A variable stiffness digital display Winkel elastic foundation test device, working method and application

By designing a variable stiffness digitally displayed Winkel elastic foundation test device and using a combination of casing components and spring fastening components, the spring stiffness can be flexibly adjusted, which solves the problem of cumbersome simulation steps of formation bed coefficients in the existing technology. , which improves the versatility of the test device and the true reflection effect of foundation deformation.

CN111948129BActive Publication Date: 2024-10-15CHONGQING UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010811983.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-08-13
Publication Date
2024-10-15
Estimated Expiration
2040-08-13

AI Technical Summary

Technical Problem

The existing elastic foundation test device needs to replace different springs when simulating the bed coefficients of different strata. The steps are cumbersome and the workload is large. The device is not versatile enough and cannot effectively reflect the foundation deformation after coal seam mining and its impact on the upper rock mass. .

Method used

A variable stiffness digital display Winkel elastic foundation test device is designed, including a casing component, a stiffness adjustment component, a spring fastening component and a miniature pull rod displacement sensor. By adjusting the height of the shell casing and steel cylinder, combined with the spring The clamping knob of the fastening component realizes the stiffness adjustment of the spring, simulates the bed coefficients of different strata, and monitors the displacement of the rigid plate through a miniature tie-rod displacement sensor.

Benefits of technology

It realizes flexible adjustment of spring stiffness, reduces the replacement and installation steps of the device, improves the versatility of the test device, and can truly reflect the foundation deformation after coal seam mining and the impact on the upper rock mass.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111948129B_ABST
    Figure CN111948129B_ABST
Patent Text Reader

Abstract

The present application discloses, in particular, a variable stiffness digital display Winkel elastic foundation test device, a working method, and an application; it belongs to the technical field of civil engineering test equipment; its technical key points include three components, namely, a sleeve component, a stiffness adjustment component, and a spring fastening component. The present application aims to provide a variable stiffness digital display Winkel elastic foundation test device, a working method, and an application; it can increase the versatility of the test device and does not require frequent replacement of springs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of civil engineering test equipment, and more specifically, relates to a variable stiffness digital display Winkel elastic foundation test device, working method, and application. Background Art

[0002] When studying the development of cracks in the roof rock strata, the distribution state of separation and the movement law caused by the mining of the underlying ore layer, large-scale physical model tests are often used because of their intuitive and reliable advantages. In the test, the bottom base and the ore layer are usually made of similar model materials according to the similarity ratio or removable rigid supports are used to simulate the mining of the ore layer. However, both schemes have shortcomings. When similar model materials are used, the process of making similar model materials is complicated, and it is difficult to control the mining disturbance during mining; when rigid support mining is used, the deformation of the base caused by the stress redistribution caused by mining cannot be effectively simulated, so it cannot truly reflect the foundation deformation after coal seam mining and its impact on the upper rock mass. However, in the relevant theories of rock layer control, the base is often considered to conform to the Winkler elastic foundation hypothesis, so the elastic foundation test device can be used to solve the problems of excavation disturbance and base deformation.

[0003] Among the existing test devices, Chinese patent CN206146745U discloses a support device that can simulate an elastic foundation. The device includes an upper sleeve and a lower sleeve. The upper sleeve is arranged on the upper part of the lower sleeve. An elastic member is arranged between the upper sleeve and the lower sleeve. A displacement meter for recording position changes is arranged on the upper sleeve. The device uses different springs to simulate the resistance of different strata, and provides a support device that can reflect the deformation and displacement of underground structures in soil. Chinese patent CN103031859 ​​A discloses a test component for simulating the action characteristics of formation resistance, including a screw assembly, a simulation spring and a contact end assembly. The screw assembly includes a screw core barrel, a screw sleeve and a loading rod. The screw core barrel extends into the screw sleeve from the rear end of the screw sleeve. Spring washers are provided on the screw core barrel and the screw sleeve. The simulation spring is sleeved between the two spring washers. The front end of the screw sleeve is connected to the contact end assembly through the loading rod. The invention uses different springs to simulate the formation resistance and reflect the action characteristics of different formations on underground building structures.

[0004] However, the biggest drawback of these patents is that different springs need to be replaced to simulate the base bed coefficients of different strata, the steps are cumbersome, different springs need to be customized according to different strata, the workload is large, and repeated disassembly and installation make the test device easy to wear, that is, the device is not universal enough. Summary of the invention

[0005] The purpose of this application is to provide a variable stiffness digital display Winkel elastic foundation test device, working method and application in view of the deficiencies of the above-mentioned prior art.

[0006] A variable stiffness digital display Winkel elastic foundation test device comprises: a casing assembly, a stiffness adjustment assembly, a spring fastening assembly, a clamp holding device, and a micro pull rod type displacement sensor.

[0007] Further, the sleeve assembly includes: a base, a bottom sleeve, a loading sleeve, an outer sleeve, an outer sleeve annular disk, an outer sleeve lifting assembly, and a rigid plate; wherein the bottom end of the bottom sleeve is fixedly connected to the top surface of the base; wherein the outer sleeve is inserted into the bottom sleeve, and the outer surface of the outer sleeve is adapted to the inner surface of the bottom sleeve; an outer sleeve annular disk is fixed to the lower end area of ​​the outer sleeve, the bottom fixed end of the outer sleeve lifting assembly is fixed on the base, and the top movable end of the outer sleeve lifting assembly is connected to the outer sleeve annular disk, and the height of the outer sleeve can be adjusted by adjusting the outer sleeve lifting assembly, and the outer sleeve lifting assembly includes a plurality of pneumatic telescopic rods, which are evenly arranged along the circumference of the outer sleeve;

[0008] The rigid plate is arranged inside the outer casing; the loading casing extends into the outer casing, and the bottom of the loading casing is fixed on the upper surface of the rigid plate;

[0009] The stiffness adjustment component includes: a spring, a steel cylinder, a steel cylinder horizontal rod, and a steel cylinder lifting component; wherein the spring is a coil spring, and the projection of the coil spring on the horizontal plane is a circle; wherein the steel cylinder is inside the loading sleeve, that is, the outer diameter of the steel cylinder is smaller than the inner diameter of the loading sleeve; the middle area of ​​the loading sleeve is provided with 4 first vertical openings extending in the vertical direction at intervals; and the outer shell sleeve is symmetrically provided with 2 second vertical openings along the full length or part of the height; wherein a steel cylinder horizontal rod is provided on the outside of the steel cylinder, and the steel cylinder horizontal rod extends to the outside of the outer shell sleeve through the first vertical opening and the second vertical opening in sequence; wherein the number of the steel cylinder horizontal rods is at least 2, and the steel cylinder lifting component includes a plurality of power telescopic rods, and the power telescopic rods are provided corresponding to the steel cylinder horizontal rods; wherein the bottom fixed end of the steel cylinder lifting component is on the fixed base, and the top movable end of the steel cylinder lifting component is connected to the steel cylinder horizontal rod; the height of the steel cylinder is adjusted by adjusting the height of the steel cylinder lifting component;

[0010] Two groups of vertical guide groove assemblies are symmetrically arranged on the inner surface of the outer casing, and a guide rod assembly is arranged on the outer side of the steel cylinder, and the end of the guide rod assembly is shaped to be inserted into the vertical guide groove assembly;

