A construction template and method for a cast-in-place pile single-sided tall concrete hanging board wall

By removing the external support system and using hook-head bolts to fix the structure, the long installation and disassembly cycle of the formwork and the appearance quality problems during the construction of bored piles are solved, and the material cost and construction efficiency are improved, as well as the recycling of bolts.

CN111502245BActive Publication Date: 2024-10-18GEZHOUBA GROUP FOUND ENG
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202010373550.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-06
Publication Date
2024-10-18
Estimated Expiration
2040-05-06

AI Technical Summary

Technical Problem

During the whole warehouse pouring process of bored pile concrete hanging wall straight walls and crown beams, the installation and disassembly period of the existing formwork is long, the external support system increases the construction cost and complexity, and the high-strength bolts penetrate the steel formwork, affecting the appearance quality.

Method used

Use one-sided tall concrete hanging board wall construction formwork to remove the external support system. Fix the structure with hook bolts and pull bolts of the straight wall formwork and cast-in-place piles to avoid bolts from penetrating the formwork. Plastic sleeves and blocking blocks are used to improve the formwork. of fixation and reusability.

Benefits of technology

It reduces the material cost of concrete pier walls and struts, simplifies the installation and disassembly process, improves construction efficiency and appearance quality, and realizes the recycling of tension bolts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111502245B_ABST
    Figure CN111502245B_ABST
Patent Text Reader

Abstract

The present invention provides a cast-in-place pile single-sided tall concrete hanging wall construction template and method, which comprises a plurality of groups of vertically arranged vertical wall templates, a plurality of vertically evenly distributed vertical wall template vertical ribs are fixed to the back of the vertical wall template, and vertical rib side back bars arranged vertically therewith are respectively arranged at different heights on the back of the vertical ribs of the vertical wall template; the vertical wall template is arranged on the side where the vertical wall panel to be cast is located, and a cast-in-place pile side back bar is arranged on the upper part of the other side of the cast-in-place pile, and the vertical rib side back bar and the cast-in-place pile side back bar are connected by tension bolts on the upper part of the straight wall template; the vertical rib side back bar and the lower part of the cast-in-place pile are fixedly connected by hook bolts; the top of the straight wall template and the cast-in-place pile are butt-jointed with a crown beam template system for casting a crown beam. The cost of concrete pier wall and support rod materials is reduced, the cumbersome installation and disassembly process of external support is eliminated, and the template construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a single-side tall combined formwork construction method, in particular to a construction method of a concrete bored cast-in-place pile hanging plate wall, a straight wall and a crown beam formwork, and belongs to the technical field of cast-in-place pile construction. Background Art

[0002] In engineering applications, the length of bored cast-in-place concrete hanging wall, vertical wall and crown beam can reach more than 20 meters. The overall installation and disassembly cycle of the combined steel formwork is long. At the same time, the vertical wall and crown beam have high requirements for appearance quality. Figure 1 As shown, the formwork 1 will deform due to the stress during the pouring process. Generally, a support system will be set up to reduce the deformation. The setting of the support rod 2 will greatly increase the difficulty of installing and disassembling the formwork, increase the construction period and cost, and the concrete pier wall 3 of the support system will also greatly increase the construction cost of the hanging wall. Usually, high-strength bolts are preset at the bottom of the hanging wall, and tension bolts are arranged on the upper part. The high-strength bolts and tension bolts will pass through the steel formwork. Because the bored pile construction specification allows the bored pile to have a hole position deviation, the pile position of the bored pile is not fixed, and the high-strength bolts and tension bolts need to leave multiple holes on the steel formwork, which will have a great impact on the appearance quality of the hanging wall after pouring. Therefore, improving the formwork construction method to optimize the formwork fixing system and make it unnecessary for the tension bolts to pass through the steel formwork are of great significance to the construction cost and quality management of the hanging wall. Summary of the invention

[0003] The purpose of the present invention is to provide a cast-in-place pile single-sided tall concrete hanging board wall construction template and method to address the above-mentioned defects. The improved template of the present invention removes the external support system, reduces the material cost of concrete pier walls and support rods, gets rid of the cumbersome installation and disassembly process of external supports, improves the template construction efficiency, and the bolts do not need to pass through steel molds, the bolts can be recycled, and the casting appearance quality is good.

