Valve linkage device, drill pipe shearing method and blowout preventer control device

By designing a linkage device in oil drilling operations, automatically opening the bypass valve and providing a high pressure source, it solves the problem of insufficient pressure on the shear gate caused by operator forgetting to open the bypass valve, ensuring the safety of drill pipe shearing and efficiency.

CN111852379BActive Publication Date: 2024-11-15GUANGZHOU DONGSU PETROLEUM D&E EQUIP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202010814380.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-08-13
Publication Date
2024-11-15
Estimated Expiration
2040-08-13

AI Technical Summary

Technical Problem

In oil drilling operations, operators tend to forget to open the bypass valve in a tight situation, resulting in insufficient pressure on the shear gate plate and ineffective cutting of the drill pipe, which increases safety risks.

Method used

Design a valve linkage device, including a linkage actuator and logic sequence valve, for automatically opening the bypass valve when the shear gate valve is in the closed position and providing a higher pressure source when needed to ensure the shear gate The pressure is sufficient to ensure that the drill pipe can be successfully cut.

Benefits of technology

It effectively avoids the problem of insufficient pressure on the shear gate plate caused by the operator forgetting to open the bypass valve, ensures that the drill pipe can be sheared quickly and safely, and reduces operating risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111852379B_ABST
    Figure CN111852379B_ABST
Patent Text Reader

Abstract

The present invention discloses a valve linkage device, including a linkage actuator, a second pressure source and a logic sequence valve. The linkage actuator is used to control the bypass valve to be in an open position when the shear gate valve is in a closed position, so that the first pressure source outputs a first pressure to the shear gate blowout preventer. The logic sequence valve is installed on the pipeline between the second pressure source and the shear gate blowout preventer, and is used to make the second pressure source output a second pressure to the shear gate blowout preventer when performing a first operation. The present invention also discloses a drill pipe shearing method and a blowout preventer control device. The present invention can prevent the operator from not opening or forgetting to open the bypass valve when the shear needs to be closed under highly tense conditions, resulting in insufficient shear gate pressure and failure to shear the drill pipe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of oil production, and in particular to a shear gate valve and bypass valve linkage device used in oil production drilling operations, a method for quickly shearing a drill pipe using a shear gate blowout preventer, and a blowout preventer control device. Background Art

[0002] Hydraulic BOP and BOP control device are very important blowout prevention equipment widely used in oil exploration and development drilling. Among them, the rated pressure of the general BOP control device system is 21MPa, and the control working pressure of the gate BOP is generally 10.5MPa. When the shear gate needs to be operated to cut the drill pipe, the required working pressure is 21MPa or even higher. Therefore, when operating the shear gate, the operation process is to open the bypass valve to allow the system pressure of 21MPa to enter the manifold, close the shear gate valve, and allow the system pressure of 21MPa to be directly supplied to the shear gate cylinder to cut the drill pipe. When the shear operation is required, it is often an abnormal situation at the wellhead or even an emergency treatment. In this highly nervous situation of the operator, it is easy to fail to open the bypass valve when operating the shear gate valve, resulting in insufficient shear gate pressure and failure to cut the drill pipe, which may lead to further danger. Summary of the invention

[0003] In order to overcome the deficiencies of the prior art, one of the objects of the present invention is to provide a valve linkage device, which can prevent the operator from failing (or forgetting) to open the bypass valve when closing the shear under highly stressful circumstances, resulting in insufficient shear gate pressure and failure to cut the drill pipe.

[0004] One of the purposes of the present invention is achieved by the following technical solution:

[0005] A valve linkage device comprises a linkage actuator, a second pressure source and a logic sequence valve, wherein the linkage actuator is used to control a bypass valve to be in an open position when the shear gate valve is in a closed position, so that a first pressure source outputs a first pressure to a shear gate blowout preventer, and the logic sequence valve is installed on a pipeline between the second pressure source and the shear gate blowout preventer, and is used to enable the second pressure source to output a second pressure to the shear gate blowout preventer when performing a first operation.

[0006] As a preferred embodiment, the linkage actuator includes an inductive stroke switch and a first shuttle valve, the first valve port of the inductive stroke switch is connected to an external air source, the second valve port of the inductive stroke switch is connected to a first air inlet of the first shuttle valve through a first pipeline, the working port of the first shuttle valve is connected to an open position of the bypass valve air control through a second pipeline, the control mechanism of the inductive stroke switch cooperates with a shear gate valve, the liquid inlet of the shear gate blowout preventer is connected to the first valve port of the shear gate valve, the second valve port of the shear gate valve is connected to the first valve port of the bypass valve through a third pipeline, and the second valve port of the bypass valve is connected to a first pressure source;

[0007] When the shear gate valve is in the closed position, the first valve port and the second valve port of the shear gate valve are connected, and the control mechanism controls the first valve port and the second valve port of the inductive stroke switch to be connected, so that the external air source drives the bypass valve to be in the open position, the first valve port and the second valve port of the bypass valve are connected, and the first pressure source outputs the first pressure to the shear gate blowout preventer.

