Rail Mounting System for Cable Towers

Through the rail-type installation system, the rail-type jacking bracket and the transfer platform are used to achieve high-precision docking of steel cable tower column segments, solving the problem of insufficient axis docking accuracy in the existing technology, and improving construction safety and operation. Simplicity.

CN111535188BActive Publication Date: 2024-10-15ROAD & BRIDGE SOUTH CHINA ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010379151.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-07
Publication Date
2024-10-15
Estimated Expiration
2040-05-07

AI Technical Summary

Technical Problem

In the existing technology, it is difficult to achieve high-precision axis docking during the docking control of inclined cable tower column segments. Errors are prone to occur especially during high-altitude hoisting, causing the internal force of the structure to deviate from the design value and increasing construction risks.

Method used

It adopts a rail-type installation system, including a rail-type jacking bracket and a transfer platform, which is composed of inclined vertical guide rails and reverse-inclined support columns. It is combined with a lifting power mechanism and a traction line to realize the docking and alignment welding of the steel cable tower. Reduce operational difficulty and complexity.

Benefits of technology

The accuracy of the docking of steel cable towers has been improved from 1/3000 tower height to 1/4000 tower height, which simplifies the design, enhances the support stability, reduces the difficulty and complexity of operation, and improves construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111535188B_ABST
    Figure CN111535188B_ABST
Patent Text Reader

Abstract

The present application discloses a guide rail installation system for a cable tower: a guide rail lifting bracket, including an inclined vertical guide rail, a guide rail support arranged on the inclined side of the vertical guide rail, a lifting power mechanism arranged at the top of the vertical guide rail, and a traction line drawn from the lifting power mechanism and extending to the bottom of the vertical guide rail; a transfer platform, including a sliding platform extending outward from the guide rail lifting bracket, and a sliding trolley that moves horizontally on the sliding platform. The present application uses a guide rail lifting bracket to install an inclined cable tower, so that the docking accuracy of the cable tower is controlled, the adjustability of the docking of the cable tower is improved, the operational difficulty and complexity of the construction process are reduced, and the safety of the construction is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of road and bridge construction, and in particular to a guide rail installation system for a steel cable tower. Background Art

[0002] The control of the docking of inclined tower column segments is a very important task. If the axis of the docking of the inclined tower segments deviates greatly from the original design axis, as the construction progresses, the internal force of the structure will significantly deviate from the design value, thus causing construction accidents.

[0003] The current control of the butt joint of the tower column segments of the inclined cable tower adopts the tower crane hoisting process, using a special hoist with a chain hoist installed on it. The inclination of the segment is adjusted by retracting and extending the chain hoist. At the same time, a sleeve-type matching device and a guide plate are installed on the inner side of the box wall panel between the two butted segments. After the segments are temporarily butt jointed, the hook can be released, and the elevation and plane position of the top surface of the segment can be adjusted by the tooling (upper and lower brackets) and jacks installed in the box until the upper position meets the requirements, and then the butt weld is performed. This process can control the deviation of the tower column butt joint axis within 1 / 3000 of the tower height.

[0004] The main disadvantage of using a tower crane to control the docking of inclined cable towers is that it is difficult to operate. The high-altitude hoisting of the tower crane will cause the tower column to sway under the action of wind load. It is easy to make errors when controlling the inclination of the tower column with a chain hoist. Since the tower crane needs to be attached to the wall on the installed segment, the installed tower column will be deformed due to the action of horizontal force, which further increases the deviation of the docking. After the temporary docking of the segment, the bracket and jack need to be adjusted to make the upper mouth meet the requirements. At this time, it is very difficult to control the axis deviation to within 1 / 3000 of the tower height.

[0005] Under normal circumstances, it is already very difficult to control the deviation of the tower column axis when the tower crane is installed according to 1 / 3000 of the tower height. Some inclined cable towers are more than 150m high, and the control deviation is as high as 50mm according to 1 / 3000 of the tower height, which cannot meet the construction requirements. Summary of the invention

[0006] The purpose of the present invention is to provide a guide rail installation system for a steel cable tower in order to overcome the defects of the prior art. Through the present application, the control accuracy of the connection between the tower columns of the inclined cable tower can be effectively improved.