[0004] In order to realize the above-mentioned technical features, the purpose of the present invention is achieved as follows: a cast-in-place pile single-sided tall concrete hanging board wall construction formwork, which includes a plurality of groups of vertically arranged straight wall formworks, a plurality of vertically evenly distributed straight wall formwork vertical ribs are fixed to the back of the straight wall formwork, and the backs of the vertical ribs of the straight wall formwork are respectively provided with vertical rib side back bars arranged vertically therewith at different heights; the straight wall formwork is arranged on the side where the straight wall panel to be cast is located, and a cast-in-place pile side back bar is arranged on the upper part of the other side of the cast-in-place pile, and the vertical rib side back bar and the cast-in-place pile side back bar are connected to each other by tension bolts on the upper part of the straight wall formwork; the vertical rib side back bar and the lower part of the cast-in-place pile are fixedly connected by hook bolts; the straight wall formwork and the top of the cast-in-place pile are butt-jointed with a crown beam formwork system for casting a crown beam.

[0005] The upper tension bolts of the straight wall formwork are covered with plastic sleeves in the section where the cast-in-place piles and the straight wall panels are located. The straight wall formwork is processed with a formwork opening at a position that cooperates with the upper tension bolts of the straight wall formwork. Block fixing plates are symmetrically fixed at the position of the formwork opening. Block fixing plates for sealing the formwork openings are fixed between the blocking block fixing plates by screw washers and screws. The blocking blocks are processed with through holes for passing the upper tension bolts of the straight wall formwork.

[0006] The hook end of the hook bolt is hooked on the main reinforcement of the steel cage at the bottom of the straight wall section of the cast-in-place pile, and the other end of the hook bolt passes through the precast guide wall and is connected to the tail pull rod at its end position through a connecting nut. The tail pull rod is fixedly connected to the vertical rib side back bar through a screw gasket and a locking nut.

[0007] The two ends of the tension bolts on the upper part of the straight wall formwork are fixedly connected to the vertical rib side bars and the cast-in-place pile side bars through screw washers and locking nuts respectively. The bottom end of the vertical rib side bars is supported on the top of the wooden pad. The bottom end of the vertical rib side bars is higher than the straight wall formwork by a certain height, and it is ensured that the hook head bolts do not contact the straight wall formwork.

[0008] The cast-in-place pile side back bars and vertical rib side back bars are both welded and assembled with two parallel arranged square steel materials, and a spacing is left between the two, so that the tension bolts and hook bolts on the upper part of the straight wall formwork can be horizontally moved and adjusted along the spacing.

[0009] The blocking block and the blocking block fixing plate are tightly bonded and adhered by means of sealant; two adjacent straight wall formworks are fixedly connected by side ribs arranged on their matching end surfaces and side rib bolts and bolt washers.

[0010] The crown beam formwork system includes a crown beam front formwork arranged on the outside of the crown beam to be cast, a plurality of vertically arranged crown beam front formwork vertical ribs are arranged on the outside of the crown beam front formwork, vertical rib side back bars are arranged on the outside of the vertical ribs of the crown beam front formwork, the vertical rib side back bars and the cast-in-place pile side back bars are fixedly connected by tension bolts at the bottom of the crown beam formwork, a crown beam rear formwork is arranged on the inside of the crown beam, and the crown beam rear formwork is tensioned and connected to the vertical plate fixed on the top of the crown beam front formwork by tension bolts at the top of the crown beam formwork.

[0011] A plurality of supporting rods of different lengths are fixed between the elliptical arc segment of the crown beam front template steel plate and the vertical ribs of the crown beam front template;

[0012] The positions of the tension bolts at the bottom of the crown beam formwork and the tension bolts at the top of the straight wall formwork are kept in the same position;

[0013] The two end positions of the tension bolts at the bottom of the crown beam template and the tension bolts at the top of the crown beam template are locked and limited by screw washers respectively;

[0014] A template opening is processed at a position where the tension bolts of the front template of the crown beam and the lower part of the crown beam template cooperate.