[0008] As a preferred embodiment, the linkage actuator further includes a first liquid-gas switch, the liquid inlet of the logic sequence valve is connected to the second pressure source through a fourth pipeline, the liquid outlet of the logic sequence valve is connected to the third pipeline through a fifth pipeline, the liquid inlet of the first liquid-gas switch is connected to the fifth pipeline, the air inlet of the first liquid-gas switch is connected to the first pipeline through a sixth pipeline, and the air outlet of the first liquid-gas switch is connected to the air inlet of the logic sequence valve;

[0009] When the liquid inlet pressure of the first liquid-gas switch is greater than a first preset value, the air inlet and the air outlet of the first liquid-gas switch are connected; when the air inlet pressure of the logic sequence valve is greater than a second preset threshold, the logic sequence valve performs a first operation, and the liquid inlet and the liquid outlet of the logic sequence valve are connected.

[0010] As a preferred embodiment, a first stop valve is installed on the first pipeline and / or a second stop valve is installed on the sixth pipeline.

[0011] As a preferred embodiment, the linkage actuator further includes a second shuttle valve, a first air inlet of the second shuttle valve is connected to the first pipeline through a seventh pipeline, a working port of the second shuttle valve is connected to the closed position of the semi-closed gate valve, a first valve port of the semi-closed gate valve is connected to the first valve port of the bypass valve through an eighth pipeline, and a second valve port of the semi-closed gate valve is connected to the semi-closed gate blowout preventer through a ninth pipeline;

[0012] When the shear gate valve is in the closed position, the control mechanism controls the external gas source to drive the bypass valve to the closed position via the second shuttle valve, the first valve port and the second valve port of the semi-closed gate valve are connected, and the first pressure source outputs the first pressure to the semi-closed gate blowout preventer.

[0013] As a preferred embodiment, the valve linkage device further includes a delivery pump for pressurizing the working fluid and delivering the working fluid to the second pressure source.

[0014] As a preferred embodiment, the valve linkage device also includes an automatic pressurizing mechanism, which includes a power source and a second liquid-gas switch, the liquid inlet of the second liquid-gas switch is connected to the second pressure source, the first valve port of the second liquid-gas switch is connected to the power source, the second valve port of the second liquid-gas switch is connected to the power source inlet of the delivery pump, and when the liquid inlet pressure of the second liquid-gas switch is greater than a third preset threshold, the first valve port and the second valve port of the second liquid-gas switch are connected.

[0015] The second object of the present invention is to provide a drill pipe shearing method, which can avoid the situation where the operator fails to (or forgets to) open the bypass valve when the shear needs to be closed under such highly nervous conditions, resulting in insufficient shear gate pressure and failure to cut the drill pipe.

[0016] The second object of the present invention is achieved by adopting the following technical solution:

[0017] A method for shearing a drill pipe using the valve linkage device according to one of the purposes of the present invention comprises the following steps:

[0018] Operating the shear gate valve to close it;

[0019] The linkage actuator controls the bypass valve to be in the open position according to the closing position information, and the first pressure source outputs the first pressure to the shear gate blowout preventer;

[0020] When the demand pressure is greater than the first pressure, the linkage actuator drives the logic sequence valve to perform a first operation, and the second pressure source outputs a second pressure to the shear gate blowout preventer.

[0021] As a preferred embodiment, the linkage actuator includes an inductive stroke switch and a first shuttle valve, the first valve port of the inductive stroke switch is connected to an external air source, the second valve port of the inductive stroke switch is connected to a first air inlet of the first shuttle valve through a first pipeline, the working port of the first shuttle valve is connected to an open position of the bypass valve air control through a second pipeline, the control mechanism of the inductive stroke switch cooperates with a shear gate valve, the liquid inlet of the shear gate blowout preventer is connected to the first valve port of the shear gate valve, the second valve port of the shear gate valve is connected to the first valve port of the bypass valve through a third pipeline, and the second valve port of the bypass valve is connected to a first pressure source;

[0022] The linkage actuator controls the bypass valve to be in the open position according to the closing position information, and the first pressure source outputs the first pressure to the shear gate blowout preventer, including:

[0023] When the shear gate valve is in the closed position, the first valve port and the second valve port of the shear gate valve are connected;

[0024] The control mechanism controls the first valve port and the second valve port of the inductive stroke switch to be connected according to the closing position information, so that an external air source drives the bypass valve to be in an open position, the first valve port and the second valve port of the bypass valve are connected, and the first pressure source outputs a first pressure to the shear gate blowout preventer.

