Large-diameter pipeline outdoor construction docking components and construction methods
By designing the docking components of the outer arc plate, inner arc plate and side top plate components, the problems of center line adjustment and pipe port damage in large-diameter pipeline construction are solved, and the effects of rapid docking and cost reduction are achieved.
Patent Information
- Application Number
- CN202010803894.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-11
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2040-08-11
AI Technical Summary
During outdoor construction of large-diameter pipelines, it is difficult to adjust the center line of the pipeline and the pipe opening is prone to damage, resulting in low construction efficiency and high cost.
A docking component including outer arc plate, inner arc plate and side top plate components is designed. The rapid adjustment of the pipeline center line and the protection of the pipe opening through arc grooves, guide tubes, positioning screws and other structures to avoid direct mechanical contact. .
It realizes rapid docking of the pipeline center line and protection of the pipe opening, improves construction efficiency, and reduces pipeline losses and costs.
Smart Images

Figure CN111851703B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to a pipe socket device, and more particularly to a large-diameter pipe outdoor construction docking component and construction method, belonging to the field of underground pipeline construction technology. Background Technology
[0002] When constructing large-diameter pipelines outdoors, the pipelines are generally placed in pre-dug trenches using hoisting equipment. This is especially true for underground rainwater pipelines, which are typically made of cement and have a wide opening at one end and a narrow opening at the other. During construction, a truck crane is needed to place the pipelines in sections in the trench and then connect them one by one. Existing rainwater pipelines are prone to the following problems during construction: 1. The centerline between pipelines is difficult to adjust; 2. The connection points are easily damaged when connecting pipelines. Due to the large size of the pipelines, connecting the center lines often requires the cooperation of a crane operator and ground staff. Typically, the crane pushes the sidewall of the concrete pipe, and ground staff use hand signals to instruct the crane operator to stop pushing. This method is very complex, and even slight mistakes can damage the outer wall of the pipeline. Connecting the pipelines usually involves mechanically pushing the pipe ends together. This direct contact between the machinery and the pipe ends can easily damage them. Damage to the pipe ends can lead to poor sealing, and in severe cases, pipe replacement may be necessary, reducing construction efficiency and increasing costs. Summary of the Invention
[0003] The technical problem to be solved by the present invention is to overcome the shortcomings of the prior art and provide a large-diameter pipeline outdoor construction docking component and construction method, which can quickly adjust the center line of the pipeline and avoid damage to the pipeline opening during pipe docking.
[0004] The technical solution adopted by this invention to solve the technical problem is as follows:
[0005] An outdoor construction docking assembly for large-diameter pipes includes two outer arc plates, each of which is L-shaped and has an arc-shaped groove on its inner side. An inner arc plate assembly is disposed on the inner side of each outer arc plate, and a side top plate assembly is inserted into the outer side of each outer arc plate. Two side top plate assemblies are also provided, with a pipe opening partition at the rear end of each side top plate assembly.
[0006] The inner arc plate assembly consists of two symmetrically arranged plates. Each inner arc plate assembly comprises a top limiting horizontal plate, a second arc plate, a bottom extending horizontal plate, and an end vertical plate. A second arc plate is placed in an arc-shaped groove on the inner side of each outer arc plate. A top limiting horizontal plate is connected to the top of each second arc plate. The top limiting horizontal plate is located on the end face of the top of the outer arc plate. A first guide tube with internal threads is provided on each top limiting horizontal plate. A matching first positioning hole with internal threads is drilled at the position of the first guide tube on the end face of the top of the outer arc plate. A matching first positioning screw is rotatably inserted into each first guide tube, and the end of the first positioning screw is rotatably inserted into the corresponding first positioning hole. A bottom extending horizontal plate is fixedly connected to the lower end of each second arc plate. An end vertical plate is vertically connected below the end of the bottom extending horizontal plate. At least two second grooves are drilled on the bottom surface of the end vertical plate, and a ball bearing is embedded in each second groove.
[0007] The outer wall of the second arc-shaped plate is in close contact with the inner wall of the arc-shaped groove on the inner side of the outer arc-shaped plate, and the second arc-shaped plate matches the arc-shaped groove on the inner side of the outer arc-shaped plate.
[0008] The bottom extension horizontal plate extends out of the lower end of the inner side of the outer arc plate, and the end vertical plate is located in front of the lower end of the inner side of the outer arc plate. The bottom of the ball on the bottom surface of the end vertical plate is on the same horizontal line as the bottom surface of the outer arc plate.
