Compacted gravel pier reinforcement structure supported by densely packed three-dimensional grid and its construction method
By setting up gravel piers and laying a gravel covering layer in the soft foundation of the tidal channel, a compacted gravel pier reinforcement structure supported by a dense three-dimensional grid is formed, which solves the blockage problem caused by the soft ground under the tidal channel and improves the efficiency of the tidal channel. Stability and uplift resistance achieve fast and economical engineering results.
Patent Information
- Application Number
- CN202010398611.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-12
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2040-05-12
AI Technical Summary
The soft stratum under the tidal channel causes the fill slope between the artificial land and the tidal channel to easily become unstable, causing deep soil slippage and slope collapse, which in turn leads to the problem of blockage of the tidal channel.
A reinforced structure of rammed gravel piers supported by a close-packed three-dimensional grid is used. By setting gravel piers in the soft foundation of the tidal channel and laying a gravel covering layer, a stable overall structure is formed to avoid deep soil slippage and collapse. , increase stability and resistance to uplift.
It effectively solves the problem of blockage of the tidal channel, improves the stability and uplift resistance of the tidal channel, reduces the risk of blockage, and the construction method is fast, feasible and low-cost.
Smart Images

Figure CN111560942B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tidal channel foundation treatment, and in particular to a compacted gravel pier reinforcement structure supported by a densely packed three-dimensional grid and a construction method thereof. Background Art
[0002] With the development of social economy, land resources are becoming increasingly tight. Land reclamation projects have alleviated the tense situation of land resources. As the number of land reclamation projects increases, the artificially reclaimed land is getting closer and closer to nearby uninhabited islands.
[0003] In the process of artificial land reclamation on soft foundations in coastal areas, there is often a need for engineering projects to increase the stability and anti-uplift of the soft foundation. For example, the tidal channel that must be reserved between the artificial land reclamation and the adjacent uninhabited islands must ensure that the artificial land reclamation project does not connect with the uninhabited islands, and according to the requirements of sea area management, the tidal channel between the artificial backfilled land and the uninhabited islands must not be blocked. However, at present, due to the relatively soft stratum under the tidal channel, the fill slope between the artificial land reclamation and the tidal channel is prone to instability, and the backfilled artificial land squeezes the tidal channel, causing deep soil sliding and slope collapse, which can easily lead to soil uplift and blockage in the tidal channel. At the same time, during the implementation of the project, due to the combined effect of soil sliding and backfill slag squeezing formed on land, the uplift of the soil between the artificial land reclamation and the uninhabited islands will also cause the problem of tidal channel blockage. Summary of the invention
[0004] The invention provides a compacted gravel pier reinforcement structure supported by a densely packed three-dimensional grid, which is used to solve the problem of blockage of the existing tidal channel caused by soft uplift of the stratum under the tidal channel and sliding and collapse of the artificial land towards the tidal channel.
[0005] To achieve the above object, the present invention provides the following technical solution: a compacted gravel pier reinforcement structure supported by a densely packed three-dimensional grid, comprising:
[0006] Gravel piers, a plurality of which are arranged in the soft foundation of the tidal channel;
[0007] A crushed stone covering layer is laid on the soft foundation, and the bottom of the crushed stone covering layer is connected to the upper end of the crushed stone pier body.
[0008] Preferably, the gravel pier body includes a first gravel pier, a second gravel pier and a third gravel pier, the first gravel piers are arranged at intervals, the second gravel pier is arranged at the center of a line connecting two adjacent first gravel piers, and the third gravel pier is arranged at the center of a line connecting two adjacent second gravel piers.
[0009] Preferably, a dynamic compaction machine is provided on the soft foundation, and a rammer is provided on the dynamic compaction machine.
[0010] Preferably, the rammer comprises:
[0011] A hammer body, wherein a plurality of exhaust holes penetrating the upper and lower end surfaces of the hammer body are arranged in the hammer body, the bottom of the exhaust hole is arranged as a conical hole, and the cross-sectional diameter of the lower end of the conical hole is larger than the cross-sectional diameter of the upper end of the conical hole;
[0012] A lifting lug is provided on the upper end of the hammer body.
[0013] Preferably, a hole cleaning device is provided at the upper end of the hammer body, and the hole cleaning device comprises:
[0014] A guide rod, wherein two guide rods are provided, and the two guide rods are symmetrically arranged on both sides of the exhaust hole, and one end of the guide rod is fixedly connected to the upper end of the hammer body;
[0015] A first spring, wherein the first spring is sleeved on the guide rod, and one end of the first spring is fixedly connected to the upper end of the hammer body;
[0016] A baffle, wherein two through holes are arranged on the baffle, and the two guide rods pass through the two through holes respectively, the guide rods are slidably connected to the through holes, and the bottom of the baffle is fixedly connected to the other end of the first spring;
[0017] A vertical rod is arranged in the exhaust hole, one end of the vertical rod is fixedly connected to the baffle, the vertical rod is cylindrical, the cross-sectional diameter of the vertical rod is smaller than the cross-sectional diameter of the exhaust hole, and one end of the vertical rod away from the baffle is arranged in a pointed cone shape.
[0018] Preferably, the dynamic compaction machine comprises:
[0019] body;
[0020] A boom is installed at one end of the fuselage in a forward-inclined manner, and a reinforcement structure is provided between the boom and the fuselage.