[0007] In order to achieve the above technical objectives, the technical solution adopted by the present invention is as follows:

[0008] A guide rail installation system for a steel cable tower, comprising:

[0009] A guide rail type lifting bracket, comprising an inclined vertical guide rail, a guide rail support arranged on an inclined side of the vertical guide rail, a lifting power mechanism arranged at the top end of the vertical guide rail, and a traction line led out from the lifting power mechanism and extending to the bottom end of the vertical guide rail;

[0010] The transfer platform comprises a sliding platform extending outward from the guide rail type lifting bracket and a sliding trolley which moves horizontally on the sliding platform.

[0011] Preferably, the inclination angle of the vertical guide rail is consistent with the designed inclination angle of the cable tower.

[0012] Preferably, the vertical guide rails include a group of vertical slide rails arranged along the surface contour of the steel cable tower body and used for supporting the steel cable tower body.

[0013] Further preferably, the vertical guide rail includes at least two vertical slide rails which are not on the same plane and are used to jointly support the tower body of the steel cable tower.

[0014] Optionally, wedge blocks with different inclination angles are arranged between the vertical slide rails that are not on the same plane.

[0015] Furthermore, the guide rail support includes a group of first columns for fixedly mounting the vertical guide rail, and a plurality of second columns intersecting and connected to the first columns at an acute angle and used for reversely tilting and supporting the first columns.

[0016] Preferably, the bottom end of the first column is fixed on the pedestal of the cable tower; the bottom end of the second column is fixed on the column foundation adjacent to the pedestal of the cable tower.

[0017] Specifically, parallel connections are provided between the first columns; a plurality of the second columns are arranged in parallel, and reinforcing rods are provided between adjacent second columns.

[0018] Furthermore, the traction line includes a lifting section extending from the lifting power mechanism in a positive direction to a pulling force application point, and also includes a reaction section extending from the lifting power mechanism in a reverse direction to a fixed engineering interface.

[0019] Optionally, the fixed engineering interface is an upper surface of a pedestal or a base supported by the guide rail.

[0020] Preferably, the sliding platform extends from the front side of the vertical guide rail toward the top of the pier of the cable tower.

[0021] Optionally, the sliding platform extends from the front side of the vertical guide rail through the top of the pier of the cable tower to the construction trestle.

[0022] Specifically, the transfer platform also includes a horizontal slide rail that limits the translation trajectory of the sliding trolley on the sliding platform; and also includes a lifting tool that assists the steel cable tower segment on the sliding trolley in adjusting its posture.

[0023] Compared with the prior art, the present invention has the following advantages:

[0024] The guide rail installation system of the cable tower of the present application, by setting up a guide rail lifting bracket, using a guide rail limiter, and controlling the linear shape of the cable tower, the docking accuracy of the cable tower is controlled, and the conventional axis deviation is increased from 1 / 3000 of the tower height to 1 / 4000 of the tower height. The guide rail installation system of the cable tower of the present application, the guide rail support is composed of an inclined first column and a second column that reversely tilts the first column to support the first column, which not only simplifies the design of the inclined guide rail lifting bracket while ensuring the support stability, so that the horizontal force and vertical force of the bracket are clearer, and it is easier to control the linear shape of the inclined tower column. The guide rail installation system of the cable tower of the present application adopts the method of aligning, welding and then lifting on the sliding platform, and the adjustability of each intermediate step is stronger, which is conducive to the control of the linear shape of the cable tower. The guide rail installation system of the cable tower of the present application converts high-altitude operations such as segment docking and alignment welding into low-altitude platform operations, which reduces the difficulty and complexity of operation and improves the safety of construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the guide rail installation system of the steel cable tower of the present application.

[0026] Figure 2 This is a schematic diagram of the vertical guide rail cross-section structure of the guide rail installation system of the present application.

[0027] Figure 3 This is a state diagram of the connected segments before being dismounted using the guide rail installation system of the steel cable tower of the present application. DETAILED DESCRIPTION

[0028] The present application is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0029] The guide rail installation method of the cable tower of the present application can be implemented by the guide rail installation system of the cable tower. By using the guide rail installation system of the cable tower, the guide rail installation method of the cable tower can be performed more efficiently and conveniently. The guide rail installation method of the cable tower is the theoretical basis of the guide rail installation system of the cable tower, and the guide rail installation system of the cable tower is the equipment basis for the implementation of the guide rail installation method of the cable tower. The guide rail installation method of the cable tower and the guide rail installation system of the cable tower are interdependent and mutually conditional.

