermal and moisture performance of total heat exchange membranes; (2) The inventive device takes into account the total heat transfer coefficient of the total heat exchange membrane including convective heat transfer; (3) Compared with the existing method for measuring the thermal conductivity of materials, the inventive device can adapt to the size of the total heat exchange membrane, has a short test time, simple operation and low cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1Shown is a schematic structural diagram of a performance testing device for a total heat exchange membrane according to an embodiment of the present invention.

[0024] Figure 2 Shown is an external front view of a performance testing device for a total heat exchange membrane according to an embodiment of the present invention.

[0025] Figure 3 The figure shows an external top view of a performance testing device for a total heat exchange membrane according to an embodiment of the present invention.

[0026] Figure 4 It is a schematic diagram of the internal box of a performance testing device of a total heat exchange membrane according to an embodiment of the present invention.

[0027] Figure 5 It is a schematic diagram of a fixture of a performance testing device for a total heat exchange membrane according to an embodiment of the present invention.

[0028] Figure 6 It is a schematic diagram of a heat preservation plate in one embodiment of the performance testing device of the total heat exchange membrane of the present invention.

[0029] Figure 7 Shown is a schematic structural diagram of a performance testing system for a full heat exchange membrane according to an embodiment of the present invention.

[0030] Component number description

[0031] Hierarchy Label Name

[0032] 1 Cold Box

[0033] 11 Air outlet

[0034] 12 Return air vent

[0035] 13 Gas pipe interface

[0036] 14 Tow Rope Hole

[0037] 2 Hot Box

[0038] 3 Full heat exchange membrane fixture

[0039] 31 Full heat exchange membrane fixing clip

[0040] 32 Clamp cover

[0041] 4 Test condition adjustment unit

[0042] 41 Temperature Control Unit

[0043] 411 Heater unit

[0044] 42 Humidity Control Unit

[0045] 421 Gas Pipeline

[0046] 422 Intake pipe

[0047] 423 Exhaust pipe

[0048] 424 Humidity Control Damper

[0049] 425 Second Humidity Recorder

[0050] 426 Kit

[0051] 426A Desiccant Kit

[0052] 426B Water Test Kit

[0053] 43 Circulation duct unit

[0054] 431 Circulation Duct

[0055] 432 Duct Soft Connector

[0056] 433 Axial flow fan

[0057] 434 Circulation Air Valve

[0058] 5 Temperature recorder

[0059] 6 The first humidity recorder

[0060] 7 Insulation board

[0061] 71 traction rope

[0062] 8 Full heat exchange membrane test piece DETAILED DESCRIPTION

[0063] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.

[0064] It should be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present invention, and thus the drawings only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout may also be more complicated.

[0065] The present invention provides a heat exchange membrane thermal and humidity performance test device and system, which fills the gap in the performance evaluation of heat exchange membranes in existing domestic and foreign specifications for heat exchangers. The present invention solves the problems that the existing membrane performance test devices cannot adapt to the size of heat exchange membranes, only consider the heat conductivity and humidity transfer performance of the membrane material itself, but ignore the heat and humidity transfer caused by air flow, and cannot perform heat and humidity performance coupling tests, so as to guide the selection of heat exchange membranes in the design and manufacturing process of heat exchangers and the improvement of the production process of heat exchange membranes.

[0066] The following will be combined Figures 1 to 7 The principle and implementation method of a performance testing device and system for a full heat exchange membrane of this embodiment are described in detail so that those skilled in the art can understand the performance testing device and system for a full heat exchange membrane of this embodiment without creative work.

[0067] It should be noted that Figures 2 to 6 If an unnumbered component is symmetrical or similar in position to a component with a known number, the component name and the technical function it plays are the same.

[0068] See also Figure 1 and Figure 2 , respectively showing a schematic diagram of the structure of a performance test device for a full heat exchange membrane of the present invention in one embodiment and an external front view of a performance test device for a full heat exchange membrane of the present invention in one embodiment. Figure 1 and Figure 2 As shown, the performance test device of the full heat exchange membrane provided by the present invention comprises: a cold box 1, a hot box 2, a full heat exchange membrane fixture 3, a test condition adjustment unit 4, a temperature recorder 5, a first humidity recorder 6 and a heat preservation board 7. A full heat exchange membrane specimen 8 is placed in the performance test device of the full heat exchange membrane for performance testing.