[0015] The method for wall construction using a cast-in-place pile single-side high concrete hanging board wall construction template comprises the following steps:

[0016] Step 1, preparation stage: prepare the vertical wall formwork for the hanging wall and the crown beam formwork system. When making the vertical wall formwork, set the formwork opening at the upper part of the cast-in-place pile between the piles;

[0017] Step 2, installation stage of the vertical wall formwork: welding the vertical wall formwork to the vertical ribs of the vertical wall formwork;

[0018] The protective concrete at the bottom of the cast-in-place pile straight wall section is peeled off to expose the main reinforcement of the cast-in-place pile. According to the designed elevation, the main reinforcement of the cast-in-place pile is hooked with hook bolts. The precast guide wall is first cast to fix the hook bolts and close the main reinforcement of the cast-in-place pile to form a protective layer. The hook bolts do not need to pass through the formwork;

[0019] Drill holes between the upper piles of the cast-in-place piles to allow the upper tension bolts of the straight wall formwork and the outer plastic sleeve to pass through, set up the side back bars of the cast-in-place piles behind the multiple cast-in-place piles, and use the upper tension bolts of the straight wall formwork to pull the side back bars of the vertical ribs and the side back bars of the cast-in-place piles together;

[0020] The end of the hook bolt is connected to the tail tie rod through a connecting nut, and the tail tie rod is fixedly connected to the lower vertical rib side back bar, thereby completing the fixation of the entire vertical wall formwork;

[0021] Step 3, pouring construction phase of the vertical wall panel: stick the contacting sides of the vertical wall formwork with double-sided tape, then align the adjacent formwork side rib drilling holes, use side rib bolts to pass through the side rib drilling holes to fasten the adjacent vertical wall formwork, and pour and maintain the vertical wall panel concrete in accordance with the specification requirements;

[0022] Step 4, dismantling of the vertical wall formwork: after the strength of the poured concrete of the vertical wall panel reaches the standard, the vertical wall formwork is dismantled. When dismantling the vertical wall formwork, all the tension bolts on the upper part of the vertical wall formwork are dismantled, and the uncast part of the hook bolt is dismantled;

[0023] Step 5, installation stage of the crown beam formwork system: install the crown beam front formwork after removing the vertical wall formwork, set the crown beam front formwork vertical ribs on the outer wall of the crown beam front formwork, use the crown beam formwork lower tension bolts to lay out the original position of the straight wall formwork upper tension bolts, and connect the vertical rib side back bars on the outer side of the crown beam front formwork vertical ribs with the cast-in-place pile side back bars;

[0024] The tops of the crown beam rear template and the crown beam front template are connected by tension bolts on the upper part of the crown beam template; support rods are arranged between the elliptical arc section of the crown beam front template steel plate and the vertical ribs of the crown beam front template for support and fixation;

[0025] Step six: cast and maintain the crown beam. After the cast concrete strength reaches the standard, dismantle the crown beam formwork system.

[0026] A method for constructing a wall using a cast-in-place pile single-sided tall concrete hanging board wall construction formwork. In the step 2, threaded holes are drilled on a blocking block installed on the template opening of the straight wall template according to the actual location of the tension bolts on the upper part of the straight wall template on site, and a colloid is used to tightly bond the blocking block to the blocking block fixing plate.

[0027] The present invention has the following beneficial effects:

[0028] 1. The improved formwork of the present invention removes the existing external support systems such as the existing struts and concrete pier walls, reduces the material costs of the concrete pier walls and struts, gets rid of the cumbersome installation and disassembly process of the external support, and improves the efficiency of formwork construction.

[0029] 2. All the tension bolts of the present invention do not pass through the template, which greatly prolongs the service life of the template. The blocking blocks added to the template are square wood, which has low cost and is easy to fix holes and replace.

[0030] 3. The external support system is removed, the cost of concrete pier walls and support rods is reduced, the cumbersome installation and disassembly process of external supports is eliminated, and the efficiency of formwork construction is improved.

[0031] 4. After the improvement, the appearance quality of casting using the template of the present invention is significantly improved.

[0032] 5. All tension bolts can be recycled, and some parts of hook bolts can be recycled to save materials. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0034] Figure 1 It is a schematic diagram of the straight wall formwork support system in the background technology.

[0035] Figure 2 It is a side view of the straight wall formwork in the present invention.

[0036] Figure 3 For the present invention Figure 2 Partial enlargement of the connection between the middle tension bolt and the vertical wall formwork and the K direction view.

