A BIM-based underwater tunnel settlement joint water box and its installation method

Through BIM technology and specific installation methods, the problems of installation accuracy and connection strength of water-connecting boxes in the submerged tunnel are solved, and rapid and safe installation and efficient construction are achieved, reducing construction risks.

CN111910663BActive Publication Date: 2024-11-01CHINA MCC5 GROUP CORP LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202010785925.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-08-07
Publication Date
2024-11-01
Estimated Expiration
2040-08-07

AI Technical Summary

Technical Problem

During the installation process of existing underwater tunnel settlement joint water boxes, the filling is not easy to fix, resulting in a deviation in the groove size, affecting the installation accuracy, and the anchoring components are prone to rust, increasing the risk of falling.

Method used

Using BIM-based installation method, 1:1 modeling is carried out through drawing software, steel bar structures are designed, anchor structures and elastic structures are installed, and blocked with tape and concrete formwork to reduce concrete entry and enhance connection strength.

Benefits of technology

It improves the installation accuracy and connection strength of the water connection box, simplifies the construction process, shortens the construction cycle, reduces the generation of construction waste, and ensures the safe use of the water connection box.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111910663B_ABST
    Figure CN111910663B_ABST
Patent Text Reader

Abstract

The present invention discloses a BIM-based underwater tunnel settlement seam water receiving box and its installation method, comprising a groove-shaped box body, wing plates arranged on both sides of the box body and extending outward, and a cover plate arranged on the wing plate, wherein the gap between the two cover plates forms an opening; the water receiving box and the main structure around the water receiving box are modeled 1:1 using drawing software; the connection point between the water receiving box and the main structure is determined, and the steel structure of the main structure is designed according to the connection point; the water receiving box is prepared; the steel bars of the main structure are installed on site according to the main structure designed in step S2; the water receiving box is installed according to the design requirements, so that the water-saving and designed connection points are connected to the steel bars of the main structure; concrete is poured, and the concrete structure is maintained. The beneficial effects of the present invention are: the water receiving box provided by the present scheme has the advantages of simple structure and convenient use, can be quickly installed, is conducive to improving construction efficiency, enhances the connection strength between the water receiving box and the surrounding concrete structure, and ensures the safety of subsequent use of the water receiving box.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction, in particular to a BIM-based underwater tunnel settlement seam water connection box and an installation method thereof. Background Art

[0002] The settlement joints of the tunnel under the lake are the key to waterproof control. In order to ensure that the tunnel does not leak during the designed service life, the design usually considers the method of external blocking and internal drainage. On the basis of the buried waterstop and the external waterstop, a water collection box is set along the settlement joints on the inner side of the main structure to collect and drain the leaked water to the tunnel drainage ditch.

[0003] It is usually considered to set up an annular water collection box to remove the leaking water. The usual way to install the water collection box is to first embed fillers such as square wood in the two previous pouring sections, remove them after the initial setting of the concrete to form a groove, and then install the water collection box in place. There are several shortcomings in using this technology: 1. The filler is not easy to fix and is prone to displacement during concrete pouring, which directly affects the size of the groove; 2. The size deviation of the groove directly affects the difficulty of installing the water collection box in place according to the design drawings; 3. The anchoring components used in the water collection box will rust later, and there is a risk of the water collection box falling. Summary of the invention

[0004] In order to overcome the deficiencies of the prior art, an object of the present invention is to provide a BIM-based underwater tunnel settlement joint water collection box and an installation method thereof, so as to improve the installation accuracy of the water collection box.

[0005] The present invention is achieved through the following technical scheme: a BIM-based underwater tunnel settlement seam water collection box, comprising a groove-type box body, wing plates arranged on both sides of the box body and extending outward, and a cover plate arranged on the wing plate, and the gap between the two cover plates forms an opening.

[0006] Furthermore, in order to better implement the present invention, a blocking structure is provided at the opening.

[0007] Furthermore, in order to better implement the present invention, the blocking structure adopts adhesive tape.

[0008] Furthermore, in order to better implement the present invention, a plurality of anchoring structures are provided on the wing plate.

[0009] Furthermore, in order to better implement the present invention, a gap is left between the wing plate and the cover plate, and the anchoring structure passes through the cover plate and is connected to the wing plate.

[0010] Furthermore, in order to better implement the present invention, a plurality of elastic structures are provided between the wing plate and the cover plate.

[0011] Furthermore, in order to better implement the present invention, the elastic structure is a spring sleeved on the anchoring structure.

[0012] A method for installing a water box for a settlement joint of an underwater tunnel based on BIM includes the following steps:

[0013] Step S1: Use drawing software to perform 1:1 modeling of the water receiving box and the main structure around the water receiving box;

[0014] Step S2: Determine the connection point between the water receiving box and the main structure, and design the steel structure of the main structure according to the connection point;

[0015] Step S3: preparing a water receiving box;

[0016] Step S4: installing the steel bars of the main structure on site according to the main structure designed in step S2;

[0017] Step S5: Install the water receiving box according to the design requirements, so that the water-saving and designed connection points are connected to the steel bars of the main structure;

[0018] Step S6: pouring concrete and curing the concrete structure.