[0025] As a preferred embodiment, the linkage actuator further includes a first liquid-gas switch, the liquid inlet of the logic sequence valve is connected to the second pressure source through a fourth pipeline, the liquid outlet of the logic sequence valve is connected to the third pipeline through a fifth pipeline, the liquid inlet of the first liquid-gas switch is connected to the fifth pipeline, the air inlet of the first liquid-gas switch is connected to the first pipeline through a sixth pipeline, and the air outlet of the first liquid-gas switch is connected to the air inlet of the logic sequence valve;

[0026] When the demand pressure is greater than the first pressure, the linkage actuator drives the logic sequence valve to perform a first operation, and the second pressure source outputs a second pressure to the shear gate blowout preventer, including:

[0027] The first pressure source delivers working liquid to the liquid inlet of the first liquid-gas switch through the third pipeline and the fifth pipeline, so that the liquid inlet pressure of the first liquid-gas switch is greater than a first preset value, and the gas inlet and gas outlet of the first liquid-gas switch are connected;

[0028] The external gas source delivers gas to the air inlet of the logic sequence valve through the first pipeline and the sixth pipeline, so that the air inlet pressure of the logic sequence valve is greater than a second preset threshold value, the logic sequence valve performs a first operation, the liquid inlet and the liquid outlet of the logic sequence valve are connected, and the second pressure source outputs a second pressure to the shear gate blowout preventer.

[0029] The third object of the present invention is to provide a blowout preventer control device, which can avoid the situation where the operator fails to (or forgets to) open the bypass valve when the shear needs to be closed under such highly nervous conditions, resulting in insufficient shear gate pressure and failure to shear the drill pipe.

[0030] The third object of the present invention is achieved by adopting the following technical solution:

[0031] A blowout preventer control device comprises the valve linkage device according to one of the objectives of the present invention.

[0032] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention provides a valve linkage device, which includes a linkage actuator, a second pressure source and a logic sequence valve, wherein the linkage actuator is used to control the bypass valve to be in an open position when the shear gate valve is in a closed position, so that the first pressure source outputs a first pressure to the shear gate blowout preventer, and the logic sequence valve is installed on the pipeline between the second pressure source and the shear gate blowout preventer, and is used to make the second pressure source output a second pressure to the shear gate blowout preventer when performing a first operation. It can be seen that the implementation of the embodiment of the present invention can avoid the situation where the bypass valve is not opened (or forgotten) when the operator needs to close the shear under a highly nervous situation, resulting in insufficient shear gate pressure and failure to cut the drill pipe. At the same time, the drill pipe can be quickly cut by a higher pressure as needed. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 A structural diagram of a valve linkage device according to an embodiment of the present invention;

[0034] Figure 2 It is a structural schematic diagram of the shear gate valve;

[0035] Figure 3 The present invention is a flowchart of a drill rod shearing method according to an embodiment of the present invention.

[0036] In the figure: 01, shear gate valve; 02, bypass valve; 03, inductive travel switch; 04, first shuttle valve; 05, first stop valve; 06, logic sequence valve; 07, delivery pump; 08, second pressure source; 09, first liquid-gas switch; 10, second liquid-gas switch; 11, second stop valve; 121, shear gate blowout preventer; 122, semi-closed gate blowout preventer; 13, gas circuit board bypass open position; 14, working port of the first shuttle valve; 15, control mechanism; 16, semi-closed gate valve. DETAILED DESCRIPTION

[0037] Below, in conjunction with the accompanying drawings and specific embodiments, the present invention is further described. It should be noted that, under the premise of no conflict, the various embodiments described below or the various technical features can be arbitrarily combined to form a new embodiment. Except for special instructions, the materials and equipment used in this embodiment can be purchased from the market. Examples of embodiments are shown in the accompanying drawings, in which the same or similar reference numerals throughout represent the same or similar elements or elements with the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and the limitations of the present application cannot be understood.

[0038] In the description of the present application, it should be understood that the terms "upper", "lower", "front", "back", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present application. In the description of the present application, "plurality" means two or more, unless otherwise precisely and specifically specified.

