A cascade utilization system of steam condensate energy in coal chemical process
Through the coal chemical process steam condensate energy cascade utilization system, the cascade utilizes low-level waste heat, which improves the efficiency of the refrigeration unit and reduces costs, and is used to prepare hot water for heating, solving the problem of low-temperature waste heat utilization rate and achieving an improvement in energy efficiency .
Patent Information
- Application Number
- CN202010580479.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-06-23
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2040-06-23
AI Technical Summary
The low-temperature waste heat utilization rate in coal chemical projects is low, resulting in low energy efficiency and requires the consumption of a large amount of high-grade steam or electricity for refrigeration, which increases production costs.
A coal chemical process steam condensate energy cascade utilization system is designed, including a closed condensate recovery unit, a jet refrigeration unit, a hot water heat exchange unit and a chilled water heat exchange unit. The cooling of the refrigeration unit is reduced through the cascade utilization of low-level waste heat. Water temperature improves the efficiency of the refrigeration unit and is further used to prepare hot water heating.
It improves the efficiency of the process refrigeration unit, reduces operating costs, realizes efficient utilization of low-level waste heat, increases energy utilization efficiency, and reduces production costs.
Smart Images

Figure CN111595172B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of energy conservation in coal chemical process, and in particular relates to a cascade utilization system of steam condensate energy in coal chemical process. Background Art
[0002] Waste heat resources are considered to be the fifth largest conventional energy source after coal, oil, natural gas and hydropower, and are also the focus of industrial energy conservation. At present, high-temperature waste heat is fully utilized in my country, but the utilization rate of low-temperature waste heat is still very low. In several typical sections of coal chemical projects such as transformation, conversion, methanol synthesis, methane synthesis, ammonia synthesis, and multi-stage compression, such problems are more prominent. These sections will generate a large amount of high-temperature waste heat, which will form low-temperature waste heat after primary utilization, and mostly exist in the form of saturated steam condensate, and then the steam condensate is cooled by water cooling or air cooling. How to fully recover and utilize this part of low-level waste heat, such as turning waste into treasure, reducing production costs, and improving energy utilization efficiency, is a difficult problem that engineering projects need to face.
[0003] While coal chemical projects generate a large amount of low-level waste heat, some processes such as low-temperature methanol washing, LNG, and ammonia synthesis also have a large demand for cooling capacity, which requires a large amount of high-grade steam or electricity. The optimization and control of cooling water temperature has a positive significance for reducing the comprehensive energy consumption of refrigeration units and cooling towers. According to literature reports, under the condition of a certain cooling capacity, when the cooling water temperature rises by 1°C, the load of the chiller motor increases by 1.6%, the unit cooling efficiency decreases, and the COP decreases by 4%.
[0004] If the low-level waste heat generated by the coal chemical project itself can be used for cooling and the cooling water temperature of the process refrigeration unit can be reduced, the efficiency of the process refrigeration unit will undoubtedly be improved. While utilizing the low-level waste heat, the original process refrigeration system can be saved. At the same time, for the northern region, after the low-level waste heat is used for cooling, it can also be further used to prepare hot water for winter heating or heating.
[0005] In addition, the jet refrigeration unit does not involve other moving parts except the working fluid pump. The working vapor and refrigerant in the system are the same substance, and does not require refrigerant separation equipment like the lithium bromide absorption refrigerator. It has the advantages of simple structure, low power consumption and small footprint. It will undoubtedly become the first choice for low-level waste heat refrigeration. Summary of the invention
[0006] In view of this, the invention aims to propose a coal chemical process steam condensate energy cascade utilization system to further utilize low-level waste heat, improve the efficiency of the process refrigeration unit, reduce the operating cost of the process system, and save energy and protect the environment.
[0007] To achieve the above object, the technical solution created by the present invention is implemented as follows:
[0008] A coal chemical process steam condensate energy cascade utilization system includes a closed condensate recovery unit, an ejector refrigeration unit, a hot water heat exchange unit, a process refrigeration unit, and a cold water heat exchange unit. The closed condensate recovery unit is connected to the ejector refrigeration unit, and the ejector refrigeration unit is respectively connected to the hot water heat exchange unit and the heat exchange refrigeration unit arranged in parallel. The heat exchange refrigeration unit includes a cold water heat exchange unit and a process refrigeration unit connected in sequence.
