A phase checking device and method based on lightning arrester leakage current signal

By using the leakage current signal of the lightning arrester to collect and compare the current signal phase, the safety hazards and low efficiency of the existing phase core method are solved, and safe and efficient phase core of different voltage levels is achieved, which is suitable for the construction of GIS stations. and expansion lines.

CN111766446BActive Publication Date: 2024-11-15CHENGDU POWER SUPPLY COMPANY OF STATE GRID SICHUAN ELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010843243.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-08-20
Publication Date
2024-11-15
Estimated Expiration
2040-08-20

AI Technical Summary

Technical Problem

The existing nuclear phase methods have safety hazards and low efficiency problems, especially in rainy days, wet, dirty or complex working conditions, high-pressure primary direct nuclear phase depends on the insulation strength and manufacturing process of insulating rods, and indirect secondary nuclear phase requires Multi-department cooperation, the workflow is long and not suitable for GIS station new or expanded lines for verification.

Method used

By using the leakage current signal of the lightning arrester, the detection host collects and compares the phase phase of the current signal of the running line and the phase line to be nucleated, and the phase sequence is determined by using the phase difference value, providing a phase core device and method based on the leakage current signal of the lightning arrester, including The current signal acquisition module, phase detection module, transceiver module, satellite timing module and battery module can perform phase nucleation on lines of different voltage levels to avoid safety hazards of high-voltage primary and secondary phase nucleation.

Benefits of technology

Improves the safety and efficiency of the nuclear phase, can nucleate the phase of the circuits of different voltage levels, solves the problem of the nuclear phase of the GIS station's new and expanded circuits, reduces the operating risks, is versatile, and is suitable for 110kV, 220kV and more. High voltage level circuit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111766446B_ABST
    Figure CN111766446B_ABST
Patent Text Reader

Abstract

The invention discloses a phase checking device and method based on the leakage current signal of a lightning arrester. The phase checking device comprises a detection host, a lightning arrester and a counter. The host and the slave are both equipped with a current signal acquisition module, a phase detection module, a transceiver module, a phase comparison module, a satellite timing module, a display screen, a voice module and a battery module. The line current is led to the lightning arrester, which is connected in series with the counter and then grounded. The current detection host is connected in parallel to both sides of the counter. By collecting the current signal at the grounding end of the lightning arrester, the need for operators to directly contact the primary high-voltage live parts with a phase checking rod in a traditional high-voltage primary direct phase checking device is avoided, which greatly reduces the operation risk. At the same time, the problem that an indirect secondary phase checking device needs to adjust the primary wiring of the system multiple times and operate the power transmission and transformation equipment multiple times, which is cumbersome and inefficient, is also avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric power detection, and in particular to a phase checking device and method based on a leakage current signal of a lightning arrester. Background Art

[0002] Phase checking is often required during the actual operation of the power system. Before substations and transmission lines are put into operation after new construction, reconstruction and expansion, and before transmission lines are overhauled and power is supplied to users, three-phase circuit phase checking tests must be carried out to ensure that the three-phase phase sequence of the power equipment put into operation is consistent.

[0003] There are two main phase checking methods currently used: one is high-voltage primary direct phase checking, that is, the staff uses insulating rods that meet the voltage level to place two transmitters close to or in contact with the primary live parts of the lines to be put into operation or in operation, and sends digital signals to the receiver through the wireless transmission module. The receiver compares the two signals with phase characteristics received in real time to determine whether the phase sequence and phase of the device under test and the reference device are consistent; the other is indirect secondary phase checking, that is, by referencing, testing, and comparing the secondary sides of two three-phase voltage transformers to confirm whether the voltage, phase sequence, and phase are correct. Among them, the primary phase checking is heavily dependent on the insulation strength and manufacturing process of the insulating rods. It cannot be used in complex working conditions such as rainy days, humidity, dirt, and obstacles, and there are major safety hazards; the secondary phase checking sometimes requires adjustment of the operating mode, which may cause power grid risks and even cause power grid events, and requires collaboration among multiple departments and teams, with a long work process and low efficiency.

[0004] From the above analysis, it can be seen that the existing phase-check devices based on voltage phase difference have many shortcomings and cannot meet the requirements of safe and efficient power production. Summary of the invention

[0005] In view of the above-mentioned deficiencies in the prior art, the present invention provides a phase checking device and method based on the leakage current signal of a lightning arrester.