[0069] See also Figure 3 , which is a top view of the exterior of a performance test device for a full heat exchange membrane according to an embodiment of the present invention. Figure 3 As shown, in one embodiment, air outlets are respectively arranged on the upper sides of the boxes of the cold box 1 and the hot box 2, and the air outlets include an air supply outlet 11 and a return air outlet 12. The air supply outlet 11 and the return air outlet 12 enable air to flow from the air supply outlet 11 to the full heat exchange membrane specimen at a set speed and direction through the operation of the test condition adjustment unit 4; the air supply outlet 11 is provided with a guide vane, and the guide vane is used to control the direction of air flowing into the cold box and the hot box.

[0070] The outer body of the cold box 1 and the hot box 2 is wrapped with the insulation layer to prevent the outside from interfering with the temperature inside the box. The cold box 1 and the hot box 2 are constructed to have a temperature difference and humidity difference on both sides of the full heat exchange membrane. The front cover of the cold box 1 and the hot box 2 can be opened for device maintenance.

[0071] See also Figure 4 , which is a schematic diagram of the internal box of the performance test device of the full heat exchange membrane of the present invention in one embodiment. The side of the cold box 1 is provided with a gas pipe interface 13 and a traction rope hole 14.

[0072] The total heat exchange membrane fixture 3 is disposed between the cold box 1 and the hot box 2 , is fixedly connected to the cold box 1 and the hot box 2 , and is snap-connected to the total heat exchange membrane specimen 8 .

[0073] See also Figure 5 , which is a schematic diagram of a fixture of a full heat exchange membrane performance test device used in the present invention in one embodiment. Figure 5 As shown, in one embodiment, the full heat exchange membrane fixture 3 is provided with specimen slits around it for inserting the full heat exchange membrane specimen, fixing the full heat exchange membrane specimen 8 so that it is connected to the test box to facilitate heat and moisture transfer in the box.

[0074] The full heat exchange membrane fixture 3 is provided with a full heat exchange membrane fixing clamp 31 for fixing the full heat exchange membrane specimen. The fixture cover 32 on the full heat exchange membrane fixture 3 can be opened to facilitate sample installation and fixture inspection and replacement.

[0075] The test condition adjustment unit 4 is fixedly connected to the cold box 1 and the hot box 2 and is used to adjust the temperature and humidity in the cold box 1 and the hot box 2 .

[0076] Please continue reading Figure 1 ,like Figure 1 As shown, the test condition adjustment unit 4 includes a temperature adjustment unit 41 , a humidity adjustment unit 42 and a circulating air duct unit 43 .

[0077] One of the temperature regulating units 41 is fixedly connected to the cold box 1 and is used to adjust the temperature of the cold box 1 before the test officially starts; the other temperature regulating unit 41 is fixedly connected to the hot box 2 and is used to adjust the temperature of the hot box 2 before the test officially starts.

[0078] Specifically, the temperature adjustment unit 41 includes: a heater device 411; the heater device 411 is fixedly connected to the cold box and the hot box, and is used to adjust the air temperature in the cold box 1 and the hot box 2 to reach the preset temperature of the cold box 1 and the hot box 2 before the test officially starts. The heater device 411 is arranged in both the cold box 1 and the hot box 2.

[0079] One humidity regulating unit 42 is fixedly connected to the cold box 1 and is used to adjust the humidity of the cold box 1 before the test officially starts; the other humidity regulating unit 42 is fixedly connected to the hot box 2 and is used to adjust the humidity of the hot box 2 before the test officially starts.

[0080] See also Figure 2 and Figure 3 Specifically, the humidity adjustment unit 42 includes: an air supply pipe 421, an air inlet pipe 422, an air outlet pipe 423, a humidity adjustment air valve 424, a second humidity recorder 425 and a reagent kit 426. The air supply pipe 421 includes a humidity adjustment axial flow fan.

