Anchor bolt assembled column plate type greening retaining wall top and prefabricated wall type guardrail connection structure and construction method thereof
By using an anchor-bolt-assembled column-plate type green retaining wall top and prefabricated wall-type guardrail connection structure, the problems of stability and cost of roadside guardrail supports are solved, thereby improving the stability and safety of the guardrail.
Patent Information
- Application Number
- CN202010702456.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-21
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing roadside guardrail supports struggle to balance stability with manufacturing costs; larger supports increase costs, while smaller supports fail to provide effective stability.
The structure adopts an anchor bolt assembled column-plate type greenable retaining wall top and a prefabricated wall-type guardrail connection structure. The bottom of the guardrail is embedded in the retaining wall component and connected by exposed steel bars and semi-grouted sleeves. Combined with inclined insert plates and folded ear structure, a stable connection between the guardrail and the retaining wall is achieved.
It improves the stability and safety of the guardrail, adapts to road slopes, reduces manufacturing costs, and enhances the overall robustness of the guardrail.
Smart Images

Figure CN111719467B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of building equipment, and in particular relates to an anchor bolt assembled column plate type greening retaining wall top and prefabricated wall type guardrail connection structure and a construction method thereof. Background Art
[0002] Roadside guardrails are a type of traffic safety facility installed on the outside of the road shoulder, traffic divider, and sidewalk curbs. They absorb collision energy by self-deformation or vehicle climbing, thereby changing the direction of vehicle travel, preventing vehicles from running off the road or entering the opposite lane, and minimizing the damage to passengers.
[0003] Roadside guardrails are used to protect vehicles and their occupants from natural or man-made objects located beside the road. Vehicles hitting traffic guardrails may damage both the vehicle or its passengers as well as the guardrail itself. In addition to protecting vehicles, roadside guardrails are also used to shield pedestrians, maintenance personnel, construction personnel, or cyclists from unpredictable traffic. Roadside guardrails are designed to prevent vehicles that leave the roadway from hitting fixed objects. Due to the variability of vehicle impact and the destructive effects at high speeds, the reliability of roadside guardrails determines the safety of vehicles and their passengers.
[0004] When it is necessary to install roadside guardrails on both sides of the raised road section, higher supports need to be set up and the roadside guardrails need to be set on the top of the supports. In this case, the stability of the roadside guardrail is determined by the stability of the supports. When the supports are larger and wider, the roadside guardrails can have better stability, but it also increases the manufacturing cost and difficulty of the supports. Smaller supports are difficult to effectively stabilize the roadside guardrails. Summary of the invention
[0005] The present invention aims to overcome the defects in the above-mentioned prior art and provide a connection structure of anchor bolt assembled column plate type greening retaining wall top and prefabricated wall type guardrail which is easy to install, has stable structure, and is safe and reliable, and a construction method thereof.
[0006] In order to achieve the above purpose, the technical solution adopted by the present invention is: an anchor-assembled column-plate type greening retaining wall top and a prefabricated wall-type guardrail connection structure, characterized in that it includes a base, a retaining wall assembly and a guardrail arranged from bottom to top, the bottom of the guardrail is embedded in the retaining wall assembly, and is arranged in sequence between adjacent guardrails; the guardrail includes a guardrail base and a prefabricated guardrail, the top of the guardrail base is pre-embedded with exposed steel bars extending outside the guardrail base, the bottom of the prefabricated guardrail is cast with a cast-in-place concrete layer, and the bottom of the prefabricated guardrail is provided with a semi-grouting sleeve compatible with the exposed steel bars; the exposed steel bars extend outward through the cast-in-place concrete layer, and the exposed steel bars passing through the cast-in-place concrete layer are arranged perpendicular to the surface of the cast-in-place concrete layer.
[0007] As a preferred solution of the present invention, the retaining wall assembly includes a column group and a plurality of inclined insert plates arranged obliquely, the column group is arranged at both ends of the inclined insert plates, the plurality of inclined insert plates are distributed along the height direction of the column group, and the plurality of inclined insert plates are arranged in parallel.
[0008] As a preferred solution of the present invention, folding ears matching the oblique insert plates are formed on both sides of the column group, threaded steel bars matching the column group are provided on the folding ears, and pins connected to the folding ears are connected to both ends of the oblique insert plates.