[0021] Preferably, it further comprises a traction device, wherein the traction device comprises:
[0022] A winch, the winch being arranged at the upper end of the fuselage;
[0023] A first rotating shaft, which is disposed at the upper end of the arm and is rotatably connected to the arm;
[0024] a second rotating shaft, the second rotating shaft being arranged in the middle of the arm frame and being rotatably connected to the arm frame, and a first pulley being installed on the second rotating shaft;
[0025] a second pulley, wherein the second pulley is mounted on the first rotating shaft, one end of the first steel wire rope is wound around the second pulley, and the other end of the first steel wire rope is passed around the first pulley and wound around the drum of the winch;
[0026] a third pulley, the third pulley being mounted on the first rotating shaft, one end of the second steel wire rope being wound around the third pulley, and the other end of the second steel wire rope being provided with a hook;
[0027] The calculation method of the shortest length of the first steel wire rope is as follows:
[0028] N=D1 / D2
[0029] S=N*h
[0030] F=W / N
[0031] Wherein, D1 represents the radius of the second pulley, D2 represents the radius of the third pulley, N represents the ratio of the radius of the second pulley to that of the third pulley, S represents the displacement of the first wire rope, h represents the displacement of the second wire rope, F represents the tension of the first wire rope, and W represents the tension exerted on the second wire rope. The shortest length of the first wire rope can be calculated through the radius ratio of the second pulley to the third pulley and the displacement of the second wire rope.
[0032] Preferably, a cavity is provided in the hammer body near the center of the upper end, a circular hole is also provided in the hammer body, one end of the circular hole is connected to the cavity, and the other end of the circular hole extends to the bottom of the hammer body, a straight groove is also provided at the bottom of the hammer body, the straight groove is connected to the circular hole, and the length of the straight groove is equal to the diameter of the hammer body, and a cleaning device is also provided in the cavity, and the cleaning device includes:
[0033] An electric telescopic rod, wherein the electric telescopic rod is arranged in the cavity, one end of the electric telescopic rod can be telescoped downward and aligned with the circular hole, and the other end of the electric telescopic rod is fixedly connected to the inner wall of the upper end of the cavity;
[0034] A second spring, wherein the second spring is sleeved on the electric telescopic rod, one end of the second spring is fixedly connected to the inner wall of the upper end of the cavity, and a support plate is arranged at the other end of the second spring, the support plate is located below the electric telescopic rod, a bearing is arranged at the center of the bottom of the support plate, and the bearing is concentric with the circular hole;
[0035] A rotating rod, wherein the rotating rod is arranged in the circular hole, one end of the rotating rod is fixedly connected to the inner ring of the bearing, and the other end of the rotating rod extends to the straight groove;
[0036] A scraper, the scraper is arranged in the I-shaped groove, the center of the scraper is fixedly connected to the rotating rod, the scraper is arranged in an I-shaped shape, and the length of the scraper is equal to the length of the I-shaped groove;
[0037] a first torsion spring, wherein the first torsion spring is sleeved on the rotating rod and located in the circular hole, an upper connecting end of the first torsion spring is fixedly mounted on a side wall of the circular hole, and a lower connecting end of the first torsion spring is mounted on the rotating rod;
[0038] a second torsion spring, wherein the second torsion spring is sleeved on the rotating rod and located in the circular hole, the second torsion spring is located below the first torsion spring and is coaxially arranged with the first torsion spring, the upper connecting end of the second torsion spring is installed on the rotating rod, and the lower connecting end of the second torsion spring is fixedly installed on the side wall of the circular hole;
[0039] A motor, wherein one end of the motor away from the output shaft is fixedly connected to the inner wall of the upper end of the cavity, and a first bevel gear is provided at one end of the motor output shaft;
[0040] A second bevel gear, wherein the second bevel gear is mounted on the rotating rod, the second bevel gear is located between the first bevel gear and the supporting plate, and the tooth shape of the second bevel gear is meshed with the tooth shape of the first bevel gear;
[0041] A processor is arranged in the cavity, the processor is electrically connected to a mobile power source installed in the cavity, the processor is electrically connected to the motor and the electric telescopic rod respectively, and the processor communicates wirelessly with a mobile terminal.
[0042] A construction method, applicable to a compacted gravel pier reinforcement structure supported by a densely packed three-dimensional grid, comprises the following steps:
[0043] Step 1: Use drilling methods to explore the tidal channel strata;
[0044] Step 2: Design the soft foundation construction of the tidal channel. According to the soft foundation and the adjacent artificial land formation, design the compacted gravel pier depth and the thickness of the gravel cover layer;
[0045] Step 3: compact the gravel pier body with the rammer of the dynamic tamping machine to make the gravel pier body meet the designed depth requirements;
[0046] Step 4: Clean the silt on the soft foundation of the tidal channel;
[0047] Step 5: Construct a crushed stone covering layer, lay the crushed stone covering layer on the upper layer of the soft foundation, and ensure that the crushed stone covering layer meets the anti-scouring requirements. Connect the upper end of the crushed stone pier body with the crushed stone covering layer to form a compacted crushed stone pier reinforcement structure supported by a densely packed three-dimensional grid.
[0048] Preferably, in step 3, the depth of the gravel pier body is probed by drilling or ultra-heavy cone dynamic probing. If the depth of the gravel pier body meets the depth requirement, the next construction step is carried out; if the depth of the gravel pier body does not meet the depth requirement, the gravel pier body is further compacted.