[0030] like Figure 1As shown, before the guide rail type cable tower installation system 1 is erected, the base 23 and the pier column structure 22 of the cable tower 2 have been basically completed, and the fixed engineering interface adjacent to the cable tower 2 has also been compacted to prepare for the subsequent use as the column foundation 3. The cable tower 2 will be divided into a number of tower segments 21 for docking installation. The guide rail type cable tower installation system 1 includes:

[0031] The guide rail type lifting support 11 comprises an inclined vertical guide rail 111, a guide rail support 112 arranged on an inclined side of the vertical guide rail 111, a lifting power mechanism 113 arranged at the top end of the vertical guide rail 111, and a traction line 114 led out from the lifting power mechanism 113 and extending to the bottom end of the vertical guide rail 111;

[0032] The transfer platform 12 includes a sliding platform 121 extending outward from the guide rail type lifting support 11 and a sliding trolley 122 which moves horizontally on the sliding platform 121 .

[0033] Furthermore, the inclination angle of the vertical guide rail 111 is consistent with the design inclination angle of the steel cable tower 2, so as to stabilize the design linearity of the steel cable tower 2. Specifically, the vertical guide rail 111 is arranged on the side of the steel cable tower 2 which is inclined to form an acute angle with the horizontal plane (or the ground), so that the vertical guide rail 111 supports the steel cable tower 2 from the back of the steel cable tower 2. The vertical guide rail 111 includes a group of vertical sliding rails 111' for supporting the tower body of the steel cable tower 2. Preferably, each of the vertical sliding rails 111' constituting the vertical guide rail 111 is arranged in parallel along the surface contour of the tower body of the steel cable tower 2. If the surface contour of the tower body of the steel cable tower 2 is curved, the vertical guide rail 111 is provided with at least two vertical sliding rails 111' which are not on the same plane and are used to jointly support the tower body of the steel cable tower 2. In this embodiment, reference is made to Figure 2The vertical guide rail 111 is arranged on the longitudinal plane provided by the guide rail support 112, the width of the longitudinal plane is slightly larger than the maximum transverse width of the cable tower 2, the vertical guide rail 111 includes at least two vertical slide rails 111' extending from the top end to the bottom end of the longitudinal plane and parallel to the longitudinal axis, each of the vertical slide rails 111' includes a track pad beam 111a, a slide rail 111b and a slider 111c which are stacked in sequence, wherein the slide rail 111b and the slider 111c can slide relative to each other, and the top surface of the slider 111c directly abuts against the surface of the cable tower 2. Further, since the cross-sectional profile of the tower body of the cable tower 2 shown in the figure is a curved profile, in order to ensure the supporting stability of the cable tower 2 by the vertical guide rail 111, two points on the surface of the tower body of the cable tower 2 that are not on the same plane are selected as supporting points of the slider 111c, and the supporting points are dispersed as much as possible symmetrically with the axis of the cable tower 2. As shown in the figure, the two vertical slide rails 111' are arranged at the position with the largest curvature in the curved profile line, and the non-coplanarity of each slider 111c is achieved by arranging wedge blocks 111d with different inclination angles under each vertical slide rail (specifically under the track pad beam 111a).