[0009] As a preferred solution of the present invention, both ends of the inclined insert plate are provided with assembly holes communicated with the folding ears.
[0010] As a preferred solution of the present invention, the column group includes a base and a connecting seat connected to each other, the base and the connecting seat are fixedly connected by bolts, and the base and the base are fixedly connected by bolts.
[0011] As a preferred solution of the present invention, a connecting hole is formed in the middle of the top of the connecting seat, and supporting feet are formed at both ends of the bottom of the guardrail base, and the size of the supporting feet is half of the size of the connecting hole.
[0012] As a preferred solution of the present invention, an upwardly turned folded edge is formed on the upper end of the inclined insert plate, and the folded edge abuts against the adjacent inclined insert plate.
[0013] As a preferred solution of the present invention, a boss abutting against the retaining wall assembly is formed on the outer side of the base.
[0014] The installation method of the anchor bolt assembled column plate type greening retaining wall top and prefabricated wall type guardrail connection structure is characterized by comprising the following steps:
[0015] Step A: pouring concrete at the desired position to form a base, placing a prefabricated retaining wall assembly on the base, fixing the retaining wall assembly to the ground with bolts, and forming a boss on the outside of the base to abut against the retaining wall assembly;
[0016] Step B: The height of the retaining wall assembly is designed according to the actual required height. The retaining wall assembly can support the connecting seat by prefabricating bases of different heights. The retaining wall assembly is arranged equidistantly according to the length direction of the required road;
[0017] Step C: The base and the connecting seat are fixedly connected by bolts, and an inclined plug plate is inserted on the base and the connecting seat, the inclined plug plate is tilted downward toward the road end, and folding ears matching the inclined plug plate are prefabricated on the base and the connecting seat;
[0018] Step D: placing a prefabricated guardrail base on the top of the connecting seat, forming a support foot at the bottom of the guardrail base, and the support foot is embedded in the connecting seat, and two support feet of adjacent guardrail bases are set on the same connecting seat;
[0019] Step E: Exposed steel bars extending upward are formed on the top of the guardrail base, a cast-in-place concrete layer is poured on the guardrail base, the top of the cast-in-place concrete layer is set according to the required road surface slope, and the exposed steel bars pass through the cast-in-place concrete layer;
[0020] Step F: distorting the exposed steel bars extending outside the cast-in-place concrete layer so that the exposed steel bars extending outside the cast-in-place concrete layer are arranged perpendicular to the cast-in-place concrete layer;
[0021] Step H: A semi-cast sleeve is provided at the bottom of the prefabricated guardrail, which is connected to the exposed steel bars after the cast-in-place concrete layer is formed;
[0022] Step I: Fill the inner side of the retaining wall assembly with soil to form a road surface, and lay asphalt on the road surface to form a road, which is flush with the base of the guardrail.
[0023] As a preferred solution of the present invention, the oblique insert plates are equidistantly arranged in the height direction of the retaining wall assembly, and the tops of the oblique insert plates form upwardly bent edges, which abut against adjacent oblique insert plates.
[0024] The beneficial effects of the present invention are as follows:
[0025] 1. By embedding the bottom of the guardrail into the retaining wall assembly, the guardrail and the retaining wall assembly have better stability, thereby improving the firmness of the overall guardrail.
[0026] 2. The guardrail can be cast with a cast-in-place concrete layer with a slope between the guardrail base and the prefabricated guardrail according to the slope of the road surface, so that the guardrail can be tilted according to the slope of the road surface, which has better safety.
[0027] 3. Exposed steel bars and grouting sleeves are connected between the guardrail base and the prefabricated guardrail, so that the guardrail base and the prefabricated guardrail have better stability.