[0011] The spring fastening assembly includes: 2 corresponding telescopic chuck assemblies, a first type pulley, a second type pulley, a rope, and a spring tensioning device; wherein the telescopic chuck assembly includes: a horizontal sleeve, an elastic telescopic rod; one end of the horizontal sleeve is rigidly connected to the inner surface of the steel cylinder, and the other end of the horizontal sleeve is provided with an opening; the elastic telescopic rod is inserted into the interior of the horizontal sleeve from the opening of the horizontal sleeve, and one end of the elastic telescopic rod is fixedly connected to the interior of the horizontal sleeve; the other end of the elastic telescopic rod is fixedly connected to a chuck plate, and friction patterns are provided on the outer surface of the chuck plate; two first type pulleys are provided on the top of each chuck plate; two second type pulleys are also provided inside the steel cylinder; the two chuck plates are used to clamp Springs of the same height; the line connecting the center points of the two second-type pulleys passes through the center of the spring; wherein the spring tensioning device comprises: a fixer, a limit device, a rope end fixing assembly, a connecting rod, and a clamping knob; one end of the connecting rod is fixedly connected to a clamping knob, and the other end of the connecting rod is provided with a thread; the connecting rod passes through the second vertical opening, and the clamping knob is arranged on the outside of the outer casing; the left end of the fixer is fixed to the outside of the steel cylinder, and a threaded hole is arranged inside the fixer, and the thread of the connecting rod is adapted to the thread of the fixer; two limit devices spaced a certain distance apart are fixedly arranged in the middle of the connecting rod; the rope end fixing assembly is arranged between the two limit devices;

[0012] The horizontal sleeves of the two telescopic chuck assemblies and the connecting rod are in the same vertical plane, that is, the horizontal sleeves of the two telescopic chuck assemblies pass through the center of the steel cylinder;

[0013] The rope is divided into 11 sections: the first section is from the rope end fixing assembly to the second type pulley on the front side; the second section is from the second type pulley on the front side to the first type pulley on the front side of the telescopic clamp assembly on the left side; the third section is from the first type pulley on the front side of the telescopic clamp assembly on the left side to the first type pulley on the rear side of the telescopic clamp assembly on the left side; the fourth section is from the first type pulley on the rear side of the telescopic clamp assembly on the left side to the second type pulley on the rear side; the fifth section is from the second type pulley on the rear side to the first type pulley on the rear side of the telescopic clamp assembly on the right side; the sixth section is from the rear side of the telescopic clamp assembly on the right side The first type pulley of the first section is to the first type pulley on the front side of the telescopic chuck assembly on the right side; the seventh section is the first type pulley on the front side of the telescopic chuck assembly on the right side to the second type pulley on the front side; the eighth section is the second type pulley on the front side to the first type pulley on the front side of the telescopic chuck assembly on the left side; the ninth section is the first type pulley on the front side of the telescopic chuck assembly on the left side to the first type pulley on the rear side of the telescopic chuck assembly on the left side; the tenth section is the first type pulley on the rear side of the telescopic chuck assembly on the left side to the second type pulley on the rear side; the eleventh section is the second type pulley on the rear side to the rope end fixing assembly;

[0014] A shell casing top plate is fixedly arranged at the top of the shell casing; one end of the spring is connected to the shell casing top plate, and the other end is connected to the rigid plate; the shell casing top plate is provided with 4 arc holes for the loading casing to pass through, the loading casing vertically extends to the top of the shell casing top plate, and the top of the loading casing is used to bear the vertical load, i.e. the test load; that is, when the loading casing is subjected to the vertical load, the loading casing presses the rigid plate to move downward, and the spring is in a tension state; the top and bottom of the loading casing are integral casings, and the middle area is 4 separate arc components; the center lines of the bottom casing, the loading casing, the shell casing, the steel cylinder, and the spring are collinear.

[0015] Furthermore, the steel cylinder and / or the fixing device is provided with a through hole for the rope to pass through.

[0016] Furthermore, a plurality of guide rods are fixedly provided on the left side of the rope end fixing assembly, and a plurality of guide holes are provided on the fixer and / or the outer shell sleeve, and the guide rods fixedly provided on the left side of the rope end fixing assembly are inserted into the guide holes; a second spring is also provided on the right side of the fixer and the left side of the rope end fixing assembly, and the second spring is wound around the guide rod; a ball is provided on the side of the limit device facing the rope end fixing assembly to reduce the friction between the limit device and the rope end fixing assembly.

[0017] Further, the distance between the first type pulley and the surface of the chuck plate is greater than the diameter of the circle formed by the springs.

[0018] Furthermore, the end of the guide rod assembly is "T"-shaped, and the guide rod assembly and the vertical guide groove assembly can ensure that the steel cylinder always maintains vertical movement.

[0019] A working method of a variable stiffness digital display Winkel elastic foundation test device is:

[0020] First, adjust the height of the outer casing: adjust the height of the outer casing by extending or shortening the outer casing lifting assembly;

[0021] Second, adjust the height of the steel cylinder: adjust the height of the steel cylinder by extending or shortening the steel cylinder lifting assembly;

[0022] Third, turn the clamping knob to achieve variable stiffness adjustment: when the clamping knob is turned, the connecting rod will move away from the steel cylinder along the fixer, thereby driving the rope end fixing assembly away from the steel cylinder;

[0023] Specifically, when the rope end fixing assembly is away from the steel cylinder, the distance between the two telescopic chuck assemblies is shortened, and the rope can shorten the displacement between the chuck plates of the two telescopic chuck assemblies until the two chuck plates clamp a position of the spring;

[0024] The actual movement process is:

[0025] In the first stage, when the rope end fixing assembly moves away from the steel cylinder, the two clamping plates move toward each other;

[0026] In the second stage, as the rope end fixing assembly continues to move away, one of the two clamping plates touches the spring and stops moving due to the obstruction of the spring.

[0027] In the third stage, as the rope end fixing assembly continues to move away, another clamping plate moves until the two clamping plates clamp the spring.

[0028] A test device includes a plurality of the aforementioned variable stiffness digital display Winkel elastic foundation test devices; and also includes: a test model box, the test model box is used to add an upper load; the lower part of the test model box is supported by the aforementioned variable stiffness digital display Winkel elastic foundation test device.

[0029] A test method, characterized in that the test device described above is used to study the influence of soil with different properties under a building structure, comprising the following steps:

[0030] S1: Determine the model size;

[0031] S2: Determine the spring stiffness K:

[0032] S2-1, first obtain the foundation bed coefficient K at different locations through field tests, load plate tests, indoor triaxial tests or indoor consolidation tests. 地基 ;

[0033] S2-2, then according to the foundation base coefficient K at different locations mentioned above 地基 , determine the spring stiffness of different variable stiffness digital display Winkel elastic foundation test devices;

[0034] S3: Assemble and debug instruments: Assemble instruments according to the instrument layout designed in S1, connect the data collector, clear the data, adjust the stiffness of the springs of each variable stiffness digital display Winkel elastic foundation test device by adjusting the height of the steel cylinder of each variable stiffness digital display Winkel elastic foundation test device and tightening the position of the clamping knob;

[0035] S4: Layered casting model: Soil is added layer by layer in the test model box to simulate the construction loading process.

