Coke dry quenching optimization control method and system
Through big data analysis and decision tree methods, the control parameters of dry-quenching production equipment are obtained, which solves the problem of difficult system regulation of dry-quenching technology and realizes efficient and automated operation of the equipment.
Patent Information
- Application Number
- CN202010982348.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-17
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2040-09-17
AI Technical Summary
The existing dry quenching technology system is difficult to control, resulting in temperature fluctuations, affecting the dry quenching rate and equipment life, and lacking effective optimization control methods and systems.
By obtaining the historical data, current operation data and production plan data of dry-quenching production equipment, conducting big data analysis, building the best operating mode, using the decision tree analysis method to obtain control parameters that meet the current operating conditions, and feed them back Give it to the control server to realize intelligent control.
The automatic operation level of dry coke quenching production equipment has been improved, the operation difficulty has been reduced, the operation efficiency has been improved, and fully automatic operation has been achieved.
Smart Images

Figure CN112000075B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of coke quenching technology, and in particular, to a coke dry quenching optimization control method and system. Background Art
[0002] CDQ technology is an important energy-saving and environmentally friendly technology in the field of coal chemical industry, and has been widely used around the world. CDQ system is the last quenching link of the entire coking plant production. Its stable production not only has a positive effect on the coking plant, but also can generate great economic benefits.
[0003] At present, CDQ technology involves many fields such as coking, heat, machinery, refractory materials, environmental protection and process control. Its process is relatively complex, with many control parameters, difficult operation and high requirements for continuous production. If the quenching system is not properly regulated, the CDQ furnace will experience temperature fluctuations, which will seriously affect the CDQ rate and even the life of the CDQ furnace.
[0004] Therefore, there is an urgent need for a device and method for regulating the dry quenching system to improve the operation level of the dry quenching and reduce the difficulty of the dry quenching operation. Summary of the invention
[0005] The present application aims to solve at least one of the technical problems existing in the prior art, and proposes a dry coke quenching optimization control method and system.
[0006] To achieve the purpose of the present application, a first aspect provides a dry coke quenching optimization control method, comprising:
[0007] Acquire historical data, current operation data and production plan data of the dry coke quenching production equipment; the historical data includes the historical operation data and historical operating condition data corresponding to the historical operation data;
[0008] Performing data analysis and processing based on the historical data, the current operating data, the production plan data and a preset operating condition data set to obtain control parameters of the dry coke quenching production equipment that meet the current operating conditions;
[0009] The control parameters are sent to a control server of the dry coke quenching production equipment, so that the control server controls the operation of the dry coke quenching production equipment based on the control parameters.
[0010] Optionally, the performing data analysis and processing based on the historical data, the current operation data, the production plan data and a preset operating condition data set to obtain control parameters of the dry coke quenching production equipment that meet the current operating conditions further includes:
[0011] Constructing a time series set, the time series set comprising a first time series corresponding to the historical operation data, a second time series corresponding to the production plan data, and a third time series corresponding to the current operation data;
[0012] Normalizing the time series set to obtain a dimensionless simplified sequence set, and using a decision tree analysis method to analyze the simplified sequence set and the preset operating condition data set to obtain similarity probabilities between the operating condition data corresponding to various operating conditions in the operating condition data set and the simplified sequence set, and using the operating condition data with the highest similarity probability to the simplified sequence set as the current operating condition data of the current operating condition of the dry coke quenching production equipment;
[0013] The historical operating condition data with the highest probability of being similar to the current operating condition data is obtained from the historical operating condition data, and the control parameters corresponding to the current operating condition data are obtained according to the historical operating data corresponding to the historical operating condition data and the current operating data.
[0014] Optionally, acquiring historical operating condition data having the highest probability of being similar to the current operating condition data from the historical operating condition data, and obtaining control parameters corresponding to the current operating condition data according to historical operating data corresponding to the historical operating condition data and the current operating data, further includes:
[0015] Acquire target historical operating condition data having the highest probability of being similar to the current operating condition data from the historical operating condition data, and obtain process parameters corresponding to the current operating condition data according to the target historical operating condition data;
[0016] From all historical operating data that meet the process parameters, obtain the target historical operating data with the highest probability of being similar to the current operating data, and adjust the value of the target historical operating data according to the similarity probability to obtain a new operating data value as the control parameter corresponding to the current operating condition data.