[0006] The present invention is implemented by the following technical scheme: a phase check device and method based on the leakage current signal of a lightning arrester, comprising a lightning arrester A, a lightning arrester B, a counter A, a counter B, a detection host A and a detection host B; the current drawn from the reference line flows through the lightning arrester A and is connected in series with the counter A and then grounded, and the detection host A is connected in parallel on both sides of the counter A; the current drawn from the phase to be checked flows through the lightning arrester B and is connected in series with the counter B and then grounded, and the detection host B is connected in parallel on both sides of the counter B;

[0007] The detection host includes a current signal acquisition module, a phase detection module, a transceiver module, a phase comparison module, a satellite timing module, and a battery module;

[0008] The current signal acquisition module is used to collect the leakage current signal of the grounding terminal of the lightning arrester;

[0009] The phase detection module is used to synchronously calculate and identify the collected phase of the operating line current signal and the phase of the current signal of the line to be checked;

[0010] The transceiver module is used for mutual communication between detection host A and detection host B;

[0011] The phase comparison module calculates the difference between the phase of the current signal of the running line measured by the detection host and the phase of the current signal of the line to be checked;

[0012] The satellite timing module is used to provide a unified time reference for detection host A and detection host B;

[0013] The battery module is used to provide power required for the operation of each module.

[0014] Principle of this technical solution: Under the same standard time, this technical solution continuously collects the ground leakage current signal of the grounding terminal of the arrester of the reference line and the line to be checked, compares the phase of the two synchronous current signals, and uses the phase difference to judge the phase sequence. When collecting current signals, it is not limited by voltage level, has universality, can check the phase of lines of different voltage levels, can avoid the safety hazards caused by high-voltage primary and secondary phase checks, improves the safety of phase checking, and solves the current problem that the phase cannot be checked for new and expanded lines of GIS stations.

[0015] Zinc oxide arrester uses good nonlinear volt-ampere characteristics to make the current flowing through the arrester extremely small (microampere or milliampere level) at normal working voltage; when overvoltage acts, the resistance drops sharply, discharging the overvoltage energy to achieve the protection effect. At the same time, the arrester has the advantages of small size, low cost, superior protection performance, good nonlinear characteristics, no continuous current, large flow, and good pollution resistance.

[0016] The traditional high-voltage primary direct phase verification method is: at the same standard time, the voltage of the operating line 1 is measured separately U A1 , U B1 , U C1 and the voltage of the power line 2 to be transmitted U A2 , U B2 , U C2 The phase information of the operating line 1 and the transmission line 2 is determined based on the phase difference between them to determine whether the operating line 1 and the transmission line 2 are in phase.

[0017] According to the voltage on the high-voltage side of the arresterU , resistive current Ir and capacitive current Ic The phase relationship between them shows that the resistive current of the arrester of the operating line 1 and the transmission line 2 Ir、 Capacitive current Ic and voltage U The phase difference between them is equal, which can be described by the formula:

[0018]

[0019]

[0020] In the formula, , is the voltage phase of the operating line 1 and the transmission line 2; , is the resistive current phase of the arresters of the operating line 1 and the transmission line 2; , It is the capacitive current phase of the lightning arrester of operating line 1 and transmission line 2.

[0021] Therefore, the resistive current of the operating line and the transmission line can be collected synchronously. Ir or capacitive current Ic The phase information of is checked.

[0022] The feasibility of line phase checking by the total leakage current of the arrester is further analyzed below. The total resistive leakage current of the arrester of the operating line 1 and the transmission line 2 Ix The phase difference can be expressed as:

[0023] (3)

[0024] In the formula, , The total leakage current phase of the arresters of the operating line 1 and the transmission line 2; , The capacitive current of the arrester of the operating line 1 and the transmission line 2 Ic and the total leakage current Ix The phase angle between them.

