A new coke replenishment system for activated coke flue gas purification process
Through the integrated active coke flue gas purification process, the new coke supplement system has solved the problem of multiple reflows of active cokes and construction and maintenance difficulties in the new coke supplement system, and achieved the effect of reducing the number of reflows, reducing the crushing rate and floor space, improving the effect of improving the Operational safety and maintenance convenience in severe weather.
Patent Information
- Application Number
- CN202010644803.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-07
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2040-07-07
AI Technical Summary
The existing new coke supplement system has problems such as multiple rebar transport of active cokes, poor loading mobility, adverse weather impact and difficult construction and maintenance, resulting in loss of active cokes and instability of the system.
A new coke supplement system for integrated active coke flue gas purification process is designed, including coke trucks, active coke storage silos, unloading and storage sections and loading sections, using electric hoists, chain fighters and bucket elevators. Equipment, realizes collective unloading and loading of active coke, and the vertical conveying device is arranged on the ground to simplify construction and maintenance.
It reduces the number of reflows of active cokes, reduces the crushing rate and floor space, reduces the cost, and improves the operation safety and maintenance convenience in bad weather.
Smart Images

Figure CN111672262B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of metallurgical flue gas purification, and in particular relates to a new coke supplement system for an activated coke flue gas purification process. Background Art
[0002] Activated coke flue gas purification technology is a relatively mature technology for industrial flue gas pollution control. Activated coke contacts flue gas in the adsorption system, adsorbs pollutants in the flue gas into the activated coke pores, and completes physical adsorption and chemical adsorption. After adsorption saturation, the activated coke is transported to the regeneration system through the conveying system, and after being analyzed under high temperature conditions, it is transported to the adsorption system for recycling through the material conveying system. During the transportation process of the material conveying system, the activated coke will be broken into small particles and powdered activated coke. Small particles and powders will affect the purification effect of the activated coke flue gas purification system and cause adverse effects such as increased tower resistance of the adsorption tower. Small particles and powdered activated coke need to be removed in the industrial production process. In addition, the activated coke flue gas purification process will chemically react and consume activated coke. Therefore, the activated coke in the entire system will continue to be lost. In order to ensure the stability of the materials in the system, it is necessary to continuously add fresh activated coke to the activated coke flue gas purification system.
[0003] The replenishment of fresh active coke is called the new coke replenishment system, which is part of the active coke material circulation system. The existing new coke replenishment system has the following problems:
[0004] 1. The storage of new coke is separated from the loading of new coke. The new activated coke needs to be transported many times from the time it is transported to the factory to the time it is added to the activated coke flue gas purification system, which increases the loss of activated coke.
[0005] 2. New coke loading should be avoided in bad weather such as rain and snow, and the loading maneuverability is poor;
[0006] 3. The vertical transportation device for activated coke needs to be installed underground, which increases the difficulty of construction and maintenance of the system. Summary of the invention
[0007] The purpose of the present invention is to provide a new coke replenishment system for an activated coke flue gas purification process which can reduce the number of times of transporting activated coke, lower the breakage rate of activated coke, save floor space and reduce the construction cost.
[0008] The object of the present invention is achieved in this way.
[0009] The present invention discloses a new coke replenishment system for an activated coke flue gas purification process, comprising a coke transport truck and an activated coke storage bin, wherein the activated coke storage bin is provided with a feed port and a discharge port, and a gate valve I and a discharger are arranged at the discharge port. The system is characterized in that the system further comprises an activated coke unloading storage section and an activated coke loading section.
[0010] The activated coke unloading and storage section comprises an activated coke storage loading workshop, an activated coke unloading electric hoist and an activated coke storage platform; the activated coke storage platform is suspended in the activated coke storage loading workshop, and the activated coke storage loading workshop is divided into an upper activated coke storage area and a lower unloading area. An electric hoist track is provided on the top of the activated coke storage loading workshop, and the active coke unloading electric hoist is installed on the electric hoist track and moves horizontally along the electric hoist track. A unloading port is provided on the active coke storage platform, and a coke transport truck is placed in the lower unloading area of the activated coke storage loading workshop;
[0011] The active coke feeding section includes an active coke feeding electric hoist, a feeding ash removal cover, a feeding dust collector, a dust collector control valve, an active coke bag breaking device, an active coke feeding hopper, an active coke horizontal conveying device, an active coke vertical conveying device, and chute I and chute II. The active coke feeding electric hoist is also installed on the electric hoist track and moves horizontally along the electric hoist track. The active coke feeding hopper is fixed on the discharge port of the active coke storage platform. The discharge port of the active coke feeding hopper is connected to the active coke horizontal conveying device. The feeding end is connected, and the loading ash removal hood is arranged on the top of the activated coke storage loading workshop, above the activated coke loading hopper, the loading ash removal hood is connected to the loading dust collector through a smoke exhaust pipe, and a dust collector control valve is provided on the smoke exhaust pipe; the activated coke bag breaking device is arranged on the upper part of the activated coke loading hopper, the activated coke horizontal conveying device is connected to the activated coke vertical conveying device through slide pipe I, and the activated coke vertical conveying device is connected to the activated coke storage bin through slide pipe II, and a gate valve and an iron remover are provided on slide pipe II.
