A ground fissure site hazard simulation device and simulation method considering groundwater

By setting up water supply pipes, drainage pipes and liftable water tanks in the ground crack site simulation device to control the soil layer water level, the problem of failure to consider the impact of groundwater in the prior art is solved, and efficient simulation of ground crack site is achieved, and More accurate engineering guidance.

CN111948379BActive Publication Date: 2024-11-26CHANGAN UNIV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202010950446.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-10
Publication Date
2024-11-26
Estimated Expiration
2040-09-10

AI Technical Summary

Technical Problem

The existing ground fracture site disaster simulation device fails to consider the impact of groundwater and cannot control the changes in groundwater levels, resulting in the inability to fully utilize the advantages of physical model testing to provide effective guidance for actual engineering construction.

Method used

A ground fracture site hazard simulation device including a test chamber, a ground fracture interface filler and a water inlet system was designed. By setting up a water supply pipe and a drainage pipe in the test chamber, the height of the water storage tank is adjusted by using a liftable water tank to realize the upper and lower plates. Control of soil layer water level, simulate the impact of groundwater level changes on ground fracture sites.

Benefits of technology

It realizes effective simulation of the water level of the upper and lower plates of the ground crack site, improves the accuracy and authenticity of the simulation test, provides more effective guidance for actual engineering construction, has a wide range of application and is easy to operate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111948379B_ABST
    Figure CN111948379B_ABST
Patent Text Reader

Abstract

The present invention provides a device and method for simulating hazards of ground fissure sites considering ground water, comprising a test box, the test box comprising a box body, the box body adopts a rectangular box structure with an upper opening; a ground fissure interface filling body is obliquely arranged in the box body, the ground fissure interface filling body divides the box body into an upper plate area and a lower plate area, and simulated soil layers are arranged in the upper plate area and the lower plate area; a first water supply pipe is arranged at the bottom of the upper plate area, and a second water supply pipe is arranged at the bottom of the lower plate area; water inlet systems are respectively arranged at both ends of the box body, and the two water inlet systems are respectively connected to the first and second water supply pipes; a plurality of drainage pipes are evenly arranged at the bottom of the box body around; the present invention forms a simulated ground fissure site by filling simulated soil layers on both sides of the ground fissure interface filling body, and the simulated soil layer and the ground fissure interface filling body are combined; by arranging the water inlet system and the water supply and drainage pipes, the water level in the simulated ground fissure site is regulated, and the hazards of the ground fissure site with groundwater changes are effectively simulated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of geological disaster analysis, and particularly relates to a ground fissure site hazard simulation device and a simulation method taking groundwater into consideration. Background Art

[0002] Ground fissures are a discontinuity or fault phenomenon of rock and soil media developed in the surface layer of the earth's crust, caused by internal and external forces and human activities. Ground fissures are a geological disaster of rupture of near-surface soil layers that is closely related to ground subsidence caused by pumping, basement structure and active structure, and have caused direct or indirect losses of tens of billions of yuan.

[0003] Up to now, many scholars at home and abroad have conducted extensive research on various aspects of ground fissures, such as their generation mechanism, activity characteristics, disaster types and control measures, and have achieved rich results. The use of indoor experiments to simulate ground fissures has higher credibility, diversified monitoring projects, and can better reveal the corresponding mechanisms. Therefore, despite the high cost, the use of model experiments to simulate ground fissure disasters is still the main means for scientific researchers.

[0004] With the construction of various projects at present, it is usually difficult to avoid the interference of groundwater in the construction of ground fissure sites. The existing ground fissure site disaster simulation device does not take into account the influence of groundwater and cannot control the change of groundwater level. Therefore, in order to study the harmful effects of groundwater level changes on ground fissure sites, the role of groundwater is more fully considered, and the simulation and control problems of groundwater level changes in the upper and lower plates of ground fissure sites in the experiment are solved, so as to give full play to the advantages of physical model experiments and provide more effective guidance for actual engineering construction. Summary of the invention

[0005] In view of the technical problems existing in the prior art, the present invention provides a ground fissure site hazard simulation device and a simulation method taking groundwater into consideration, so as to solve the technical problem that the ground fissure site hazard simulation device in the prior art does not take the impact of groundwater into consideration and cannot control groundwater changes.