[0025] Practical operating experience shows that the resistive current component Ir Only accounts for the total leakage current Ix 10% to 20% of the total voltage. The included angle of a single arrester can be calculated using the inverse sine formula. θ The range is 5.7°~11.5°. Therefore, under the same phase sequence and the same standard time, the total leakage current of the arrester collected by the operating line 1 in good working condition is I x1The total leakage current of the arrester collected from the power transmission line 2 I x2 The maximum possible error of the phase angle difference is 11.5-5.7=5.8°. In other words, compared with the voltage phase difference in the high-voltage primary direct phase check method, the total leakage current phase check method may introduce an uncertainty factor of 5.8° phase difference. However, when checking the phase relationship, although it is currently considered that the current phase difference is not greater than 30° for the same phase, and the current phase difference is greater than 30° for the opposite phase, the phase difference when in phase is often only about 2°. Therefore, the current phase difference criterion for checking the phase relationship is applicable to the total leakage current phase check method proposed in this article.

[0026] A further preferred solution is that the detection host also includes a voice module, and the voice module is used to broadcast the verification results.

[0027] A further preferred solution is that the communication bit error rate of the transceiver module is less than or equal to 1%, and the wireless transmission distance is greater than or equal to 100m.

[0028] A further preferred solution is that the detection host also includes a display screen, and the display screen is used to display the current phase of each phase line, the phase difference and the judgment result.

[0029] A further preferred solution is that the satellite timing module adopts the timing technology of the global positioning system GPS, and the maximum error is less than or equal to 100us.

[0030] A further preferred solution is that the battery module is a large-capacity lithium battery pack, which is formed by connecting multiple lithium batteries in parallel, and the continuous working time is greater than or equal to 4 hours.

[0031] A further preferred solution is that a power switch button is provided on the detection host.

[0032] The present invention also provides a phase checking method of a phase checking device based on a leakage current signal of a lightning arrester, and the specific method comprises:

[0033] S1, the reference line A phase, B phase, C phase all lead current to flow through a group of lightning arresters and counters in series and then grounded, the check phase line A' phase, B' phase, C' phase all lead current to flow through a group of lightning arresters and counters in series and then grounded;

[0034] S2, the detection host A is connected in parallel to count both sides of the A phase line, and the detection host B is connected in parallel to count both sides of the A′ phase line;

[0035] S3, the detection host A and the detection host B synchronously collect the ground leakage current signal of the arrester of phase A of the reference line and phase A′ of the line to be checked;

[0036] S4, the collected current signal is bidirectionally transmitted between the detection host A and the detection host B, and the detection host A and the detection host B identify, calculate and judge the obtained current signal, and finally obtain the current phase, phase difference and judgment result;

[0037] S5. According to the above steps, the B phase line and the B′ phase line, the C phase line and the C′ phase line are approved in turn.

[0038] A further preferred solution is that the criterion for judging the phase check result is: if the leakage current phase difference is less than 30°, it is in phase; if the leakage current phase difference is greater than 30°, it is out of phase.

[0039] Technical principle of this scheme: Under the same standard time, by continuously collecting the ground leakage current signal of the arrester grounding terminal of the power transmission line and the operating line, the phases of the two synchronous current signals are compared, and the phase sequence is judged by the phase difference; when checking the phase relationship, it is considered that the current phase difference is not greater than 30° as in-phase, and the current phase difference is greater than 30° as out-of-phase. By using the phase difference of the current signal at the grounding terminal of the arrester to check the phase relationship, it is not limited by the voltage level and has universality. It can check the phase of lines of different voltage levels, avoid the safety hazards caused by high-voltage primary and secondary phase checks, improve the safety of phase checking, and solve the current problem that the phase cannot be checked for new and expanded lines of GIS stations.

[0040] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0041] 1. The present invention provides a phase checking device and method based on the leakage current signal of the lightning arrester; by using the phase difference of the current signal at the grounding end of the lightning arrester to check the phase relationship, it is not limited by the voltage level and has universality. It can perform phase checking on lines of different voltage levels, avoid the safety hazards caused by high-voltage primary phase checking and secondary phase checking, and improve the safety of phase checking.

[0042] 2. The present invention provides a phase checking device and method based on the arrester leakage current signal, which is universal for phase checking of 110kV, 220kV and even higher voltage level lines, avoiding the disadvantage that traditional high-voltage primary direct phase checking devices can only check the phase of a certain voltage level line.

[0043] 3. The present invention provides a phase checking device and method based on the arrester leakage current signal. After the arrester is installed on the three-phase GIS line, the phase checking of the GIS substation with cable incoming and no three-phase voltage transformer on the interval line side can be realized. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention.