[0017] Optionally, the process parameters include one or more of the dry coke quenching discharge temperature, the boiler inlet temperature, the pre-storage chamber material level control range and the combustible gas composition control range.
[0018] Optionally, the control parameters include one or more of the real-time coke removal volume, circulating air volume and air introduction volume values, boiler feed water volume and effective power of the steam turbine generator.
[0019] Optionally, the obtaining of production plan data further comprises:
[0020] Obtaining red coke out of the coke oven data and coke oven maintenance data, and formulating a production plan for dry coke quenching production equipment based on the red coke out of the coke oven data and the coke oven maintenance data;
[0021] The production plan data is generated based on the production plan and the production and maintenance plan of the dry coke quenching production equipment.
[0022] Optionally, the method further includes: storing the obtained process parameters and control parameters, and updating the preset operating condition data set based on the process parameters and the control parameters.
[0023] Optionally, the method further comprises:
[0024] The neighboring network real-time operation data of each neighboring network dry quenching coke production equipment and the neighboring network control parameters issued by the neighboring network edge server are obtained from the neighboring network edge server, and the preset operating condition data set is updated based on the neighboring network real-time operation data and the neighboring network control parameters.
[0025] Optionally, the method further includes: performing security monitoring on the control parameter, and sending an alarm message to the control server if the control parameter exceeds a preset threshold range.
[0026] Optionally, the operating data includes one or more of the periodic loading amount of the coke loading rail scale, the material level of the CDQ furnace, the circulating air volume, the real-time value of the belt scale, the temperature parameters and pressure parameters of the CDQ furnace, and the temperature parameters and pressure parameters of the boiler.
[0027] To achieve the purpose of the present application, a first aspect provides a dry coke quenching optimization control system, which is connected to a coke oven production management device and a control server of a dry coke quenching production device, respectively, and is used to:
[0028] Acquire historical data and current operation data of the dry coke quenching production equipment from the control server, and acquire production plan data from the coke oven production management equipment; the historical data includes historical operation data and historical operating condition data corresponding to the historical operation data;
[0029] Performing data analysis and processing based on the historical data, the current operating data, the production plan data and a preset operating condition data set to obtain control parameters of the dry coke quenching production equipment that meet the current operating conditions;
[0030] The control parameters are sent to the control server, so that the control server controls the operation of the dry coke quenching production equipment based on the control parameters.
[0031] Optionally, further used for:
[0032] Constructing a time series set, the time series set comprising a first time series corresponding to the historical operation data, a second time series corresponding to the production plan data, and a third time series corresponding to the current operation data;
[0033] Normalizing the time series set to obtain a dimensionless simplified sequence set, and using a decision tree analysis method to analyze the simplified sequence set and the preset operating condition data set to obtain similarity probabilities between the operating condition data corresponding to various operating conditions in the operating condition data set and the simplified sequence set, and using the operating condition data with the highest similarity probability to the simplified sequence set as the current operating condition data of the current operating condition of the dry coke quenching production equipment;
[0034] The historical operating condition data with the highest probability of being similar to the current operating condition data is obtained from the historical operating condition data, and the control parameters corresponding to the current operating condition data are obtained according to the historical operating data corresponding to the historical operating condition data and the current operating data.