[0009] This system can further utilize low-level waste heat, improve the efficiency of process refrigeration units, reduce process system operating costs, and save energy and protect the environment.
[0010] While reducing the cooling water temperature of the process refrigeration system and improving the efficiency of the process refrigeration unit, the energy in the process steam condensate is fully recovered.
[0011] Furthermore, the closed condensate recovery unit includes a condensate tank and a condensate pump which are connected in sequence, the condensate tank is connected to an external process condensate inlet, and the condensate pump is connected to a water outlet of the closed condensate recovery unit.
[0012] Furthermore, the ejector refrigeration unit includes a first generator, a first evaporator, and a first condenser arranged in parallel, and also includes an ejector, wherein the first inlet of the ejector is connected to the refrigerant outlet of the first generator, the second inlet of the ejector is connected to the refrigerant outlet of the first evaporator, and the outlet of the ejector is connected to the refrigerant inlet of the first condenser.
[0013] Furthermore, the refrigerant outlet of the first condenser is connected to the refrigerant inlet of the first evaporator after passing through a throttle valve, and the refrigerant outlet of the first condenser is also connected to the refrigerant inlet of the first generator after passing through a working fluid pump.
[0014] Furthermore, the cold water inlet of the first condenser is connected to the external cooling water inlet, and the cold water outlet of the first condenser is connected to the external cooling water outlet.
[0015] Furthermore, the condensate inlet of the first generator is connected to the water outlet of the closed condensate recovery unit, and the condensate outlet of the first generator is connected to the hot water heat exchange unit.
[0016] Furthermore, the hot water heat exchange unit includes a first water-to-water heat exchanger, the condensate inlet of the first water-to-water heat exchanger is connected to the condensate outlet of the first generator, the condensate outlet of the first water-to-water heat exchanger is connected to the external process condensate outlet, the hot water inlet of the first water-to-water heat exchanger is connected to the external hot water return port, and the hot water outlet of the first water-to-water heat exchanger is connected to the external hot water supply port.
[0017] Furthermore, the hot water heat exchange unit also includes a bypass valve, the liquid inlet of the bypass valve is connected to the condensate outlet of the first generator, and the liquid outlet of the bypass valve is connected to the external process condensate outlet.
[0018] After the low-level waste heat is used for refrigeration, it can be further used to prepare hot water for winter heating or heating, which further utilizes the low-level waste heat and has a high heat utilization rate.
[0019] The cascade utilization of low-level waste heat turns waste into treasure, improves energy utilization efficiency, reduces production costs, and brings huge economic benefits to the enterprise.
[0020] Furthermore, the process refrigeration unit includes a second evaporator and a second condenser 43 arranged in parallel, the refrigerant outlet of the second evaporator is connected to the refrigerant inlet of the second condenser after passing through the compressor, the refrigerant outlet of the second condenser is connected to the refrigerant inlet of the second evaporator after passing through the expansion valve, the medium inlet of the second evaporator is connected to the inlet of the external process cold medium, and the medium outlet of the second evaporator is connected to the outlet of the external process cold medium.
[0021] The cooling water in the second condenser is lower in temperature than the commonly used cooling water, which improves the efficiency of the process refrigeration unit and reduces operating costs.
[0022] Furthermore, the cold water heat exchanger unit includes a second water-to-water heat exchanger and a cold water pump connected in sequence, the cold water pump is connected to the cold water inlet of the first evaporator, the second water-to-water heat exchanger is connected to the cold water outlet of the first evaporator, the cold water outlet of the second water-to-water heat exchanger is connected to the cooling water inlet of the second condenser, the cooling water outlet of the second condenser is connected to the external cooling water outlet, and the cooling water inlet of the second water-to-water heat exchanger is connected to the external cooling water inlet.