[0039] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "connected", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, or it can be connected through an intermediary medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0040] The terms "first", "second", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0041] Embodiment 1:

[0042] Please refer to Figure 1 and Figure 2As shown, a valve linkage device includes a linkage actuator, a second pressure source and a logic sequence valve, wherein the linkage actuator is used to control the bypass valve 02 to be in an open position when the shear gate valve 01 is in a closed position, so that the first pressure source outputs a first pressure to the shear gate blowout preventer 121 (that is, the first pressure source supplies pressure to the hydraulic cylinder of the shear gate blowout preventer, and the pressure value is the first pressure value), and the logic sequence valve 06 is installed on the pipeline between the second pressure source 08 and the shear gate blowout preventer, and is used to make the second pressure source output a second pressure to the shear gate blowout preventer (that is, the second pressure source supplies pressure to the hydraulic cylinder of the shear gate blowout preventer, and the pressure value is the second pressure value) when performing the first operation.

[0043] The shear gate valve and the bypass valve are linked through the linkage actuator. When the shear gate valve is in the closed position, the bypass valve is opened accordingly, so that the first pressure source sequentially transmits a pressure source with a first pressure value to the shear gate blowout preventer through the bypass valve and the shear gate valve. The first pressure source can be a hydraulic source with a liquid as the working medium. The first pressure source supplies pressure to the hydraulic cylinder of the shear gate, drives the shear gate to squeeze the drill pipe to complete the operation of shearing the drill pipe.

[0044] The method of controlling the shear gate valve to be in the closed position can be local manual operation or remote drilling platform operation. The linkage actuator includes an inductive stroke switch 03 and a first shuttle valve 04. The first valve port of the inductive stroke switch is connected to an external air source, the second valve port of the inductive stroke switch is connected to the first air inlet of the first shuttle valve through a first pipeline, the working port 14 of the first shuttle valve is connected to the open position of the bypass valve air control through a second pipeline, the second air inlet of the first shuttle valve is connected to the bypass open position 13 of the air circuit board, the control mechanism 15 of the inductive stroke switch cooperates with the shear gate valve, the liquid inlet of the shear gate blowout preventer is connected to the first valve port of the shear gate valve, the second valve port of the shear gate valve is connected to the first valve port of the bypass valve through a third pipeline, and the second valve port of the bypass valve is connected to the first pressure source.

[0045] The blowout preventer is provided with a shear gate and a semi-closed gate, etc. The portion provided with the shear gate is called a shear gate blowout preventer 121, and the portion provided with the semi-closed gate is called a semi-closed gate blowout preventer 122. The shear gate is used to shear the drill pipe, and the semi-closed gate blowout preventer is used to hold the drill pipe so that it is located at the center of the blowout preventer before the shear gate shears the drill pipe, so as to avoid the drill pipe from deviating, which is beneficial to the shear gate's shearing effect on the drill pipe.

[0046] As an implementation mode, the inductive stroke switch can adopt a machine-controlled reversing valve. When the machine-controlled reversing valve is adopted, the control mechanism can be a machine-controlled mechanism such as a cam, a roller, a lever or a bump. The valve core of the machine-controlled reversing valve is manipulated by the machine-controlled mechanism to achieve the purpose of reversing, so that the first valve port and the second valve port of the inductive stroke switch are connected. The machine-controlled mechanism is used to cooperate with the joystick of the shear gate valve, that is, when the joystick puts the shear gate valve in the closed position, the joystick applies pressure to the machine-controlled mechanism, so that the machine-controlled mechanism manipulates the valve core of the machine-controlled reversing valve to reposition.

[0047] As another embodiment, the inductive stroke switch can adopt a pneumatic reversing valve. When the pneumatic reversing valve is adopted, the control mechanism can be a lever-type gas-controlled switch. When the shear gate valve is placed in the closed position, the external gas is connected to the open position of the gas-controlled switch, thereby manipulating the valve core position of the pneumatic reversing valve, so that the first valve port and the second valve port of the inductive stroke switch are connected.

[0048] The bypass valve can also adopt a pneumatic reversing valve. When the first valve port and the second valve port of the inductive stroke switch are connected, the external air source vents to the open position of the air-controlled switch of the bypass valve through the first shuttle valve, so that the bypass valve is in the open position, and the first valve port and the second valve port of the bypass valve are connected. At this time, the first pressure source outputs the first pressure to the shear gate blowout preventer via the bypass valve, the third pipeline, and the shear gate valve. The first pressure is generally about 21MPa.

[0049] A first stop valve 05 is also installed in the first pipeline, and the first stop valve is generally placed in an open position.

[0050] According to different on-site working conditions, especially when the strength of some drill pipes is increased, the drill pipe cannot be completely sheared off under the first pressure of the shear ram, which is very likely to cause wellhead danger. In a preferred embodiment of the present invention, a second pressure greater than the first pressure (the pressure value of the second pressure is, for example, 28MPa) is provided by a second pressure source and output to the shear ram blowout preventer, which is specifically achieved by controlling a logic sequence valve installed between the second pressure source and the shear ram blowout preventer through a linkage actuator.