[0012] Furthermore, the activated coke unloading electric hoist and the activated coke loading electric hoist are respectively provided with a hook and a steel wire rope for hanging the coke bag.
[0013] Furthermore, the activated coke horizontal conveying device is a chain bucket sealed feeder; the activated coke vertical conveying device is a bucket elevator; the activated coke horizontal conveying device and the activated coke vertical conveying device are arranged in a Z shape or a C shape.
[0014] Compared with the prior art, the present invention has the following advantages:
[0015] (1) The new coke replenishment system for the activated coke flue gas purification process of the present invention integrates the activated coke unloading storage system and the activated coke loading system into one, thereby reducing the number of times the activated coke is transported, reducing the breakage rate of the activated coke, saving space, and reducing the construction cost;
[0016] (2) The new coke replenishment system of the activated coke flue gas purification process of the present invention can replenish fresh activated coke in bad weather such as rain and snow, thereby reducing the workload of on-site operators;
[0017] (3) In the new coke replenishment system of the activated coke flue gas purification process of the present invention, the activated coke vertical conveying device can be arranged on the ground, the on-site construction is simple, the floor space is small, and the subsequent maintenance is convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a structural schematic diagram of the present invention. DETAILED DESCRIPTION
[0019] The present invention will be further described below in conjunction with the accompanying drawings.
[0020] like Figure 1 As shown, a new coke replenishment system for an activated coke flue gas purification process of the present invention comprises a coke transport truck 1 and an activated coke storage bin 18, wherein the activated coke storage bin 18 is provided with a feed inlet and a discharge outlet, and a gate valve I 19 and a discharger 20 are provided at the discharge outlet, and the activated coke further ...
[0021] Unloading storage section and activated coke loading section,
[0022] The activated coke unloading and storage section comprises an activated coke storage and loading workshop 2, an activated coke unloading electric hoist 3 and an activated coke storage platform 4; the activated coke storage platform 4 is suspended in the activated coke storage and loading workshop 2, and the activated coke storage and loading workshop 2 is divided into an upper activated coke storage area and a lower unloading area, an electric hoist track 5 is provided on the top of the activated coke storage and loading workshop 2, the active coke unloading electric hoist 3 is installed on the electric hoist track, and moves horizontally along the electric hoist track 5, a unloading port is opened on the active coke storage platform 4, and a coke transport truck 1 is placed in the lower unloading area of the activated coke storage and loading workshop 2;
[0023] The active coke loading section includes an active coke loading electric hoist 9, a loading ash removal cover 8, a loading dust collector 6, a dust collector control valve 7, an active coke bag breaking device 10, an active coke loading hopper 12, an active coke horizontal conveying device 13, an active coke vertical conveying device 11, and a chute I 14 and a chute II 15. The active coke loading electric hoist 9 is also installed on the electric hoist track 5 and moves horizontally along the electric hoist track 5. The active coke unloading electric hoist 3 and the active coke loading electric hoist 9 are respectively provided with a hook and a wire rope for hanging coke bags; the active coke loading hopper 12 is fixed on the discharge port of the active coke storage platform 4, and the active coke loading The discharge port of the hopper 12 is connected with the feed end of the activated coke horizontal conveying device 13. The loading ash removal hood 8 is arranged on the top of the activated coke storage loading workshop 2, above the activated coke loading hopper. The loading ash removal hood 8 is connected to the loading dust collector 6 through a smoke exhaust pipe, and a dust collector control valve 7 is provided on the smoke exhaust pipe; the activated coke bag breaking device 10 is arranged on the upper part of the activated coke loading hopper 12, the activated coke horizontal conveying device 13 is connected to the activated coke vertical conveying device 11 through a chute 14Ⅰ, and the activated coke vertical conveying device 11 is connected to the activated coke storage bin 18 through a chute Ⅱ15, and a gate valve 16 and an iron remover 17 are provided on the chute Ⅱ15.