[0035] Optionally, comprising a central server and at least one edge server;
[0036] The central server is connected to each of the edge servers respectively, and the central server is used to:
[0037] Acquire the real-time operation data of each of the dry coke quenching production equipment and the control parameters issued by the edge server from the edge server, and store the real-time operation data and the control parameters in its historical database;
[0038] The edge server is connected to the central server, the coke oven production management equipment and the control server respectively, and the edge server is used for:
[0039] Acquire the current operation data of the dry coke quenching production equipment from the control server, acquire the historical data from the historical data, and acquire the production plan data from the coke oven production management equipment; the historical data includes the historical operation data and the historical operating condition data corresponding to the historical operation data;
[0040] Constructing a time series set, the time series set comprising a first time series corresponding to the historical operation data, a second time series corresponding to the production plan data, and a third time series corresponding to the current operation data;
[0041] Normalizing the time series set to obtain a dimensionless simplified sequence set, and using a decision tree analysis method to analyze the simplified sequence set and the preset operating condition data set to obtain similarity probabilities between the operating condition data corresponding to various operating conditions in the operating condition data set and the simplified sequence set, and using the operating condition data with the highest similarity probability to the simplified sequence set as the current operating condition data of the current operating condition of the dry coke quenching production equipment;
[0042] Acquire target historical operating condition data having the highest probability of being similar to the current operating condition data from the historical operating condition data, and obtain process parameters corresponding to the current operating condition data according to the target historical operating condition data;
[0043] From all historical operating data that meet the process parameters, obtain target historical operating data with the highest probability of being similar to the current operating data, and adjust the value of the target historical operating data according to the similarity probability to obtain a new operating data value as the control parameter corresponding to the current operating condition data;
[0044] The control parameters are sent to the control server, so that the control server controls the operation of the dry coke quenching production equipment based on the control parameters.
[0045] Optionally, the central server includes a cloud server, and the cloud server is connected to both the local edge server and a neighboring network edge server in an adjacent device network, for:
[0046] The neighboring network real-time operation data of each neighboring network dry quenching coke production equipment and the neighboring network control parameters issued by the neighboring network edge server are obtained from the neighboring network edge server, and the preset operating condition data set is updated based on the neighboring network real-time operation data and the neighboring network control parameters.
[0047] Optionally, the edge server includes a data communication module and a data computing module;
[0048] The data communication module performs data communication with the coke oven production management device, the control server and the central server respectively, so as to obtain the production plan data from the coke oven production management device, obtain the current operation data of the dry coke quenching production device from the control server, and obtain the historical data from the central server;
[0049] The data calculation module is connected to the data communication module and is used to perform the following processing on the data acquired by the data communication module:
[0050] Constructing a time series set, the time series set comprising a first time series corresponding to the historical operation data, a second time series corresponding to the production plan data, and a third time series corresponding to the current operation data;
[0051] Normalizing the time series set to obtain a dimensionless simplified sequence set, and using a decision tree analysis method to analyze the simplified sequence set and the preset operating condition data set to obtain similarity probabilities between the operating condition data corresponding to various operating conditions in the operating condition data set and the simplified sequence set, and using the operating condition data with the highest similarity probability to the simplified sequence set as the current operating condition data of the current operating condition of the dry coke quenching production equipment;
[0052] Acquire target historical operating condition data having the highest probability of being similar to the current operating condition data from the historical operating condition data, and obtain process parameters corresponding to the current operating condition data according to the target historical operating condition data;
[0053] From all historical operating data that meet the process parameters, obtain target historical operating data with the highest probability of being similar to the current operating data, and adjust the value of the target historical operating data according to the similarity probability to obtain a new operating data value as the control parameter corresponding to the current operating condition data;
[0054] The control parameters are sent to the control server, so that the control server controls the operation of the dry coke quenching production equipment based on the control parameters.
[0055] Optionally, the data calculation module includes an analysis submodule, an optimization submodule and a decision submodule;
[0056] The analysis submodule is connected to the optimization submodule, and is used to obtain the target historical operation data with the highest probability of being similar to the current operation data from all the historical operation data that meet the process parameters, and send the target historical operation data to the optimization submodule;
[0057] The optimization submodule is also connected to the decision submodule, and is used to adjust the value of the target historical operation data according to the similarity probability to obtain a new operation data value;
[0058] The decision submodule is used to determine the new operating data value as the control parameter corresponding to the current operating condition data.
[0059] Optionally, a display device is further included, and the display device is connected to the control server;
[0060] The display device is used to display the real-time status and real-time operation data of the dry coke quenching production equipment; and provide a human-computer interaction interface for an operator to input data, so that the control server controls the operation of the dry coke quenching production equipment based on the data input by the operator.
[0061] Optionally, the edge server further includes a monitoring module;
[0062] The monitoring module is connected to the control server and is used to perform security monitoring on the control parameters. If the control parameters exceed a preset threshold range, an alarm message is sent to the control server.