[0006] In order to achieve the above object, the technical solution adopted by the present invention is:

[0007] The present invention provides a ground fissure site hazard simulation device considering ground water, comprising a test box, a ground fissure interface filling body and a water inlet system; the test box comprises a box body, a first water supply pipe, a second water supply pipe and a plurality of drainage pipes, and the box body adopts a rectangular box body structure with an upper opening; the ground fissure interface filling body is obliquely arranged in the box body, and the ground fissure interface filling body divides the box body into an upper plate area and a lower plate area, and simulated soil layers are arranged in both the upper plate area and the lower plate area;

[0008] The first water supply pipe is arranged at the bottom of the upper plate area, and the second water supply pipe is arranged at the bottom of the lower plate area; water inlet systems are respectively arranged at both ends of the box body, one of which is connected to the first water supply pipe, and the other is connected to the second water supply pipe; a plurality of drainage pipes are evenly arranged at the bottom of the four sides of the box body, one end of the drainage pipe is connected to the inside of the box body, and the other end is connected to the outside.

[0009] Furthermore, the test box also includes two water level observation tubes, which are respectively arranged at the two ends of the box body and are used to observe the water levels of the filling soil layer in the upper plate area and the filling soil layer in the lower plate area.

[0010] Furthermore, the first water supply pipe or the second water supply pipe includes a water supply main pipe and a plurality of water supply branch pipes; the water supply main pipe is horizontally arranged at the end of the box body, one end of the water supply main pipe is connected to the water outlet of the water inlet system, and the other end is connected to the water inlet of the water supply branch pipe; the plurality of water supply branch pipes are evenly arranged at the bottom of the upper plate area or the lower plate area, and a plurality of water outlet holes are evenly arranged on the water supply branch pipes.

[0011] Furthermore, the water supply branch pipe adopts a U-shaped pipe, and several U-shaped pipes are evenly arranged on the water supply main pipe; both ends of the U-shaped pipe are connected to the water supply branch pipe, and several water outlet holes are evenly arranged on the U-shaped pipe; the length of the U-shaped pipe matches the length of the upper plate area or the lower plate area.

[0012] Furthermore, it also includes an earth-moving system, which is installed on the box body; the earth-moving system includes an A-frame, a crossbeam and a crane, the A-frame is fixedly arranged on the box body, the crossbeam is horizontally arranged on the A-frame, the crossbeam is arranged along the length direction of the box body, and the crane is slidably installed on the crossbeam.

[0013] Furthermore, the angle between the filling body at the ground fissure interface and the horizontal plane is 70°-80°.

[0014] Furthermore, the water inlet system adopts a liftable water tank, which includes a water storage tank and a lifting frame. The lifting frame is fixedly arranged at the end of the box body, the water storage tank is installed on the lifting frame, and the water outlet of the water storage tank is connected to the first water supply pipe or the second water supply pipe.

[0015] Furthermore, the simulated soil layer in the upper plate area or the lower plate area is formed by filling the soil in layers, and the layer height of the simulated soil layer is 10-15 cm.

[0016] Furthermore, the ground fissure interface filling body is made of fine sand or powdered fine sand.

[0017] The present invention also provides a method for simulating ground fissure site hazards taking groundwater into consideration, comprising the following steps:

[0018] Step 1, tilting the ground fissure template in the box, filling soil in layers on both sides of the ground fissure template, so as to form a simulated soil layer in the upper plate area and a simulated soil layer in the lower plate area on both sides of the ground fissure template;

[0019] Step 2: After the simulated soil layer is filled, the ground fissure template is taken out to form a simulated ground fissure interface between the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area, and then the ground fissure filling body is filled in layers in the simulated ground fissure interface to form a simulated ground fissure site;

[0020] Step 3: close the drainage pipe, open the water inlet system, and inject water into the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area, respectively, until the water level in the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area reaches the design value;