[0034] Continue to refer Figure 1 The guide rail support 112 includes a group of first columns 1121 for fixing the vertical guide rail 111, and a plurality of second columns 1122 intersecting and connected with the first columns 1121 at an acute angle and used to support the first columns 1121 in a reverse tilt, that is, the first columns 1121, the second columns 1122 and the horizontal plane form an acute triangle support structure, and the same first column 1121 is supported by a plurality of mutually parallel second columns 1122. Preferably, the bottom end of the first column 1121 is fixed on the pedestal 23 of the cable tower 2; the bottom end of the second column 1122 is fixed on the column foundation 3 adjacent to the pedestal 23 of the cable tower, so the bottom ends of the first column 1121 and the second column 1122 are not on the same horizontal plane in most cases. In order to enhance the structural stability of the guide rail support 112, a parallel joint 1123 is provided between the first columns 1121, and the frame structure formed by the first columns 1121 and the parallel joint 1123 mainly serves as the installation plane of the vertical guide rail 111; a reinforcing rod 1124 is provided between adjacent second columns 1122, and the reinforcing rod may further include a parallel joint (unnumbered) vertically intersecting and connected to the second columns 1122, and a diagonal brace (unnumbered) cross-arranged between adjacent parallel joints. Other component forms that can be used as reinforcing rods may also be used in this application and should not be used to limit the content of this application. Furthermore, the angle between the first column 1121 and the second column 1122 should be determined based on the load borne by the guide rail support 112 and the state of the column foundation 3, and in principle should not exceed 90°.

[0035] The lifting power mechanism 113 is fixedly arranged at the top of the vertical guide rail 111, and is used to lift the load from bottom to top through the traction line 114, especially to lift the load from bottom to top along the angle defined by the vertical guide rail 111. The lifting power mechanism 113 should select a suitable power mechanism according to the size of the load, such as a winch or a crane. The traction line 114 includes a lifting section 1141 extending from the lifting power mechanism 113 to the tension application point, and also includes a reaction section 1142 extending from the lifting power mechanism 113 in the reverse direction. The reaction section 1142 requires a fixed engineering interface to provide a reaction force for the lifting tension. The fixed engineering interface is usually the upper surface of the base 23, the column foundation 3 or other fixed engineering interfaces adjacent to the installation system 1. Those skilled in the art should make a reasonable selection according to the requirements of the reaction force.

[0036] The transfer platform 12 is used to move the tower segment 21 of the cable tower 2 to the top of the pier structure 22 for docking and installation. Specifically, the sliding platform 121 of the transfer platform 12 extends from the front of the vertical guide rail 111 to the top of the pier structure 22. The so-called front of the vertical guide rail 111 can be understood as the direction outside the range of the guide rail support 112. According to the actual situation of the construction site, the sliding platform 121 should not be limited to a platform that straightly connects the tower segment 21 transfer starting point to the top of the pier structure 22. Furthermore, the sliding platform 121 can cooperate with the construction trestle 4 of the bridge project, that is, it extends from the front of the vertical guide rail 111 through the top of the pier structure 22 to the construction trestle 4, so as to facilitate the transfer of the tower segment 21 unloaded on the construction trestle 4 to the designated location. Furthermore, since the bottom end of the guide rail support 112 is fixed on the pedestal 23 or the column foundation 3, and the tower segment 21 is installed on the pier structure 22, the sliding platform 121 is arranged at a position slightly below the middle of the vertical guide rail 111. The sliding trolley 122 is used to directly transport the tower segment 21. In order to ensure the safety of transportation and improve the efficiency, the transfer platform 12 also includes a horizontal slide rail (not shown) that limits the translation track of the sliding trolley 122 on the sliding platform 121. The laying of the horizontal slide rail can be achieved by adopting known means. If the tower segment 21 is placed in a horizontal position when unloading on the construction trestle 4 or other location far away from the construction site of the cable tower 2, it is necessary to adjust the tower segment 21 from a horizontal position to an upright position before the tower segment 21 is transferred to the sliding trolley 122 (or before the sliding trolley approaches the docking installation position). At this time, a lifting tool 124 (such as a truck crane or a crawler crane) is required to assist in adjusting the posture of the tower segment 21.

[0037] The guide rail installation system 1 of the steel cable tower is used to assemble the tower segments 21 of the steel cable tower 2. The guide rail installation method of the steel cable tower of the present application comprises the following steps:

[0038] S1, a guide rail type lifting bracket is set up on one side of the cable tower pier, and a transfer platform is set up on the pier.

[0039] like Figure 1 As shown, at the construction position of the cable tower 2, the guide rail type lifting bracket 11 is erected on the inclined side of the cable tower 2 after the pedestal 23 and the pier structure 22 are basically completed. The structure of the guide rail type lifting bracket 11 is as described above, that is, it includes an inclined vertical guide rail 111, a guide rail support 112 arranged on the inclined side of the vertical guide rail 111, a lifting power mechanism 113 arranged at the top end of the vertical guide rail 111, and a traction line 114 led out from the lifting power mechanism 113 and extended to the bottom end of the vertical guide rail 111.