[0081] The side of the cold box 1 is provided with an air supply pipe interface 13, and the hot box 2 is provided in the same manner. One end of the air supply pipe 421 is fixedly connected to the air supply pipe interface 13, and the other end is movably connected to the reagent box 426. Before the test begins, the air humidity in the cold box 1 and the hot box 2 is adjusted so that the air in the cold box 1 and the hot box 2 reaches the initial humidity requirement of the test.

[0082] The air inlet pipe 422 and the exhaust pipe 423 are fixedly connected to the branch pipe of the air supply pipe 421, and the air inlet pipe 422 and the exhaust pipe 423 are respectively provided with a humidity regulating air valve 424 and a second humidity recorder 425. The second humidity recorder 425 is used to monitor the change of air humidity in the test kit 426 before the test starts. The air inlet pipe 422 is used to adjust the insertion depth of the test kit 426 according to the data of the second humidity recorder 425 to control the humidification amount or moisture absorption amount; the humidity regulating air valve 424 is used to make the air of the cold box 1 and the hot box 2 flow between the box body and the test kit 426 before the test starts.

[0083] It should be noted that when the second humidity recorder 425 and the temperature recorder are integrated measuring instruments, they are used to monitor the changes in air temperature and humidity in the test kit 426 before the test begins.

[0084] Please continue reading Figure 1 ,like Figure 1 As shown, the reagent box 426 is divided into two spaces by a partition, one side is a desiccant reagent box 426A, and the other side is a water reagent box 426B; the desiccant reagent box 426A is movably connected to the air inlet pipe 422 and the exhaust pipe 423, and the water reagent box 426B is movably connected to the air inlet pipe 422 and the exhaust pipe 423. Before the test starts, the humidity regulating air valve 424 installed in the air supply pipe 421 is opened, and the air in the cold box 1 and the hot box 2 enters the reagent box 426 respectively through the axial flow fan in the air supply pipe 421 to flow the air. When the air humidity in the cold box 1 and the hot box 2 meets the requirements, the humidity regulating air valve 424 in the air supply pipe 421 is closed. The depth of the air inlet pipe 422 inserted into the desiccant reagent box 426A or the water reagent box 426B can be adjusted according to the air temperature and humidity to control the humidification amount or moisture absorption amount.

[0085] One of the circulating air duct units 43 is fixedly connected to the cold box 1, and is used to flow the air of the cold box 1 from the air supply port to the full heat exchange membrane specimen 8 at a set speed and direction; the other circulating air duct unit 43 is fixedly connected to the hot box 2, and is used to flow the air of the hot box 2 from the air supply port to the full heat exchange membrane specimen 8 at a set speed and direction.

[0086] Please continue reading Figure 1 ,like Figure 1 As shown, the circulating air duct unit 43 includes: a circulating air duct 431, an air duct flexible connection 432, an axial flow fan 433 and a circulating air valve 434. The circulating air duct 431 and the air delivery pipe 421 are both called connecting air ducts.

[0087] The air supply port 11 and the return air port 12 are connected to the circulating air duct 431 via the duct flexible joint 432; the axial flow fan 433 is fixedly disposed in the circulating air duct 431, and is used to make the air flow from the air supply port to the full heat exchange membrane specimen 8 at a set speed and direction, so as to realize the circulation of the air in the cold box 1 and the hot box 2; the circulating air valve 434 is fixedly disposed in the circulating air duct 431, and is used to control the opening and closing of the circulating air duct 431.

[0088] The outer side of the circulating air duct is also provided with a heat-insulating layer to prevent the external environment from affecting the internal temperature of the box when the air flows in the circulating air duct 431 .

[0089] The temperature recorder 5 is fixedly connected to the cold box 1 and the hot box 2 and is used to record the temperature inside the cold box 1 and the hot box 2 .

[0090] The first humidity recorder 6 is fixedly connected to the cold box 1 and the hot box 2 and is used to record the humidity in the cold box 1 and the hot box 2 .