[0023] Compared with the prior art, the coal chemical process steam condensate energy cascade utilization system created by the present invention has the following advantages:
[0024] (1) The coal chemical process steam condensate energy cascade utilization system described in the present invention can further utilize low-level waste heat, improve the efficiency of the process refrigeration unit, reduce the operating cost of the process system, and save energy and protect the environment.
[0025] (2) The coal chemical process steam condensate energy cascade utilization system described in the present invention can fully recover the energy in the process steam condensate while reducing the cooling water temperature of the process refrigeration system and improving the efficiency of the process refrigeration unit.
[0026] (3) The coal chemical process steam condensate energy cascade utilization system described in the present invention can further prepare hot water for winter heating or heating after the low-level waste heat is used for refrigeration, further utilizing the low-level waste heat and achieving a high heat utilization rate.
[0027] (4) The coal chemical process steam condensate energy cascade utilization system described in the present invention utilizes low-level waste heat in a cascade manner, turning waste into treasure, improving energy utilization efficiency while reducing production costs, and bringing huge economic benefits to the enterprise.
[0028] (5) The coal chemical process steam condensate energy cascade utilization system described in the present invention adopts an ejector refrigeration unit for refrigeration, which saves space and has little impact on the process layout. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] The drawings constituting part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:
[0030] Figure 1 A schematic diagram of a system for cascaded utilization of energy of steam condensate in a coal chemical process as described in an embodiment of the present invention.
[0031] Description of reference numerals:
[0032] 1-closed condensate recovery unit; 11-condensate tank; 12-condensate pump;
[0033] 2-ejection refrigeration unit; 21-ejector; 22-first generator; 23-first evaporator; 24-first condenser; 25-throttle valve; 26-working fluid pump;
[0034] 3-hot water heat exchange unit; 31-hot water pump; 32-first water-to-water heat exchanger; 33-bypass valve;
[0035] 4-process refrigeration unit; 41-second evaporator; 42-compressor; 43-second condenser 43; 44-expansion valve; 45-cold medium pump;
[0036] 5-cold water heat exchange unit; 51-cold water pump; 52-second water-to-water heat exchanger;
[0037] A-process condensate inlet; B-hot water supply inlet; C-hot water return inlet; D-process condensate outlet; E-process cold medium inlet; F-process cold medium outlet; G-cooling water inlet; H-cooling water outlet. DETAILED DESCRIPTION
[0038] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.
[0039] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0040] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. Unless otherwise clearly specified and limited, the term "fixed connection" can be a commonly used fixed connection method such as plug-in, welding, threaded connection, bolt connection, etc. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0041] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments.
[0042] As shown in the figure, when the system is initially operated, the cooling water circulation system is first turned on, using the cold medium pump 45, the hot water pump 31, and the cold water pump 51; secondly, the closed condensate recovery unit 1, the jet refrigeration unit 2, the hot water heat exchange unit 3, the process refrigeration unit 4, and the cold water heat exchange unit 5 are turned on.
[0043] The steam condensate (generally about 150°C) from different process devices in the external pipe network enters the closed condensate recovery unit 1 from the external process condensate inlet A, and is collected by the condensate tank 11 and pressurized by the condensate pump 12 before being transported to the ejector refrigeration unit 2. The steam condensate is cooled to about 105°C by heat exchange in the first generator 22 and then enters the hot water heat exchange unit 3.
[0044] During the heating season, the steam condensate A enters the first water-to-water heat exchanger 32 to continue to heat exchange and cool to about 80°C after heat exchange and cooling in the first generator 22. The steam condensate after the second cooling flows out from the process condensate outlet D for collection. The first water-to-water heat exchanger 32 is used to heat the hot water return water C (generally about 70°C) from the external network. The hot water return water is pressurized by the hot water pump 31 and heated to about 95°C in the first water-to-water heat exchanger 32. It then flows out from the hot water supply port B and is delivered to the external pipe network as hot water supply. The heated hot water can be used as hot water for daily life.