[0009] The side top panel assembly consists of a top panel, an insert plate, and a rectangular groove. The top panel is arranged in an inverted "L" shape. An insert plate is located in the center of the inner side of the top panel of the top panel. A second guide tube with internal threads is located at the front end of the outer side of the top panel of the top panel. A matching second positioning screw is rotatably inserted into the second guide tube, with the end of the second positioning screw extending directly to the inner side of the top panel of the top panel. A rectangular groove is carved in the rear part of the top panel of the top panel. A second positioning hole with internal threads is carved in the front end face of the rectangular groove. A third guide tube with internal threads is located at the rear end face of the top panel of the top panel. The position of the third guide tube corresponds to the position of the second positioning hole. A matching third threaded rod is rotatably inserted into the third guide tube. The end of the tube is rotatably inserted into the corresponding second positioning hole; a tube is provided on the outside of the vertical plate on the side of the top plate, and a matching rectangular tube is inserted into the tube, the rectangular tube being slidably connected to the tube; three positioning rings with internal threads are provided at the end of the rectangular tube, and a matching positioning screw is rotatably inserted into the positioning ring, the bottom of each positioning screw being pointed; a fourth guide tube with internal threads is provided on the side of the tube port, and at least five third positioning holes with internal threads are provided on the side of the rectangular tube corresponding to the position of the fourth guide tube, a matching fourth positioning bolt is rotatably inserted into the fourth guide tube, and the end of the fourth positioning bolt is directly connected to the third positioning hole, the fourth positioning bolt matching the third positioning hole.
[0010] The rectangular groove is located behind the outer arc plate. A pipe opening partition is provided between the rectangular grooves behind the two top plates. A third groove is carved at both ends of the bottom surface of the pipe opening partition corresponding to the position of the rectangular groove. A ball is embedded in each of the third grooves. A positioning through hole is carved at the position of the third threaded rod on the pipe opening partition. The inner diameter of the positioning through hole is larger than the outer diameter of the third threaded rod. The third threaded rod passes through the third guide tube, the positioning through hole, and the second positioning hole in sequence. The pipe opening partition can move within the rectangular groove and along the third threaded rod. Arc-shaped handrails are provided in the middle of the two sides of the pipe opening partition.
[0011] A fourth groove is provided on the outer side of the outer arc plate at the position corresponding to the insert plate, and the length of the insert plate is greater than the depth of the fourth groove; a fourth positioning hole with internal threads is provided on the outer side of the outer arc plate at the position corresponding to the second guide tube, and the end of the second positioning screw is rotatably inserted into the fourth positioning hole, and the fourth positioning hole matches the second threaded rod.
[0012] The two outer arc plates are symmetrically distributed on both sides of the outer wall of the pipe's large opening. An inner arc plate assembly is respectively provided in the arc-shaped groove on the inner side of each outer arc plate, and the two inner arc plate assemblies are symmetrically distributed.
[0013] The construction method of the large-diameter pipe socket auxiliary device includes the following steps:
[0014] 1) Construction preparation:
[0015] A. Measure and lay out the lines, dig the pipeline pre-buried trench, and lay precast slabs at the bottom of the pre-buried trench;
[0016] B. Mark the position of the center line in the middle of each precast slab;
[0017] C. Check the pipe opening for any damage, and apply Vaseline evenly to the inner wall of the larger end of the pipe.
[0018] D. Place the first section of pipe on the precast slab using a truck crane, and manually roll it to position the pipe in the center of the precast slab. Place stones on both sides of the outer wall of the pipe to secure it in place.
[0019] 2) Specific operating steps:
[0020] A. Secure the two outer arc plates to the outside of the large end of the first pipe section, and insert the insert plates on the inner side of the two top plates into the fourth groove on the outer side of each outer arc plate.
[0021] B. Insert the second positioning screw on the side of each top plate into the fourth positioning hole inside the second guide tube and on the outer side of the outer arc plate in sequence by rotating it.
[0022] C. Pull the rectangular insert out of the insert cylinder, so that the end of the rectangular insert rests against the inner wall of the pre-embedded trench, and insert it into the fourth guide tube by rotating the fourth positioning bolt, and insert it into the third positioning hole on the side of the corresponding rectangular insert, and fix the rectangular insert to the insert cylinder together.