[0028] 4. A folded edge is provided on the top of the inclined insert plate, so that adjacent inclined insert plates can abut against each other to form an integral retaining wall surface, making the road surface more stable. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the structure of the present invention;
[0030] Figure 2 is a cross-sectional view of the present invention;
[0031] Figure 3 yes Figure 1 A partial enlarged view of the middle A;
[0032] Figure 4 It is a schematic diagram of the structure of the guardrail;
[0033] Figure 5This is a schematic diagram of the installation of the oblique insert plate and the folding ear;
[0034] Figure 6 It is a structural diagram of the connecting seat;
[0035] Figure 7 It is a schematic diagram of the connection between the base and the base;
[0036] Figure 8 It is a connection diagram of the base, the pedestal and the inclined insert plate;
[0037] Fig. 9 It is a structural schematic diagram of the oblique insert plate;
[0038] Fig.10 It is a schematic diagram of the structure of the folded ear;
[0039] The reference numerals in the figure are: base 1, boss 1-1, retaining wall assembly 2, pedestal 2-1, connecting seat 2-2, folded ear 2-3, inclined plug plate 2-4, connecting hole 2-5, threaded steel bar 2-6, latch 2-7, assembly hole 2-8, folded edge 2-9, guardrail 3, guardrail base 3-1, prefabricated guardrail 3-2, exposed steel bar 3-3, semi-grouting sleeve 3-4, cast-in-place concrete layer 3-5, support leg 3-6, retaining board 3-7. DETAILED DESCRIPTION
[0040] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0041] like Figure 1-10 As shown, the anchor bolt assembled column-plate type greening retaining wall top and prefabricated wall type guardrail connection structure includes a base 1, a retaining wall assembly 2 and a guardrail 3 arranged from bottom to top, the bottom of the guardrail 3 is embedded in the retaining wall assembly 2, and adjacent guardrails 3 are arranged in sequence; the guardrail 3 includes a guardrail base 3-1 and a prefabricated guardrail 3-2, the top of the guardrail base 3-1 is pre-embedded with exposed steel bars 3-3 extending to the outside of the guardrail base 3-1, the bottom of the prefabricated guardrail 3-2 is cast with a cast-in-place concrete layer 3-5, and the bottom of the prefabricated guardrail 3-2 is provided with a semi-grouting sleeve 3-4 compatible with the exposed steel bars 3-3; the exposed steel bars 3-3 extend outward through the cast-in-place concrete layer 3-5, and the exposed steel bars 3-3 passing through the cast-in-place concrete layer 3-5 are arranged perpendicular to the surface of the cast-in-place concrete layer 3-5.
[0042] The base 1 is cast-in-place concrete, the retaining wall assembly 2 is a prefabricated structure, and the retaining wall assembly 2 is arranged along the length direction of the required road, adjacent retaining wall assemblies 2 are connected in sequence, the guardrail 3 is arranged at the top of the retaining wall assembly 2, and the length of the guardrail 3 is consistent with the length of the retaining wall assembly 2, the guardrail 3 is arranged along the length direction of the retaining wall assembly 2, and adjacent guardrails 3 are connected in sequence to form a roadside guardrail of the road.
[0043] The bottom of the guardrail base 3-1 is embedded in the retaining wall assembly 2, thereby making the connection between the guardrail base 3-1 and the retaining wall assembly 2. The guardrail base 3-1 and the prefabricated guardrail 3-2 are prefabricated according to the actual size of the retaining wall assembly 2. The length of the guardrail base 3-1 and the prefabricated guardrail 3-2 is consistent with the length of the retaining wall assembly 2. The guardrail base 3-1 and the prefabricated guardrail 3-2 are prefabricated by tying steel bars and pouring concrete.
[0044] A cast-in-place concrete layer 3-5 is provided between the guardrail base 3-1 and the prefabricated guardrail 3-2. The cast-in-place concrete layer 3-5 is set according to the required slope of the road, so that the prefabricated guardrail 3-2 is inclined on the guardrail base 3-1 according to the slope of the road. The horizontal height of the cast-in-place concrete layer 3-5 is lower than the top height of the exposed steel bars 3-3. The top of the exposed steel bars 3-3 is connected to the semi-grouting sleeve 3-4 in the prefabricated guardrail 3-2, and the semi-grouting sleeve 3-4 is pre-buried in the bottom of the prefabricated guardrail 3-2.
[0045] The exposed steel bar 3-3 is arranged perpendicular to the surface of the cast-in-place concrete layer 3-5, so that the exposed steel bar 3-3 is easy to connect with the semi-grouting sleeve 3-4. The semi-grouting sleeve 3-4 is a combination of a specially processed sleeve, matching grouting material and steel bars. When connecting the exposed steel bar 3-3, the fast-hardening non-shrinkage grouting material is injected, and the exposed steel bar 3-3 and the semi-grouting sleeve 3-4 are connected by the bonding and biting effect between the materials, so that the guardrail base 3-1 and the prefabricated guardrail 3-2 are fixedly connected.