[0063] This application has the following beneficial effects:
[0064] The dry coke quenching optimization control method provided in the present application applies big data analysis and mining technology, and through data analysis and processing of the acquired historical data, current operation data, production plan data and preset working condition data set, in combination with the operation specifications and theoretical research of the dry coke quenching production equipment, the optimal working condition operation mode of the dry coke quenching production equipment is constructed, and the working condition data set of the dry coke quenching production equipment is established based on the operation data under the optimal working condition operation mode. At the same time, in combination with the production conditions of the coke oven and the dry quenching furnace (reference production plan data), an intelligent control algorithm can be applied to obtain the control parameters of the dry coke quenching production equipment that meet the current working conditions, and then the optimal control parameters can be fed back to the control server (dry coke quenching DCS system) of the dry coke quenching production equipment, so that the control server controls the operation of the dry coke quenching production equipment based on the process parameters, thereby realizing the full automatic operation of the dry coke quenching production equipment, improving the operating efficiency of the dry coke quenching, reducing the operating difficulty of the dry coke quenching production equipment, and improving the automation level of the dry coke quenching production equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0065] Figure 1 A schematic diagram of the structure of a dry coke quenching optimization control system provided in an embodiment of the present application;
[0066] Figure 2 A schematic flow chart of the dry coke quenching optimization control method provided in an embodiment of the present application. DETAILED DESCRIPTION
[0067] The present application is described in detail below, and examples of embodiments of the present application are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar components or components with the same or similar functions. In addition, if the detailed description of the known technology is unnecessary for the features of the present application shown, it will be omitted. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be interpreted as limiting the present application.
[0068] It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as those generally understood by those skilled in the art to which this application belongs. It should also be understood that terms such as those defined in general dictionaries should be understood to have meanings consistent with those in the context of the prior art, and will not be interpreted with idealized or overly formal meanings unless specifically defined as here.
[0069] It will be understood by those skilled in the art that, unless otherwise stated, the singular forms "a", "an" and "the" used herein may also include plural forms. It should be understood that when we refer to an element as being "connected" or "coupled" to another element, it may be directly connected or coupled to the other element, or there may be intermediate elements. In addition, "connected" or "coupled" as used herein may include wireless connection or wireless coupling. The term "and / or" as used herein includes all or any unit and all combinations of one or more associated listed items.
[0070] The technical solution of the present application and how the technical solution of the present application solves the above-mentioned technical problems are described in detail below with reference to specific embodiments in conjunction with the accompanying drawings.
[0071] This embodiment provides a dry coke quenching optimization control method, which is applied to Figure 1 The dry coke quenching optimization control system shown can be connected to the coke oven production management equipment and the control server of the dry coke quenching production equipment through Ethernet (or other networks) respectively, so as to obtain the historical data, current operation data and production plan data of the dry coke quenching production equipment, and control and manage the dry coke quenching production equipment based on these data.
[0072] Among them, the coke oven production management equipment can serve the factory area and dispatch four major vehicles to formulate the production tasks of the coke oven and the dry quenching furnace according to the overall production tasks, so as to realize the dispatching management of the whole process from coal preparation to coke quenching. The dry quenching coke production equipment can be any equipment for dry quenching coke production including the dry quenching furnace, such as the coke loading and discharging system, the deoxygenation system, the gas circulation system, the boiler system, the coke powder collection system, the dust removal system, the circulating water system and the desalted water system. The control server of the dry quenching coke production equipment can be an existing dry quenching coke DCS (Distributed Control System), which can include multiple servers to control one or more dry quenching coke production equipment respectively. A server of the dry quenching coke optimization control system can include one or more servers with computing and data communication capabilities. These servers can be centrally set or distributed, and can also include cloud servers. This embodiment does not specifically limit this. A server of the dry coke quenching optimization control system can correspond to one or more dry coke quenching production equipments mentioned above, and by acquiring data from the control server and sending control parameters to the control server, the control server controls the operation of the dry coke quenching production equipment based on the process parameters, thereby realizing the optimization control of the dry coke quenching optimization control system on the dry coke quenching production equipment. Specifically, a server of the dry coke quenching optimization control system can correspond to one or more edge servers, an edge server can correspond to one or more dry coke quenching production equipments, or a dry coke quenching production equipment can also correspond to multiple edge servers, which can be set according to the complexity of the equipment, and this embodiment does not specifically limit this.