[0036] The advantages of this application are:

[0037] (1) The load-bearing sleeve is mainly under pressure. Normally, changing the stiffness of the spring is to change the effective length of the compressed spring. The inventor team also adhered to the above research and development ideas during the research and development. However, there is a core problem. When under pressure, the spiral spring cannot only be a fixed point of vertical displacement; because the spring will be compressed when under pressure, therefore, when under pressure, it is also necessary to provide a force point for one circle of the spring.

[0038] Therefore, during the development of this application, the research has been carried out on the basis of the technical problem of "providing a force point of one circle of the spring when under pressure". However, the above technical route is actually very difficult to solve.

[0039] In order to solve the above problems, the present application overcomes the technical prejudice. Although the foundation, rock and other basic structures are in a compressed state, the present application also wants to study the influence of the change of soil spring and rock spring (both in a compressed state) on the superstructure. Through the design of the present application, the technical prejudice is changed.

[0040] A rigid plate is arranged at the lower part of the loading sleeve, and a spring 201 is arranged between the rigid plate and the outer sleeve top plate 108. When the loading sleeve is under pressure, the rigid plate moves downward, and at the same time, one end of the spring is clamped by the spring fastening assembly 300; that is, the rigid plate and the clamping plate of the spring fastening assembly 300 serve as the two ends of the spring under force, and the effective length of the spring is changed by adjusting the distance between the rigid plate and the clamping plate of the spring fastening assembly 300.

[0041] The basic condition for the implementation of the above is that when the loading sleeve is under pressure, the spring between the adjusting rigid plate and the clamping plate of the spring fastening assembly 300 is in a tension state (this requires overcoming technical prejudices. In fact, both soil springs and rock springs are in a compression state, that is, the soil and rock settle; and the present application cleverly uses spring tension to simulate the above process), that is, the test equipment of the present application is not obvious.

[0042] Since the spring is in a tensile state, there is no need to consider the problem of "providing force points for one circle of the spring when under compression".

[0043] (2) The second problem of the present application (also the second inventive concept) is: how to clamp the spring to form a fixed end of the spring; at the same time, the rope does not cross the spring.

[0044] The rope 303 is divided into 11 sections:

[0045] The first section is from the rope end fixing assembly 304-3 to the second type pulley 307 at the front side;

[0046] The second section is from the second type pulley 307 on the front side to the first type pulley on the front side of the telescopic chuck assembly 301 on the left side;

[0047] The third section is from the first type pulley on the front side of the telescopic chuck assembly 301 on the left to the first type pulley on the rear side of the telescopic chuck assembly 301 on the left;

[0048] The fourth section is from the first type pulley at the rear side of the telescopic chuck assembly 301 on the left side to the second type pulley at the rear side;

[0049] The fifth section is from the second type pulley at the rear side to the first type pulley at the rear side of the telescopic chuck assembly 301 on the right side;

[0050] The sixth section is from the first type pulley on the rear side of the telescopic chuck assembly 301 on the right side to the first type pulley on the front side of the telescopic chuck assembly 301 on the right side;

[0051] The seventh section is from the first type pulley on the front side of the telescopic chuck assembly 301 on the right side to the second type pulley 307 on the front side;

[0052] The eighth section is from the second type pulley 307 at the front to the first type pulley at the front of the telescopic chuck assembly 301 at the left side;

[0053] The ninth section is from the first type pulley on the front side of the telescopic chuck assembly 301 on the left to the first type pulley on the rear side of the telescopic chuck assembly 301 on the left;

[0054] The 10th section is from the first type pulley on the rear side of the telescopic chuck assembly 301 on the left side to the second type pulley on the rear side;

[0055] The 11th section is the second type pulley to rope end fixing assembly 304-3 on the rear side.

[0056] The distance between the first type pulley and the chuck plate is greater than the diameter of the circle formed by the springs.

[0057] The above features are all necessary technical features to solve this problem. If there is no second type pulley, the rope will be within the range of the spring and cannot move up and down;

[0058] With the above design, the rope will not enter the spring at any time (ie, the horizontal projection of the rope has no intersection with the horizontal projection of the spring).

[0059] (3) The third inventive concept of the present application (corresponding to the filling test device, which is filed separately from the first inventive concept due to the singularity issue): how to improve the device so that the change in stiffness can be simulated during the test (corresponding to the excavation and filling of the ore layer). The equipment of Example 1 cannot achieve the change in stiffness during the test, and it cannot meet the requirements of the mineral filling mining test. To this end, the following improvements are made: the "stiffness adjustment component 200 and spring fastening component 300" of Example 1 constitute a spring end adjustment component; Fig.13As shown, multiple spring end adjustment components are arranged in the vertical direction of the outer casing of the device; a micro pull rod displacement sensor 500 is arranged between the rigid plate 107 and the lowest steel cylinder horizontal rod 203, or a rigid plate displacement sensor (for example: ultrasonic ranging sensor, infrared ranging sensor) is arranged at the bottom of the base to monitor the displacement of the rigid plate. Its working method is as follows: first, multiple spring end adjustment components are all clamped at different heights to the corresponding spring height; second, according to the need, in order from bottom to top, the clamping head plate of the spring fastening component 300 of the corresponding spring end adjustment component is sequentially loosened; correspondingly, the purpose of gradually reducing the stiffness of the spring is achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0060] The present application is further described in detail below in conjunction with the embodiments in the accompanying drawings, but does not constitute any limitation to the present application.

[0061] In order to make the purpose, technical solution and beneficial effects of the present invention clearer, the present invention provides the following drawings for illustration:

[0062] Figure 1 This is a schematic diagram of the vertical structure of a variable stiffness digital display Winkel elastic foundation test device of Example 1.

[0063] Figure 2 This is a vertical design diagram of the sleeve assembly 100 of Example 1.

[0064] Figure 3 This is a vertical design diagram of the stiffness adjustment component 200 of Example 1.

[0065] Figure 4 It is a schematic diagram of the vertical structure of a variable stiffness digital display Winkel elastic foundation test device in another direction of Example 1.

[0066] Figure 5 This is a horizontal projection design drawing of the outer shell casing top plate 108 of Example 1.

[0067] Figure 6 for Figure 1 AA cross-sectional view (the steel cylinder horizontal rod 203 on the right side is not shown).

[0068] Figure 7 Schematic diagram of horizontal projection of the spring fastening assembly 300 of Example 1.

[0069] Figure 8 It is a horizontal projection schematic diagram of the telescopic clamp assembly 301 and the first type pulley 302 of Example 1.

[0070] Fig. 9 Schematic diagram of horizontal projection of the spring tensioning device 304 of Example 1.

[0071] Fig.10 It is a schematic horizontal projection diagram of the decomposed spring tensioning device 304 of Example 1.

[0072] Fig.11 This is the front structural diagram of the model test of Example 1.

[0073] Fig.12 This is a side structural diagram of the model test of Example 1.

[0074] Fig.13 It is a vertical structural schematic diagram of a variable stiffness digital display Winkel elastic foundation test device of Example 2.

[0075] Fig.14 Schematic diagram of horizontal projection of the spring fastening assembly 300 of Example 3.