[0046] The retaining wall assembly 2 includes a column group and a plurality of inclined plates 2-4 that are arranged obliquely. The column groups are arranged at both ends of the inclined plates 2-4. The plurality of inclined plates 2-4 are distributed along the height direction of the column group. The plurality of inclined plates 2-4 are arranged in parallel. The inclined plates 2-4 are inclined downward toward the road surface direction, so that the inclined plates 2-4 play a role of retaining soil, and greenery can be planted at the inclined plates 2-4 facing away from the road surface direction. The number of inclined plates 2-4 is set according to the height of the column group.
[0047] Folding ears 2-3 matched with the oblique plug plates 2-4 are formed on both sides of the column group, and assembly holes 2-8 connected with the folding ears 2-3 are provided at both ends of the oblique plug plates 2-4. Threaded steel bars 2-6 matched with the column group are provided on the folding ears 2-3, and pins 2-7 connected with the folding ears 2-3 are connected at both ends of the oblique plug plates 2-4. An upwardly turned folded edge 2-9 is formed on the upper end of the oblique plug plates 2-4, and the folded edge 2-9 is against the adjacent oblique plug plates 2-4.
[0048] The upper folded ear 2-3 is abutted against the top of the adjacent lower oblique plug plate 2-4. The folded ear 2-3 is prefabricated. During the prefabrication process, the folded ear 2-3 is embedded with horizontally arranged threaded steel bars 2-6. The embedded threaded steel bars 2-6 partially extend outside the folded ear 2-3. The threaded steel bars 2-6 pass through the reserved holes on the column group and enter the embedded steel bar sleeves in the column group. The threaded steel bars 2-6 and the steel bar sleeves are tightened through threads, and then sealed and waterproofed with epoxy resin.
[0049] The folding ear 2-3 and the column group are prefabricated separately, and the folding ear 2-3 and the column group are connected for secondary installation in the factory. The threaded steel bar 2-6 on the folding ear 2-3 is screwed tightly with the steel bar sleeve of the column group, and is sealed and waterproofed with epoxy resin. When transported to the construction site, the folding ear 2-3 and the column group are an integral structure.
[0050] Both ends of the inclined plug plate 2-4 are provided with assembly holes 2-8 connected to the folding ears 2-3. The inclined plug plate 2-4 and the folding ears 2-3 are positioned and connected by an obliquely arranged latch 2-7. The folding ears 2-3 are formed with through holes connected to the assembly holes 2-8.
[0051] The column group includes a base 2-1 and a connecting seat 2-2 connected to each other. The base 2-1 and the connecting seat 2-2 are fixedly connected by bolts, and the base 2-1 and the base 1 are fixedly connected by bolts. The height of the base 2-1 is set according to the required height of the actual column group. The upper and lower ends of the base 2-1 are formed with platform surfaces that are larger than the main body size of the base 2-1. The bottom of the base 2-1 is connected to the base 1 by bolts, and the top of the base 2-1 is fixedly connected to the connecting seat 2-2 by bolts.
[0052] A connecting hole 2-5 is formed in the middle of the top of the connecting seat 2-2, and supporting feet 3-6 are formed at both ends of the bottom of the guardrail base 3-1. The size of the supporting feet 3-6 is half the size of the connecting hole 2-5, and the depth of the connecting hole 2-5 is consistent with the length of the supporting feet 3-6. One connecting hole 2-5 is provided with supporting feet 3-6 of two adjacent guardrail bases 3-1, and the supporting feet 3-6 of the two adjacent guardrail bases 3-1 are fastened and connected under the action of the connecting hole 2-5.
[0053] A boss 1 - 1 is formed on the outer side of the base 1 to abut against the retaining wall assembly 2 , and the boss 1 - 1 extends upward to abut against the side of the base 2 - 1 .