[0021] Step 4: After the water level in the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area is stable, apply external loads to the simulated soil layer in the upper plate area and / or the simulated soil layer in the lower plate area in the box according to the design requirements; record the deformation and damage of the simulated ground fissure site under the action of the external load, the influence range of the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area, and the response characteristics of the simulated ground fissure site, and complete the ground fissure site hazard simulation test.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] The present invention provides a ground fissure site hazard simulation device taking ground water into consideration, wherein a ground fissure interface filling body is obliquely arranged in a test box, and simulated soil layers are filled on both sides of the ground fissure interface filling body, and the simulated soil layer and the ground fissure interface filling body are combined to form a simulated ground fissure site; a water inlet system and a water supply pipe are arranged to supply water to the simulated ground fissure site in the box; a drainage pipe is arranged to adjust the water level in the simulated ground fissure site, thereby effectively simulating the hazards of the ground fissure site caused by ground water fluctuations, and giving full play to the advantages of the physical model test; the device has a simple structure, is easy to operate, and has a wide range of applications, and provides effective guidance for actual engineering construction.

[0024] Furthermore, by arranging water level observation pipes at both ends of the box, real-time observation of the water levels in the upper plate area filling soil layer and the lower plate area filling soil layer is achieved through the water level observation pipes, thereby ensuring the accuracy of the simulation test.

[0025] Furthermore, by arranging a U-shaped water supply pipe at the bottom of the box, a uniform supply of groundwater to the internal soil is achieved. The U-shaped water supply pipes on both sides of the upper and lower plates are not connected and can be disassembled, so as to facilitate the adjustment of the horizontal distribution of the ground fissure interface.

[0026] Furthermore, by arranging a soil transport system on the box body, the labor intensity of the soil filling process is reduced and the operation is simple.

[0027] Furthermore, the angle between the filling body at the ground fissure interface and the horizontal plane is set to 70°-80°, ensuring consistency with the inclination angle of actual ground fissures in the field; the present invention can also adjust the angle between the filling body at the ground fissure interface and the horizontal plane according to the needs of the simulation, so as to make the simulation results more realistic.

[0028] Furthermore, the water inlet system adopts a liftable water tank, and the water tank is installed on a lifting frame. By adjusting the height of the water tank and the vertical height of the water tank at both ends of the box on the lifting frame, the difference in groundwater levels in the upper and lower plates on both sides of the ground fissure interface can be effectively controlled, thereby realizing the study of the hazards of ground fissure sites under groundwater fluctuation conditions. The simulation effect is highly realistic, and the simulation of different groundwater conditions can be realized, with a wide range of applications.

[0029] Furthermore, the simulated soil layer was filled in layers to ensure that the filling effect of the ground fissure interface was consistent with the actual situation, effectively guaranteeing the accuracy of the simulation test results.

[0030] Furthermore, the ground fissure interface filling body adopts fine sand or powdered fine sand, and the fine sand or powdered fine sand is used as an impermeable material. The properties of the fine sand or powdered fine sand are approximately consistent with the field ground fissure filling material, making the simulation of the ground fissure closer to reality.

[0031] The present invention also provides a method for simulating ground fissure site hazards taking into account groundwater, which can effectively simulate the ground fissure site hazards taking into account the influence of groundwater level changes, provide guidance for engineering construction, have a simple operation process, and have high accuracy of simulation test results.

[0032] In summary, the device and method for simulating hazards of ground fissure sites taking ground water into consideration described in the present invention optimize the simulation of water level control of the upper and lower plates of the ground fissure site by setting a water supply and drainage system in the box; jointly control the water level height in the soil through the water supply and drainage pipes in the water supply system and the box; and control the difference in stratum water levels in the upper and lower plates on both sides of the ground fissure interface by setting a liftable water tank and adjusting the height of the water storage tanks on both sides to study the harmful effects of external loads and groundwater coupling on the ground fissure site. The device and method for simulating hazards of ground fissure sites taking ground water into consideration described in the present invention can be used for indoor ground fissure simulation tests, fully consider the impact of groundwater on ground fissure sites, and give play to the advantages of physical model tests, which have high benefits and broad application prospects in the field of geological disaster research. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a schematic diagram of the overall structure of the ground fissure site hazard simulation device of the present invention;

[0034] Figure 2It is a schematic diagram of the structure of the test box in the ground fissure site hazard simulation device of the present invention;

[0035] Figure 3 It is a schematic diagram of the arrangement of water inlet pipes in the ground fissure site hazard simulation device of the present invention;

[0036] Figure 4 It is a schematic diagram of the structure of the lifting water tank in the ground fissure site hazard simulation device of the present invention;

[0037] Figure 5 It is a schematic diagram of a crane and a crossbeam in the ground fissure site hazard simulation device described in the present invention.