[0076] Fig.15 FIG. 3 is a state diagram of the spring fastening assembly 300 of Embodiment 3 when the spring is clamped.

[0077] Fig.16 FIG. 3 is another state diagram of the spring fastening assembly 300 of Embodiment 3 when the spring is clamped.

[0078] Reference numerals:

[0079] Casing assembly 100, base 101, bottom casing 102, loading casing 103, outer casing 104, outer casing annular disk 105, outer casing lifting assembly 106, rigid plate 107, outer casing top plate 108;

[0080] A first vertical opening 103-2, a vertical guide groove assembly 104-1, and a second vertical opening 104-2;

[0081] Stiffness adjustment assembly 200, spring 201, steel cylinder 202, steel cylinder horizontal rod 203, steel cylinder lifting assembly 204, guide rod assembly 205;

[0082] Spring fastening assembly 300, telescopic clamp assembly 301, first type pulley 302, rope 303, spring tensioning device 304, fixer 304-1, limit device 304-2, rope end fixing assembly 304-3, connecting rod 304-4, clamping knob 304-5;

[0083] Clamp holding force device 400;

[0084] Miniature pull-rod displacement sensor 500;

[0085] Splicing assembly 600, first connecting member 600-1, second connecting member 600-2, top cover plate 600-3;

[0086] Wire 700;

[0087] Test model box 800. DETAILED DESCRIPTION

[0088] Embodiment 1:

[0089] like Figure 1 As shown, a variable stiffness digital display Winkel elastic foundation test device includes: a casing assembly 100, a stiffness adjustment assembly 200, a spring fastening assembly 300, a clamp holding force device 400, and a micro pull rod displacement sensor 500;

[0090] The casing assembly 100 includes: a base 101, a bottom casing 102, a loading casing 103, an outer casing 104, an outer casing annular disk 105, an outer casing lifting assembly 106, and a rigid plate 107;

[0091] Wherein, the bottom end of the bottom sleeve 102 is fixedly connected to the top surface of the base 101;

[0092] The outer casing 104 is inserted into the bottom casing 102, and the outer surface of the outer casing 104 is matched with the inner surface of the bottom casing 102. The bottom casing 102 is provided to ensure that the outer casing is in a vertical state; an outer casing annular disk 105 is fixed to the lower end region of the outer casing 104, and the bottom fixed end of the outer casing lifting assembly 106 is fixed on the base 101, and the top movable end of the outer casing lifting assembly 106 is connected to the outer casing annular disk 105. By adjusting the outer casing lifting assembly 106, the height of the outer casing 104 can be adjusted (inevitably, if the length of the outer casing lifting assembly 106 remains unchanged, the height of the outer casing 1 remains unchanged), and the outer casing lifting assembly 106 includes a plurality of pneumatic telescopic rods, which are evenly arranged along the circumference of the outer casing;

[0093] The rigid plate 107 is disposed inside the outer casing 104 (the rigid plate 107 is not fixed to the outer casing 104 and can move up and down inside the outer casing 104);

[0094] The loading sleeve 103 extends into the housing sleeve 104 , and the bottom of the loading sleeve 103 is fixed on the upper surface of the rigid plate 107 .

[0095] The stiffness adjustment assembly 200 includes: a spring 201, a steel cylinder 202, a steel cylinder horizontal rod 203, and a steel cylinder lifting assembly 204;

[0096] Wherein, the spring 201 is a coil spring, and the projection of the coil spring on the horizontal plane is a circle;

[0097] The steel cylinder 202 is inside the loading sleeve 103, that is, the outer diameter of the steel cylinder 202 is smaller than the inner diameter of the loading sleeve 103; the middle area of ​​the loading sleeve 103 is provided with four first vertical openings 103-2 extending in the vertical direction at intervals; the outer shell sleeve 104 is symmetrically provided with two second vertical openings 104-2 along the entire length or part of the height;

[0098] Among them, a steel cylinder horizontal rod 203 is arranged outside the steel cylinder 202, and the steel cylinder horizontal rod 203 extends to the outside of the outer shell sleeve 104 through the first vertical opening 103-2 and the second vertical opening 104-2 in sequence (that is, there are at least two first vertical openings on the loading sleeve 103 corresponding to the second vertical openings of the outer shell sleeve 104);

[0099] The number of the steel cylinder horizontal rods 203 is at least 2, and the steel cylinder lifting assembly 204 includes a plurality of pneumatic telescopic rods, which are arranged correspondingly to the steel cylinder horizontal rods;

[0100] The bottom fixed end of the steel cylinder lifting assembly 204 is fixed on the base 101, and the top movable end of the steel cylinder lifting assembly 204 is connected to the steel cylinder horizontal rod 203;

[0101] Two groups of vertical guide groove assemblies 104-1 are symmetrically arranged on the inner surface of the outer casing 104, and a guide rod assembly 205 is arranged on the outer side of the steel cylinder 202. The end of the guide rod assembly 205 is inserted into the vertical guide groove assembly 104-1 (the shapes of the two are adapted). The end of the guide rod assembly 205 is "T"-shaped. Through the guide rod assembly 205 and the vertical guide groove assembly 104-1, it is possible to ensure that the steel cylinder 202 always maintains vertical movement; and the horizontal position of the steel cylinder 202 can be maintained;

[0102] That is, the height of the steel cylinder 202 is adjusted by adjusting the height of the steel cylinder lifting assembly 204 .

[0103] The spring fastening assembly 300 includes: two corresponding telescopic chuck assemblies 301 (i.e., the corresponding angles of the two corresponding telescopic chuck assemblies 301 are 180 degrees), a first type pulley 302, a second type pulley 307, a rope 303 (e.g., a steel rope, a steel wire), and a spring tensioning device 304;

[0104] The telescopic chuck assembly 301 comprises: a horizontal sleeve 301-1, an elastic telescopic rod 301-2; one end of the horizontal sleeve is rigidly connected to the inner surface of the steel cylinder 202, and the other end of the horizontal sleeve is provided with an opening; the elastic telescopic rod 301-2 is inserted into the interior of the horizontal sleeve from the opening of the horizontal sleeve, and one end of the elastic telescopic rod 301-2 is fixedly connected to the interior of the horizontal sleeve; the other end of the elastic telescopic rod 301-2 is fixedly connected to a chuck plate 301-3, and friction patterns are provided on the outer surface of the chuck plate 301-3; two first-type pulleys 302 are provided on the top of each chuck plate 301-3; and two second-type pulleys 307 are also provided inside the steel cylinder 202;

[0105] Use two chuck plates to clamp springs of the same height (the height of the chuck plates does not exceed the height of the spring pitch);

[0106] The line connecting the center points of the two second type pulleys 307 passes through the center of the spring;

[0107] The projection of the spring 201 on the horizontal plane is circular, with a diameter of d; the width of the clamping plate 301 - 3 is greater than d.