[0037] Figure 4 For the present invention Figure 2 Partial enlargement of the connection II between the middle hook head bolt and the straight wall formwork and the view in the P direction.

[0038] Figure 5 For the present invention Figure 2 Middle AA section view.

[0039] Figure 6 For the present invention Figure 2 Middle BB section view.

[0040] Figure 7 It is a front view of the straight wall formwork in the present invention.

[0041] Figure 8 It is a side view of the crown beam formwork system in the present invention.

[0042] Fig. 9 It is a front view of the crown beam formwork system in the present invention.

[0043] Fig.10 It is the rear view of the crown beam formwork system in the present invention.

[0044] In the figure: 1-formwork; 2-support rod; 3-concrete pier wall; 4-cast-in-place pile; 5-precast guide wall; 6-vertical wall panel; 7-crown beam; 8-vertical wall formwork; 9-vertical wall formwork vertical rib; 10-crown beam front formwork; 11-crown beam front formwork vertical rib; 12-crown beam rear formwork; 13-hook bolt; 14-upper tension bolt of the vertical wall formwork; 15-lower tension bolt of the crown beam formwork; 16-upper tension bolt of the crown beam formwork; 1 7-screw gasket; 18-cast-in-place pile side back bar; 19-vertical rib side back bar; 20-connecting nut; 21-plastic sleeve; 22-block; 23-wooden block; 24-screw; 25-screw gasket; 26-block fixing plate; 27-threaded drilling hole; 28-side rib; 29-side rib bolt; 30-bolt gasket; 31-support rod; 32-template opening; 33-cast-in-place pile main reinforcement; 34-tail pull rod. DETAILED DESCRIPTION

[0045] The embodiments of the present invention are further described below in conjunction with the accompanying drawings.

[0046] Embodiment 1:

[0047] See also Figure 1-10A construction formwork for a single-sided tall concrete hanging wall of a cast-in-place pile, comprising a plurality of groups of vertically arranged straight wall formworks 8, a plurality of vertically evenly distributed straight wall formwork vertical ribs 9 are fixed to the back of the straight wall formwork 8, and vertical rib side back bars 19 arranged vertically therewith are respectively arranged at different heights on the back of the straight wall formwork vertical ribs 9; the straight wall formwork 8 is arranged on the side where the straight wall panel 6 to be cast is located, and a cast-in-place pile side back bar 18 is arranged on the upper part of the other side of the cast-in-place pile 4, and the vertical rib side back bar 19 and the cast-in-place pile side back bar 18 are connected to each other by tension bolts 14 on the upper part of the straight wall formwork; the vertical rib side back bar 19 and the lower part of the cast-in-place pile 4 are fixedly connected by hook bolts 13; the straight wall formwork 8 and the top of the cast-in-place pile 4 are butt-jointed with a crown beam formwork system for casting a crown beam 7. By adopting the construction formwork of the above structure, it can be used for pouring concrete of the straight wall panel 6, and during the pouring process, by adopting the tension fixing method between the hook head bolts 13 and the tension bolts 14 on the upper part of the straight wall formwork, the effective support and fixation of the straight wall formwork 8 is guaranteed, replacing the traditional external support system, thereby greatly simplifying the construction process and improving work efficiency.

[0048] Furthermore, the upper tension bolts 14 of the straight wall formwork are sleeved with plastic sleeves 21 at the section where the cast-in-place piles 4 and the straight wall panels 6 are located. The straight wall formwork 8 is processed with a formwork opening 32 at the position matching with the upper tension bolts 14 of the straight wall formwork. The blocking block fixing plates 26 are symmetrically fixed at the position of the formwork opening 32. The blocking block fixing plates 26 are fixedly installed with the blocking blocks 22 for blocking the formwork opening 32 through the screw washers 25 and the screws 24. The blocking blocks 22 are processed with through holes 27 for passing the upper tension bolts 14 of the straight wall formwork. The above-mentioned formwork openings 32 avoid drilling the straight wall formwork 8, thereby enabling the straight wall formwork 8 to be reused and extending its service life. In addition, the plastic sleeves 21 ensure that the upper tension bolts 14 of the straight wall formwork can be easily removed after the pouring is completed for reuse.