[0051] Specifically, the linkage actuator also includes a first liquid-gas switch 09, the liquid inlet of the logic sequence valve is connected to the second pressure source through a fourth pipeline, the liquid outlet of the logic sequence valve is connected to the third pipeline through a fifth pipeline, the liquid inlet of the first liquid-gas switch is connected to the fifth pipeline, the air inlet of the first liquid-gas switch is connected to the first pipeline through a sixth pipeline, and the air outlet of the first liquid-gas switch is connected to the air inlet of the logic sequence valve.

[0052] When the liquid inlet pressure of the first liquid-gas switch is greater than the first preset value (since the liquid inlet pressure of the first liquid-gas switch comes from the first pressure source, the first preset value can be set to be slightly smaller than the first pressure value), the air inlet and the air outlet of the first liquid-gas switch are connected, and when the air inlet pressure of the logic sequence valve is greater than the second preset threshold value (the air inlet pressure of the logic sequence valve comes from the external air source, so the second preset threshold value can be set according to the air source pressure, for example, the second preset threshold value is slightly smaller than the air pressure value of the external air source), the logic sequence valve performs a first operation, and the liquid inlet and the liquid outlet of the logic sequence valve are connected.

[0053] Since the second pressure source is only started when needed, a second stop valve can be set on the sixth pipeline. At the same time, the end of the sixth pipeline away from the air inlet of the first liquid-gas switch is connected to the first pipeline between the first stop valve and the first air inlet of the first shuttle valve, so that the strength of the drill pipe can be predicted in advance. When a pressure greater than the first pressure needs to be output to the shear gate blowout preventer, the second stop valve is opened, otherwise, the second stop valve is in the closed position.

[0054] The linkage actuator also includes a second shuttle valve, a first air inlet of the second shuttle valve is connected to the first pipeline through a seventh pipeline, a working port of the second shuttle valve is connected to the closed position of the semi-closed gate valve, a first valve port of the semi-closed gate valve 16 is connected to the first valve port of the bypass valve through an eighth pipeline, and a second valve port of the semi-closed gate valve is connected to the semi-closed gate blowout preventer 122 through a ninth pipeline.

[0055] The matching relationship between the second shuttle valve and the semi-closed gate valve is similar to the matching relationship between the first shuttle valve and the bypass valve, which will not be described in detail here. When the shear gate valve is in the closed position, the control mechanism controls the external gas source to drive the bypass valve to the closed position via the second shuttle valve, the first valve port and the second valve port of the semi-closed gate valve are connected, and the first pressure source outputs the first pressure to the semi-closed gate blowout preventer.

[0056] The linkage between the semi-closed gate valve and the shear gate valve can realize the first pressure source supplying pressure to the hydraulic cylinder of the semi-closed gate blowout preventer through the semi-closed gate valve. At this time, the semi-closed gate blowout preventer holds the drill pipe to the center position of the blowout preventer to avoid the deviation of the drill pipe, which is beneficial to the shear gate's shearing effect on the drill pipe.

[0057] The second pressure source can be stored in the high-pressure accumulator. In order to ensure that the pressure of the second pressure source is around the second pressure, in a preferred embodiment of the present invention, a delivery pump 07 and an automatic pressurizing mechanism are also provided, wherein the delivery pump is used to pressurize the working fluid and deliver the working fluid to the high-pressure accumulator. The automatic pressurizing mechanism is used to start the delivery pump to pressurize the high-pressure accumulator when the output pressure of the high-pressure accumulator is less than the second pressure.

[0058] The automatic boosting mechanism includes a power source and a second liquid-gas switch 10, the liquid inlet of the second liquid-gas switch is connected to the second pressure source, the first valve port of the second liquid-gas switch is connected to the power source, and the second valve port of the second liquid-gas switch is connected to the power source inlet of the delivery pump. When the liquid inlet pressure of the second liquid-gas switch is greater than a third preset threshold value, the first valve port and the second valve port of the second liquid-gas switch are connected.

[0059] The power source here can be a gas source or a hydraulic source, which is selected according to the type of the delivery pump. For example, when the delivery pump is an air pump, the power source is a gas source, and the liquid inlet pressure of the second liquid-gas switch comes from the second pressure source. Therefore, the third preset threshold value can be set to the second pressure value, or slightly less than the second pressure value. When the output pressure of the second pressure source is less than the second pressure value, the external gas source delivers power to the air pump, so that the air pump works, pressurizes the external working liquid and delivers it to the high-pressure accumulator.