[0038] Among them, 1 test box, 2 ground fissure interface filling body, 3 water inlet system, 4 earth transportation system; 11 box body, 12 first water supply pipe, 13 second water supply pipe, 14 drainage pipe, 15 water level observation pipe; 31 water storage tank, 32 lifting frame; 41 herringbone frame, 42 crossbeam, 43 crane; 101 water supply main pipe, 102 water supply branch pipe. DETAILED DESCRIPTION

[0039] In order to make the technical problems, technical solutions and beneficial effects solved by the present invention more clearly understood, the present invention is further described in detail with reference to the following specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0040] As attached Figure 1-5 As shown, the present invention provides a ground fissure site hazard simulation device taking groundwater into consideration, comprising a test box 1, a ground fissure interface filling body 2, a water inlet system 3 and a soil transport system 4; the test box 1 comprises a box body 11, a first water supply pipe 12, a second water supply pipe 13, a plurality of drainage pipes 14 and two water level observation pipes 15; the box body 11 adopts a rectangular box body structure with an upper opening, and the ground fissure interface filling body 2 is obliquely arranged in the box body 11, and the inclination angle of the ground fissure interface filling body 2 is the same as the inclination angle of the ground fissure interface in an actual ground fissure site; the ground fissure interface filling body 2 divides the space in the box body 11 into an upper plate area and a lower plate area, the upper plate area is filled with an upper plate area simulated soil layer, and the lower plate area is filled with a lower plate area simulated soil layer.

[0041] The first water supply pipe 12 is arranged at the bottom of the upper plate area, and the second water supply pipe 13 is arranged at the bottom of the lower plate area; water inlet systems 3 are respectively arranged at both ends of the box body 11, one of which is connected to the first water supply pipe 12, and the other is connected to the second water supply pipe 13; a plurality of drainage pipes 14 are evenly arranged at the bottom of the box body 11, one end of the drainage pipe 14 is connected to the interior of the box body 11, and the other end is connected to the outside.

[0042] Two water level observation pipes 15 are respectively arranged at the bottom of both ends of the box body 11, one of which is used to observe the water level in the filling soil layer of the upper plate area, and the other is used to observe the water level in the filling soil layer of the lower plate area.

[0043] The soil transport system 4 is installed on the box body 11, and the soil transport system 4 includes an A-frame 41, a crossbeam 42 and a crane 43. The A-frame 41 is fixedly set on the box body 11, and the crossbeam 42 is horizontally set on the A-frame 41; the crossbeam 42 is set along the length direction of the box body 11, and the length of the crossbeam 42 matches the length of the box body 11; the crane 43 is slidably installed on the crossbeam 42, and the crane 43 is used to lift soil and external load loading devices.

[0044] The simulated soil layer in the upper plate area or the simulated soil layer in the lower plate area is formed by layered filling of soil, and the layered height of the simulated soil layer in the upper plate area or the simulated soil layer in the lower plate area is 10-15cm; the ground fissure interface filling body 2 is made of fine sand or fine sand, and the fine sand or fine sand is filled in layers; the angle between the ground fissure interface filling body 2 and the horizontal plane is 70°-80°.

[0045] The first water supply pipe 12 and the second water supply pipe 13 have the same structure. The first water supply pipe 12 or the second water supply pipe 13 includes a water supply main pipe 101 and a plurality of water supply branch pipes 102. The water supply main pipe 101 is horizontally arranged at the end of the box body 11, one end of the water supply main pipe 101 is connected to the water outlet of the water inlet system 3, and the other end is connected to the water inlet of the water supply branch pipe 102. The plurality of water supply branch pipes 102 are evenly arranged at the bottom of the upper plate area or the lower plate area, and a plurality of water outlet holes are evenly arranged on the water supply branch pipes 102.