[0049] The technical solution of the present invention has the following advantages: The present invention discloses a compacted gravel pier reinforcement structure supported by a dense three-dimensional grid and a construction method thereof, comprising: a gravel pier body, a plurality of said gravel pier bodies are arranged in the soft foundation of a tidal channel; a gravel covering layer, said gravel covering layer is laid on the soft foundation, and the bottom of said gravel covering layer is connected to the upper end of said gravel pier body. The purpose of the present invention is to provide a compacted gravel pier reinforcement structure supported by a dense three-dimensional grid, by treating the soft foundation of the tidal channel, the gravel pier body and the gravel covering layer are formed into a whole, so that a stable structure is formed in the soft foundation of the tidal channel, avoiding deep slippage and collapse of the soft foundation soil layer, increasing stability and anti-uplift, and reducing blockage of the tidal channel.
[0050] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the devices particularly pointed out in the written description and the drawings of the description.
[0051] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0053] Figure 1 This is a schematic diagram of the overall structure of the compacted gravel pier reinforcement structure supported by a densely packed three-dimensional grid provided by the present invention;
[0054] Figure 2 A three-dimensional diagram of the structure of the compacted gravel pier reinforcement body supported by a densely packed three-dimensional grid provided by the present invention;
[0055] Figure 3 The distribution diagram of the crushed stone pier body of the compacted crushed stone pier reinforcement structure supported by the densely packed three-dimensional grid provided by the present invention;
[0056] Figure 4 The construction drawing of the compacted gravel pier reinforcement structure supported by the densely packed three-dimensional grid provided by the present invention;
[0057] Figure 5 A structural diagram of the rammer provided by the present invention;
[0058] Figure 6 A schematic diagram of a dynamic compaction machine provided by the present invention;
[0059] Figure 7 A structural diagram of the traction device provided by the present invention;
[0060] Figure 8 A side view of the traction device provided by the present invention;
[0061] Fig. 9 A structural diagram of the cleaning device provided by the present invention;
[0062] Fig.10 A bottom view of the hammer provided by the present invention;
[0063] Fig.11 The present invention provides a flow chart of a construction method.
[0064] As follows: 1- gravel pier body, 2- soft foundation, 3- gravel cover layer, 4- first gravel pier, 5- second gravel pier, 6- third gravel pier, 7- dynamic tamping machine, 8- tamping hammer, 9- hammer body, 10- lifting ear, 11- exhaust hole, 12- cone hole, 13- guide rod, 14- first spring, 15- baffle, 16- through hole, 17- vertical rod, 18- fuselage, 19- boom, 20- winch, 21- first rotating shaft, 22- second rotating shaft, 23- The first pulley, 24-the second pulley, 25-the first steel wire rope, 26-the third pulley, 27-the second steel wire rope, 28-the hook, 29-the cavity, 30-the round hole, 31-the straight groove, 32-the electric telescopic rod, 33-the second spring, 34-the support plate, 35-the bearing, 36-the rotating rod, 37-the scraper, 38-the first torsion spring, 39-the second torsion spring, 40-the motor, 41-the first bevel gear, 42-the second bevel gear, 43-the processor. DETAILED DESCRIPTION
[0065] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0066] The embodiment of the present invention provides a compacted gravel pier reinforcement structure supported by a densely packed three-dimensional grid, such as Figure 1 , Figure 2 As shown, including:
[0067] A rubble pier 1, wherein a plurality of rubble piers 1 are arranged in a soft foundation 2 of a tidal channel;
[0068] A crushed stone covering layer 3 is laid on the soft foundation 2 , and the bottom of the crushed stone covering layer 3 is connected to the upper end of the crushed stone pier body 1 .
[0069] The working principle and beneficial effects of the above technical solution are as follows: a crushed stone pier body 1 is arranged in the soft foundation 2 of the tidal channel, and then a crushed stone covering layer 3 is laid on the soft foundation 2, and the crushed stone covering layer 3 is connected with the crushed stone pier body 1 as a whole to form a special overall stable structure, the crushed stone pier body 1 adopts a high-energy level compacted crushed stone replacement pier, and the replacement material is graded crushed stone or large-size mountain stone slag, the crushed stone pier body 1 is arranged in an olive shape, and the depth of the crushed stone pier body 1 ranges from 5 to 18 meters, which can pass through the deep slip surface, play a role in overall stability, drainage and compaction, improve the ability of horizontal resistance to reduction, and enhance the deadweight and internal friction angle of the soil; the crushed stone pier body 1 is paved A crushed stone covering layer 3 is provided, the particle size range of the crushed stone covering layer 3 is several centimeters to tens of centimeters, and the thickness range of the crushed stone covering layer 3 is tens of centimeters to several meters, which ensures the density of the crushed stone covering layer 3, meets the tidal scouring resistance, increases stability and deadweight, and plays a role in balancing the sliding uplift. By reinforcing the soft foundation 2 of the tidal channel to form a compacted crushed stone pier reinforcement structure supported by a densely packed three-dimensional grid, the problem of the tidal channel being blocked by the deep sliding uplift and the collapse and instability of the adjacent artificial land slope can be solved. The present invention is fast, feasible, low-cost, effective, and has been verified by engineering cases. The successful application and promotion of the present invention will surely reap huge social and economic benefits.
[0070] In one embodiment, Figure 3 As shown, the gravel pier body 1 includes a first gravel pier 4, a second gravel pier 5 and a third gravel pier 6. The first gravel piers 4 are arranged at intervals, the second gravel pier 5 is arranged at the center of the line connecting two adjacent first gravel piers 4, and the third gravel pier 6 is arranged at the center of the line connecting two adjacent second gravel piers 5.