[0023] D. Insert a matching positioning screw by rotating it inside the positioning ring at the end of the rectangular insert block, so that the bottom of the positioning screw is inserted into the soil on both sides of the pre-embedded plate.
[0024] F. Place the second arc plate in the arc-shaped groove on the inner side of the two outer arc plates respectively, so that the front end of the second arc plate is pressed against the large end of the first section of pipe. At this time, the position of the first guide tube corresponds to the position of the first positioning hole on the top end face of the outer arc plate.
[0025] J. Rotate and insert the first positioning screw into the first guide tube, with the end of the first positioning screw directly connected to the first positioning hole;
[0026] H. Measure the position of the middle position between the two end vertical plates, which coincides with the center line on the precast plate;
[0027] I. Use a truck crane to lift the second section of pipe and place it inside the second arc plate, aligning the small end of the second section of pipe with the large end of the first section of pipe. The large end of the second section of pipe is located in the middle of the rectangular groove behind the outer arc plate.
[0028] K. Place a pipe opening partition between the two rectangular slots, and rotate and insert a third threaded rod into the third guide tube at the tail end of each top plate. The third threaded rod passes through the positioning through holes at both ends of the pipe opening partition and is inserted into the second positioning hole on the upper end face of the rectangular slot.
[0029] L. At least one worker holds the arc-shaped handrail on the side of the pipe opening baffle and pushes the pipe opening baffle to press tightly against the large end of the second pipe section. The small end of the second pipe section is squeezed into the large end of the first pipe section by mechanically pushing the pipe opening baffle.
[0030] M. Remove the pipe opening baffle, top plate, outer arc plate, and inner protective plate assembly; repeat the above steps to continue the subsequent pipe connection operation.
[0031] The positive and beneficial effects of this invention are:
[0032] 1. This invention uses outer arc plates on both sides of the outer wall of the pipe opening to position the previous pipe opening. A side top plate assembly is installed outside the outer arc plate to clamp and position it. An inner arc plate assembly is placed within the arc-shaped groove of the outer arc plate. During use, the center between the two end vertical plates is aligned with the center line of the pipe. This allows for quick pipe connection during subsequent pipe docking by simply placing the pipe within the arc plate and mechanically pressing it to ensure the center line of the subsequent pipe remains consistent with the center line of the previous pipe.
[0033] 2. This invention, by incorporating a pipe opening baffle, avoids direct mechanical contact with the pipe opening during pipe compression and propulsion operations, thus preventing damage to the pipe opening. Furthermore, by installing ball bearings at the corresponding rectangular groove positions on both ends of the bottom surface of the pipe opening baffle, the baffle can move rapidly when pushed by the machinery.
[0034] 3. By providing handrails on both sides of the pipe opening partition, the present invention allows workers to hold onto the handrails when the pipe opening partition is mechanically pushed forward, thus preventing the pipe opening partition from tipping over.
[0035] 4. This invention features an insert plate located in the center of the inner side of the bottom panel of the top plate. During use, the top plate is placed on the side of the precast slab at the bottom of the pipe trench. The insert plate is inserted into the fourth groove on the outer side of the arc-shaped plate. Then, the second positioning screw is rotated and inserted into the corresponding second guide tube and the corresponding fourth positioning hole. Simultaneously, the rectangular insert block is pulled out from the insert cylinder, and its end is pressed against the inner wall of the pipe trench. The positioning stud is then rotated and inserted into the bottom surface of the trench, and the fourth positioning bolt is rotated and inserted into the corresponding fourth guide tube, thus fixing the rectangular insert block. This completes the clamping and positioning of the outer arc plate. It is convenient to use and simple to operate, laying the foundation for subsequent pipe connections.
[0036] 5. This invention, through the construction method and the docking component, enables the rapid segmentation and docking of pipelines, and ensures that adjacent pipelines are always on the same center line, thereby improving work efficiency, reducing pipeline wear, and lowering costs. Attached Figure Description
[0037] Figure 1 This is a schematic diagram of the structure of the present invention;
[0038] Figure 2 This is a partial structural diagram of the side top plate assembly and the outer arc plate of the present invention;
[0039] Figure 3 This is a schematic diagram of the installation between the outer arc plate and the inner arc plate assembly of the present invention;
[0040] Figure 4 This is a schematic diagram of the bottom structure of the end vertical plate of the present invention;
[0041] Figure 5 This is a schematic diagram of the bottom structure of the nozzle partition of the present invention. Detailed Implementation
[0042] The invention will be further explained and described below with reference to the accompanying drawings:
[0043] See Figures 1-5 An outdoor construction docking assembly for large-diameter pipes includes two outer arc plates 1, each outer arc plate 1 being L-shaped. An arc-shaped groove 1-A is provided on the inner side of each outer arc plate 1. An inner arc plate assembly is provided on the inner side of each outer arc plate 1, and a side top plate assembly is inserted on the outer side of each outer arc plate 1. There are two side top plate assemblies, and a pipe opening partition 4 is provided at the rear end of the two side top plate assemblies.