[0045] In the attached picture:

[0046] Figure 1 Schematic diagram of the phase-check installation of the arrester leakage current signal.

[0047] Figure 2 This is a schematic diagram of the internal modules of the detection host.

[0048] Figure 3 It is the equivalent circuit of lightning arrester.

[0049] Figure 4 This is the voltage and current vector diagram of the lightning arrester.

[0050] Figure 5 It is the voltage and current vector diagram of the three-phase lightning arrester.

[0051] 1- Lightning arrester A, 2- Counter A, 3- Detection host A, 4- Lightning arrester B, 5- Counter B, 6- Detection host B. DETAILED DESCRIPTION

[0052] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.

[0053] Before a newly built, rebuilt or expanded power plant or transmission and transformation project is put into operation, an on-site phase verification test must be carried out to verify whether the two lines to be connected in parallel are indeed in the same phase sequence and phase. Over the years, two traditional phase verification methods have been widely used: the high-voltage primary direct verification method and the indirect secondary verification method.

[0054] The high-voltage direct verification method is generally applicable to voltage levels of 110kV and below. Under the operating voltage, two high-insulation, high-resistance phase-check rods are used to directly contact the two-phase high-voltage line to be verified, and the measured voltage signal is introduced into the phase-check device. The voltage phase difference is used to determine whether the two high-voltage lines to be tested are in phase. The main disadvantages of this method are: direct contact with high-voltage wires, heavy reliance on the insulation strength and manufacturing process of the material, and cannot be used in complex working conditions such as rainy days, humidity, dirt, obstacles, etc., which poses a major safety hazard.

[0055] The indirect secondary verification method is generally applicable to voltage levels of 220kV and above. When the conditions for direct phase verification of the high-voltage primary are not available on site, the voltage transformer of the same type connected to the two-phase high-voltage conductor is used to perform indirect verification through the secondary side of the voltage transformer. The main disadvantages of this method are: it requires multiple adjustments to the system primary wiring and multiple operations on the power transmission and transformation equipment, which is cumbersome and prone to errors; ferromagnetic resonance may occur between the voltage transformer and the system capacitor, causing overvoltage and damage to the equipment, resulting in personal and system accidents; it requires collaboration among multiple departments and teams, and the work process is long and inefficient.

[0056] In addition, for GIS substations with cable incoming lines and no three-phase voltage transformers on the interval line side, the above two methods cannot perform phase checking.

[0057] Example 1

[0058] like Figure 1 As shown, a phase check device based on the arrester leakage current signal provided by the present invention is used, including an arrester A1, an arrester B4, a counter A2, a counter B5, a detection host A3 and a detection host B6; the current drawn from the reference line flows through the arrester A1 and is connected in series with the counter A2 and then grounded, and the detection host A3 is connected in parallel on both sides of the counter A2; the current drawn from the phase to be checked flows through the arrester B4 and is connected in series with the counter B5 and then grounded, and the detection host B6 is connected in parallel on both sides of the counter B5;

[0059] like Figure 2 As shown in the schematic diagram of the internal modules of the detection host, the detection host includes a current signal acquisition module, a phase detection module, a transceiver module, a phase comparison module, a satellite timing module, and a battery module;

[0060] The current signal acquisition module is used to collect the leakage current signal of the grounding terminal of the lightning arrester;

[0061] The phase detection module is used to synchronously calculate and identify the collected phase of the operating line current signal and the phase of the current signal of the line to be checked;

[0062] The transceiver module is used for mutual communication between detection host A and detection host B;

[0063] The phase comparison module calculates the difference between the phase of the current signal of the running line measured by the detection host and the phase of the current signal of the line to be checked;

[0064] The satellite timing module is used to provide a unified time reference for detection host A and detection host B;

[0065] The battery module is used to provide power required for the operation of each module.

[0066] The detection host also includes a voice module, which is used to broadcast the verification results.

[0067] The communication bit error rate of the transceiver module is less than or equal to 1%, and the wireless transmission distance is greater than or equal to 100m.

[0068] The detection host also includes a display screen, which is used to display the current phase of each phase line, the phase difference and the judgment result.