[0071] The working principle and beneficial effects of the above technical solution are as follows: when compacting the gravel pier body 1, the first gravel pier 4 is compacted first, then the second gravel pier 5 is compacted, and finally the third gravel pier 6 is compacted. The distance between the first gravel pier 4 and the second gravel pier 5 is 6m-15m, and the distance between two adjacent third gravel piers 6 is 6m-15m. The first gravel pier 4, the second gravel pier 5, and the third gravel pier 6 are arranged, and the tamping construction is carried out by alternate row skipping. The gravel pier body 1 below the gravel cover layer 3 can be a tight three-dimensional support structure, which can better improve the overall stability of the soft foundation 2 stratum.
[0072] In one embodiment, Figure 4 As shown, a dynamic compaction machine 7 is provided on the soft foundation 2, and a rammer 8 is provided on the dynamic compaction machine 7.
[0073] The working principle and beneficial effects of the above technical solution are as follows: a dynamic compaction machine 7 is arranged on the soft foundation 2, and the dynamic compaction machine 7 can compact the soft foundation 2 through the rammer 8 to achieve the purpose of dynamic compaction replacement.
[0074] In one embodiment, Figure 5 As shown, the rammer 8 comprises:
[0075] A hammer body 9, wherein a plurality of exhaust holes 11 penetrating the upper and lower end surfaces of the hammer body 9 are arranged in the hammer body 9, and the bottom of the exhaust hole 11 is arranged as a tapered hole 12, and the cross-sectional diameter of the lower end of the tapered hole 12 is larger than the cross-sectional diameter of the upper end of the tapered hole 12;
[0076] A lifting lug 10 is provided on the upper end of the hammer body 9 .
[0077] The working principle and beneficial effects of the above technical solution are as follows: strong tamping is a commonly used engineering technology in foundation reinforcement projects. The tamping hammer 8 includes a hammer body 9 and a lifting lug 10. The hammer diameter of the hammer body 9 ranges from 1.2m to 3.2m. The hammer body 9 is hooked with a sling to the lifting lug 10 to transport the hammer body 9 to a high place, and then the lifting lug 10 is released to allow the hammer body 9 to fall freely. The soft foundation 2 is compacted by the dynamic impact of the hammer body 9, thereby achieving the purpose of strengthening the foundation. When the hammer body 9 falls, it will produce a strong impact force on the ground, which may produce a local vacuum suction hammer or a local air is strongly compressed. The formation of an air cushion causes the rammer 8 to bounce and tilt, affecting the compaction effect. After the local air is strongly compressed, the air mass that then diffuses makes a very high decibel bursting sound, which will cause serious environmental noise pollution to the surrounding area of the construction area. Therefore, an exhaust hole 11 that penetrates the hammer body 9 is provided in the hammer body 9, so that the exhaust hole 11 serves as a ventilation channel. During the falling process of the hammer body 9, the gas between the formation and the hammer body 9 is discharged outside the hammer body 9 to enhance the compaction effect. The bottom of the exhaust hole 11 is set to a cone to increase the cross-sectional area of the bottom of the exhaust hole 11, so that the exhaust hole 11 is not easily blocked by the soil of the formation.
[0078] In one embodiment, Figure 5 As shown, a hole cleaning device is provided at the upper end of the hammer body 9, and the hole cleaning device comprises:
[0079] A guide rod 13, wherein two guide rods 13 are provided, and the two guide rods 13 are symmetrically arranged on both sides of the exhaust hole 11, and one end of the guide rod 13 is fixedly connected to the upper end of the hammer body 9;
[0080] A first spring 14, wherein the first spring 14 is sleeved on the guide rod 13, and one end of the first spring 14 is fixedly connected to the upper end of the hammer body 9;
[0081] A baffle 15, wherein two through holes 16 are provided on the baffle 15, and the two guide rods 13 pass through the two through holes 16 respectively, and the guide rods 13 are slidably connected to the through holes 16, and the bottom of the baffle 15 is fixedly connected to the other end of the first spring 14;
[0082] A vertical rod 17 is disposed in the exhaust hole 11, one end of the vertical rod 17 is fixedly connected to the baffle 15, the vertical rod 17 is cylindrical, the cross-sectional diameter of the vertical rod 17 is smaller than the cross-sectional diameter of the exhaust hole 11, and one end of the vertical rod 17 away from the baffle 15 is set to a pointed cone.
[0083] The working principle and beneficial effects of the above technical solution are as follows: when the hammer body 9 falls to the ground, the vertical rod 17 still moves toward the bottom of the exhaust hole 11 under the action of inertia, and then the baffle 15 moves upward along the guide rod 13 under the elastic force of the first spring 14, and at the same time drives the vertical rod 17 upward. In the short time after the hammer body 9 falls to the ground, under the action of inertia and the elastic force of the first spring 14, the vertical rod 17 can reciprocate in the exhaust hole 11, thereby automatically clearing the soil in the pore and avoiding the exhaust hole 11 from being blocked. The cross-sectional diameter of the vertical rod 17 is smaller than the cross-sectional diameter of the exhaust hole 11 to prevent the vertical rod 17 from blocking the exhaust hole 11. One end of the vertical rod 17 is set to a pointed cone shape to reduce the contact area, reduce the adhesion of the soil at the bottom of the exhaust hole 11 and the bottom of the vertical rod 17, so that the vertical rod 17 can reciprocate more times in the exhaust hole 11 and the hole cleaning effect is better.
[0084] In one embodiment, Figure 6 As shown, the dynamic compaction machine 7 comprises:
[0085] Fuselage 18;
[0086] The arm 19 is installed at one end of the fuselage 18 in a forward-inclined manner, and a reinforcement structure is provided between the arm 19 and the fuselage 18.