[0044] There are two inner arc plate assemblies, symmetrically distributed. Each inner arc plate assembly consists of a top limiting horizontal plate 2, a second arc plate 2-1, a bottom extending horizontal plate 2-2, and an end vertical plate 2-3. A second arc plate 2-1 is placed in an arc-shaped groove 1-A on the inner side of each outer arc plate 1. A top limiting horizontal plate 2 is connected to the top of each second arc plate 2-1. The top limiting horizontal plate 2 is located on the end face of the top of the outer arc plate 1. A first guide tube 6 with internal threads is provided on each top limiting horizontal plate 2. The first guide tube 6 corresponds to the position of the end face of the top of the outer arc plate 1. A matching first positioning hole 1-D with internal threads is provided at the position. A matching first positioning screw 7 is rotatably inserted into each first guide tube 6, and the end of the first positioning screw 7 is rotatably inserted into the corresponding first positioning hole 1-D. A bottom extension horizontal plate 2-2 is fixedly connected to the lower end of each second arc plate 2-1. An end vertical plate 2-3 is vertically connected below the end of the bottom extension horizontal plate 2-2. At least two second grooves 2-4 are provided on the bottom surface of the end vertical plate 2-3. A ball bearing 2-5 is embedded in each second groove 2-4.
[0045] The outer wall of the second arc plate 2-1 is in close contact with the inner wall of the arc-shaped groove 1-A on the inner side of the outer arc plate 1, and the second arc plate 2-1 matches the arc-shaped groove 1-A on the inner side of the outer arc plate 1.
[0046] The bottom extension plate 2-2 extends out of the lower end of the inner side of the outer arc plate 1, and the end vertical plate 2-3 is located in front of the lower end of the inner side of the outer arc plate 1. The bottom of the ball 2-5 located on the bottom surface of the end vertical plate 2-3 is on the same horizontal line as the bottom surface of the outer arc plate 1.
[0047] The side top panel assembly consists of a top panel 3, an insert plate 3-1, and a rectangular groove 13. The top panel 3 is arranged in an inverted "L" shape. An insert plate 3-1 is provided in the middle of the inner side of the top panel of the top panel 3. A second guide tube 8 with internal threads is provided at the front end of the outer side of the top panel of the top panel 3. A matching second positioning screw 9 is rotatably inserted into the second guide tube 8. The end of the second positioning screw 9 extends straight through the inner side of the top panel of the top panel 3. A rectangular groove 13 is carved in the rear part of the top panel of the top panel 3. A second positioning hole 13-1 with internal threads is carved in the front end face of the rectangular groove 13. A third guide tube 10 with internal threads is provided in the rear end face of the top panel of the top panel 3. The position of the third guide tube 10 corresponds to the position of the second positioning hole 13-1. A matching third threaded rod 11 is rotatably inserted into the third guide tube 10, and the end of the third threaded rod 11 is rotatably inserted into the corresponding second positioning hole 13-1.
[0048] The rectangular groove 13 is located behind the outer arc plate 1. A pipe opening partition 4 is provided between the rectangular grooves 13 behind the two top plates 3. The bottom surfaces of the pipe opening partition 4 are respectively provided with third grooves at the positions corresponding to the rectangular grooves 13. A ball bearing is embedded in each third groove. A positioning through hole 4-1 is provided on the pipe opening partition 4 at the position corresponding to the third threaded rod 11. The inner diameter of the positioning through hole 4-1 is larger than the outer diameter of the third threaded rod 11. The third threaded rod 11 is sequentially inserted into the third guide tube 10, the positioning through hole 4-1, and the second positioning hole 13-1. The pipe opening partition 4 can move within the rectangular groove 13 and along the third threaded rod 11. Arc-shaped handrails 5 are respectively provided in the middle of the two sides of the pipe opening partition 4.