[0045] After the low-level waste heat is used for refrigeration, it can be further used to prepare hot water for winter heating or heating, which further utilizes the low-level waste heat and has a high heat utilization rate.
[0046] The cascade utilization of low-level waste heat turns waste into treasure, improves energy utilization efficiency, reduces production costs, and brings huge economic benefits to the enterprise.
[0047] During the non-heating season, the steam condensate A, after heat exchange and cooling in the first generator 22 , directly passes through the bypass valve 33 and flows out from the process condensate outlet D for collection without passing through the first water-to-water heat exchanger 32 .
[0048] The cooling water G from the external pipe network is divided into two paths: one path flows through the first condenser 24 and is used as cooling water for the ejector refrigeration unit 2; the other path passes through the second water-to-water heat exchanger 52, exchanges heat with the cold water from the first evaporator 23, and after being cooled to the optimal cooling temperature point, is used as cooling water in the second condenser 43 of the process refrigeration unit 4.
[0049] Refrigerant circulation system inside the ejector refrigeration unit 2: Gaseous refrigerant is ejected from the ejector 21 outlet and flows into the first condenser 24. The gaseous condensing agent is cooled by cooling water from the external network in the first condenser 24 and condensed into liquid refrigerant at a temperature of about 45-50°C. At this time, the cooling water is heated from about 30-35°C to about 35-40°C.
[0050] After the liquid refrigerant flows out of the first condenser 24, one stream is pressurized by the working fluid pump 26 and enters the first generator 22, where it exchanges heat with the condensate and vaporizes into high-temperature and high-pressure refrigerant vapor at a temperature of about 78-100°C, and then enters the ejector 21; the other stream passes through the throttle valve 25 and enters the first evaporator 23, where it undergoes a phase change and becomes low-temperature and low-pressure refrigerant vapor at a temperature of about 0-4°C. The low-temperature and low-pressure refrigerant vapor is ejected into the ejector 21 by the ejector 21, and then enters the first condenser 24 to enter the next cycle.
[0051] The gas-liquid phase change in the first evaporator 23 requires heat absorption, and the heat comes from the cold water flowing into the first evaporator 23 from the cold water pump 51 (at the beginning, the cold water pump 51 is connected to the external network to inject cold water, and after a period of time, the cold water circulates in the system). The cold water is cooled to about 7°C in the first evaporator 23, and then flows into the second water-to-water heat exchanger 52. In the second water-to-water heat exchanger 52, it exchanges heat with the cooling water from the external network and heats up to about 12°C before being circulated to the first evaporator 23. The cooling water after heat exchange and cooling in the second water-to-water heat exchanger 52 flows into the second condenser 43 as cooling water.
[0052] At this time, the cooling water in the second condenser 43 has a lower temperature than the commonly used cooling water, which improves the efficiency of the process refrigeration unit 4 and reduces the operating cost.
[0053] Refrigerant circulation system inside the process refrigeration unit 4: The refrigerant vapor flows out of the second evaporator 41, enters the second condenser 43 after being pressurized by the compressor 42, and is cooled to become refrigerant condensate in the second condenser 43. The refrigerant condensate is throttled by the expansion valve 44, enters the second evaporator 41 for gasification, and enters the next cycle. At the same time, the process cold medium E from the external pipe network is cooled by the second evaporator 41 of the process refrigeration unit 4, and is pressurized by the cold medium pump 45 and sent back to the external pipe network.
[0054] After production is finished, the shutdown operation is the opposite of the initial operation.