[0054] The installation method of the anchor bolt assembled column-plate type greening retaining wall top and prefabricated wall type guardrail connection structure includes the following steps: pouring concrete at the required position to form a base 1, placing a prefabricated retaining wall component 2 on the base 1, the retaining wall component 2 is fixedly connected to the ground by bolts, and a boss 1-1 is formed on the outer side of the base 1 to abut against the retaining wall component 2.
[0055] The height of the retaining wall assembly 2 is designed according to the actual required height. The retaining wall assembly 2 can support the connecting seat 2-2 by prefabricating bases 2-1 of different heights. The retaining wall assembly 2 is arranged equidistantly along the length direction of the required road, and the retaining wall assembly 2 is arranged in sequence to form a retaining wall structure.
[0056] The base 2-1 and the connecting seat 2-2 are fixedly connected by bolts, and an inclined plug plate 2-4 is inserted on the base 2-1 and the connecting seat 2-2. Folding ears 2-3 compatible with the inclined plug plate 2-4 are prefabricated on the base 2-1 and the connecting seat 2-2. Both ends of the inclined plug plate 2-4 are embedded in the folding ears 2-3, and the top of the inclined plug plate 2-4 is against the adjacent folding ears 2-3. Multiple inclined plug plates 2-4 are located on the same vertical plane of the retaining wall assembly 2, and multiple inclined plug plates 2-4 form a retaining wall.
[0057] The inclined plates 2-4 are tilted downward toward the road end, so that the soil inside the road contacts the lower end of the inclined plates 2-4 under the action of gravity, and the soil inside the road is always located inside the road due to the contact between the inclined surfaces of the inclined plates 2-4 and the adjacent inclined plates 2-4.
[0058] A prefabricated guardrail base 3-1 is placed on the top of the connecting seat 2-2, and a support foot 3-6 is formed at the bottom of the guardrail base 3-1. The support foot 3-6 is embedded in the connecting seat 2-2, and two support feet 3-6 of adjacent guardrail bases 3-1 are set on the same connecting seat 2-2, and adjacent guardrail bases 3-1 are in close contact with each other.
[0059] A retaining plate 3-7 is also provided at the bottom center of the guardrail base 3-1. The retaining plate 3-7 is located between the two supporting legs 3-6. The retaining plate 3-7 is located above the uppermost inclined plug plate 2-4, and the bottom of the retaining plate 3-7 is against the top of the uppermost inclined plug plate 2-4. The retaining plate 3-7 is vertically arranged, and the retaining plate 3-7 is located at the bottom center of the guardrail base 3-1 and is arranged along the length direction of the guardrail base 3-1. The guardrail base 3-1, the retaining plate 3-7 and the supporting legs 3-6 are an integrally formed structure, which is prefabricated.
[0060] An exposed steel bar 3-3 extending upward is formed at the top of the guardrail base 3-1, and a cast-in-place concrete layer 3-5 is poured on the guardrail base 3-1. The top of the cast-in-place concrete layer 3-5 is set according to the required road surface slope. The exposed steel bar 3-3 passes through the cast-in-place concrete layer 3-5, and the exposed steel bar 3-3 extending outside the cast-in-place concrete layer 3-5 is distorted so that the exposed steel bar 3-3 extending outside the cast-in-place concrete layer 3-5 is vertically arranged with the cast-in-place concrete layer 3-5. A semi-cast sleeve is provided at the bottom of the prefabricated guardrail 3-2, which is connected to the exposed steel bar 3-3 after the cast-in-place concrete layer 3-5 is formed.
[0061] After the guardrail base 3-1 is prefabricated, exposed steel bars 3-3 extend from the top. After arriving at the construction site, workers bend the exposed steel bars 3-3 at a very small angle according to the longitudinal slope of the road section. This angle is the same as the longitudinal slope of the route, so that it is aligned one by one with the reserved semi-grouting sleeves 3-4 of the prefabricated guardrail 3-2.
[0062] When there is a sudden change in the height of the retaining wall of 50 cm or more, the two legs 3-6 on the guardrail base 3-1 are longer on one side and shorter on the other side, the legs 3-6 on the higher side of the slope are longer, and the legs 3-6 on the lower side of the slope are shorter, so that the installation of the guardrail base 3-1 has better stability.