[0049] Furthermore, the hook end of the hook bolt 13 is hooked on the main reinforcement 33 of the steel cage at the bottom of the straight wall section of the cast-in-place pile 4, and the other end of the hook bolt 13 passes through the precast guide wall 5, and is connected to a tail tie rod 34 at its end position through a connecting nut 20. The tail tie rod 34 is fixedly connected to the vertical rib side back bar 19 through a screw gasket 17 and a locking nut. The hook bolt 13 can be used to fix the bottom of the straight wall formwork 8, wherein the hook bolt 13 hooks the main reinforcement of the steel cage closest to the formwork, and before the formwork is installed, the concrete at the bottom of the straight wall section of the cast-in-place pile 4 is first stripped to expose the main reinforcement of the steel cage 33, and the hook bolt 13 is used to hook the main reinforcement of the steel cage 33, and the middle of the hook bolt is connected by a connecting nut 20, and the precast guide wall 5 is first used to close and fix the exposed main reinforcement of the steel cage 33 and the hook bolt 13 of the cast-in-place pile 4, and the straight wall formwork 8 is arranged above the hook bolt 13, and the vertical ribs 9 of the straight wall formwork are welded to fix the straight wall formwork 8, and the pads 23 are arranged below the vertical ribs 9 of the straight wall formwork, and the hook bolt 13 passes through the interval section of the vertical ribs 9 of the straight wall formwork, and the hook bolt 13 is bolted to the side back bars 19 of the vertical ribs through the bolt gasket 17, and the side back bars 19 of the vertical ribs are vertically welded and fixed on the vertical ribs 9 of the straight wall formwork,

[0050] Furthermore, the two ends of the tension bolts 14 on the upper part of the straight wall formwork are fixedly connected to the vertical rib side back bars 19 and the cast-in-place pile side back bars 18 through screw washers 17 and locking nuts respectively. The bottom ends of the vertical rib side back bars 19 are supported on the top of the wooden pads 23. The bottom ends of the vertical rib side back bars 19 are longer than the straight wall formwork 8 by a certain height, and ensure that the hook head bolts 13 do not contact the straight wall formwork 8.

[0051] Furthermore, the cast-in-place pile side back bars 18 and the vertical rib side back bars 19 are both welded and assembled using two parallel square steel materials, and a spacing is left between the two, so that the upper tension bolts 14 and the hook bolts 13 of the straight wall formwork can be horizontally moved and adjusted along the spacing. The cast-in-place pile side back bars 18 and the vertical rib side back bars 19 can fix the entire straight wall formwork 8 as a whole, thereby forming the entire panel support system, ensuring the surface quality of the straight wall panel 6.

[0052] Furthermore, the blocking block 22 and the blocking block fixing plate 26 are tightly bonded and adhered by sealant; the two adjacent straight wall templates 8 are fixedly connected by the side ribs 28, side rib bolts 29 and bolt washers 30 arranged on the mating end faces thereof. The template opening 32 is blocked by the blocking block 22 using the wood block, thereby avoiding the need for drilling holes in the straight wall template 8 and extending its service life.

[0053] Furthermore, the crown beam formwork system includes a crown beam front formwork 10 arranged on the outside of the crown beam 7 to be cast, and a plurality of vertically arranged crown beam front formwork vertical ribs 11 are arranged on the outside of the crown beam front formwork vertical ribs 11, and vertical rib side back bars 19 are arranged on the outside of the crown beam front formwork vertical ribs 11, and the vertical rib side back bars 19 and the cast-in-place pile side back bars 18 are fixedly connected by the lower tension bolts 15 of the crown beam formwork, and a crown beam rear formwork 12 is arranged on the inner side of the crown beam 7, and the crown beam rear formwork 12 is tensionedly connected to the vertical plate fixed on the top of the crown beam front formwork 10 by the upper tension bolts 16 of the crown beam formwork.

[0054] Furthermore, a plurality of support rods 31 of different lengths are fixed between the elliptical arc segment of the crown beam front template steel plate 10 and the crown beam front template vertical ribs 11; the positions of the crown beam template lower tension bolts 15 and the straight wall template upper tension bolts 14 are kept in the same position; the two end positions of the crown beam template lower tension bolts 15 and the crown beam template upper tension bolts 16 are locked and limited by screw washers 17 respectively; the crown beam front template 10 and the crown beam template lower tension bolts 15 are processed with template openings 32. The stability of the top support of the crown beam front template 10 is ensured by the above-mentioned support rods 31.