[0046] The water supply branch pipe 102 adopts a U-shaped pipe, and several U-shaped pipes are evenly arranged on the water supply main pipe 101; both ends of the U-shaped pipe are connected to the water supply branch pipe 102, and several water outlet holes are evenly arranged on the U-shaped pipe; the length of the U-shaped pipe matches the length of the upper plate area or the lower plate area.

[0047] The water inlet system 3 adopts a liftable water tank, which includes a water storage tank 31 and a lifting frame 32. The lifting frame 32 is fixedly arranged at the end of the box body 11, and the water storage tank 31 is installed on the lifting frame 32. The water outlet of the water storage tank 31 is connected to the first water supply pipe 12 or the second water supply pipe 13.

[0048] The present invention also provides a method for simulating ground fissure site hazards taking groundwater into consideration, comprising the following steps:

[0049] Step 1, tilt the ground fissure template in the box, and fill the soil in layers on both sides of the ground fissure template to form a simulated soil layer in the upper plate area and a simulated soil layer in the lower plate area on both sides of the ground fissure template;

[0050] Step 2: After the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area are filled, the ground fissure template is taken out to form a simulated ground fissure interface between the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area, and then the ground fissure filling body is filled in layers in the simulated ground fissure interface to form a simulated ground fissure site;

[0051] Step 3: close the drainage pipe, open the water inlet system, and inject water into the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area, respectively, until the water level in the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area reaches the design value;

[0052] Step 4: After the water level in the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area is stable, apply external loads to the simulated soil layer in the upper plate area and / or the simulated soil layer in the lower plate area in the box according to the design requirements; record the deformation and damage of the simulated ground fissure site under the action of the external load, the influence range of the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area, and the response characteristics of the simulated ground fissure site, and complete the ground fissure site hazard simulation test.

[0053] Example

[0054] The present embodiment provides a ground fissure site hazard simulation device taking groundwater into consideration, comprising a test box, a ground fissure interface filling body, a water inlet system and a soil transportation system; the test box comprises a box body, a first water supply pipe, a second water supply pipe, a plurality of drainage pipes and two water level observation pipes; the box body adopts a rectangular box structure with an upper opening, the box body is composed of a steel structure frame, and the top of the steel structure frame is open; the ground fissure interface filling body is tiltedly arranged in the box body, and the inclination angle of the ground fissure interface filling body is the same as the inclination angle of the ground fissure interface in an actual ground fissure site; the ground fissure interface filling body divides the space in the box body into an upper plate area and a lower plate area, the upper plate area is filled with an upper plate area simulated soil layer, and the lower plate area is filled with a lower plate area simulated soil layer.

[0055] The first water supply pipe is arranged at the bottom of the upper plate area, and the second water supply pipe is arranged at the bottom of the lower plate area; water inlet systems are respectively arranged at both ends of the box body, one of which is connected to the first water supply pipe, and the other is connected to the second water supply pipe; a plurality of drainage pipes are evenly arranged at the bottom of the four sides of the box body, one end of the drainage pipe is connected to the inside of the box body, and the other end is connected to the outside.

[0056] Two water level observation pipes are respectively arranged at the bottom of both ends of the box body, one of which is used to observe the water level in the filling soil layer of the upper plate area, and the other is used to observe the water level in the filling soil layer of the lower plate area.

[0057] The first water supply pipe has the same structure as the second water supply pipe. The first water supply pipe or the second water supply pipe comprises a water supply main pipe and a plurality of water supply branch pipes. The water supply main pipe is horizontally arranged at the end of the box body, one end of the water supply main pipe is connected to the water outlet of the water inlet system, and the other end is connected to the water inlet of the water supply branch pipe. The plurality of water supply branch pipes are evenly arranged at the bottom of the upper plate area or the lower plate area, and a plurality of water outlet holes are evenly arranged on the water supply branch pipes.

[0058] The water supply branch pipe adopts a U-shaped pipe, and several U-shaped pipes are evenly arranged on the water supply main pipe; both ends of the U-shaped pipe are connected to the water supply branch pipe, and several water outlet holes are evenly arranged on the U-shaped pipe; the length of the U-shaped pipe matches the length of the upper plate area or the lower plate area.