[0087] The working principle and beneficial effects of the above technical solution are as follows: the tamping machine 7 is a primary mechanical equipment for implementing tamping treatment of the foundation. In the process of foundation treatment, the tamping machine 7 plays an important role. The energy level range of the tamping machine 7 is 5000kNm~25000kNm. The tamping machine 7 includes a fuselage 18 and an arm 19. The fuselage 18 is used to support the arm 19. A reinforcement structure is arranged between the arm 19 and the fuselage 18. The reinforcement structure can be a hydraulic support. The inclination angle of the arm 19 can be controlled by adjusting the length of the hydraulic support. The arm 19 provides support for the rammer 8.
[0088] In one embodiment, Figure 6 , Figure 7 , Figure 8 As shown, it also includes a traction device, and the traction device includes:
[0089] A hoist 20, wherein the hoist 20 is disposed at the upper end of the fuselage 18;
[0090] A first rotating shaft 21, which is disposed at the upper end of the arm 19 and is rotatably connected to the arm 19;
[0091] A second rotating shaft 22, which is disposed in the middle of the arm 19 and is rotatably connected to the arm 19, and a first pulley 23 is mounted on the second rotating shaft 22;
[0092] a second pulley 24, wherein the second pulley 24 is mounted on the first rotating shaft 21, one end of a first steel wire rope 25 is wound around the second pulley 24, and the other end of the first steel wire rope is passed around the first pulley 23 and wound around the drum of the hoist 20;
[0093] A third pulley 26, wherein the third pulley 26 is mounted on the first rotating shaft 21, one end of a second steel wire rope 27 is wound around the third pulley 26, and a hook 28 is provided at the other end of the second steel wire rope 27;
[0094] The method for calculating the shortest length of the first steel wire rope 25 is as follows:
[0095] N=D1 / D2
[0096] S=N*h
[0097] F=W / N
[0098] Among them, D1 represents the radius of the second pulley 24, D2 represents the radius of the third pulley 26, N represents the radius ratio of the second pulley 24 to the third pulley 26, S represents the displacement of the first steel wire rope 25, h represents the displacement of the second steel wire rope 27, F represents the tension of the first steel wire rope 25, and W represents the tension exerted on the second steel wire rope 27. The shortest length of the first steel wire rope 25 can be calculated through the radius ratio of the second pulley 24 to the third pulley 26 and the displacement of the second steel wire rope 27.
[0099] The working principle and beneficial effects of the above technical solution are as follows: first, the hook 28 at the lower end of the second steel wire rope 27 is hooked into the lifting ear 10 of the rammer 8, and the winch 20 is arranged at the upper end of the fuselage 18. The winch 20 rotates to tighten the first steel wire rope 25, and the first steel wire rope 25 changes direction through the first pulley 23 installed on the second rotating shaft 22, and then drives the second pulley 24 on the first rotating shaft 21 to rotate, and the first steel wire rope 25 in the second pulley 24 is gradually wound around the winch 20. When the second pulley 24 rotates, it drives the third pulley 26 to rotate, thereby tightening and winding the second steel wire rope 27. In the third pulley 26, the hook 28 at the lower end of the second steel wire rope 27 drives the rammer 8 to move upward until it reaches the height required for strong tamping, and then the hook 28 is automatically released, and the rammer 8 falls freely downward to complete a strong tamping work. The radius ratio N of the radius D1 of the second pulley 24 and the radius D2 of the third pulley 26, and then the maximum height h of the rammer 8, can be used to calculate the shortest length of the first steel wire rope 25, thereby saving costs. According to the weight W of the rammer 8, the minimum traction force F required for the first steel wire rope 25 can also be calculated, and then a winch 20 that meets the needs can be selected.
[0100] In one embodiment, Fig. 9 , Fig.10 As shown, a cavity 29 is provided near the center of the upper end of the hammer body 9, and a circular hole 30 is also provided in the hammer body 9. One end of the circular hole 30 is connected to the cavity 29, and the other end of the circular hole 30 extends to the bottom of the hammer body 9. A straight groove 31 is also provided at the bottom of the hammer body 9, and the straight groove 31 is connected to the circular hole 30. The length of the straight groove 31 is equal to the diameter of the hammer body 9. A cleaning device is also provided in the cavity 29, and the cleaning device includes:
[0101] An electric telescopic rod 32, wherein the electric telescopic rod 32 is disposed in the cavity 29, wherein one end of the electric telescopic rod 32 is retractable downward and aligned with the circular hole 30, and the other end of the electric telescopic rod 32 is fixedly connected to the inner wall of the upper end of the cavity 29;
[0102] A second spring 33, the second spring 33 is sleeved on the electric telescopic rod 32, one end of the second spring 33 is fixedly connected to the inner wall of the upper end of the cavity 29, and a support plate 34 is arranged at the other end of the second spring 33, the support plate 34 is located below the electric telescopic rod 32, and a bearing 35 is arranged at the center of the bottom of the support plate 34, and the bearing 35 is concentric with the circular hole 30;
[0103] A rotating rod 36, wherein the rotating rod 36 is disposed in the circular hole 30, one end of the rotating rod 36 is fixedly connected to the inner ring of the bearing 35, and the other end of the rotating rod 36 extends to the straight groove 31;
[0104] A scraper 37, wherein the scraper 37 is disposed in the slot 31, the center of the scraper 37 is fixedly connected to the rotating rod 36, the scraper 37 is configured in an I-shape, and the length of the scraper 37 is equal to the length of the slot 31;
[0105] A first torsion spring 38, wherein the first torsion spring 38 is sleeved on the rotating rod 36 and is located in the circular hole 30, wherein an upper connecting end of the first torsion spring 38 is fixedly mounted on a side wall of the circular hole 30, and a lower connecting end of the first torsion spring 38 is mounted on the rotating rod 36;
[0106] A second torsion spring 39, which is sleeved on the rotating rod 36 and located in the circular hole 30. The second torsion spring 39 is located below the first torsion spring 38 and is coaxially arranged with the first torsion spring 38. The upper connecting end of the second torsion spring 39 is installed on the rotating rod 36, and the lower connecting end of the second torsion spring 39 is fixedly installed on the side wall of the circular hole 30;
[0107] A motor 40, wherein one end of the motor 40 away from the output shaft is fixedly connected to the inner wall of the upper end of the cavity 29, and a first bevel gear 41 is provided at one end of the output shaft of the motor 40;
[0108] A second bevel gear 42, wherein the second bevel gear 42 is mounted on the rotating rod 36, and the second bevel gear 42 is located between the first bevel gear 41 and the supporting plate 34, and the tooth shape of the second bevel gear 42 is meshed with the tooth shape of the first bevel gear 41;
[0109] A processor 43, wherein the processor 43 is disposed in the cavity 29, the processor 43 is electrically connected to a mobile power source installed in the cavity 29, the processor 43 is electrically connected to the motor 40 and the electric telescopic rod 32 respectively, and the processor 43 wirelessly communicates with a mobile terminal.