[0108] The spring tensioning device 304 includes: a fixer 304-1, a limit device 304-2, a rope end fixing assembly 304-3, a connecting rod 304-4, and a clamping knob 304-5; one end of the connecting rod 304-4 is fixedly connected to the clamping knob 304-5, and the other end of the connecting rod 304-4 is provided with a thread (the axial direction of the connecting rod 304-4 passes through the center of the steel cylinder 202); the connecting rod 304-4 passes through the second vertical opening 104-2, and the clamping knob 304-5 is arranged on the outside of the outer shell sleeve 104; the left end of the fixer 304-1 is fixed to the outside of the steel cylinder 202, and the inside of the fixer 304-1 is provided with a threaded hole, and the thread of the connecting rod 304-4 is adapted to the thread of the fixer 304-1; two limit devices 304 are fixedly provided at a certain distance in the middle of the connecting rod 304-4 -2; the rope end fixing assembly 304-3 is arranged between the two limiting devices 304-2; a plurality of guide rods are fixedly arranged on the left side of the rope end fixing assembly 304-3, and a plurality of guide holes are arranged on the fixing device 304-1 and / or the outer shell sleeve 104, and the guide rods fixedly arranged on the left side of the rope end fixing assembly 304-3 are inserted into the guide holes; a second spring is also arranged on the right side of the fixing device 304-1 and the left side of the rope end fixing assembly 304-3, and the second spring is wound on the guide rod; a ball is arranged on the side of the limiting device 304-2 facing the rope end fixing assembly 304-3 to reduce the friction between the limiting device 304-2 and the rope end fixing assembly 304-3; (the fixing device 304-1 passes through the first vertical opening 103-2, that is, it is required that: the width of the fixing device 304-1 is smaller than the width of the first vertical opening 103-2;)

[0109] The horizontal sleeves 301 - 1 of the two telescopic chuck assemblies 301 and the connecting rod 304 - 4 are in the same vertical plane, that is, the horizontal sleeves 301 - 1 of the two telescopic chuck assemblies 301 pass through the center of the steel cylinder 202 ;

[0110] The rope 303 is divided into 11 sections:

[0111] The first section is from the rope end fixing assembly 304-3 to the second type pulley 307 at the front side;

[0112] The second section is from the second type pulley 307 on the front side to the first type pulley on the front side of the telescopic chuck assembly 301 on the left side;

[0113] The third section is from the first type pulley on the front side of the telescopic chuck assembly 301 on the left to the first type pulley on the rear side of the telescopic chuck assembly 301 on the left;

[0114] The fourth section is from the first type pulley at the rear side of the telescopic chuck assembly 301 on the left side to the second type pulley at the rear side;

[0115] The fifth section is from the second type pulley at the rear side to the first type pulley at the rear side of the telescopic chuck assembly 301 on the right side;

[0116] The sixth section is from the first type pulley on the rear side of the telescopic chuck assembly 301 on the right side to the first type pulley on the front side of the telescopic chuck assembly 301 on the right side;

[0117] The seventh section is from the first type pulley on the front side of the telescopic chuck assembly 301 on the right side to the second type pulley 307 on the front side;

[0118] The eighth section is from the second type pulley 307 at the front to the first type pulley at the front of the telescopic chuck assembly 301 at the left side;

[0119] The ninth section is from the first type pulley on the front side of the telescopic chuck assembly 301 on the left to the first type pulley on the rear side of the telescopic chuck assembly 301 on the left;

[0120] The 10th section is from the first type pulley on the rear side of the telescopic chuck assembly 301 on the left side to the second type pulley on the rear side;

[0121] The 11th section is the second type pulley to rope end fixing assembly 304-3 on the rear side.

[0122] It is particularly important to note that the distance between the first type pulley and the chuck plate is greater than the diameter of the circle formed by the spring.

[0123] The connection between the sleeve assembly 100 and the stiffness adjustment assembly 200 is:

[0124] A casing top plate 108 is fixedly disposed on the top of the casing 104;

[0125] One end of the spring 201 is connected to the housing sleeve top plate 108, and the other end is connected to the rigid plate 107;

[0126] like Figure 5 As shown, the outer casing top plate 108 is provided with four arc-shaped holes for the loading casing 103 to pass through. The loading casing 103 vertically extends to the top of the outer casing top plate 108. The top of the loading casing 103 is used to bear the vertical load, i.e., the test load; that is, when the loading casing is subjected to the vertical load, the loading casing presses the rigid plate 107 to move downward, and the spring 201 is in a tension state.

[0127] In particular, the top and bottom of the loading sleeve 103 are integral sleeves, and the middle area is composed of four separate arc-shaped components.

[0128] In particular, a clamp holding device 400 (ie, a pipe clamp) is provided at the top of the loading sleeve 103. The clamp holding device 400 clamps the loading sleeve 103 through a plurality of high-strength bolts, thereby further improving the rigidity of the top of the loading sleeve and ensuring that it is stressed.

[0129] The center lines of the bottom sleeve 102, the loading sleeve 103, the outer sleeve 104, and the steel cylinder 202 are collinear (i.e., the horizontal cross-sections of the bottom sleeve 102, the loading sleeve 103, the outer sleeve 104, the steel cylinder 202, and the spring 201 are all circular, and the above circles are concentric circles).

[0130] The connection between the stiffness adjustment assembly 200 and the spring fastening assembly 300 is:

[0131] The steel cylinder 202 and / or the fixing device 304-1 are provided with a through hole for the rope 303 to pass through (the above technical feature is not a necessary technical feature, because the rope can enter the steel cylinder from the upper part of the steel cylinder 202).

[0132] The working methods of this application are:

[0133] First, adjusting the height of the outer shell sleeve 104: by extending or shortening the outer shell sleeve lifting assembly 106, the height of the outer shell sleeve 104 is adjusted;

[0134] Second, adjusting the height of the steel cylinder 202: adjusting the height of the steel cylinder 202 by extending or shortening the steel cylinder lifting assembly 204;

[0135] Third, turn the clamping knob 304-5 to achieve variable stiffness adjustment: when the clamping knob 304-5 is turned, the connecting rod will move away from the steel cylinder 202 along the fixer 304-1, thereby driving the rope end fixing assembly 304-3 away from the steel cylinder 202;

[0136] Specifically, when the rope end fixing assembly 304-3 is away from the steel cylinder 202, the distance between the two telescopic chuck assemblies 301 is shortened, and the displacement between the chuck plates 301-3 of the two telescopic chuck assemblies 301 is shortened through the rope 303, until the two chuck plates 301-3 clamp a position of the spring;

[0137] The actual movement process is:

[0138] In the first stage, when the rope end fixing assembly 304-3 moves away from the steel cylinder 202, the two clamping plates move toward each other;

[0139] In the second stage, as the rope end fixing assembly 304-3 continues to move away, one of the two clamping plates touches the spring and stops moving due to the obstruction of the spring.

[0140] In the third stage, as the rope end fixing assembly 304-3 continues to move away, another clamping plate moves until the two clamping plates clamp the spring.

[0141] It should be particularly noted that the lateral stiffness of the coil spring is greater than the stiffness of the elastic telescopic rod 301 - 2 .

[0142] The difficulties in developing this application are:

[0143] The loading sleeve is mainly subjected to pressure. Normally, changing the stiffness of the spring will change the effective length of the compressed spring.

[0144] The inventor team also adhered to the above research and development ideas during the research and development. However, there is a core problem. When under pressure, the spiral spring cannot simply have a vertical displacement at a fixed point. Since the spring will be compressed when under pressure, it is also necessary to provide a force point for one circle of the spring when under pressure.