[0059] The water inlet system adopts a liftable water tank, which includes a water storage tank and a lifting frame. The lifting frame is fixedly arranged at the end of the box body, and the water storage tank is installed on the lifting frame. The water outlet of the water storage tank is connected with the first water supply pipe or the second water supply pipe. Through the up and down movement of the water storage tank on the lifting frame, the water in the water storage tank enters the simulated soil layer of the upper plate area or the simulated soil layer of the lower plate area through the water supply main pipe and the water supply branch pipe, thereby realizing effective control of the water level changes inside the simulated soil layer in the upper plate area or the lower plate area.

[0060] In this embodiment, the water supply system, the first water supply pipe, the second water supply pipe and the drainage pipe are combined to form a water level control system. The water level control system can jointly control the water level height in the simulated soil layer of the upper plate area or the simulated soil layer of the lower plate area according to the coordinated action of the liftable water tank and the first water supply pipe, the second water supply pipe and the drainage pipe inside the tank; at the same time, this embodiment can also control the difference in groundwater levels between the upper and lower plates on both sides of the ground fissure interface by adjusting the height of the water tank, so as to study the hazards of the ground fissure site under the condition of changing groundwater level.

[0061] The soil transport system is installed on the box body, and the soil transport system includes an A-frame, a crossbeam and a crane. The A-frame is fixedly set on the box body and horizontally set on the A-frame; the crossbeam is set along the length direction of the box body, and the length of the crossbeam matches the length of the box body; the crane is slidably installed on the crossbeam, and the crane is used to lift the soil and external load loading device; by setting up the soil transport system, the materials in the test can be conveniently transported to the designated location; preferably, the crossbeam adopts a steel structure crossbeam.

[0062] The simulated soil layer in the upper plate area or the simulated soil layer in the lower plate area is formed by filling the soil in layers, and the layer height of the simulated soil layer in the upper plate area or the simulated soil layer in the lower plate area is 10-15cm; in order to ensure that the filling effect of the ground fissure interface is consistent with the actual situation, the thickness of each layer should not be too large when the stratum is filled in layers, and the loose thickness of each layer of soil should not exceed 15cm, and the thickness after artificial compaction should be about 10cm. For each layer of soil filled, the corresponding ground fissure interface treatment is carried out; specifically, a wooden board with a thickness of about 2cm is used to reserve the position of the ground fissure in advance, and the thickness of the loose soil on both sides of the wooden board after compaction should be about 10cm; for each layer of soil filled, fine sand or powdered fine sand is used to evenly pour the gap formed after the wooden board is pulled out to form a ground fissure interface. Fill in layers until the designed height of the ground fissure interface; the angle between the filling body of the ground fissure interface and the horizontal plane is 70°-80°, and the filling body of the ground fissure interface serves as a weak geological interface for artificial filling; during the filling process of the simulated soil layer in the upper plate area or the simulated soil layer in the lower plate area, sensors are arranged in the simulated soil layer, and random sampling tests are carried out when each layer of simulated soil layer is completed, ensuring that the simulated soil layer is similar to the stratum of the original site.

[0063] This embodiment also provides a method for simulating ground fissure site hazards considering groundwater, comprising the following steps:

[0064] Step 1. Set the ground fissure template in a tilted manner in the box, transport the pre-prepared soil into the box through the soil transport system, and perform artificial layered filling on both sides of the ground fissure template to form simulated soil layers in the upper plate area and lower plate area on both sides of the ground fissure template respectively; sensors are deployed during the layered filling process, and random sampling tests should be carried out when each layer is filled to ensure that it is similar to the stratum of the original site; the ground fissure template uses a 2-3 cm thick wooden board, and the angle between the wooden board and the horizontal plane is 70-80° to simulate the actual ground fissure inclination; the layered filling height is 10-15 cm.