[0055] Embodiment 2:

[0056] The method for wall construction using a cast-in-place pile single-side high concrete hanging board wall construction template comprises the following steps:

[0057] Step 1, preparation stage: prepare the slatted wall straight wall formwork 8 and the crown beam formwork system. When making the straight wall formwork 8, a formwork opening 32 is set at the upper part of the cast-in-place pile between the piles;

[0058] Step 2, installation stage of the straight wall formwork 8: welding the straight wall formwork 8 to the vertical ribs 9 of the straight wall formwork;

[0059] The protective concrete at the bottom of the vertical wall section of the bored pile 4 is peeled off to expose the main reinforcement 33 of the bored pile. According to the designed elevation, the main reinforcement 33 of the bored pile is hooked with the hook bolt 13. The precast guide wall 5 is first cast to fix the hook bolt 13 and close the main reinforcement 33 of the bored pile to form a protective layer. The hook bolt 13 does not need to pass through the template.

[0060] Drill holes between the upper piles of the cast-in-place piles 4 to allow the upper tension bolts 14 of the straight wall formwork and the outer plastic sleeve 21 to pass through, set the cast-in-place pile side back bars behind the multiple cast-in-place piles 4, and use the upper tension bolts 14 of the straight wall formwork to pull the vertical rib side back bars 19 and the cast-in-place pile side back bars 18 together;

[0061] The end of the hook bolt 13 is connected to the tail tie rod 34 through the connecting nut 20, and the tail tie rod 34 is fixedly connected to the lower vertical rib side back bar 19, thereby completing the fixing of the entire straight wall formwork 8;

[0062] Step 3, pouring construction phase of the straight wall panel 6: stick the contacting sides of the straight wall formwork 8 with double-sided tape, then align the drilled holes of the adjacent formwork side ribs 28, use the side rib bolts 29 to penetrate the drilled holes of the side ribs 28 to tighten the adjacent straight wall formwork 8, and pour the straight wall panel concrete and maintain it according to the specification requirements;

[0063] Step 4, disassembly stage of the vertical wall formwork 8: after the cast concrete strength of the vertical wall panel 6 reaches the standard, the vertical wall formwork 8 is disassembled. When the vertical wall formwork 8 is disassembled, all the tension bolts 14 on the upper part of the vertical wall formwork are disassembled, and the uncast part of the hook bolt 13 is disassembled;

[0064] Step 5, installation stage of the crown beam formwork system: after the vertical wall formwork 6 is removed, the crown beam front formwork 10 is installed, and the crown beam front formwork vertical ribs 11 are arranged on the outer wall of the crown beam front formwork 10, and the crown beam formwork lower tension bolts 15 are arranged at the original positions of the straight wall formwork upper tension bolts, and the vertical rib side back bars 19 on the outer sides of the crown beam front formwork vertical ribs 11 are connected to the cast-in-place pile side back bars 18 by tension;

[0065] The top of the crown beam rear template 12 and the crown beam front template 10 are connected by tension bolts 16 on the upper part of the crown beam template; a support rod 31 is arranged between the elliptical arc segment of the crown beam front template steel plate 10 and the crown beam front template vertical rib 11 for support and fixation;

[0066] Step six, pouring and curing the crown beam 7, and after the poured concrete strength reaches the standard, dismantling the crown beam formwork system.

[0067] A method for constructing a wall using a cast-in-place pile single-sided high concrete hanging board wall construction formwork. In the step 2, according to the actual position of the tension bolts 14 on the upper part of the straight wall formwork on site, threaded holes 27 are drilled on the blocking block 22 installed on the template opening 32 of the straight wall formwork 8, and the blocking block 22 is tightly bonded to the blocking block fixing plate 26 using a colloid.