[0069] The satellite timing module adopts the timing technology of the global positioning system GPS, and the maximum error is less than or equal to 100us.

[0070] The battery module is a large-capacity lithium battery pack, which is composed of multiple lithium batteries connected in parallel and has a continuous working time of greater than or equal to 4 hours.

[0071] The detection host is provided with a power switch button.

[0072] like Figure 3 As shown, the equivalent circuit of the arrester consists of a nonlinear resistor R and capacitor C In parallel, Ix is the total leakage current of the arrester, Ir is the resistive current, Ic is the capacitive current.

[0073] Depend on Figure 4 The vector diagram of the voltage and current of the arrester shows that the resistive current of the arrester Ir With voltage U In phase, the capacitive current Ic Leading voltage U The phase angle is 90°. Figure 4 middle, θ is the capacitive current Ic and the total leakage current Ix The phase angle between Ix Resistive current Ir and capacitive current Ic The vector sum of .

[0074] Similarly, under the same standard time, the voltage and current vector diagram of the three-phase lightning arrester on the line side can be obtained, such as Figure 5 shown.

[0075] The traditional high-voltage primary direct phase verification method is: at the same standard time, the voltage of the operating line 1 is measured separately U A1 , U B1 , U C1 and the voltage of the power line 2 to be transmitted U A2 , U B2, U C2 The phase information of the operating line 1 and the transmission line 2 is determined based on the phase difference between them to determine whether the operating line 1 and the transmission line 2 are in phase.

[0076] according to Figure 4 Medium voltage U , resistive current Ir , capacitive current Ic and the total leakage current Ix The phase relationship between them can convert the method for judging the voltage phase difference in the traditional high-voltage primary phase checking method into the phase checking method based on the arrester leakage current phase information of the present invention.

[0077] For arresters in good operating condition, generally Figure 4 The resistive current in Ir Only accounts for the total leakage current Ix 10% to 20% of the angle, the included angle can be calculated according to the inverse sine formula θ Therefore, under the same phase sequence and the same standard time, the total leakage current of the arrester collected by the operating line 1 in good working condition is I x1 The total leakage current of the arrester collected from the power transmission line 2 I x2 The maximum phase angle difference is 11.5-5.7=5.8°, which meets the judgment standard that the current phase difference is not greater than 30° for the same phase; on the contrary, under different phase sequences and the same time standard, the total leakage current is I x The phase angle difference must be greater than 30°.

[0078] Resistive current of the arrester Ir With voltage U In phase, the capacitive current Ic Leading voltage U The phase angle is 90°. Therefore, the resistive current of the operating line and the transmission line can also be collected. Ir or capacitive current Ic The phase information of is checked.

[0079] Example 2

[0080] After the relocation project of a 110kV outgoing cable of a 220kV substation is completed, phase checking work is required before power transmission. When the interval switch to be transmitted is disconnected and only the arrester on the line side is energized, the staff uses the arrester energized tester to synchronously collect the leakage current signals of the three-phase arresters of the line to be transmitted and a running line, and uses the phase checking device based on the arrester leakage current signal to use the phase checking method provided by the present invention, and the specific method includes:

[0081] S1, the reference line A phase, B phase, C phase all lead current to flow through a group of lightning arresters and counters in series and then grounded, the check phase line A' phase, B' phase, C' phase all lead current to flow through a group of lightning arresters and counters in series and then grounded;

[0082] S2, the detection host A is connected in parallel to count both sides of the A phase line, and the detection host B is connected in parallel to count both sides of the A′ phase line;

[0083] S3, the detection host A and the detection host B synchronously collect the ground leakage current signal of the arrester of phase A of the reference line and phase A′ of the line to be checked;

[0084] S4, the collected current signal is bidirectionally transmitted between the detection host A and the detection host B, and the detection host A and the detection host B identify, calculate and judge the obtained current signal, and finally obtain the current phase, phase difference and judgment result;

[0085] S5. According to the above steps, the B phase line and the B′ phase line, the C phase line and the C′ phase line are approved in turn.

[0086] The judgment criteria for the phase check results are: if the leakage current phase difference is less than 30°, it is in phase; if the leakage current phase difference is greater than 30°, it is out of phase.

[0087] The collected data are shown in Table 1.