[0060] The valve linkage device mentioned above is mainly composed of linkage actuators and logic sequence valves, which will not affect the local operation of the original bypass valve on the blowout preventer control device, or the remote operation of the bypass valve through the driller's platform. Moreover, when the shear gate of the blowout preventer is replaced with a control full-sealed gate, the operating pressure is about 10.5MPa. Since some components of the valve linkage device are installed on the shear gate valve, the bypass valve will not be linked.

[0061] By implementing the embodiments of the present invention, it is possible to avoid the situation where the operator fails to (or forgets to) open the bypass valve when the shearing is to be closed under high stress, resulting in insufficient shear gate pressure and inability to shear the drill pipe. At the same time, the drill pipe can be quickly sheared by applying greater pressure as needed.

[0062] Embodiment 2

[0063] Example 2 discloses a drill rod shearing method, please refer to Figure 3 As shown, it includes the following steps:

[0064] S310, operate the shear gate valve to put it in the closed position.

[0065] The shear gate valve can be controlled to be in the closed position by local manual operation or by remote drilling platform operation.

[0066] S320: The linkage actuator controls the bypass valve to be in the open position according to the closing position information, and the first pressure source outputs the first pressure to the shear gate blowout preventer.

[0067] The linkage actuator includes an inductive stroke switch, a first shuttle valve and a second shuttle valve. The first valve port of the inductive stroke switch is connected to an external air source, the second valve port of the inductive stroke switch is connected to a first air inlet of the first shuttle valve through a first pipeline, the working port of the first shuttle valve is connected to the open position of the bypass valve air control through a second pipeline, the control mechanism of the inductive stroke switch cooperates with a shear gate valve, the liquid inlet of the shear gate blowout preventer is connected to the first valve port of the shear gate valve, the second valve port of the shear gate valve is connected to the first valve port of the bypass valve through a third pipeline, and the second valve port of the bypass valve is connected to a first pressure source; the first air inlet of the second shuttle valve is connected to the first pipeline through a seventh pipeline, the working port of the second shuttle valve is connected to the closed position of the semi-closed gate valve, the first valve port of the semi-closed gate valve is connected to the first valve port of the bypass valve through an eighth pipeline, and the second valve port of the semi-closed gate valve is connected to the semi-closed gate blowout preventer through a ninth pipeline.

[0068] When the shear gate valve is in the closed position, the first valve port and the second valve port of the shear gate valve are connected; the control mechanism controls the first valve port and the second valve port of the inductive stroke switch to be connected according to the closed position information, so that the external air source drives the bypass valve to be in the open position, drives the bypass valve to be in the closed position, the first valve port and the second valve port of the bypass valve are connected, the first valve port and the second valve port of the semi-closed gate valve are connected, and the first pressure source outputs the first pressure to the shear gate blowout preventer and the semi-closed gate blowout preventer (that is, the first pressure source supplies pressure to the hydraulic cylinder of the shear gate blowout preventer and the semi-closed gate blowout preventer, and the pressure value is the first pressure value), the first pressure drives the semi-closed gate to hold the drill pipe to the center position of the blowout preventer to prevent the drill pipe from deviating, and then the first pressure drives the shear gate to shear the drill pipe.

[0069] S330: When the demand pressure is greater than the first pressure, the linkage actuator drives the logic sequence valve to perform a first operation, and the second pressure source outputs a second pressure to the shear gate blowout preventer.

[0070] The linkage actuator also includes a first liquid-gas switch, the liquid inlet of the logic sequence valve is connected to the second pressure source through a fourth pipeline, the liquid outlet of the logic sequence valve is connected to the third pipeline through a fifth pipeline, the liquid inlet of the first liquid-gas switch is connected to the fifth pipeline, the air inlet of the first liquid-gas switch is connected to the first pipeline through a sixth pipeline, and the air outlet of the first liquid-gas switch is connected to the air inlet of the logic sequence valve;

[0071] When the demand pressure is greater than the first pressure, the linkage actuator drives the logic sequence valve to perform a first operation, and the second pressure source outputs a second pressure to the shear gate blowout preventer, including:

[0072] The first pressure source delivers working liquid to the liquid inlet of the first liquid-gas switch through the third pipeline and the fifth pipeline, so that the liquid inlet pressure of the first liquid-gas switch is greater than a first preset value, and the gas inlet and gas outlet of the first liquid-gas switch are connected;

[0073] The external gas source delivers gas to the air inlet of the logic sequence valve through the first pipeline and the sixth pipeline, so that the air inlet pressure of the logic sequence valve is greater than a second preset threshold value, the logic sequence valve performs a first operation, the liquid inlet and the liquid outlet of the logic sequence valve are connected, and the second pressure source outputs a second pressure to the shear gate blowout preventer.