[0049] A fourth groove 1-C is provided on the outer side of the outer arc plate 1 at a position corresponding to the insertion plate 3-1, and the length of the insertion plate 3-1 is greater than the depth of the fourth groove 1-C; a fourth positioning hole 1-B with internal threads is provided on the outer side of the outer arc plate 1 at a position corresponding to the second guide tube 8, and the end of the second positioning screw 9 is rotatably inserted into the fourth positioning hole 1-B, and the fourth positioning hole 1-B matches the second threaded screw 9.
[0050] Two outer arc plates 1 are symmetrically distributed on both sides of the outer wall of the pipe's large opening. An inner arc plate assembly is provided in an arc-shaped groove 1-A on the inner side of each outer arc plate 1. The two inner arc plate assemblies are symmetrically distributed.
[0051] The construction method for the above-mentioned large-diameter pipe socket auxiliary device includes the following steps:
[0052] 1) Construction preparation:
[0053] A. Measure and lay out the lines, dig the pipeline pre-buried trench, and lay precast slabs at the bottom of the pre-buried trench;
[0054] B. Mark the position of the center line in the middle of each precast slab;
[0055] C. Check the pipe opening for any damage, and apply Vaseline evenly to the inner wall of the larger end of the pipe.
[0056] D. Place the first section of pipe on the precast slab using a truck crane, and manually roll it to position the pipe in the center of the precast slab. Place stones on both sides of the outer wall of the pipe to secure it in place.
[0057] 2) Specific operating steps:
[0058] A. The two outer arc plates 1 are respectively clamped on the outside of the large end of the first section of pipe, and the insert plates 3-1 on the inner side of the two top plates 3 are respectively inserted into the fourth groove 1-C on the outer side of each outer arc plate 1.
[0059] B. Insert the second positioning screw 9 on the side of each top plate 3 into the fourth positioning hole 1-B on the outer side of the second guide tube 8 and the outer side of the outer arc plate 1 in sequence by rotating it.
[0060] C. Pull the rectangular insert 17 out of the insert cylinder 16 so that the end of the rectangular insert 17 rests against the inner wall of the pre-embedded trench. Rotate and insert it into the fourth guide tube 21 through the fourth positioning bolt 22, and insert it into the third positioning hole 20 on the side of the corresponding rectangular insert 17 to fix the rectangular insert 17 and the insert cylinder 16 together.
[0061] D. A matching positioning screw 19 is inserted into the positioning ring 18 at the end of the rectangular insert 17, so that the bottom of the positioning screw 19 is inserted into the soil on both sides of the pre-embedded plate.
[0062] F. Place the second arc plate 2-1 in the arc-shaped groove 1-A on the inner side of the two outer arc plates 1 respectively, so that the front end of the second arc plate 2-1 is pressed against the large end of the first section of pipe. At this time, the position of the first guide tube 6 corresponds to the position of the first positioning hole 1-D on the top end face of the outer arc plate 1.
[0063] J. Rotate and insert the first positioning screw 7 into the first guide tube 6, with the end of the first positioning screw 7 directly connected to the first positioning hole 1-D;
[0064] H. Measure the position of the middle position between the two end vertical plates 2-3, which coincides with the position of the center line on the precast plate;
[0065] I. Lift the second section of pipe using a truck crane and place it inside the second arc plate 2-1, aligning the small end of the second section of pipe with the large end of the first section of pipe. The large end of the second section of pipe is located in the middle of the rectangular groove 13 behind the outer arc plate 1.
[0066] K. Place a pipe opening partition 4 between the two rectangular slots 13. Rotate and insert a third threaded rod 11 into the third guide tube 10 at the tail end of each top plate 3. The third threaded rod 11 passes through the positioning through holes 4-1 at both ends of the pipe opening partition 4 and is inserted into the second positioning hole 13-1 on the upper end face of the rectangular slot 13.
[0067] L. At least one worker holds the arc-shaped handrail on the side of the pipe opening baffle 4 and pushes the pipe opening baffle 4 to press tightly against the large end of the second pipe section. The small end of the second pipe section is squeezed into the large end of the first pipe section by mechanically pushing the pipe opening baffle 4.
[0068] M. Remove the pipe opening baffle 4, top plate 3, outer arc plate 1 and inner protective plate assembly; repeat the above steps to continue the subsequent pipe connection operation.