[0091] It should be noted that the temperature and humidity test in the box uses an instrument that measures temperature and humidity in one piece, which is described separately in the figure for easy distinction. For easy distinction, the humidity recorders in the cold box and the hot box are called the first humidity recorders, and the humidity recorder in the humidity adjustment unit is called the second humidity recorder.

[0092] See also Figure 2 and Figure 6 The insulation board 7 can be movably attached to both sides of the full heat exchange membrane clamp 3. Before the test officially starts, it is placed on both sides of the full heat exchange membrane fixture 3 to maintain the air temperature of the cold box 1 and the hot box 2 at the initial required temperature. The insulation board 7 is provided with a traction rope 71, and the cold box 1 is provided with a traction rope hole 14. The hot box 2 is similarly provided so that when the traction rope 71 passes through the traction rope hole 13 and is subjected to traction, it leaves both sides of the full heat exchange membrane fixture 3, so that the full heat exchange membrane test piece 8 starts heat and moisture transfer.

[0093] Specifically, a heat preservation plate 7 is placed inside the cold box 1 and the hot box 2. Before the test starts, the heat preservation plate 7 is placed close to both sides of the full heat exchange membrane fixture 3 to perform initial condition heat preservation control on the cold box 1 and the hot box 2. When the test starts, the traction rope 71 fixed on the heat preservation plate 7 is pulled outside the box body of the cold box 1 and the hot box 2 to make them fall.

[0094] See also Figure 7 , which is a schematic diagram of the structure of a performance test system for a full heat exchange membrane according to an embodiment of the present invention. Figure 7 As shown, the performance testing system of the total heat exchange membrane provided by the present invention comprises: a performance testing device A of the total heat exchange membrane and a performance evaluation device B of the total heat exchange membrane.

[0095] The performance testing device A of the total heat exchange membrane is communicatively connected with the performance evaluation equipment B of the total heat exchange membrane.

[0096] Specifically, the temperature and humidity data recorded in the performance testing device A of the total heat exchange membrane are uploaded to the performance evaluation device B of the total heat exchange membrane via a USB data cable.

[0097] The performance testing device A for the total heat exchange membrane comprises: a cold box and a hot box; a total heat exchange membrane fixture, which is arranged between the cold box and the hot box, fixedly connected to the cold box and the hot box, and snap-connected to the total heat exchange membrane specimen; a test condition adjustment unit, which is fixedly connected to the cold box and the hot box and is used to adjust the temperature and humidity in the cold box and the hot box; a temperature recorder, which is fixedly connected to the cold box and the hot box and is used to record the temperature in the cold box and the hot box; a first humidity recorder, which is fixedly connected to the cold box and the hot box and is used to record the humidity in the cold box and the hot box.

[0098] The total heat exchange membrane performance evaluation equipment B is used to evaluate the thermal and hygroscopic performance of the total heat exchange membrane specimen.

[0099] In this embodiment, the performance evaluation device B of the full heat exchange membrane includes: a processor, a memory, a transceiver, a communication interface and / or a system bus; the memory and the communication interface are connected to the processor and the transceiver through the system bus and complete communication with each other, the memory is used to store computer programs, the communication interface is used to communicate with other devices, and the processor and the transceiver are used to run computer programs, so that the performance evaluation device of the full heat exchange membrane can perform performance tests on the full heat exchange membrane specimens.

[0100] The system bus mentioned above can be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. The system bus can be divided into an address bus, a data bus, a control bus, etc. The communication interface is used to realize the communication between the database access device and other devices (such as clients, read-write libraries, and read-only libraries). The memory may include a random access memory (RAM), and may also include a non-volatile memory, such as at least one disk storage.

[0101] The above-mentioned processor can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components.