Claims

1. A cast-in-place pile single-sided tall concrete hanging board wall construction template, characterized by: It comprises a plurality of groups of vertically arranged vertical wall formworks (8), a plurality of vertically evenly distributed vertical wall formwork vertical ribs (9) are fixed to the back of the vertical wall formworks (8), and vertical rib side back bars (19) arranged perpendicularly thereto are respectively arranged at different heights on the back of the vertical wall formwork vertical ribs (9); the vertical wall formworks (8) are arranged on the side where the vertical wall panel (6) to be cast is located, and a cast-in-place pile side back bar (18) is arranged on the upper part of the other side of the cast-in-place pile (4), and the vertical rib side back bar (19) and the cast-in-place pile side back bar (18) are connected to each other by tension bolts (14) on the upper part of the vertical wall formworks; the vertical rib side back bar (19) and the lower part of the cast-in-place pile (4) are fixedly connected by hook bolts (13); the tops of the vertical wall formworks (8) and the cast-in-place piles (4) are butted against each other with a crown beam formwork system for casting a crown beam (7); The upper tension bolts (14) of the straight wall formwork are sleeved with a plastic sleeve (21) at the section where the upper tension bolts (14) of the straight wall formwork are penetrated through the cast-in-place piles (4) and the straight wall panel (6); a formwork opening (32) is machined on the straight wall formwork (8) at a position cooperating with the upper tension bolts (14) of the straight wall formwork; a blocking block fixing plate (26) is symmetrically fixed at the position where the formwork opening (32) is located; a blocking block (22) for blocking the formwork opening (32) is fixedly installed between the blocking block fixing plates (26) via screw washers (25) and screws (24); and a through hole (27) for passing the upper tension bolts (14) of the straight wall formwork is machined on the blocking block (22); The hook end of the hook bolt (13) is hooked on the main reinforcement (33) of the steel cage at the bottom of the vertical wall section of the cast-in-place pile (4), and the other end of the hook bolt (13) passes through the precast guide wall (5) and is butt-jointed with a tail tie rod (34) at its end position through a connecting nut (20), and the tail tie rod (34) is fixedly connected to the vertical rib side back bar (19) through a screw washer (17) and a locking nut.

2. According to claim 1, a cast-in-place pile single-sided high concrete hanging board wall construction template, characterized in that: The two ends of the tension bolts (14) on the upper part of the straight wall formwork are fixedly connected to the vertical rib side bars (19) and the cast-in-place pile side bars (18) through screw washers (17) and locking nuts, respectively. The bottom end of the vertical rib side bars (19) is supported on the top of the wooden pad (23). The bottom end of the vertical rib side bars (19) is longer than the height of the straight wall formwork (8) to ensure that the hook bolts (13) do not contact the straight wall formwork (8).

3. According to claim 2, a cast-in-place pile single-sided high concrete hanging board wall construction template, characterized in that: The cast-in-place pile side back bars (18) and the vertical rib side back bars (19) are both welded and assembled using two parallel square steel materials, with a spacing left between them so that the tension bolts (14) and hook bolts (13) on the upper part of the straight wall formwork can be horizontally moved and adjusted along the spacing.

4. According to claim 3, a cast-in-place pile single-sided high concrete hanging board wall construction template is characterized by: The blocking block (22) and the blocking block fixing plate (26) are tightly bonded together by means of a sealant; and two adjacent straight wall formworks (8) are fixedly connected by side ribs (28) arranged on their mating end surfaces and side rib bolts (29) and bolt washers (30).

5. According to claim 4, a cast-in-place pile single-sided high concrete hanging board wall construction template is characterized by: The crown beam formwork system comprises a crown beam front formwork (10) arranged on the outside of a crown beam (7) to be cast, a plurality of vertically arranged crown beam front formwork vertical ribs (11) are arranged on the outside of the crown beam front formwork vertical ribs (11), vertical rib side back bars (19) are arranged on the outside of the crown beam front formwork vertical ribs (11), the vertical rib side back bars (19) and the cast-in-place pile side back bars (18) are fixedly connected by the crown beam formwork lower tension bolts (15), and a crown beam rear formwork (12) is arranged on the inside of the crown beam (7), and the crown beam rear formwork (12) and the vertical plate fixed on the top of the crown beam front formwork (10) are tensionedly connected by the crown beam formwork upper tension bolts (16).