[0088] Table 1 Phase verification results of operating lines and lines to be powered

[0089]

[0090] According to the leakage current phase information in Table 1 and the current phase verification criteria, it can be judged that the phase sequence of the power transmission line is correct, and the switch and knife switch can be closed to complete the power transmission. In addition, in order to verify the correctness of the phase verification method proposed in this paper, the high-voltage primary direct phase verification method was used to perform the phase verification again, and the results also showed that the phase sequence was correct.

[0091] The phase checking method using the arrester leakage current signal only needs to obtain the current signal at the grounding terminal of the arrester, avoiding direct contact of the primary high-voltage live part with the phase checking rod by the operators, greatly reducing the operation risk; the phase checking device developed based on this method can be applied to the phase checking of lines, transformers and other equipment of various voltage levels, and the device has universality; this invention can solve the problem that the current traditional method cannot perform the phase checking of lines involving GIS.

[0092] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A phase checking device based on the leakage current signal of a lightning arrester, characterized in that: The invention comprises a lightning arrester A (1), a lightning arrester B (4), a counter A (2), a counter B (5), a detection host A (3) and a detection host B (6); the current drawn from the reference line flows through the lightning arrester A and is connected in series with the counter A and then is grounded, and the detection host A is connected in parallel to both sides of the counter A; the current drawn from the phase line to be checked flows through the lightning arrester B (4) and is connected in series with the counter B (5) and then is grounded, and the detection host B (6) is connected in parallel to both sides of the counter B (5); The detection host includes a current signal acquisition module, a phase detection module, a transceiver module, a phase comparison module, a satellite timing module, and a battery module; The current signal acquisition module is used to collect the leakage current signal of the grounding terminal of the lightning arrester; The phase detection module is used to synchronously calculate and identify the collected phase of the operating line current signal and the phase of the current signal of the line to be checked; The transceiver module is used for mutual communication between the detection host A (3) and the detection host B (6); The phase comparison module calculates the difference between the phase of the current signal of the running line measured by the detection host and the phase of the current signal of the line to be checked; The satellite timing module is used to provide a unified time reference for the detection host A (3) and the detection host B (6); The battery module is used to provide each module with power required for operation; The steps include: S1, the reference line A phase, B phase, C phase all lead current to flow through a group of lightning arresters and counters in series and then grounded, the check phase line A' phase, B' phase, C' phase all lead current to flow through a group of lightning arresters and counters in series and then grounded; S2, the detection host A is connected in parallel to count both sides of the A phase line, and the detection host B is connected in parallel to count both sides of the A′ phase line; S3, the detection host A and the detection host B synchronously collect the ground leakage current signal of the arrester of phase A of the reference line and phase A′ of the line to be checked; S4, the collected current signal is bidirectionally transmitted between the detection host A and the detection host B, and the detection host A and the detection host B identify, calculate and judge the obtained current signal, and finally obtain the current phase, phase difference and judgment result; S5. According to the above steps, the B phase line and the B' phase line, the C phase line and the C' phase line are approved in turn; The judgment criteria for the phase check results are: if the leakage current phase difference is less than 30°, it is in phase; if the leakage current phase difference is greater than 30°, it is out of phase.

2. A phase checking device based on the arrester leakage current signal according to claim 1, characterized in that: The detection host also includes a voice module, which is used to broadcast the verification results.

3. A phase checking device based on the arrester leakage current signal according to claim 1, characterized in that: The communication bit error rate of the transceiver module is less than or equal to 1%, and the wireless transmission distance is greater than or equal to 100m.

4. A phase checking device based on the arrester leakage current signal according to claim 1, characterized in that: The detection host also includes a display screen, which is used to display the current phase of each phase line, the phase difference and the judgment result.

5. A phase checking device based on the arrester leakage current signal according to claim 1, characterized in that: The satellite timing module adopts the timing technology of the global positioning system GPS, and the maximum error is less than or equal to 100us.

6. A phase checking device based on the arrester leakage current signal according to claim 1, characterized in that: The battery module is a large-capacity lithium battery pack, which is composed of multiple lithium batteries connected in parallel and has a continuous working time of greater than or equal to 4 hours.

7. A phase checking device based on the arrester leakage current signal according to claim 1, characterized in that: The detection host is provided with a power switch button.