[0102] In summary, the performance test device and system of the total heat exchange membrane described in the present invention fills the gap in the performance evaluation of the total heat exchange membrane in the existing relevant specifications of the total heat exchanger at home and abroad. It solves the problem that the existing membrane performance test device cannot adapt to the size of the total heat exchange membrane, only considers the heat conductivity and moisture transfer performance of the membrane material itself, but ignores the heat transfer and moisture transfer caused by air flow, and cannot perform heat and moisture performance coupling test, so as to guide the selection of total heat exchange membranes in the design and manufacturing process of total heat exchangers and the improvement of the total heat exchange membrane production process. Considering the coupling effect between material heat transfer and moisture transfer, it fills the gap in the thermal and moisture performance coupling test of the total heat exchange membrane; the inventive device considers the total heat transfer coefficient of the total heat exchange membrane including convective heat transfer; compared with the existing method of measuring the thermal conductivity of materials, the inventive device can adapt to the size of the total heat exchange membrane, the test time is short, the operation is simple, and the cost is low. The present invention effectively overcomes the various shortcomings in the prior art and has a high industrial utilization value.

[0103] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A performance testing device for a full heat exchange membrane, characterized in that: The full heat exchange membrane specimen is placed in the full heat exchange membrane performance test device for performance testing, and the full heat exchange membrane performance test device comprises: cold box and hot box; The full heat exchange membrane fixture is arranged between the cold box and the hot box, fixedly connected to the cold box and the hot box, and connected with the full heat exchange membrane specimen by clamping; when the fixture cover on the full heat exchange membrane fixture is opened, it is convenient to install the sample and inspect and replace the fixture; the full heat exchange membrane fixture is provided with specimen slits around it for inserting the full heat exchange membrane specimen; the full heat exchange membrane fixture is provided with a full heat exchange membrane fixing clamp for fixing the full heat exchange membrane specimen; A test condition adjustment unit, fixedly connected to the cold box and the hot box, for adjusting the temperature and humidity in the cold box and the hot box; A temperature recorder, fixedly connected to the cold box and the hot box, for recording the temperature inside the cold box and the hot box; A first humidity recorder, fixedly connected to the cold box and the hot box, for recording the humidity in the cold box and the hot box; Insulation layer, the outer part of the cold box and the hot box is wrapped with the insulation layer to prevent the outside from interfering with the temperature inside the box; The insulation plate can be movably attached to both sides of the total heat exchange membrane fixture; a traction rope is arranged on the insulation plate, and traction rope holes are respectively arranged on the cold box and the hot box, so that when the traction rope passes through the traction rope holes and is subjected to traction force, it leaves both sides of the total heat exchange membrane fixture, so that the total heat exchange membrane specimen starts heat and moisture transfer.

2. The performance testing device of the total heat exchange membrane according to claim 1, characterized in that: An air supply port and an air return port are respectively arranged on the upper side of the cold box and the hot box, and the air supply port and the air return port are operated by the test condition adjustment unit so that air flows from the air supply port to the full heat exchange membrane test piece at a set speed and direction; The air supply port is provided with a guide plate, and the guide plate is used to control the direction of air flowing into the cold box and the hot box.

3. The performance testing device of the total heat exchange membrane according to claim 2 is characterized in that: The test condition adjustment unit includes a temperature adjustment unit, a humidity adjustment unit and a circulating air duct unit; One of the temperature adjustment units is fixedly connected to the cold box and is used to adjust the temperature of the cold box before the test officially starts; the other temperature adjustment unit is fixedly connected to the hot box and is used to adjust the temperature of the hot box before the test officially starts; One of the humidity adjustment units is fixedly connected to the cold box and is used to adjust the humidity of the cold box before the test officially starts; the other humidity adjustment unit is fixedly connected to the hot box and is used to adjust the humidity of the hot box before the test officially starts; The circulating air duct unit is fixedly connected to the cold box and is used to flow the air of the cold box from the air supply port to the total heat exchange membrane specimen at a set speed and direction; The other circulating air duct unit is fixedly connected to the heat box and is used to flow the air of the heat box from the air supply port to the total heat exchange membrane specimen at a set speed and direction.

4. The performance testing device for the total heat exchange membrane according to claim 3 is characterized in that: The temperature adjustment unit includes: a heater device; The heater device is fixedly connected to the cold box and the hot box, and is used to adjust the air temperature in the cold box and the hot box to reach the preset temperature of the cold box and the hot box before the test officially starts.