[0074] As a preferred embodiment, the valve linkage device further includes a delivery pump and an automatic pressurizing mechanism, wherein the delivery pump is used to pressurize the working fluid and deliver the working fluid to the high-pressure accumulator. The automatic pressurizing mechanism is used to start the delivery pump to pressurize the high-pressure accumulator when the output pressure of the high-pressure accumulator is less than the second pressure.

[0075] The automatic pressurizing mechanism includes a power source and a second liquid-gas switch, the liquid inlet of the second liquid-gas switch is connected to the second pressure source, the first valve port of the second liquid-gas switch is connected to the power source, the second valve port of the second liquid-gas switch is connected to the power source inlet of the delivery pump, and when the liquid inlet pressure of the second liquid-gas switch is greater than a third preset threshold, the first valve port and the second valve port of the second liquid-gas switch are connected.

[0076] The power source here can be a gas source or a hydraulic source, which is selected according to the type of the delivery pump. For example, when the delivery pump is an air pump, the power source is a gas source, and the liquid inlet pressure of the second liquid-gas switch comes from the second pressure source. Therefore, the third preset threshold value can be set to the second pressure value, or slightly less than the second pressure value. When the output pressure of the second pressure source is less than the second pressure value, the external gas source delivers power to the air pump, so that the air pump works, pressurizes the external working liquid and delivers it to the high-pressure accumulator.

[0077] Embodiment 3

[0078] Embodiment 3 discloses a blowout preventer control device, which adds the above-mentioned valve linkage mechanism on the basis of the existing blowout preventer control device.

[0079] In addition, the present invention also provides a blowout preventer, which is based on the existing blowout preventer and is equipped with the above-mentioned valve linkage mechanism.

[0080] The above implementation modes are only preferred implementation modes of the embodiments of the present invention and cannot be used to limit the protection scope of the embodiments of the present invention. Any non-substantial changes and replacements made by technicians in this field on the basis of the embodiments of the present invention shall fall within the scope of protection required by the embodiments of the present invention.

Claims

1. A valve linkage device, characterized in that: It includes a linkage actuator, a second pressure source and a logic sequence valve, wherein the linkage actuator is used to control the bypass valve to be in an open position when the shear gate valve is in a closed position, so that the first pressure source outputs a first pressure to the shear gate blowout preventer, and the logic sequence valve is installed on the pipeline between the second pressure source and the shear gate blowout preventer, and is used to enable the second pressure source to output a second pressure to the shear gate blowout preventer when performing a first operation; The linkage actuator includes an inductive stroke switch and a first shuttle valve, wherein the first valve port of the inductive stroke switch is connected to an external air source, the second valve port of the inductive stroke switch is connected to a first air inlet of the first shuttle valve through a first pipeline, the working port of the first shuttle valve is connected to an open position of the bypass valve air control through a second pipeline, the control mechanism of the inductive stroke switch cooperates with a shear gate valve, the liquid inlet of the shear gate blowout preventer is connected to the first valve port of the shear gate valve, the second valve port of the shear gate valve is connected to the first valve port of the bypass valve through a third pipeline, and the second valve port of the bypass valve is connected to a first pressure source; When the shear gate valve is in the closed position, the first valve port and the second valve port of the shear gate valve are connected, and the control mechanism controls the first valve port and the second valve port of the inductive stroke switch to be connected, so that the external air source drives the bypass valve to be in the open position, the first valve port and the second valve port of the bypass valve are connected, and the first pressure source outputs the first pressure to the shear gate blowout preventer; The linkage actuator also includes a first liquid-gas switch, the liquid inlet of the logic sequence valve is connected to the second pressure source through a fourth pipeline, the liquid outlet of the logic sequence valve is connected to the third pipeline through a fifth pipeline, the liquid inlet of the first liquid-gas switch is connected to the fifth pipeline, the air inlet of the first liquid-gas switch is connected to the first pipeline through a sixth pipeline, and the air outlet of the first liquid-gas switch is connected to the air inlet of the logic sequence valve; When the liquid inlet pressure of the first liquid-gas switch is greater than a first preset value, the gas inlet and the gas outlet of the first liquid-gas switch are connected, and when the gas inlet pressure of the logic sequence valve is greater than a second preset threshold, the logic sequence valve performs a first operation, and the liquid inlet and the liquid outlet of the logic sequence valve are connected; The linkage actuator also includes a second shuttle valve, a first air inlet of the second shuttle valve is connected to the first pipeline through a seventh pipeline, a working port of the second shuttle valve is connected to the closed position of the semi-closed gate valve, a first valve port of the semi-closed gate valve is connected to the first valve port of the bypass valve through an eighth pipeline, and a second valve port of the semi-closed gate valve is connected to the semi-closed gate blowout preventer through a ninth pipeline; When the shear gate valve is in the closed position, the control mechanism controls the external gas source to drive the bypass valve to the closed position via the second shuttle valve, the first valve port and the second valve port of the semi-closed gate valve are connected, and the first pressure source outputs the first pressure to the semi-closed gate blowout preventer.