[0069] In the above description, the arc-shaped groove on the inner side of the outer arc plate is tightly attached to the outer wall of the large end of the pipe; the inner walls of the two second arc plates 2-1 are tightly attached to the outer wall of the pipe body; when the insert plate 3-1 is inserted into the fourth groove 1-C, the inverted "L"-shaped top plate 3 is just stuck at the side position of the precast plate at the bottom of the trench.
[0070] In the above description, the length of the second arc-shaped plate 2-1 is less than the length of the tube body.
[0071] In the above description, when the new pipe is placed in the second arc plate 2-1, the small end of the new pipe is aligned with the large end of the previous pipe section, and the large end of the new pipe is located in the middle of the rectangular groove 13.
[0072] Working principle:
[0073] 1. Before use, the two outer arc plates 1 are respectively clamped at the large end of the pipe opening, and then the two top plates 3 are placed on both sides of the precast plate. Then push the top plates 3 towards the outer arc plate so that the insert plate 3-1 is inserted into the corresponding fourth groove 1-C. Then rotate the second positioning screw into the corresponding second guide tube 8 and insert it into the fourth positioning hole 1-B on the outside of the outer arc plate.
[0074] 2. The rectangular insert 17 inside the outer insert cylinder 16 of the top plate 3 is pulled out so that the outer end of the rectangular insert 17 presses against the inner walls of both sides of the trench. Then, it is inserted into the corresponding fourth guide tube 21 by rotating the fourth positioning bolt 22 and inserted into the third positioning hole 20 on the side of the rectangular insert 21 to fix the position of the rectangular insert. Finally, the three positioning screws 19 are inserted into the bottom surface of the trench by rotating to fix them.
[0075] 3. Place a second arc plate 2-1 in each outer arc plate 1, and insert it into the first guide tube 6 by rotating the first positioning screw 7, and insert it into the first positioning hole 1-D on the top surface of the outer arc plate;
[0076] 4. When installing the outer arc plate and inner protective plate assembly, ensure that the center position between the two end vertical plates 2-3 coincides with the center line of the precast plate;
[0077] 5. When using, place the new pipe body on the second arc plate 2-1, with the pipe wall of the new pipe tightly against the inner wall of the second arc plate. Align the large end of the previous pipe section with the small end of the new pipe. The large end of the new pipe is located in the middle of the rectangular groove 13. Place the pipe opening partition 4 in the two rectangular grooves 13, and insert the third threaded rod 11 through the positioning through hole 4-1 on the pipe opening partition and into the second positioning hole 13-1. Then, tightly attach the pipe opening partition to the large end of the new pipe.
[0078] 6. By mechanically pushing the pipe end baffle, the smaller end of the new pipe is pushed into the larger end of the previous pipe section to complete the pipe connection. During the process of pushing the pipe end baffle, at least one worker needs to hold the arc-shaped handle 5 and follow the movement of the pipe end baffle by the machine.
[0079] To ensure that the pipes remain aligned during the insertion process, we only need to measure the center position between the two end vertical plates 2-3 to make sure that the center position coincides with the center line on the precast plate.
[0080] This invention ensures that the pipes remain aligned during pipe connection by setting an inner arc plate assembly inside the outer arc plate. It also ensures the outer arc plate is tightly secured by a side top plate assembly outside the outer arc plate, preventing loosening during pipe connection. Furthermore, it prevents direct mechanical contact with the pipe opening, thus avoiding damage. The invention is convenient to use, simple to operate, and easy to promote.