[0110] The working principle and beneficial effects of the above technical solution are as follows: a cavity 29 is provided in the hammer body 9, and a protective cover is also provided on the side wall of the hammer body 9. The cavity 29 in the hammer body 9 can be seen by opening the protective cover. A circular hole 30 is also provided in the hammer body 9, and the circular hole 30 is connected with the cavity 29 and the bottom of the hammer body 9 respectively. A processor 43 is provided in the cavity 29. The model of the processor 43 is MSM8274AB. The processor 43 is powered by a mobile power supply. The processor 43 communicates wirelessly with the mobile terminal. The mobile terminal is a mobile phone. The instruction is sent to the processor 43 through the mobile phone. Then the processor 43 controls the telescopic end of the electric telescopic rod 32 to move downward, and at the same time controls the motor 40 to start and drive the first bevel gear 41 to rotate. The electric telescopic rod 32 pushes the support plate 34 to move downward, and at the same time controls the rotating rod 36 to move downward. The rotating rod 36 drives the scraper 37 to extend from the slot 31, and then the second bevel gear 42 of the rotating rod 36 is engaged with the first bevel gear 41 at the output end of the motor 40, and the rotating rod 36 starts to rotate. The scraper 37 is driven to rotate and start cleaning the bottom of the hammer body 9. The scraper 37 is set in an I-shaped shape, and the upper end of the scraper 37 is flush with the bottom of the hammer body 9, so that the soil attached to the bottom of the hammer body 9 can be scraped off to keep the bottom of the hammer body 9 flat. After cleaning, the command is sent to the processor 43 through the mobile phone to control the motor 40 to stop rotating, and the electric telescopic rod 32 is retracted at the same time. Through the elastic force of the first torsion spring 38 and the second torsion spring 39, the rotating rod 36 rotates to rotate and align the scraper 37 with the slot 31. At the same time, under the action of the second spring 33, the rotating rod 36 automatically resets, and the scraper 37 also returns to its original position and enters the slot 31. A cleaning device is set to replace manual cleaning of the bottom of the hammer body 9. When cleaning, it is only necessary to raise the hammer body 9, and then remotely control the cleaning device to clean the bottom of the hammer body 9, which improves safety and avoids the hammer body 9 from accidentally falling and injuring people during manual cleaning. Cleaning the bottom of the hammer body 9 can improve the quality of strong compaction and make the strong compaction surface smoother.
[0111] The embodiment of the present invention also provides a construction method of a compacted gravel pier reinforcement structure supported by a densely packed three-dimensional grid, such as Fig.11 As shown, the following steps are included:
[0112] Step 1: Use drilling methods to explore the tidal channel strata;
[0113] Step 2: Design the construction of the soft foundation 2 of the tidal channel, and design the depth of the compacted gravel pier 1 and the thickness of the gravel cover layer 3 according to the soft foundation 2 and the adjacent artificial land formation;
[0114] Step 3: compacting the gravel pier body 1 by the rammer 8 of the dynamic tamping machine 7, so that the gravel pier body 1 meets the designed depth requirement;
[0115] Step 4: Clean the upper silt of the soft foundation 2 of the tidal channel;
[0116] Step 5: construct a crushed stone covering layer 3, and lay the crushed stone covering layer 3 on the upper layer of the soft foundation 2. The crushed stone covering layer 3 meets the anti-scouring requirements, and the upper end of the crushed stone pier body 1 is connected to the crushed stone covering layer 3 to form a compacted crushed stone pier reinforcement structure supported by a dense three-dimensional grid.