[0063] The guardrail base 3-1 and the prefabricated guardrail 3-2 are both prefabricated structures, and the problem of arbitrary slope on site is solved by the cast-in-place concrete layer 3-5. The guardrail base 3-1, the prefabricated guardrail 3-2, the base 2-1 and the connecting seat 2-2 are all standardized components, all of which are uniformly numbered and stored in the warehouse.
[0064] The inner side of the retaining wall assembly 2 is filled with soil to form a road surface, and asphalt is laid on the road surface to form a road, which is flush with the guardrail base 3-1.
[0065] The oblique insert plates 2-4 are arranged equidistantly along the height direction of the retaining wall assembly 2, and an upwardly bent edge 2-9 is formed on the top of the oblique insert plate 2-4, and the bent edge 2-9 abuts against the adjacent oblique insert plate 2-4.
[0066] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention; therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
[0067] Although this article makes use of the following figures more frequently: base 1, boss 1-1, retaining wall assembly 2, pedestal 2-1, connecting seat 2-2, folded ear 2-3, inclined insert plate 2-4, connecting hole 2-5, threaded steel bar 2-6, pin 2-7, assembly hole 2-8, folded edge 2-9, guardrail 3, guardrail base 3-1, prefabricated guardrail 3-2, exposed steel bar 3-3, semi-grouting sleeve 3-4, cast-in-place concrete layer 3-5, support leg 3-6, retaining board 3-7 and other terms, the possibility of using other terms is not excluded; these terms are used only to more conveniently describe and explain the essence of the present invention; interpreting them as any additional restrictions is contrary to the spirit of the present invention.
Claims
1. A construction method for connecting a structure of an anchor bolt assembled column-plate type greening retaining wall top and a prefabricated wall type guardrail, characterized in that: The invention comprises a base (1), a retaining wall assembly (2) and a guardrail (3) which are arranged from bottom to top, wherein the bottom of the guardrail (3) is embedded in the retaining wall assembly (2) and is arranged in sequence between adjacent guardrails (3); the guardrail (3) comprises a guardrail base (3-1) and a prefabricated guardrail (3-2); the top of the guardrail base (3-1) is pre-buried with exposed steel bars (3-3) extending outside the guardrail base (3-1); the bottom of the prefabricated guardrail (3-2) is cast with a cast-in-place concrete layer (3-5); the bottom of the prefabricated guardrail (3-2) is provided with a semi-grouting sleeve (3-4) adapted to the exposed steel bars (3-3); the exposed steel bars (3-3) extend outward through the cast-in-place concrete layer (3-5); the exposed steel bars (3-3) passing through the cast-in-place concrete layer (3-5) are arranged perpendicular to the surface of the cast-in-place concrete layer (3-5); and the following steps are also included: Step A: pouring concrete at a desired position to form a base (1), placing a prefabricated retaining wall assembly (2) on the base (1), fixing the retaining wall assembly (2) to the ground via bolts, and forming a boss (1-1) on the outside of the base (1) to abut against the retaining wall assembly (2); Step B: The height of the retaining wall assembly (2) is designed according to the actual required height. The retaining wall assembly (2) can support the connecting seat (2-2) by prefabricating bases (2-1) of different heights. The retaining wall assembly (2) is arranged equidistantly along the length direction of the required road. Step C: The base (2-1) and the connecting seat (2-2) are fixedly connected by bolts, and an inclined plug plate (2-4) is inserted on the base (2-1) and the connecting seat (2-2), the inclined plug plate (2-4) is tilted downward toward the road end, and the base (2-1) and the connecting seat (2-2) are prefabricated with folding ears (2-3) that are compatible with the inclined plug plate (2-4); Step D: placing a prefabricated guardrail base (3-1) on the top of the connecting seat (2-2), forming a support foot (3-6) at the bottom of the guardrail base (3-1), and the support foot (3-6) is embedded in the connecting seat (2-2), and two support feet (3-6) of adjacent guardrail bases (3-1) are arranged on the same connecting seat (2-2); Step E: an exposed steel bar (3-3) extending upward is formed on the top of the guardrail base (3-1), a cast-in-place concrete layer (3-5) is poured on the guardrail base (3-1), the top of the cast-in-place concrete layer (3-5) is set according to the required road surface slope, and the exposed steel bar (3-3) passes through the cast-in-place concrete layer (3-5); Step F: distorting the exposed steel bars (3-3) extending outside the cast-in-place concrete layer (3-5) so that the exposed steel bars (3-3) extending outside the cast-in-place concrete layer (3-5) are arranged perpendicular to the cast-in-place concrete layer (3-5); Step H: a semi-cast sleeve is provided at the bottom of the prefabricated guardrail (3-2), and is connected to the exposed steel bars (3-3) after the cast-in-place concrete layer (3-5) is formed; Step I: Fill the inner side of the retaining wall assembly (2) with soil to form a road surface, and lay asphalt on the road surface to form a road, which is flush with the guardrail base (3-1).