Claims
1. A large-diameter pipeline outdoor construction docking assembly, comprising an outer arc plate (1), characterized in that: There are two outer arc plates (1), each of which is arranged in an "L" shape, and an arc-shaped groove (1-A) is arranged on the inner side surface of each outer arc plate (1); an inner arc plate assembly is arranged on the inner side surface of each outer arc plate (1), and a side top plate assembly is inserted on the outer side surface of each outer arc plate (1); there are two side top plate assemblies, and a pipe orifice partition plate (4) is arranged at the rear end position of the two side top plate assemblies; there are two inner arc plate assemblies, which are arranged in a symmetrical shape; each inner arc plate assembly is composed of a top limit horizontal plate (2), a second arc plate (2-1), a bottom extended horizontal plate (2-2) and an end vertical plate (2-3), and the arc-shaped groove (1-A) on the inner side surface of each outer arc plate (1) is arranged on the inner side surface of each outer arc plate (1). A second arc-shaped plate (2-1) is placed in the groove (1-A), and a top limiting horizontal plate (2) is connected to the top of each of the second arc-shaped plates (2-1), and the top limiting horizontal plate (2) is located on the end surface of the top of the outer arc plate (1). A first guide tube (6) with an internal thread is provided on each of the top limiting horizontal plates (2), and a matching first positioning hole (1-D) with an internal thread is dug at a position of the top end surface of the outer arc plate (1) corresponding to the first guide tube (6). A matching first positioning screw (7) is rotatably inserted in each of the first guide tubes (6), and the end of the first positioning screw (7) is rotatably inserted in the corresponding first positioning hole (1-D); in each of the first The lower ends of the two arc-shaped plates (2-1) are fixedly connected to a bottom extension horizontal plate (2-2); an end vertical plate (2-3) is vertically connected below the end of the bottom extension horizontal plate (2-2); at least two second grooves (2-4) are excavated on the bottom surface of the end vertical plate (2-3); a ball (2-5) is embedded in each of the second grooves (2-4); the outer wall of the second arc-shaped plate (2-1) is tightly attached to the inner wall of the arc-shaped groove (1-A) on the inner side surface of the outer arc-shaped plate (1); the second arc-shaped plate (2-1) matches the arc-shaped groove (1-A) on the inner side surface of the outer arc-shaped plate (1); the bottom extension horizontal plate (2-2) extends out from the lower end of the inner side surface of the outer arc-shaped plate (1); and the end vertical plate (2- 3) located at the front position of the lower end of the inner side surface of the outer arc plate (1), the bottom of the ball (2-5) located at the bottom surface of the end vertical plate (2-3) is on the same horizontal line as the bottom surface of the outer arc plate (1); the side top plate assembly is composed of a top plate (3), an insert plate (3-1) and a rectangular groove (13), the top plate (3) is arranged in an inverted "L" shape, the insert plate (3-1) is arranged in the middle of the inner side of the top panel of the top plate (3), and a second guide tube (8) with internal threads is arranged at the front end position of the outer side surface of the top panel of the top plate (3), and a matching second positioning screw (9) is rotatably inserted in the second guide tube (8), and the end of the second positioning screw (9) directly passes through the inner side of the top panel of the top plate (3);A rectangular groove (13) is excavated at the rear of the top panel of the top plate (3); a second positioning hole (13-1) with an internal thread is excavated at the front end surface of the rectangular groove (13); a third guide tube (10) with an internal thread is arranged at the rear end surface of the top panel of the top plate (3); the position of the third guide tube (10) corresponds to the position of the second positioning hole (13-1) in front and in back; a matching third threaded rod (11) is rotatably inserted in the third guide tube (10), and the end of the third threaded rod (11) is rotatably inserted in the corresponding second positioning hole (13-1); an insertion tube ( 16), a matching rectangular plug block (17) is inserted in the insert tube (16), and the rectangular plug block (17) is slidably connected to the insert tube (16); three positioning rings (18) with internal threads are provided at the ends of the rectangular plug block (17), and a matching positioning screw (19) is rotatably inserted in the positioning ring (18), and the bottom of each positioning screw (19) is distributed in a pointed shape; a fourth guide tube (21) with internal threads is provided on the side of the end portion of the insert tube (16), and at least five third positioning holes (21) with internal threads are provided on the side of the rectangular plug block (17) at positions corresponding to the fourth guide tube (21). 