5. The performance testing device for the total heat exchange membrane according to claim 3 is characterized in that: The humidity adjustment unit comprises: an air delivery pipe, an air inlet pipe, an air outlet pipe, a humidity adjustment air valve, a second humidity recorder and a test kit; the air delivery pipe comprises a humidity adjustment axial flow fan; The cold box and the hot box are provided with gas pipe interfaces on their sides, one end of the gas pipe is fixedly connected to the gas pipe interface, and the other end is movably connected to the test kit. Before the test begins, the air humidity in the cold box and the hot box is adjusted; The air inlet pipe and the exhaust pipe are fixedly connected to the branch pipe of the air supply pipe, and are respectively provided with a humidity regulating air valve and a second humidity recorder. The second humidity recorder is used to monitor the air humidity in the test kit, and the air inlet pipe is used to adjust the insertion depth of the test kit according to the data of the second humidity recorder to control the humidification amount or moisture absorption amount; the humidity regulating air valve is used to allow the air of the cold box and the hot box to flow between the box body and the test kit before the test starts.

6. The performance testing device for the total heat exchange membrane according to claim 5, characterized in that: The test kits are divided into two spaces by a partition, one side is a desiccant test kit, and the other side is a water test kit; the desiccant test kit is movably connected to the air intake pipe and the exhaust pipe, and the water test kit is movably connected to the air intake pipe and the exhaust pipe.

7. The performance testing device for the total heat exchange membrane according to claim 3 is characterized in that: The circulating air duct unit comprises: a circulating air duct, an air duct flexible connection, an axial flow fan and a circulating air valve; The air supply port and the air return port are connected to the circulating air duct via the air duct flexible connection; The axial flow fan is fixedly arranged in the circulating air duct, and is used to make the air flow from the air supply port to the total heat exchange membrane specimen at a set speed and direction; The circulating air valve is fixedly arranged in the circulating air duct and is used to control the opening and closing of the circulating air duct.

8. A performance testing system for a full heat exchange membrane, characterized in that: The performance test system of the total heat exchange membrane comprises: a performance test device of the total heat exchange membrane and a performance evaluation device of the total heat exchange membrane; The performance testing device of the total heat exchange membrane is communicatively connected with the performance evaluation equipment of the total heat exchange membrane; The performance test device of the full heat exchange membrane comprises: a cold box and a hot box; a full heat exchange membrane fixture, which is arranged between the cold box and the hot box, fixedly connected to the cold box and the hot box, and connected with the full heat exchange membrane specimen by snapping; when the fixture cover on the full heat exchange membrane fixture is opened, it is convenient to install the sample and inspect and replace the fixture; the full heat exchange membrane fixture is provided with specimen slits around it for inserting the full heat exchange membrane specimen; the full heat exchange membrane fixture is provided with a full heat exchange membrane fixing clamp for fixing the full heat exchange membrane specimen; a test condition adjustment unit, which is fixedly connected to the cold box and the hot box, and is used to adjust the temperature and humidity in the cold box and the hot box; a temperature recorder An instrument, fixedly connected to the cold box and the hot box, for recording the temperature in the cold box and the hot box; a first humidity recorder, fixedly connected to the cold box and the hot box, for recording the humidity in the cold box and the hot box; a thermal insulation layer, the thermal insulation layer is wrapped around the outside of the box body of the cold box and the hot box to prevent the outside from interfering with the temperature inside the box body; a thermal insulation board, the thermal insulation board can be movably attached to both sides of the full heat exchange membrane fixture; a traction rope is arranged on the thermal insulation board, and traction rope holes are respectively arranged on the cold box and the hot box, so that when the traction rope passes through the traction rope hole and is subjected to traction, it leaves both sides of the full heat exchange membrane fixture, so that the full heat exchange membrane specimen starts heat and moisture transfer; The performance evaluation equipment of the total heat exchange membrane is used to evaluate the thermal and hygroscopic performance of the total heat exchange membrane specimen.