[0065] Step 2: After the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area are filled, the ground fissure template is taken out to form a simulated ground fissure interface between the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area; the ground fissure interface is then filled by using narrow and long particles such as fine sand or powdered fine sand for layered filling, and impermeable materials such as plastic films are set at the positions on both sides of the interface that contact the stratum soil body to control the difference in water levels between the upper and lower plates on both sides as an impermeable interface, and the process is performed layer by layer until the design height is reached;

[0066] Step 3, fill water into the liftable water tanks at both ends of the box; after the soil layer inside the box is filled, close the drainage pipes on the outside of the bottom of the box, adjust the water valve on the liftable water tank, and inject water into the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area through the water supply main pipe and the water supply branch pipe connected to the water storage tank; manually adjust the water level results fed back by the water level observation pipes at both ends of the box until the water level inside the soil reaches the designed position; at the same time, the difference in water level between the upper and lower plates on both sides of the ground fissure interface is controlled by adjusting the vertical height of the two water storage tanks on the lifting frame;

[0067] Step 4: After the groundwater level in the simulated soil layer of the upper plate area and the simulated soil layer of the lower plate area is stable, external load is applied to the simulated soil layer of the upper plate area or the simulated soil layer of the lower plate area according to the loading conditions required by the test design to simulate the impact of groundwater level changes on the hazards of the ground fissure site.

[0068] Step 5. During the loading process, use sensors designed to be distributed inside and outside the simulated soil layer in the upper plate area or the simulated soil layer in the lower plate area to monitor and measure, and analyze the deformation and damage of the ground fissure site under the action of external loads when the groundwater level changes, the influence range of the upper and lower plates, and the response characteristics of the stratum soil.

[0069] The device and method for simulating hazards of ground fissure sites taking ground water into consideration described in the present invention control the groundwater level in the simulated soil layer inside the box by setting a water inlet system, a water supply pipe and a drainage pipe; control the difference in groundwater level between the upper and lower plates on both sides of the ground fissure interface by adjusting the vertical heights of the water storage tanks at both ends of the box on the lifting frame, so as to achieve the simulation effect of the hazards of ground fissure sites taking ground water level changes into consideration; combined with corresponding monitoring means, the harmful effects of groundwater level changes on ground fissure sites can be studied more scientifically, and the required dynamic and static loads can be applied according to the design of the test to study the harmful effects of external loads and groundwater coupling on the ground fissure sites; the device and method for simulating hazards of ground fissure sites taking ground water level changes into consideration can be used to simulate the hazards of ground fissure sites.

[0070] The device and method for simulating hazards of ground fissure sites taking ground water into consideration described in the present invention optimize the simulation of water level control of the upper and lower plates of a ground fissure site, jointly control the water level height in the soil through a water inlet system and a water inlet pipe and a drainage pipe in a box, and study the harmful effects of external loads and groundwater coupling on ground fissure sites, which has high benefits and broad application prospects in the field of geological disaster research.

[0071] The above embodiment is only one of the implementation methods that can realize the technical solution of the present invention. The scope of protection claimed by the present invention is not limited only to this embodiment, but also includes changes, replacements and other implementation methods that can be easily thought of by any technician familiar with the technical field within the technical scope disclosed by the present invention.

Claims

1. A ground fissure site hazard simulation device considering groundwater, characterized in that: The invention comprises a test box (1), a ground fissure interface filling body (2) and a water inlet system (3); the test box (1) comprises a box body (11), a first water supply pipe (12), a second water supply pipe (13) and a plurality of drainage pipes (14); the box body (11) adopts a rectangular box structure with an upper opening; the ground fissure interface filling body (2) is obliquely arranged in the box body (11); the ground fissure interface filling body (2) divides the box body (11) into an upper plate area and a lower plate area; and simulated soil layers are arranged in both the upper plate area and the lower plate area; The first water supply pipe (12) is arranged at the bottom of the upper plate area, and the second water supply pipe (13) is arranged at the bottom of the lower plate area; water inlet systems (3) are respectively arranged at both ends of the box body (11), one of which is connected to the first water supply pipe (12), and the other is connected to the second water supply pipe (13); a plurality of drainage pipes (14) are evenly arranged at the bottom of the box body (11), one end of the drainage pipe (14) is connected to the inside of the box body (11), and the other end is connected to the outside; The test box (1) also includes two water level observation pipes (15), which are respectively arranged at two ends of the box body (11) and are used to observe the water levels of the filling soil layer in the upper plate area and the filling soil layer in the lower plate area respectively; The first water supply pipe (12) or the second water supply pipe (13) comprises a water supply main pipe (101) and a plurality of water supply branch pipes (102); the water supply main pipe (101) is horizontally arranged at the end of the box body (11), one end of the water supply main pipe (101) is connected to the water outlet of the water inlet system (3), and the other end is connected to the water inlet of the water supply branch pipe (102); the plurality of water supply branch pipes (102) are evenly arranged at the bottom of the upper plate area or the lower plate area, and a plurality of water outlet holes are evenly arranged on the water supply branch pipes (102).