2. The valve linkage device according to claim 1, characterized in that: The valve linkage device further includes a delivery pump for pressurizing the working fluid and delivering the working fluid to the second pressure source.

3. The valve linkage device according to claim 2, characterized in that: The valve linkage device also includes an automatic pressurizing mechanism, which includes a power source and a second liquid-gas switch, the liquid inlet of the second liquid-gas switch is connected to the second pressure source, the first valve port of the second liquid-gas switch is connected to the power source, and the second valve port of the second liquid-gas switch is connected to the power source inlet of the delivery pump. When the liquid inlet pressure of the second liquid-gas switch is greater than a third preset threshold, the first valve port and the second valve port of the second liquid-gas switch are connected.

4. A method for shearing a drill pipe using the valve linkage device according to any one of claims 1 to 3, characterized in that: It includes the following steps: The shear gate valve is operated to be in the closed position; the linkage actuator controls the bypass valve to be in the open position according to the closed position information, and the first pressure source outputs the first pressure to the shear gate blowout preventer; When the demand pressure is greater than the first pressure, the linkage actuator drives the logic sequence valve to perform a first operation, and the second pressure source outputs a second pressure to the shear gate blowout preventer.

5. The drill pipe shearing method according to claim 4, characterized in that: The linkage actuator includes an inductive stroke switch and a first shuttle valve, wherein the first valve port of the inductive stroke switch is connected to an external air source, the second valve port of the inductive stroke switch is connected to a first air inlet of the first shuttle valve through a first pipeline, the working port of the first shuttle valve is connected to an open position of the bypass valve air control through a second pipeline, the control mechanism of the inductive stroke switch cooperates with a shear gate valve, the liquid inlet of the shear gate blowout preventer is connected to the first valve port of the shear gate valve, the second valve port of the shear gate valve is connected to the first valve port of the bypass valve through a third pipeline, and the second valve port of the bypass valve is connected to a first pressure source; The linkage actuator controls the bypass valve to be in the open position according to the closing position information, and the first pressure source outputs the first pressure to the shear gate blowout preventer, including: When the shear gate valve is in the closed position, the first valve port and the second valve port of the shear gate valve are connected; The control mechanism controls the first valve port and the second valve port of the inductive stroke switch to be connected according to the closing position information, so that an external air source drives the bypass valve to be in an open position, the first valve port and the second valve port of the bypass valve are connected, and the first pressure source outputs a first pressure to the shear gate blowout preventer.

6. The drill pipe shearing method according to claim 5, characterized in that: The linkage actuator also includes a first liquid-gas switch, the liquid inlet of the logic sequence valve is connected to the second pressure source through a fourth pipeline, the liquid outlet of the logic sequence valve is connected to the third pipeline through a fifth pipeline, the liquid inlet of the first liquid-gas switch is connected to the fifth pipeline, the air inlet of the first liquid-gas switch is connected to the first pipeline through a sixth pipeline, and the air outlet of the first liquid-gas switch is connected to the air inlet of the logic sequence valve; When the demand pressure is greater than the first pressure, the linkage actuator drives the logic sequence valve to perform a first operation, and the second pressure source outputs a second pressure to the shear gate blowout preventer, including: The first pressure source delivers working liquid to the liquid inlet of the first liquid-gas switch through the third pipeline and the fifth pipeline, so that the liquid inlet pressure of the first liquid-gas switch is greater than a first preset value, and the gas inlet and gas outlet of the first liquid-gas switch are connected; The external gas source delivers gas to the air inlet of the logic sequence valve through the first pipeline and the sixth pipeline, so that the air inlet pressure of the logic sequence valve is greater than a second preset threshold value, the logic sequence valve performs a first operation, the liquid inlet and the liquid outlet of the logic sequence valve are connected, and the second pressure source outputs a second pressure to the shear gate blowout preventer.

7. A blowout preventer control device, characterized in that: It comprises the valve linkage device according to any one of claims 1-3.

Citation Information

Patent Citations

  • Shear boost triggering and bottle reducing system and method

    CN102454378A

  • Loader-digger and hydraulic system thereof

    CN103290879A

  • Hydraulic cylinder supercharging device of blowout preventer

    CN201043451Y

  • Valve linkage device, blowout preventer control device and blowout preventer

    CN212454348U

  • Electronic deadman / autoshear circuit

    US20150123022A1