0), a matching fourth positioning bolt (22) is rotatably inserted in the fourth guide tube (21), and the end of the fourth positioning bolt (22) is directly inserted into the third positioning hole (20), and the fourth positioning bolt (22) matches the third positioning hole (20); the rectangular groove (13) is located behind the outer arc plate (1), and a pipe mouth partition (4) is arranged between the rectangular grooves (13) behind the two top plates (3), and third grooves are respectively dug at the positions of the two ends of the bottom surface of the pipe mouth partition (4) corresponding to the rectangular grooves (13), and a ball is respectively embedded in each of the third grooves; the position corresponding to the third threaded rod (11) on the pipe mouth partition (4) A positioning through hole (4-1) is dug at the position of the outer arc plate (1), the inner diameter of the positioning through hole (4-1) is larger than the outer diameter of the third threaded rod (11); the third threaded rod (11) is sequentially inserted into the third guide tube (10), the positioning through hole (4-1) and the second positioning hole (13-1); the pipe mouth partition (4) can be moved in the rectangular groove (13) and along the third threaded rod (11); arc-shaped handrails (5) are respectively provided at the middle of the two side surfaces of the pipe mouth partition (4); a fourth groove (1-C) is dug at the outer surface of the outer arc plate (1) at a position corresponding to the plug plate (3-1), and the length of the plug plate (3-1) is larger than the depth of the fourth groove (1-C);A fourth positioning hole (1-B) with an internal thread is dug at a position corresponding to the second guide tube (8) on the outer side of the outer arc plate (1), and the end of the second positioning screw (9) is rotatably inserted into the fourth positioning hole (1-B), and the fourth positioning hole (1-B) matches the second positioning screw (9); the two outer arc plates (1) are symmetrically distributed on both sides of the outer wall of the large end of the pipeline, and an inner arc plate component is respectively arranged in an arc-shaped groove (1-A) on the inner side surface of each outer arc plate (1), and the two inner arc plate components are symmetrically distributed. ; 2. The construction method of the large-diameter pipeline outdoor construction docking assembly according to claim 1 is characterized by: The steps include: 1) Construction preparation: A. Measure and lay out the lines, dig the pre-buried trench for the pipeline, and lay the prefabricated slabs at the bottom of the pre-buried trench; B. Mark the center line in the middle of each precast panel; C. Check whether the pipe mouth is damaged, and evenly apply vaseline on the inner wall of the pipe at the large end; D. Place the first section of the pipe on the prefabricated board by using a truck crane, and manually roll the pipe to the center of the prefabricated board, and place stones on both sides of the outer wall of the pipe to clamp and position it; 2) Specific operation steps: A. The two outer arc plates (1) are respectively clamped on the outside of the large end of the first section of the pipeline, and the inserting plates (3-1) on the inner side surfaces of the two top plates (3) are respectively inserted into the fourth groove (1-C) on the outer side surface of each outer arc plate (1); B. Rotate and insert the second positioning screw (9) on the side of each top plate (3) into the second guide tube (8) and into the fourth positioning hole (1-B) on the outer side of the outer arc plate (1); C. Pull the rectangular plug (17) out of the insert tube (16) so that the end of the rectangular plug (17) is against the inner wall of the embedded groove, and the rectangular plug (17) is rotated and inserted into the fourth guide tube (21) by the fourth positioning bolt (22), and inserted into the third positioning hole (20) on the side of the corresponding rectangular plug (17), so as to fix the rectangular plug (17) and the insert tube (16) together; D. Rotate and insert a matching positioning screw (19) in the positioning ring (18) at the end of the rectangular plug (17), so that the bottom of the positioning screw (19) is inserted into the soil on both sides of the embedded plate; F. Place the second arc plates (2-1) in the arc-shaped grooves (1-A) on the inner sides of the two outer arc plates (1) respectively, so that the front end of the second arc plate (2-1) is pressed against the large end of the first pipe section, and the position of the first guide tube (6) corresponds to the position of the first positioning hole (1-D) on the top end face of the outer arc plate (1) above and below; J. Rotatably inserting a first positioning screw (7) in the first guide tube (6), wherein the end of the first positioning screw (7) directly passes through the first positioning hole (1-D); H. Measure the middle position between the two end vertical plates (2-3) and the position where it coincides with the center line of the precast plate; I. Lift the second pipe section by a truck crane and place the second pipe section in the second arc plate (2-1) so that the small end of the second pipe section is aligned with the large end of the first pipe section, and the large end of the second pipe section is located in the middle of the rectangular groove (13) behind the outer arc plate (1); K. A pipe opening baffle (4) is placed between the two rectangular grooves (13), and a third threaded rod (11) is rotatably inserted into a third guide tube (10) at the rear end of each top plate (3); the third threaded rod (11) is sequentially inserted into the positioning through holes (4-1) at both ends of the pipe opening baffle (4), and inserted into the second positioning hole (13-1) on the upper end surface of the rectangular groove (13); L. At least one staff member holds the arc-shaped handrail on the side of the pipe opening baffle (4) and pushes the pipe opening baffle (4) and the large opening end of the second pipe section to be tightly attached together, and mechanically pushes the pipe opening baffle (4) to squeeze the small opening end of the second pipe section into the large opening end of the first pipe; M. Remove the pipe opening baffle (4), top plate (3), outer arc plate (1) and inner guard plate assembly; repeat the above steps to continue the subsequent pipe docking operation.