[0019] Furthermore, in order to better implement the present invention, an anchoring structure is provided at the connection point of the water receiving box.

[0020] Furthermore, in order to better implement the present invention, the anchoring structure uses an L-shaped steel bar with an opening facing outward.

[0021] The beneficial effects achieved by this program are:

[0022] The water collection box provided by this solution has the advantages of simple structure and easy use. It can be installed quickly, which is beneficial to improving construction efficiency, enhancing the connection strength between the water collection box and the surrounding concrete structure, and ensuring the safety of subsequent use of the water collection box. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a structural schematic diagram of the water receiving box;

[0024] Figure 2 for Figure 1 A top view of

[0025] Among them, 1-opening, 2-anchoring structure, 3-box body, 4-cover plate, and 5-wing plate. DETAILED DESCRIPTION

[0026] The present invention is further described in detail below in conjunction with examples, but the embodiments of the present invention are not limited thereto.

[0027] Embodiment 1:

[0028] like Figure 1 As shown, in this embodiment, a BIM-based underwater tunnel settlement seam water connection box includes a groove-shaped box body 3, wing plates 5 arranged on both sides of the box body 3 and extending outward, and a cover plate 4 arranged on the wing plate 5, and the gap between the two cover plates 4 forms an opening 1.

[0029] Before construction, use drawing software to carry out 1:1 modeling of the water connection box and the main structure around the water connection box, such as using Revit, Bentley, ArchiCAD and other software, and use the building information model (BIM) to determine the connection points between the water connection box and the main structure, and design the steel structure of the main structure according to the connection points.

[0030] Prepare the water collection box according to the design requirements.

[0031] During construction, the steel bars of the main structure are installed on site according to the designed main structure model, and the water collection box is installed on the steel bars of the main structure so that the connection points of the water collection box and the steel bars are aligned and connected with each other. Then, concrete is poured and the formwork can be removed after the concrete is cured.

[0032] In this embodiment, the box body 3 is used as the main structure for drainage, and the cover plate 4 can reduce the opening of the box body 3 to prevent larger impurities from falling into the box body 3 and causing blockage.

[0033] The connection point is arranged on the cover plate 4, so that the top of the box body 3 can also be connected to the steel bar, thereby enhancing the connection strength between the box body 3 and the steel bar.

[0034] The wing plates 5 extending outwardly on both sides of the box body 3 can be buried in the concrete structure after pouring concrete, thereby enhancing the connection strength between the box body 3 and the concrete and preventing the box body 3 from detaching from the concrete structure due to shear force when uneven settlement occurs.

[0035] This solution allows the water collection box to be poured simultaneously with the concrete when pouring it, thus avoiding the need to perform grooving on the concrete structure at a later stage, ensuring the installation accuracy and connection strength of the water collection box, and being able to improve construction efficiency, shorten construction period, and reduce the generation of construction waste.

[0036] Embodiment 2:

[0037] On the basis of the above embodiment, in this embodiment, a blocking structure is provided at the opening 1. When pouring concrete, the blocking structure can prevent concrete from entering the box body 3 and causing blockage. After the concrete construction is completed, the blocking structure is removed so that the water receiving box can be used normally.

[0038] In this embodiment, the blocking structure is made of adhesive tape, so that it is easy to remove the blocking structure at a later stage.

[0039] The blocking structure can also adopt a concrete formwork, which is installed at the opening 1 so that the concrete formwork is sealed and connected to the cover plates 4 on both sides. The inner bottom surface of the box body 3 is used to support the concrete formwork. When pouring concrete, the concrete formwork can be used to shape the end faces of the concrete structure on both sides of the water receiving box, avoiding the use of additional concrete formwork.

[0040] In this embodiment, a layer of plastic sheeting can also be provided between the concrete formwork and the box body 3. When pouring concrete, the plastic sheeting can enhance the isolation effect, prevent the concrete from entering the box body 3, and reduce the bonding strength between the concrete and the concrete formwork. After the concrete is cured, it is convenient to remove the concrete formwork. The plastic sheeting can be removed after the concrete formwork is removed, which can also prevent some impurities from entering the box body 3 when the concrete formwork is removed.

[0041] Embodiment 3:

[0042] On the basis of the above embodiment, in this embodiment, a plurality of anchor structures 2 are provided on the wing plate 5. The anchor structures 2 are provided at the connection points of the water receiving box design, and the anchor structures 2 are connected to the steel bars of the main structure to enhance the connection strength between the water receiving box and the steel bars. The anchor structures 2 themselves, as protruding structures, can also be conveniently connected to the steel bars, thereby reducing the difficulty of construction.