[0040] The transfer platform 12 includes a sliding platform 121 extending outward from the guide rail lifting bracket 11 and a sliding trolley 122 moving horizontally on the sliding platform 121. The transfer platform 12 is used to connect the unloading location of the tower segment 21 to the docking installation construction point of the tower segment 21.

[0041] S2, placing the first segment of the top of the segmented cable tower on the top of the pier through the transfer platform;

[0042] Taking the top of the cable tower as the counting starting position, the tower segment 21 of the first section is transferred from its unloading location (such as the construction trestle 4) to the top of the pier structure 22 by the sliding trolley 122, and various adjustment tools (such as three-way jacks and wedges) are used to adjust the axial position of the tower segment 21 until it basically coincides with the layout line, and the side wall surface of the tower segment 21 is made close to the vertical guide rail 111, thereby realizing the first section in place.

[0043] Furthermore, before the tower segment 21 is transferred to the top of the pier structure 22 , if the tower segment 21 is in a horizontal position on the construction trestle 4 or other unloading position, it is necessary to achieve a transition to an upright position on the sliding trolley 122 with the assistance of a lifting tool 124 .

[0044] S3, after lifting the first segment by using the guide rail type lifting bracket 11, positioning the second segment below the first segment;

[0045] like Figure 1 As shown, after the tower segment 21 of the first section is correctly in place, the tower segment 21 of the first section is lifted a certain distance along the vertical guide rail 111 by utilizing the lifting power mechanism 113 and the traction line 114 of the guide rail type lifting bracket 11, so that the tower segment 21 of the second section can be in place above the pier structure 22.

[0046] Specifically, the lifting section 1141 of the traction line 114 is led out from the lifting power mechanism 113, and the end of the lifting section 1141 is connected to a preset lifting point on the outer wall of the tower segment 21 of the first segment. The lifting point is set on the outer wall of the tower segment 21 to facilitate the downward movement of the lifting point from the previous segment to the next segment. The construction personnel have a larger operating space when switching the lifting point, which reduces the difficulty of operation. Furthermore, the lifting point is preferably set on the two adjacent side walls of the tower segment 21 that are directly opposite to the side wall of the vertical guide rail 111. Such a setting can reduce the pulling force required for lifting and reduce the load requirements of the lifting power mechanism 113.

[0047] The tower segment of the second section is put into place on the top of the pier in a similar manner to the tower segment 21 of the first section: the tower segment of the second section is transported from its unloading location to the top of the pier structure 22 by a sliding trolley 122, and various adjustment tools are used to adjust the axis position of the other end so that it basically coincides with the layout line, and the side wall surface of the tower segment is made close to the vertical guide rail 111.

[0048] S4, after the first segment and the second segment are butt-welded to form a butted segment, lifting the butted segment;

[0049] refer to Figure 3 , reversely start the lifting power mechanism 113 so that the tower segment 21 of the first segment that has been lifted is lowered to the top surface of the tower segment of the second segment, and then the tower segment 21 of the first segment and the tower segment of the second segment are welded in position, so that the two tower segments that become a whole after docking form a docked segment 211. Next, the end of the lifting segment 11141 of the traction line 114 is transferred and fixed to the hanging point of the outer wall of the tower segment of the second segment. Preferably, the hanging point of the tower segment of the second segment is set directly below the hanging point of the tower segment 21 of the first segment, so that the construction personnel can perform the hanging point conversion operation. In the next step, the lifting power mechanism 113 is used to pull the traction line 114 again to lift the docked segment 211 along the vertical guide rail 111 for a distance, so that the next tower segment (the tower segment of the third segment) can be put in place above the pier structure.

[0050] S5, installing the remaining segments in a cycle by following the installation process of the second segment;

[0051] The lifting process reserves the next tower segment in position above the pier structure 22, and the remaining tower segments are installed in a loop by the second segment installation process to gradually extend the cable tower from top to bottom. The installation process of the second segment refers to the above-mentioned steps S3 and S4. Each time the lifting process is performed using the lifting power mechanism 113, the traction line 114 is connected to the tower segment at the lowest end of the docked segment 211.