2. A ground fissure site hazard simulation device considering groundwater according to claim 1, characterized in that: The water supply branch pipe (102) is a U-shaped pipe, and a plurality of U-shaped pipes are evenly arranged on the water supply main pipe (101); both ends of the U-shaped pipe are connected to the water supply branch pipe (102), and a plurality of water outlet holes are evenly arranged on the U-shaped pipe; the length of the U-shaped pipe matches the length of the upper plate area or the lower plate area.

3. A ground fissure site hazard simulation device considering groundwater according to claim 1, characterized in that: The invention also comprises a soil transport system (4), which is installed on the box body (11); the soil transport system (4) comprises an A-frame (41), a crossbeam (42) and a crane (43); the A-frame (41) is fixedly arranged on the box body (11); the crossbeam (42) is horizontally arranged on the A-frame (41); the crossbeam (42) is arranged along the length direction of the box body (11); and the crane (43) is slidably installed on the crossbeam (42).

4. A ground fissure site hazard simulation device considering groundwater according to claim 1, characterized in that: The angle between the ground fissure interface filling body (2) and the horizontal plane is 70°-80°.

5. The device for simulating ground fissure hazards taking groundwater into consideration according to claim 1, characterized in that: The water inlet system (3) adopts a liftable water tank, which comprises a water storage tank (31) and a lifting frame (32). The lifting frame (32) is fixedly arranged at the end of the box body (11), the water storage tank (31) is installed on the lifting frame (32), and the water outlet of the water storage tank (31) is connected to the first water supply pipe (12) or the second water supply pipe (13).

6. The device for simulating ground fissure hazards taking groundwater into consideration according to claim 1, characterized in that: The simulated soil layer in the upper plate area or the lower plate area is formed by filling the soil in layers, and the layer height of the simulated soil layer is 10-15 cm.

7. The device for simulating ground fissure hazards taking groundwater into consideration according to claim 1, characterized in that: The ground fissure interface filling body (2) is made of fine sand or powdered fine sand.

8. A method for simulating ground fissure site hazards considering groundwater, characterized in that: A ground fissure site hazard simulation device taking groundwater into consideration as described in any one of claims 1 to 7 comprises the following steps: Step 1, tilting the ground fissure template in the box, filling soil in layers on both sides of the ground fissure template, so as to form a simulated soil layer in the upper plate area and a simulated soil layer in the lower plate area on both sides of the ground fissure template; Step 2: After the simulated soil layer is filled, the ground fissure template is taken out to form a simulated ground fissure interface between the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area, and then the ground fissure filling body is filled in layers in the simulated ground fissure interface to form a simulated ground fissure site; Step 3: close the drainage pipe, open the water inlet system, and inject water into the simulated soil layer of the upper plate area and the simulated soil layer of the lower plate area respectively until the water level in the simulated soil layer of the upper plate area and the simulated soil layer of the lower plate area reaches the design value; Step 4: After the water level in the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area is stable, apply external loads to the simulated soil layer in the upper plate area and / or the simulated soil layer in the lower plate area in the box according to the design requirements; record the deformation and damage of the simulated ground fissure site under the action of the external load, the influence range of the simulated soil layer in the upper plate area and the simulated soil layer in the lower plate area, and the response characteristics of the simulated ground fissure site, and complete the ground fissure site hazard simulation test.

Citation Information

Patent Citations

  • Method and device for simulating ground crack hazards

    CN103510550A

  • Ground fracture test device and method for simulating fracture dislocation and underground water change

    CN110954680A

  • Ground fissure site hazard simulation device considering underground water

    CN212568782U

  • Systems and methods for hydraulic fracture and reservoir simulation

    US20190292884A1