[0024] The active coke horizontal conveying device 13 of the present invention is a chain bucket sealed feeder; the active coke vertical conveying device 11 is a bucket elevator; the active coke horizontal conveying device 13 and the active coke vertical conveying device 11 are arranged in a Z shape or a C shape. The on-site construction is simple, the floor space is small, and the later maintenance is convenient.
[0025] The active coke of the present invention adopts the active coke 21 packaged in ton bags. The coke transport truck 1 transports the active coke 21 packaged in ton bags to the active coke storage loading workshop 2. The lower unloading area is the operating space of the coke transport truck 1, and the upper space is the active coke storage platform 4. The active coke unloading electric hoist 3 lifts the active coke 21 packaged in ton bags to the active coke storage platform 4, completing the operation process of the unloading and storage section of the active coke.
[0026] When the low material level alarm of the activated coke storage bin 27 is sounded, the activated coke loading section is started: the activated coke loading electric hoist 9 lifts and moves the activated coke 21 packed in ton bags to the activated coke loading hopper 12, and the activated coke bag breaking device 10 is used to break the ton bag packaging of the activated coke. At this time, the activated coke is transported to the activated coke storage bin 18 through the activated coke loading hopper 12, the activated coke horizontal conveying device 13, the chute Ⅰ14, the activated coke vertical conveying device 11, the chute Ⅱ15, the valve 25, and the iron remover 26, completing the process flow of the activated coke loading section. When the activated coke flue gas purification system needs to be supplemented with activated coke, the bottom gate valve Ⅰ19 of the activated coke storage bin 18 and the discharger 20 are opened to start replenishing fresh activated coke into the system. The process of the present invention is short, which effectively reduces the workload of on-site operators.
Claims
1. A new coke replenishment system for an activated coke flue gas purification process, comprising a coke transport truck and an activated coke storage bin, wherein the activated coke storage bin is provided with a feed inlet and a discharge outlet, and a gate valve I and a discharger are provided at the discharge outlet, characterized in that: It also includes the activated coke unloading and storage section and the activated coke loading section. The activated coke unloading and storage section comprises an activated coke storage loading workshop, an activated coke unloading electric hoist and an activated coke storage platform; the activated coke storage platform is suspended in the activated coke storage loading workshop, and the activated coke storage loading workshop is divided into an upper activated coke storage area and a lower unloading area. An electric hoist track is provided on the top of the activated coke storage loading workshop, and the active coke unloading electric hoist is installed on the electric hoist track and moves horizontally along the electric hoist track. A unloading port is provided on the active coke storage platform, and a coke transport truck is placed in the lower unloading area of the activated coke storage loading workshop; The active coke feeding section includes an active coke feeding electric hoist, a feeding ash removal cover, a feeding dust collector, a dust collector control valve, an active coke bag breaking device, an active coke feeding hopper, an active coke horizontal conveying device, an active coke vertical conveying device, and chute I and chute II. The active coke feeding electric hoist is also installed on the electric hoist track and moves horizontally along the electric hoist track. The active coke feeding hopper is fixed on the discharge port of the active coke storage platform. The discharge port of the active coke feeding hopper is connected to the active coke horizontal conveying device. The feed end is connected, the loading ash removal hood is arranged on the top of the activated coke storage loading workshop, above the activated coke loading hopper, the loading ash removal hood is connected to the loading dust collector through a smoke exhaust pipe, and a dust collector control valve is arranged on the smoke exhaust pipe; the activated coke bag breaking device is arranged on the upper part of the activated coke loading hopper, the activated coke horizontal conveying device is connected to the activated coke vertical conveying device through a slide pipe I, the activated coke vertical conveying device is connected to the activated coke storage bin through a slide pipe II, and a gate valve and an iron remover are arranged on the slide pipe II; The activated coke unloading electric hoist and the activated coke loading electric hoist are respectively provided with a hook and a steel wire rope for hanging the coke bag; The activated coke horizontal conveying device is a chain bucket sealed feeder; the activated coke vertical conveying device is a bucket elevator; the activated coke horizontal conveying device and the activated coke vertical conveying device are arranged in a Z shape or a C shape.