[0117] The working principle and beneficial effects of the above technical solution are as follows: before starting construction, drilling is used to explore the tidal channel stratum to confirm the tidal channel stratum structure, and then the construction of the tidal channel soft foundation 2 is designed based on the explored stratum structure. According to the soft foundation 2 and the adjacent artificial land stratum conditions, the required compacted gravel pier body 1 depth and the thickness of the gravel cover layer 3 are designed. Then, according to the designed depth, the rammer 8 of the dynamic rammer 7 is used to tamp the gravel pier body 1 so that the gravel pier body 1 meets the designed depth requirement, and then the tidal channel surface is desilted. and backfill the mountain stones. The elevation after dredging and backfilling cannot exceed the low tide level. After the tidal channel is leveled, a crushed stone covering layer 3 is constructed and laid on the upper layer of the soft foundation 2. The crushed stone covering layer 3 meets the anti-scouring requirements, so that the upper end of the crushed stone pier body 1 is connected to the crushed stone covering layer 3 to form a compacted crushed stone pier reinforcement structure supported by a dense three-dimensional grid. By reinforcing the foundation of the tidal channel to form a compacted crushed stone pier reinforcement structure supported by a dense three-dimensional grid, the problem of blockage caused by the soft foundation 2 of the tidal channel due to deep sliding uplift and collapse and instability of the adjacent slopes is solved.
[0118] In one embodiment, in step 3, the depth of the gravel pier body 1 is probed by drilling or ultra-heavy cone dynamic probing. If the depth of the gravel pier body 1 meets the depth requirement, the next step of construction is carried out. If the depth of the gravel pier body 1 does not meet the depth requirement, the gravel pier body 1 is further compacted.
[0119] The working principle and beneficial effects of the above technical solution are as follows: during the construction process, drilling or super-heavy cone dynamic probing is required to measure the depth of the gravel pier 1 so that the gravel pier 1 reaches the depth range below the shear sliding surface of the soft foundation 2, thereby increasing the weight of the soil and enhancing the stability and anti-uplift performance of the soft foundation 2.
[0120] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A construction method for a compacted gravel pier reinforcement structure supported by a densely packed three-dimensional grid, characterized in that: The reinforced structure of the compacted gravel pier includes: A rubble pier (1), wherein a plurality of the rubble piers (1) are arranged in a soft foundation (2) of a tidal channel; A crushed stone covering layer (3), wherein the crushed stone covering layer (3) is laid on top of the soft foundation (2), and the bottom of the crushed stone covering layer (3) is connected to the upper end of the crushed stone pier body (1); The construction method of the compacted gravel pier reinforcement structure includes the following steps: Step 1: Use drilling methods to explore the tidal channel strata; Step 2: Design the construction of the soft foundation (2) of the tidal channel, and design the depth of the compacted gravel pier (1) and the thickness of the gravel cover layer (3) according to the soft foundation (2) and the adjacent artificial land formation conditions; Step 3: compacting the gravel pier body (1) by means of a tamping hammer (8) of a dynamic tamping machine (7) so that the gravel pier body (1) meets the designed depth requirement; Step 4: Clean the upper silt of the soft foundation (2) of the tidal channel; Step 5: constructing a crushed stone covering layer (3), laying the crushed stone covering layer (3) on the upper layer of the soft foundation (2), wherein the crushed stone covering layer (3) meets the anti-scouring requirements, and connecting the upper end of the crushed stone pier body (1) with the crushed stone covering layer (3), so as to form a compacted crushed stone pier reinforcement structure supported by a densely packed three-dimensional grid; A dynamic compaction machine (7) is arranged on the soft foundation (2), and a tamping hammer (8) is arranged on the dynamic compaction machine (7); The rammer (8) comprises: A hammer body (9), wherein a plurality of exhaust holes (11) penetrating the upper and lower end surfaces of the hammer body (9) are arranged in the hammer body (9), the bottom of the exhaust hole (11) is arranged as a conical hole (12), and the cross-sectional diameter of the lower end of the conical hole (12) is larger than the cross-sectional diameter of the upper end of the conical hole (12); A lifting lug (10), wherein the upper end of the hammer body (9) is provided with a lifting lug (10); A cavity (29) is provided in the hammer body (9) near the center of the upper end. A circular hole (30) is also provided in the hammer body (9). One end of the circular hole (30) is communicated with the cavity (29). The other end of the circular hole (30) extends to the bottom of the hammer body (9). A straight groove (31) is also provided at the bottom of the hammer body (9). The straight groove (31) is communicated with the circular hole (30). The length of the straight groove (31) is equal to the diameter of the hammer body (9). A cleaning device is also provided in the cavity (29). The cleaning device comprises: an electric telescopic rod (32), the electric telescopic rod (32) being arranged in the cavity (29), the electric telescopic rod (32) having one telescopic end pointing downward and aligned with the circular hole (30), and the other end of the electric telescopic rod (32) being fixedly connected to the inner wall of the upper end of the cavity (29); a second spring (33), the second spring (33) being sleeved on the electric telescopic rod (32), one end of the second spring (33) being fixedly connected to the inner wall of the upper end of the cavity (29), a support plate (34) being provided at the other end of the second spring (33), the support plate (34) being located below the electric telescopic rod (32), a bearing (35) being provided at the center of the bottom of the support plate (34), the bearing (35) being concentric with the circular hole (30); A rotating rod (36), the rotating rod (36) being disposed in the circular hole (30), one end of the rotating rod (36) being fixedly connected to the inner ring of the bearing (35), and the other end of the rotating rod (36) extending to the straight groove (31); a scraper (37), the scraper (37) being arranged in the slot (31), the center of the scraper (37) being fixedly connected to the rotating rod (36), the scraper (37) being arranged in an I-shape, and the length of the scraper (37) being equal to the length of the slot (31); a first torsion spring (38), the first torsion spring (38) being sleeved on the rotating rod (36) and located in the circular hole (30), the upper connecting end of the first torsion spring (38) being fixedly mounted on the side wall of the circular hole (30), and the lower connecting end of the first torsion spring (38) being mounted on the rotating rod (36); a second torsion spring (39), the second torsion spring (39) being sleeved on the rotating rod (36) and located in the circular hole (30), the second torsion spring (39) being located below the first torsion spring (38) and being coaxially arranged with the first torsion spring (38), the upper connecting end of the second torsion spring (39) being mounted on the rotating rod (36), and the lower connecting end of the second torsion spring (39) being fixedly mounted on the side wall of the circular hole (30); A motor (40), wherein one end of the motor (40) away from the output shaft is fixedly connected to the inner wall of the upper end of the cavity (29), and a first bevel gear (41) is provided at one end of the output shaft of the motor (40); a second bevel gear (42), the second bevel gear (42) being mounted on the rotating rod (36), the second bevel gear (42) being located between the first bevel gear (41) and the supporting plate (34), the tooth shape of the second bevel gear (42) being meshed with the tooth shape of the first bevel gear (41); A processor (43), wherein the processor (43) is disposed in the cavity (29), the processor (43) is electrically connected to a mobile power source installed in the cavity (29), the processor (43) is electrically connected to the motor (40) and the electric telescopic rod (32), respectively, and the processor (43) wirelessly communicates with a mobile terminal.