[0043] In this embodiment, a gap is left between the wing plate 5 and the cover plate 4, and the anchoring structure 2 passes through the cover plate 4 and is connected to the wing plate 5. The anchoring structure 2 is provided with two connection points, which is conducive to improving the connection strength between the anchoring structure 2 and the box body 3, and improving the stability and position accuracy of the anchoring structure 2, and is conducive to ensuring that the anchoring structure 2 and the designed connection points can be set one by one, thereby improving the installation accuracy of the water receiving box and reducing the workload of debugging.

[0044] In this embodiment, the anchor structure 2 is an L-shaped steel bar with an opening facing outward. The anchor structure 2 is designed to be L-shaped, and can be used as a force-bearing structure at the turning point of the L-shaped structure, so that the anchor structure 2 and the steel bar can be easily tied.

[0045] Embodiment 4:

[0046] On the basis of the above-mentioned embodiment, in this embodiment, a plurality of elastic structures are arranged between the wing plate 5 and the cover plate 4. By using the elastic structure to support the wing plate 5 and the cover plate 4, the bearing capacity of the cover plate 4 can be enhanced when pouring concrete, and the cover plate 4 can be prevented from being deformed under the pressure or impact force of the concrete. When the wing plate 5 and the cover plate 4 are compressed or deformed due to thermal expansion and contraction, a reverse thrust can be applied to the wing plate 5 and the cover plate 4 to reduce or offset the deformation of the wing plate 5 and the cover plate 4, and when the external force factor is eliminated, the water receiving box can restore its shape accuracy.

[0047] In this embodiment, the elastic structure is a spring mounted on the anchor structure 2. The spring is used to support the wing plate 5 and the cover plate 4, and is also convenient for installation. In this embodiment, when the spring is installed between the wing plate 5 and the cover plate 4, the spring is kept in a compressed state, and the spring can apply pre-pressure to the wing plate 5 and the cover plate 4, thereby enhancing the bearing capacity of the water receiving box, avoiding compression deformation of the water receiving box or reducing the compression deformation of the water receiving box.

[0048] In this embodiment, a sealing strip can also be provided between the wing plate 5 and the cover plate 4 to seal the gap between the wing plate 5 and the cover plate 4 to prevent impurities or moisture from entering between the wing plate 5 and the cover plate 4 and causing corrosion of the anchoring structure 2, which is beneficial to ensuring the service life of the water collection box.

[0049] Embodiment 5:

[0050] On the basis of the above-mentioned embodiment, in this embodiment, the turning point between the bottom and the side of the box body 3 is designed to be rounded, so as to avoid the formation of dead corners and stress concentration, and prevent impurities carried by the infiltrated water from remaining in the dead corners and increasing the risk of corrosion of the box body 3.

[0051] In this embodiment, the inner surface of the box body 3 can be coated with an anti-corrosion layer to enhance the anti-corrosion performance of the box body 3 .

[0052] In this embodiment, other contents not described are the same as those in the above embodiment, and thus will not be described in detail.

[0053] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification or equivalent change made to the above embodiment based on the technical essence of the present invention shall fall within the protection scope of the present invention.

Claims

1. A method for installing a water box for a settlement seam of an underwater tunnel based on BIM, characterized in that: The water receiving box comprises a groove-shaped box body (3), wing plates (5) arranged on both sides of the box body (3) and extending outward, and a cover plate (4) arranged on the wing plate (5), wherein the gap between the two cover plates (4) forms an opening (1); The opening (1) is provided with a blocking structure; The blocking structure adopts adhesive tape; A plurality of anchoring structures (2) are provided on the wing plate (5); A gap is left between the wing plate (5) and the cover plate (4), and the anchoring structure (2) passes through the cover plate (4) and is connected to the wing plate (5); A plurality of elastic structures are provided between the wing plate (5) and the cover plate (4); The elastic structure is a spring sleeved on the anchoring structure (2); The installation method includes the following steps: Step S1: Use drawing software to perform 1:1 modeling of the water receiving box and the main structure around the water receiving box; Step S2: Determine the connection point between the water receiving box and the main structure, and design the steel structure of the main structure according to the connection point; Step S3: preparing a water receiving box; Step S4: installing the steel bars of the main structure on site according to the main structure designed in step S2; Step S5: Install the water receiving box according to the design requirements, so that the water-saving and designed connection points are connected to the steel bars of the main structure; Step S6: pouring concrete and curing the concrete structure; An anchoring structure (2) is provided at the connection point of the water receiving box; The anchoring structure (2) uses an L-shaped steel bar with an opening facing outward.

Citation Information

Patent Citations

  • Prefabricated piping lane links up waterproof construction with cast -in -place piping lane

    CN207597428U

  • Subaqueous tunnel roof movement joint waterproof construction

    CN208763073U

  • Underwater tunnel settlement joint water receiving box based on BIM

    CN213014328U

  • Anti-corrosive method for concrete structure

    JP1997158305A

  • Fixing device for receiving frame supporting grating attached to water passage with slit water-leading groove

    JP2010196454A