[0055] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A coal chemical process steam condensate energy cascade utilization system, Features: The invention comprises a closed condensate recovery unit (1), an ejection refrigeration unit (2), a hot water heat exchange unit (3), a process refrigeration unit (4), and a cold water heat exchange unit (5); the closed condensate recovery unit (1) is connected to the ejection refrigeration unit (2); the ejection refrigeration unit (2) is respectively connected to the hot water heat exchange unit (3) and the heat exchange refrigeration unit; the heat exchange refrigeration unit comprises a cold water heat exchange unit (5) and a process refrigeration unit (4) which are connected in sequence; The ejector refrigeration unit (2) comprises a first generator (22), a first evaporator (23), and a first condenser (24) arranged in parallel, and also comprises an ejector (21), wherein a first inlet of the ejector (21) is connected to a refrigerant outlet of the first generator (22), a second inlet of the ejector (21) is connected to a refrigerant outlet of the first evaporator (23), and an outlet of the ejector (21) is connected to a refrigerant inlet of the first condenser (24); steam condensate is heat exchanged and cooled in the first generator (22); The process refrigeration unit (4) comprises a second evaporator (41) and a second condenser (43) which are arranged in parallel, the refrigerant outlet of the second evaporator (41) is connected to the refrigerant inlet of the second condenser (43) after passing through a compressor (42), the refrigerant outlet of the second condenser (43) is connected to the refrigerant inlet of the second evaporator (41) after passing through an expansion valve (44), the medium inlet of the second evaporator (41) is connected to an external process cold medium inlet (E), and the medium outlet of the second evaporator (41) is connected to an external process cold medium outlet (F); The cold water heat exchange unit (5) comprises a second water-to-water heat exchanger (52) and a cold water pump (51) which are connected in sequence, the cold water pump (51) being connected to the cold water inlet of the first evaporator (23), the second water-to-water heat exchanger (52) being connected to the cold water outlet of the first evaporator (23), the cold water outlet of the second water-to-water heat exchanger (52) being connected to the cooling water inlet of the second condenser (43), the cooling water outlet of the second condenser (43) being connected to an external cooling water outlet (H), and the cooling water inlet of the second water-to-water heat exchanger (52) being connected to an external cooling water inlet (G); The hot water heat exchange unit (3) comprises a first water-to-water heat exchanger (32), the condensate inlet of the first water-to-water heat exchanger (32) is connected to the condensate outlet of the first generator (22), the condensate outlet of the first water-to-water heat exchanger (32) is connected to an external process condensate outlet (D), the hot water inlet of the first water-to-water heat exchanger (32) is connected to an external hot water return port (C), and the hot water outlet of the first water-to-water heat exchanger (32) is connected to an external hot water supply port (B).
2. A coal chemical process steam condensate energy cascade utilization system according to claim 1, Features: The closed condensate recovery unit (1) comprises a condensate tank (11) and a condensate pump (12) which are connected in sequence; the condensate tank (11) is connected to an external process condensate inlet (A); and the condensate pump (12) is connected to a water outlet of the closed condensate recovery unit (1).
3. A coal chemical process steam condensate energy cascade utilization system according to claim 1, Features: The refrigerant outlet of the first condenser (24) is connected to the refrigerant inlet of the first evaporator (23) after passing through a throttle valve (25), and the refrigerant outlet of the first condenser (24) is also connected to the refrigerant inlet of the first generator (22) after passing through a working fluid pump (26).
4. A coal chemical process steam condensate energy cascade utilization system according to claim 1, Features: The cold water inlet of the first condenser (24) is connected to the external cooling water inlet (G), and the cold water outlet of the first condenser (24) is connected to the external cooling water outlet (H).
5. A coal chemical process steam condensate energy cascade utilization system according to claim 1, Features: The condensate inlet of the first generator (22) is connected to the water outlet of the closed condensate recovery unit (1), and the condensate outlet of the first generator (22) is connected to the hot water heat exchange unit (3).
6. A coal chemical process steam condensate energy cascade utilization system according to claim 1, Features: The hot water heat exchange unit (3) further comprises a bypass valve (33), the liquid inlet of the bypass valve (33) being connected to the condensate outlet of the first generator (22), and the liquid outlet of the bypass valve (33) being connected to an external process condensate outlet (D).
Citation Information
Patent Citations
Spraying-compression combination type large temperature difference heat exchanger unit
CN103982933A
Dead steam recovery technique
CN104930873A
Bypass device of heat exchanger unit secondary side
CN203657077U
Coal industry low level technology waste heat refrigerating system
CN206291528U
Coal chemical process steam condensate energy gradient utilization system
CN212339992U