2. The construction method of the compacted gravel pier reinforcement structure supported by a densely packed three-dimensional grid according to claim 1 is characterized in that: The gravel pier body (1) comprises a first gravel pier (4), a second gravel pier (5) and a third gravel pier (6), wherein the first gravel pier (4) is arranged at intervals, the second gravel pier (5) is arranged at the center of a line connecting two adjacent first gravel piers (4), and the third gravel pier (6) is arranged at the center of a line connecting two adjacent second gravel piers (5).
3. The construction method of the compacted gravel pier reinforcement structure supported by a densely packed three-dimensional grid according to claim 1 is characterized in that: A hole cleaning device is provided at the upper end of the hammer body (9), and the hole cleaning device comprises: A guide rod (13), wherein two guide rods (13) are provided, and the two guide rods (13) are symmetrically arranged on both sides of the exhaust hole (11), and one end of the guide rod (13) is fixedly connected to the upper end of the hammer body (9); a first spring (14), wherein the first spring (14) is sleeved on the guide rod (13), and one end of the first spring (14) is fixedly connected to the upper end of the hammer body (9); a baffle (15), wherein two through holes (16) are provided on the baffle (15), the two guide rods (13) respectively pass through the two through holes (16), the guide rods (13) are slidably connected to the through holes (16), and the bottom of the baffle (15) is fixedly connected to the other end of the first spring (14); A vertical rod (17), the vertical rod (17) being arranged in the exhaust hole (11), one end of the vertical rod (17) being fixedly connected to the baffle plate (15), the vertical rod (17) being cylindrical, the cross-sectional diameter of the vertical rod (17) being smaller than the cross-sectional diameter of the exhaust hole (11), and one end of the vertical rod (17) being far from the baffle plate (15) being arranged in a pointed cone shape.
4. The construction method of the compacted gravel pier reinforcement structure supported by a densely packed three-dimensional grid according to claim 3 is characterized in that: The dynamic compaction machine (7) comprises: Fuselage (18); A boom (19), the boom (19) being installed at one end of the fuselage (18) in a forward-inclined manner, and a reinforcement structure being provided between the boom (19) and the fuselage (18).
5. The construction method of the compacted gravel pier reinforcement structure supported by a densely packed three-dimensional grid according to claim 4 is characterized in that: Also included is a traction device, the traction device comprising: a hoist (20), the hoist (20) being arranged at the upper end of the fuselage (18); A first rotating shaft (21), the first rotating shaft (21) being arranged at the upper end of the arm frame (19) and being rotatably connected to the arm frame (19); a second rotating shaft (22), the second rotating shaft (22) being disposed in the middle of the arm frame (19) and being rotatably connected to the arm frame (19), and a first pulley (23) being mounted on the second rotating shaft (22); a second pulley (24), the second pulley (24) being mounted on the first rotating shaft (21), one end of a first steel wire rope (25) being wound around the second pulley (24), and the other end of the first steel wire rope (25) being passed around the first pulley (23) and wound around a drum of the hoist (20); a third pulley (26), the third pulley (26) being mounted on the first rotating shaft (21), one end of a second steel wire rope (27) being wound around the third pulley (26), and the other end of the second steel wire rope (27) being provided with a hook (28); The method for calculating the shortest length of the first steel wire rope (25) is as follows: Wherein, D1 represents the radius of the second pulley (24), D2 represents the radius of the third pulley (26), N represents the ratio of the radius of the second pulley (24) to the radius of the third pulley (26), S represents the displacement of the first steel wire rope (25), h represents the displacement of the second steel wire rope (27), F represents the tension of the first steel wire rope (25), and W represents the tension exerted on the second steel wire rope (27). The shortest length of the first steel wire rope (25) can be calculated through the ratio of the radius of the second pulley (24) to the third pulley (26) and the displacement of the second steel wire rope (27).
6. The construction method of the compacted gravel pier reinforcement structure supported by a densely packed three-dimensional grid according to claim 1 is characterized in that: In step 3, the depth of the gravel pier (1) is measured by drilling or ultra-heavy cone dynamic penetration. If the depth of the gravel pier (1) meets the depth requirement, the next step of construction is carried out. If the depth of the gravel pier (1) does not meet the depth requirement, the gravel pier (1) is further compacted.