[0145] Therefore, during the development of this application, the research has been carried out on the basis of the technical problem of "providing a force point of one circle of the spring when under pressure". However, the above technical route is actually very difficult to solve.

[0146] In order to solve the above problems, the present application overcomes the technical prejudice. Although the foundation, rock and other basic structures are in a compressed state, the present application also wants to study the influence of the change of soil spring and rock spring (both in a compressed state) on the superstructure. Through the design of the present application, the technical prejudice is changed.

[0147] A rigid plate is arranged at the lower part of the loading sleeve, and a spring 201 is arranged between the rigid plate and the outer sleeve top plate 108. When the loading sleeve is under pressure, the rigid plate moves downward, and at the same time, one end of the spring is clamped by the spring fastening assembly 300; that is, the rigid plate and the clamping plate of the spring fastening assembly 300 serve as the two ends of the spring under force, and the effective length of the spring is changed by adjusting the distance between the rigid plate and the clamping plate of the spring fastening assembly 300.

[0148] The basic condition for the implementation of the above is that when the loading sleeve is under pressure, the spring between the adjusting rigid plate and the clamping plate of the spring fastening assembly 300 is in a tension state (this requires overcoming technical prejudices. In fact, both soil springs and rock springs are in a compression state, that is, the soil and rock settle; and the present application cleverly uses spring tension to simulate the above process), that is, the test equipment of the present application is not obvious.

[0149] Since the spring is in a tensile state, there is no need to consider the problem of "providing force points for one circle of the spring when under compression".

[0150] Furthermore, it is also necessary to explain that a vertically arranged micro pull-rod displacement sensor 500 is connected between the rigid plate 107 and the steel cylinder horizontal rod 203 to monitor the vertical displacement of the rigid plate.

[0151] Furthermore, it is also necessary to explain that: the splicing assembly 600 is also included, including: a top cover plate 600-3 and a first connecting member 600-1 and a second connecting member 600-2, wherein the top cover plate 600-3 is located at the top of the loading sleeve 103, and the first connecting member 600-1 and the second connecting member 600-2 are located around the top cover plate 600-3;

[0152] The top cover plate is used to bear the upper test box or the upper test model, and the first connecting member 600 - 1 and the second connecting member 600 - 2 are used to connect with the upper test box or the upper test model.

[0153] The micro pull-rod displacement sensor 500 is connected to the data acquisition instrument via a wire 700 .

[0154] Other things to note are:

[0155] Spring stiffness coefficient K 弹簧 First, calculate the foundation base coefficient K 地基 The product of the model area A occupied by the top cover plate; where the foundation bed coefficient is obtained through field tests, indoor tests or experience:

[0156] K 弹簧 for:

[0157]

[0158] Where K 弹簧 (unit: kN / m) is the spring stiffness coefficient, A (unit: m 2 ) is the area of ​​the model covered by a row of top cover plates along the thickness direction of the model (i.e., the product of the model thickness and the width of the top cover plate), K 地基 (Unit: kN / m 3 ) is the foundation bed coefficient, and n is the number of instruments along the thickness direction of the model.

[0159] The surface of the outer casing is provided with a spring stiffness scale line for observing the spring stiffness at this position. The stiffness K (unit: kN / m) represented by the spring stiffness scale line on the surface of the outer casing can be calculated and marked by the following formula:

[0160]

[0161] Where K z (Unit: kN / m) is the original length stiffness of the spring, L Z(Unit: mm) is the original length of the spring, and L (Unit: mm) is the distance from the scale line to the top of the outer casing.

[0162] like Figure 11-12 As shown, a test device includes several variable stiffness digital display Winkel elastic foundation test devices of embodiment 1; and also includes: a test model box 800, wherein the test model box is used to add an upper load.

[0163] A test method for studying the effects of soils with different properties under a building structure (rock on one side and backfill soil on the other side) comprises the following steps:

[0164] S1: Determine the model size;

[0165] S2: Determine the spring stiffness K:

[0166] S2-1, first obtain the foundation bed coefficient K at different locations through field tests, load plate tests, indoor triaxial tests or indoor consolidation tests. 地基 ;

[0167] S2-2, then according to the foundation base coefficient K at different locations mentioned above 地基 , determine the spring stiffness of different variable stiffness digital display Winkel elastic foundation test devices;

[0168] S3: Assemble and debug instruments: Assemble instruments according to the instrument layout designed in S1, connect the data collector, clear the data, and adjust the stiffness of the spring of each variable stiffness digital display Winkel elastic foundation test device by adjusting the height of the steel cylinder 202 of each variable stiffness digital display Winkel elastic foundation test device and tightening the position of the clamping knob;.

[0169] S4: Layered casting model: add soil or other materials in layers in the above test model box to simulate the construction of upper load; (the lower bottom plate of the test model box can be a single whole plate (corresponding to the integral foundation, such as raft foundation) or a block plate (corresponding to the non-integral foundation));

[0170] S5: Obtain the P-displacement s curves of different loads through the acquisition instrument.

[0171] Example 2: The purpose of Example 2 is to study a mineral filling mining test device. Its biggest feature is that the stiffness needs to change during the test.

[0172] The equipment of Example 1 cannot achieve a change in stiffness during the test and cannot meet the requirements of the mineral filling mining test.

[0173] To this end, the following improvements are made:

[0174] The "stiffness adjustment component 200 and spring fastening component 300" of Example 1 constitute a spring end adjustment component; Fig.13 As shown, a plurality of spring end adjustment components are arranged in the vertical direction of the outer shell sleeve of the device; a miniature pull rod displacement sensor 500 is arranged between the rigid plate 107 and the lowest steel cylinder horizontal rod 203, or a rigid plate displacement sensor (for example: ultrasonic ranging sensor, infrared ranging sensor) is arranged at the bottom of the base to monitor the displacement of the rigid plate.

[0175] Here’s how it works:

[0176] First, multiple spring end adjustment assemblies are all clamped at corresponding spring heights at different heights;

[0177] Secondly, as needed, loosen the clamping plates of the spring fastening assembly 300 of the corresponding spring end adjustment assembly in order from bottom to top; accordingly, the purpose of gradually reducing the stiffness of the spring is achieved.

[0178] Of course, the design of the present application can also achieve the purpose of gradually increasing the stiffness, that is, firstly, the multiple spring end adjustment assemblies all clamp the corresponding spring heights at different heights;

[0179] Secondly, as needed, loosen the clamping plates of the spring fastening assembly 300 of the corresponding spring end adjustment assembly in order from top to bottom; accordingly, the purpose of gradually increasing the stiffness of the spring is achieved.

[0180] A thick ore layer layer filling mining test device includes several variable stiffness digital display Winkel elastic foundation test devices of embodiment 2; and also includes: a test model box 800, wherein the test model box is used to add an upper load.