[0052] S6, connecting the butted segments to the piers to complete the installation of the cable tower.

[0053] After the last tower segment is welded to the connected segment 211, the entire connected segment 211 can be dismounted. Dismounting generally refers to transferring the load from a temporary support structure to a permanent support structure. The dismounting connection performed in this embodiment refers to the transfer of the connected segment 211 supported by the guide rail lifting bracket 11 to the pier structure 22, and the connected segment 211 is supported by the pier structure 22 to complete the installation of the cable tower 2. Before the dismounting connection of the connected segment 211 and the pier structure 22, the plane position and height of the connected segment 211 are adjusted to make the final linear adjustment of the cable tower 2.

[0054] After the cable tower 2 is installed, the guide rail lifting bracket 11 can be temporarily retained as an auxiliary structure to support the cable tower 2 until the cable stay of the bridge needs to be installed. When the cable stay is installed and debugged, the inclined cable tower 2 is in a force balance state and can stably maintain the inclined state.

[0055] In summary, the present application uses a guide rail type lifting bracket to install the inclined cable tower, so that the docking accuracy of the cable tower is controlled, the adjustability of the docking of the cable tower is improved, the operational difficulty and complexity of the construction process is reduced, and the safety of the construction is improved.

[0056] The above embodiments are preferred implementation modes of the present application, but are not limited to the above embodiments. Any other changes, modifications, substitutions, combinations, and simplifications that do not deviate from the spirit and principles of the present application should be equivalent replacement methods and are included in the protection scope of the present application.

Claims

1. A guide rail installation system for a cable tower, characterized in that: include: A guide rail type lifting bracket, comprising an inclined vertical guide rail, a guide rail support arranged on an inclined side of the vertical guide rail, a lifting power mechanism arranged at the top end of the vertical guide rail, and a traction line led out from the lifting power mechanism and extending to the bottom end of the vertical guide rail; The transfer platform comprises a sliding platform extending outward from the guide rail type lifting bracket and a sliding trolley moving horizontally on the sliding platform; The inclination angle of the vertical guide rail is consistent with the designed inclination angle of the cable tower; The guide rail support includes a group of first columns for fixing the vertical guide rail, and a plurality of second columns intersecting and connected with the first columns at an acute angle and used for reversely supporting the first columns in an inclined manner; the bottom end of the first column is fixed on the pedestal of the cable tower; the bottom end of the second column is fixed on the column foundation adjacent to the pedestal of the cable tower; The traction line includes a lifting section extending from the lifting power mechanism in the forward direction to the tension application point, and also includes a reaction section extending from the lifting power mechanism in the reverse direction to a fixed engineering interface; the fixed engineering interface is the upper surface of the pedestal or the foundation of the guide rail support.

2. The guide rail installation system of the cable tower according to claim 1, characterized in that: The vertical guide rails include a group of vertical slide rails arranged along the surface contour of the steel cable tower body and used for supporting the steel cable tower body.

3. The guide rail installation system of the steel cable tower according to claim 2, characterized in that: The vertical guide rails include at least two vertical slide rails which are not on the same plane and are used to jointly support the tower body of the steel cable tower.

4. The guide rail installation system of the steel cable tower according to claim 3, characterized in that: Wedge blocks with different inclination angles are arranged between vertical slide rails that are not on the same plane.

5. The guide rail installation system for a steel cable tower according to claim 1, characterized in that: A parallel connection is arranged between the first columns; a plurality of the second columns are arranged in parallel, and a reinforcing rod is arranged between adjacent second columns.

6. The guide rail installation system for a steel cable tower according to claim 1, characterized in that: The sliding platform extends from the front side of the vertical guide rail toward the top of the pier of the cable tower.

7. The guide rail installation system for a steel cable tower according to claim 6, characterized in that: The sliding platform extends from the front side of the vertical guide rail through the top of the pier of the cable tower to the construction trestle.

8. The guide rail installation system for a steel cable tower according to claim 1, characterized in that: The transfer platform also includes a horizontal slide rail that limits the translation trajectory of the sliding trolley on the sliding platform; and also includes a lifting tool that assists the steel cable tower segment on the sliding trolley in adjusting its posture.