2. The construction method of the anchor bolt assembled column plate type greening retaining wall top and prefabricated wall type guardrail connection structure according to claim 1 is characterized in that: The inclined insert plates (2-4) are arranged equidistantly along the height direction of the retaining wall assembly (2); the top of the inclined insert plates (2-4) forms an upwardly bent edge (2-9), and the edge (2-9) abuts against an adjacent inclined insert plate (2-4).
3. The construction method of the anchor bolt assembled column plate type greening retaining wall top and prefabricated wall type guardrail connection structure according to claim 1 is characterized in that: The retaining wall assembly (2) comprises a column group and a plurality of inclined plug plates (2-4) arranged obliquely, the column group being arranged at both ends of the inclined plug plates (2-4), the plurality of inclined plug plates (2-4) being distributed along the height direction of the column group, and the plurality of inclined plug plates (2-4) being arranged in parallel.
4. The construction method of the anchor bolt assembled column plate type greening retaining wall top and prefabricated wall type guardrail connection structure according to claim 3 is characterized in that: Folding ears (2-3) adapted to the oblique plug plate (2-4) are formed on both sides of the column group, threaded steel bars (2-6) adapted to the column group are arranged on the folding ears (2-3), and latch pins (2-7) connected to the folding ears (2-3) are connected to both ends of the oblique plug plate (2-4).
5. The construction method of the anchor bolt assembled column plate type greening retaining wall top and prefabricated wall type guardrail connection structure according to claim 4 is characterized in that: Both ends of the inclined insert plate (2-4) are provided with assembly holes (2-8) which are in communication with the folding ears (2-3).
6. The construction method of the anchor bolt assembled column plate type greening retaining wall top and prefabricated wall type guardrail connection structure according to claim 3 is characterized in that: The column group comprises a base (2-1) and a connecting seat (2-2) which are connected to each other; the base (2-1) and the connecting seat (2-2) are fixedly connected by bolts; and the base (2-1) and the base (1) are fixedly connected by bolts.
7. The construction method of the anchor bolt assembled column plate type greening retaining wall top and prefabricated wall type guardrail connection structure according to claim 6 is characterized in that: A connecting hole (2-5) is formed in the middle of the top of the connecting seat (2-2), and supporting feet (3-6) are formed at both ends of the bottom of the guardrail base (3-1), and the size of the supporting feet (3-6) is half the size of the connecting hole (2-5).
8. The construction method of the anchor bolt assembled column plate type greening retaining wall top and prefabricated wall type guardrail connection structure according to claim 3 is characterized in that: An upwardly turned folded edge (2-9) is formed at the upper end of the inclined insert plate (2-4), and the folded edge (2-9) abuts against an adjacent inclined insert plate (2-4).
9. The construction method of the anchor bolt assembled column plate type greening retaining wall top and prefabricated wall type guardrail connection structure according to claim 1 is characterized in that: A boss (1-1) is formed on the outer side of the base (1) and abuts against the retaining wall assembly (2).
Citation Information
Patent Citations
Foam concrete light retaining wall constructed in deep ultra-soft soil layer sequentially through pre-compaction and excavation and construction method of foam concrete light retaining wall
CN107386317A
Semi-grouting sleeve connection prefabricated assembly type reinforced-bar concrete central anti-collision guardrail
CN108867482A
Anchor bolt assembled column and plate type afforestable retaining wall
CN110578336A
Assembly type concrete crash barrier based on grouting sleeve connection
CN209907191U
Anchor bolt assembly type column plate type greening retaining wall top and prefabricated wall type guardrail connecting structure
CN212404950U