[0181] A thick ore layer layer filling mining test method, comprising the steps of:

[0182] S1: Determine the model size and prepare similar model materials: Set the model similarity ratio according to the test needs, determine the test model size, design the instrument layout position and number, and prepare similar model materials for the overlying strata of the ore body according to the similarity ratio;

[0183] S2: Determine the spring rate at each stage:

[0184] S2-1 First, the foundation bed coefficient K of the original stratum, partial filling and complete filling is obtained through field test, load plate test, indoor triaxial test or indoor consolidation test. 矿层 , K 部分充填 and K 充填 ;

[0185] S2-2, then calculate the required spring stiffness coefficient K of the formation in the unmined state according to the following formula 弹簧-矿层 , foundation spring stiffness coefficient K when partially filled 弹簧-部分充填 , the foundation spring stiffness coefficient K after full backfill mining (i.e. the original ore layer is completely replaced by backfill) 弹簧-充填 ;

[0186] Then we can get: K 弹簧-矿层 , K 弹簧-充填 , K 弹簧-部分充填 for:

[0187]

[0188] A(Unit: m 2 ) is the area of ​​the model covered by a row of top cover plates along the thickness direction of the model (i.e., the product of the model thickness and the width of the top cover plate), K 地基 (Unit: kN / m 3 ) is the foundation bed coefficient, and n is the number of instruments along the thickness direction of the model.

[0189] When the stratum foundation coefficient K is not filled after mining the upper layer 部分充填 , then K 弹簧-部分充填 It can be estimated by the following formula:

[0190]

[0191] where h 总 (Unit: m) is the total thickness of the ore layer, h 开采 (Unit: m) is the thickness of the stratified mining on the ore layer.

[0192] S3: Assemble and debug the instrument: Assemble the instrument according to the instrument layout designed in the first step, connect the data acquisition instrument, clear the data, and adjust the height of the steel cylinder 202 of each variable stiffness digital display Winkel elastic foundation test device and tighten the position of the clamping knob to preliminarily adjust the stiffness coefficient of the spring of each variable stiffness digital display Winkel elastic foundation test device to the calculated K 弹簧-矿层 , then accurately adjust the spring stiffness coefficient by observing the data logger readings and disconnect the data logger.

[0193] S4: Casting model: Cast the overlying model in layers and maintain it according to the design requirements of the prepared model material until it meets the strength requirements of the test.

[0194] S5: Simulation of construction mining and filling: The stiffness coefficients of the springs of the variable stiffness digital display Winkel elastic foundation test device are adjusted according to the preset sequence, that is, the situation when the mining thickness gradually changes is simulated (K 弹簧-矿层 To K 弹簧-充填刚度 gradually decreases).

[0195] S6: Extract data: When all excavation steps are completed, end data collection, extract instrument deformation data, and analyze the stress and deformation of the ore layer.

[0196] It should be noted that this application is applicable to the following coil springs:

[0197] The pitch of the helical spring is >10*spring wire diameter;

[0198] Chuck plate width> spring outer diameter;

[0199] The thickness of the chuck plate is 1 / 10 to 1 / 4 of the pitch of the coil spring.

[0200] The above design requirements can ensure that: the chuck plate clamps a part of the spring and can maximize the guarantee that the chuck plate can return to its original state (i.e. prevent it from being pressed straight) after being released.

[0201] Example 3: Fig.14 As shown, the width of the chuck plate is smaller than the diameter of the spring, and is 1 / 4 to 1 / 8 of the diameter of the spring; and the two corresponding chuck plates pass through the central axis of the spring;

[0202] That is, Example 3 provides the use of the present application. When simulating variable stiffness, the simulated stiffness is some "scattered points" (the height of the steel cylinder is also some specific values), rather than continuous stiffness, that is, Figure 15-16 As shown, there are only two state diagrams (one chuck plate can pass through the pitch of the coil spring).

[0203] The design of Example 3 is more practical when used.

[0204] Furthermore, the front side of the chuck plate is adapted to the spatial position of the coil spring, that is, a small spiral protrusion is also provided on the front side of the chuck plate (the protrusion is used to compress the spring so that the compressed part becomes the force-bearing end) to prevent the spring from being straightened and better protect the spring.

[0205] It should be noted that the design of Example 3 can be used in the designs of Example 1 and Example 2.

[0206] The above-mentioned embodiments are preferred implementation modes of the present application and are only used to facilitate the explanation of the present application. They are not intended to limit the present application in any form. Any person with ordinary knowledge in the relevant technical field, if they do not depart from the scope of the technical features of the present application, can make equivalent embodiments by making partial changes or modifications to the technical contents disclosed in the present application and do not depart from the technical features of the present application. All of these still fall within the scope of the technical features of the present application.