6. According to claim 5, a cast-in-place pile single-sided high concrete hanging board wall construction template is characterized by: A plurality of support rods (31) of different lengths are fixed between the elliptical arc segment of the crown beam front template (10) and the vertical ribs (11) of the crown beam front template; The positions of the tension bolts (15) at the bottom of the crown beam formwork and the tension bolts (14) at the top of the straight wall formwork are kept in the same position; Both end positions of the tension bolts (15) at the bottom of the crown beam template and the tension bolts (16) at the top of the crown beam template are locked and limited by screw washers (17) respectively; A template opening (32) is machined at a position where the crown beam front template (10) cooperates with the tension bolts (15) at the bottom of the crown beam template.

7. A method for wall construction using the cast-in-place pile single-sided high concrete hanging board wall construction template as described in claim 6, characterized in that: It includes the following steps: Step 1, preparation stage: prepare the vertical wall formwork (8) of the hanging wall and the crown beam formwork system. When making the vertical wall formwork (8), a formwork opening (32) is set at the upper part of the cast-in-place pile between the piles; Step 2, installation phase of the vertical wall formwork (8): welding the vertical wall formwork (8) and the vertical wall formwork vertical ribs (9) together; The protective concrete at the bottom of the vertical wall section of the cast-in-place pile (4) is peeled off to expose the main reinforcement of the steel cage (33). According to the designed elevation, the main reinforcement of the steel cage (33) is hooked with a hook bolt (13). The precast guide wall (5) is first cast to fix the hook bolt (13) and close the main reinforcement of the steel cage (33) to form a protective layer. The hook bolt (13) does not need to pass through the formwork. Drill holes in the inter-pile area of ​​the cast-in-place piles (4) to allow the upper tension bolts (14) of the straight wall formwork and the plastic sleeves (21) therethrough to pass through, erect the cast-in-place pile side bars behind the plurality of cast-in-place piles (4), and use the upper tension bolts (14) of the straight wall formwork to tension the vertical rib side bars (19) and the cast-in-place pile side bars (18) together; The end of the hook bolt (13) is connected to the tail tie rod (34) through the connecting nut (20), and the tail tie rod (34) is fixedly connected to the lower vertical rib side back bar (19), thereby completing the fixing of the entire straight wall formwork (8); Step 3, the pouring construction stage of the vertical wall panel (6): the contacting sides of the vertical wall formwork (8) are affixed with double-sided tape, and then the holes drilled in the adjacent side ribs (28) of the formwork are aligned, and the adjacent vertical wall formworks (8) are fastened by passing the side rib bolts (29) through the holes drilled in the side ribs (28), and the vertical wall panel concrete is poured and maintained in accordance with the specification requirements; Step 4, disassembly stage of the vertical wall formwork (8): after the poured concrete strength of the vertical wall panel (6) reaches the standard, the vertical wall formwork (8) is disassembled. When disassembling the vertical wall formwork (8), all the tension bolts (14) on the upper part of the vertical wall formwork are disassembled, and the uncast part of the hook bolt (13) is disassembled; Step 5, installation stage of the crown beam formwork system: after the vertical wall formwork (8) is removed, the crown beam front formwork (10) is installed, the crown beam front formwork vertical ribs (11) are arranged on the outer wall of the crown beam front formwork (10), the crown beam formwork lower tension bolts (15) are arranged at the original positions of the vertical wall formwork upper tension bolts, and the vertical rib side back bars (19) on the outer sides of the crown beam front formwork vertical ribs (11) are tensioned and connected with the cast-in-place pile side back bars (18); The top of the crown beam rear template (12) and the crown beam front template (10) are connected to each other by tension bolts (16) on the upper part of the crown beam template; a support rod (31) is provided between the elliptical arc section of the crown beam front template (10) and the vertical ribs (11) of the crown beam front template for support and fixation; Step six, pouring and curing the crown beam (7), and after the poured concrete strength reaches the standard, dismantling the crown beam formwork system.

8. The method for wall construction using the cast-in-place pile single-sided high concrete hanging board wall construction template according to claim 7, characterized in that: In the second step, a through hole (27) is drilled on the blocking block (22) installed on the template opening (32) of the straight wall template (8) according to the actual position of the tension bolts (14) on the upper part of the straight wall template on site, and the blocking block (22) and the blocking block fixing plate (26) are tightly bonded and adhered using a colloid.

Citation Information

Patent Citations

  • Cast-in-place pile single-side high and large concrete hanging plate wall construction formwork

    CN212562456U

  • Cast-in-place pile concrete hanging plate wall steel formwork

    CN215564404U