Claims

1. A variable stiffness digital display Winkel elastic foundation test device, characterized in that: include: Sleeve assembly, stiffness adjustment assembly, spring fastening assembly; The sleeve assembly comprises: a base, a bottom sleeve, a loading sleeve, an outer sleeve, an outer sleeve annular disk, an outer sleeve lifting assembly, and a rigid plate; wherein the bottom end of the bottom sleeve is fixedly connected to the top surface of the base; wherein the outer sleeve is inserted into the bottom sleeve, and the outer surface of the outer sleeve is adapted to the inner surface of the bottom sleeve; an outer sleeve annular disk is fixed to the lower end area of ​​the outer sleeve, the bottom fixed end of the outer sleeve lifting assembly is fixed on the base, and the top movable end of the outer sleeve lifting assembly is connected to the outer sleeve annular disk, and the height of the outer sleeve can be adjusted by adjusting the outer sleeve lifting assembly, and the outer sleeve lifting assembly comprises a plurality of pneumatic telescopic rods, which are evenly arranged along the circumference of the outer sleeve; the rigid plate is arranged inside the outer sleeve; the loading sleeve extends into the outer sleeve, and the bottom of the loading sleeve is fixed to the upper surface of the rigid plate; The stiffness adjustment component includes: a spring, a steel cylinder, a steel cylinder horizontal rod, and a steel cylinder lifting component; wherein the spring is a coil spring, and the projection of the coil spring on the horizontal plane is a circle; wherein the steel cylinder is inside the loading sleeve, that is, the outer diameter of the steel cylinder is smaller than the inner diameter of the loading sleeve; the middle area of ​​the loading sleeve is provided with 4 first vertical openings extending in the vertical direction at intervals; and the outer shell sleeve is symmetrically provided with 2 second vertical openings along the full length or part of the height; wherein a steel cylinder horizontal rod is provided on the outside of the steel cylinder, and the steel cylinder horizontal rod extends to the outside of the outer shell sleeve through the first vertical opening and the second vertical opening in sequence; wherein the number of the steel cylinder horizontal rods is at least 2, and the steel cylinder lifting component includes a plurality of power telescopic rods, and the power telescopic rods are provided corresponding to the steel cylinder horizontal rods; wherein the bottom fixed end of the steel cylinder lifting component is on the fixed base, and the top movable end of the steel cylinder lifting component is connected to the steel cylinder horizontal rod; the height of the steel cylinder is adjusted by adjusting the height of the steel cylinder lifting component; Two groups of vertical guide groove assemblies are symmetrically arranged on the inner surface of the outer casing, and a guide rod assembly is arranged on the outer side of the steel cylinder, and the end of the guide rod assembly is shaped to be inserted into the vertical guide groove assembly; The spring fastening assembly includes: 2 corresponding telescopic chuck assemblies, a first type pulley, a second type pulley, a rope, and a spring tensioning device; wherein the telescopic chuck assembly includes: a horizontal sleeve, an elastic telescopic rod; one end of the horizontal sleeve is rigidly connected to the inner surface of the steel cylinder, and the other end of the horizontal sleeve is provided with an opening; the elastic telescopic rod is inserted into the interior of the horizontal sleeve from the opening of the horizontal sleeve, and one end of the elastic telescopic rod is fixedly connected to the interior of the horizontal sleeve; the other end of the elastic telescopic rod is fixedly connected to a chuck plate, and friction patterns are provided on the outer surface of the chuck plate; two first type pulleys are provided on the top of each chuck plate; two second type pulleys are also provided inside the steel cylinder; the two chuck plates are used to clamp Springs of the same height; the line connecting the center points of the two second-type pulleys passes through the center of the spring; wherein the spring tensioning device comprises: a fixer, a limit device, a rope end fixing assembly, a connecting rod, and a clamping knob; one end of the connecting rod is fixedly connected to a clamping knob, and the other end of the connecting rod is provided with a thread; the connecting rod passes through the second vertical opening, and the clamping knob is arranged on the outside of the outer casing; the left end of the fixer is fixed to the outside of the steel cylinder, and a threaded hole is arranged inside the fixer, and the thread of the connecting rod is adapted to the thread of the fixer; two limit devices spaced a certain distance apart are fixedly arranged in the middle of the connecting rod; the rope end fixing assembly is arranged between the two limit devices; The horizontal sleeves of the two telescopic chuck assemblies and the connecting rod are in the same vertical plane, that is, the horizontal sleeves of the two telescopic chuck assemblies pass through the center of the steel cylinder; The rope is divided into 11 sections: the first section is from the rope end fixing assembly to the second type pulley on the front side; the second section is from the second type pulley on the front side to the first type pulley on the front side of the telescopic clamp assembly on the left side; the third section is from the first type pulley on the front side of the telescopic clamp assembly on the left side to the first type pulley on the rear side of the telescopic clamp assembly on the left side; the fourth section is from the first type pulley on the rear side of the telescopic clamp assembly on the left side to the second type pulley on the rear side; the fifth section is from the second type pulley on the rear side to the first type pulley on the rear side of the telescopic clamp assembly on the right side; the sixth section is from the first type pulley on the rear side of the telescopic clamp assembly on the right side The first section is from the first type pulley on the front side of the telescopic chuck assembly on the right; the seventh section is from the first type pulley on the front side of the telescopic chuck assembly on the right to the second type pulley on the front side; the eighth section is from the second type pulley on the front side to the first type pulley on the front side of the telescopic chuck assembly on the left; the ninth section is from the first type pulley on the front side of the telescopic chuck assembly on the left to the first type pulley on the rear side of the telescopic chuck assembly on the left; the tenth section is from the first type pulley on the rear side of the telescopic chuck assembly on the left to the second type pulley on the rear side; the eleventh section is from the second type pulley on the rear side to the rope end fixing assembly; A shell casing top plate is fixedly arranged at the top of the shell casing; one end of the spring is connected to the shell casing top plate, and the other end is connected to the rigid plate; the shell casing top plate is provided with 4 arc holes for the loading casing to pass through, the loading casing vertically extends to the top of the shell casing top plate, and the top of the loading casing is used to bear the vertical load, i.e. the test load; that is, when the loading casing is subjected to the vertical load, the loading casing presses the rigid plate to move downward, and the spring is in a tension state; the top and bottom of the loading casing are integral casings, and the middle area is 4 separate arc components; the center lines of the bottom casing, the loading casing, the shell casing, the steel cylinder, and the spring are collinear.

2. A variable stiffness digital display Winkel elastic foundation test device according to claim 1, characterized in that: The steel cylinder and / or the fixing device is provided with a through hole for the rope to pass through.

3. A variable stiffness digital display Winkel elastic foundation test device according to claim 2, characterized in that: A plurality of guide rods are fixedly arranged on the left side of the rope end fixing assembly, and a plurality of guide holes are arranged on the fixer and / or the outer shell sleeve, and the guide rods fixedly arranged on the left side of the rope end fixing assembly are inserted into the guide holes; a second spring is also arranged on the right side of the fixer and the left side of the rope end fixing assembly, and the second spring is wound around the guide rod; a ball is arranged on the side of the limit device facing the rope end fixing assembly to reduce the friction between the limit device and the rope end fixing assembly.

4. A variable stiffness digital display Winkel elastic foundation test device according to claim 3, characterized in that: The distance between the first type of pulley and the surface of the chuck plate is greater than the diameter of the circle formed by the springs.

5. The variable stiffness digital display Winkel elastic foundation test device according to claim 4, characterized in that: The end of the guide rod assembly is "T"-shaped. Through the guide rod assembly and the vertical guide groove assembly, it can be ensured that the steel cylinder always maintains vertical movement.

6. The working method of the variable stiffness digital display Winkel elastic foundation test device according to claim 1 is characterized in that: The following steps are involved: First, adjust the height of the outer casing: adjust the height of the outer casing by extending or shortening the outer casing lifting assembly; Second, adjust the height of the steel cylinder: adjust the height of the steel cylinder by extending or shortening the steel cylinder lifting assembly; Third, turn the clamping knob to achieve variable stiffness adjustment: when the clamping knob is turned, the connecting rod will move away from the steel cylinder along the fixer, thereby driving the rope end fixing assembly away from the steel cylinder; Specifically, when the rope end fixing assembly is away from the steel cylinder, the distance between the two telescopic chuck assemblies is shortened, and the rope can shorten the displacement between the chuck plates of the two telescopic chuck assemblies until the two chuck plates clamp a position of the spring; The actual movement process is: In the first stage, when the rope end fixing assembly moves away from the steel cylinder, the two clamping plates move toward each other; In the second stage, as the rope end fixing assembly continues to move away, one of the two clamping plates touches the spring and stops moving due to the obstruction of the spring. In the third stage, as the rope end fixing assembly continues to move away, another clamping plate moves until the two clamping plates clamp the spring.

7. A test system, characterized in that: It comprises a plurality of variable stiffness digital display Winkel elastic foundation test devices as claimed in claim 1; it also comprises: a test model box, the test model box is used to add an upper load; the lower part of the test model box is supported by a plurality of variable stiffness digital display Winkel elastic foundation test devices as claimed in claim 1.

8. A test method, characterized in that: Using the test system as claimed in claim 7, The following steps are involved: S1: Determine the model size; S2: Determine the spring stiffness K: S2-1, first obtain the foundation bed coefficient K at different locations through field tests, load plate tests, indoor triaxial tests or indoor consolidation tests. 地基 ; S2-2, then according to the foundation base coefficient K at different locations mentioned above 地基, Determine the spring stiffness of different variable stiffness digital display Winkel elastic foundation test devices; S3: Assemble and debug instruments: Assemble instruments according to the instrument layout designed in S1, connect the data collector, clear the data, adjust the stiffness of the springs of each variable stiffness digital display Winkel elastic foundation test device by adjusting the height of the steel cylinder of each variable stiffness digital display Winkel elastic foundation test device and tightening the position of the clamping knob; S4: Layered casting model: Soil is added layer by layer in the test model box to simulate the construction loading process.