[0073] like Figure 2 As shown, the dry coke quenching optimization control method provided in this embodiment may include the following steps:
[0074] Step S1, obtaining historical data, current operation data and production plan data of the dry coke quenching production equipment.
[0075] Among them, historical data includes historical operation data and historical operating condition data corresponding to the historical operation data. The operating conditions may include the production conditions of the dry coke quenching production equipment under different loads, the conditions of heat preservation and pressure maintenance, and the conditions of temperature reduction and pressure reduction. The operating data (whether historical operation data or current operation data) may include the regular loading amount of the coke loading rail scale, the material level of the dry quenching furnace, the circulating air volume, the real-time value of the belt scale, the temperature parameters and pressure parameters of the dry quenching furnace, and the temperature parameters and pressure parameters of the boiler, etc.
[0076] In this embodiment, the dry coke quenching optimization control system can transmit data with the coke oven production management equipment and the control server of the dry coke quenching production equipment through the OPC communication interface. And a database can be set to store the above-mentioned acquired data. Specifically, a historical database, an optimization database and a real-time database can be set respectively. Among them, the historical database can be used to store the above-mentioned historical data and production plan data; the optimization database can be used to store the optimization data of the above-mentioned historical data and production plan data, and the optimization data can be the data that can be directly analyzed and calculated after the above-mentioned historical data and production plan data are pre-processed, such as threshold processing, data cleaning, data normalization, etc., such as the simplified sequence set described below. The real-time database can be used to store the current operation data of the dry coke quenching production equipment.
[0077] Specifically, obtaining production plan data may further include the following processing: obtaining red coke out of the coke oven data and coke oven maintenance data, and formulating a production plan for the dry coke quenching production equipment based on the red coke out of the coke oven data and the coke oven maintenance data; generating production plan data based on the production plan and the production maintenance plan for the dry coke quenching production equipment.
[0078] In this embodiment, the dry coke quenching optimization control system can obtain the red coke discharge data and coke oven maintenance data of the coke oven on a regular basis every day, and formulate the production plan of the dry coke quenching production equipment (which can be the coke quenching oven) on that day based on the red coke discharge data and the coke oven maintenance data, and then generate production plan data based on the production plan and the production maintenance plan of the dry coke quenching production equipment. The production plan data may include the coke discharge planning data of the dry coke quenching (such as real-time coke discharge volume, circulating air volume and air introduction volume values, boiler feed water volume and steam turbine generator effective power, etc.), thereby providing a basis for the dry coke quenching optimization control system to intelligently control the dry coke quenching production equipment.
[0079] Step S2, performing data analysis and processing based on historical data, current operation data, production plan data and preset operating condition data set to obtain control parameters of the dry coke quenching production equipment that meet the current operating conditions.
[0080] The working condition data set may include the operation data under the above-mentioned different working conditions and the corresponding production plan data. The working condition data set may be stored in the above-mentioned historical database or in a dedicated working condition database, which is not specifically limited in this embodiment. Specifically, the obtained control parameters may be stored, and the preset working condition data set may be updated according to the process parameters under the current working condition at each moment.
[0081] In this embodiment, the current mature big data analysis and mining technology can be applied to mine a large amount of historical operation data, combined with the operation specifications and theoretical research of dry coke quenching production equipment, to construct the optimal operating mode of dry coke quenching production equipment, and to establish the operating data set of dry coke quenching production equipment based on the operating data under the optimal operating mode. At the same time, combined with the production conditions of the coke oven and the dry quenching furnace (reference production plan data), the intelligent control algorithm is applied to calculate the optimal control parameters of the dry coke quenching production equipment, and then the optimal control parameters can be fed back to the dry coke quenching DCS system, so as to realize the full automatic operation of the dry coke quenching production equipment, improve the operating efficiency of the dry coke quenching, reduce the operating difficulty of the dry coke quenching production equipment, and improve the operating level of the dry coke quenching production equipment.
[0082] In a specific embodiment of the present application, data analysis and processing can be performed based on historical data, current operation data, production plan data and preset operating condition data sets to determine the current operating condition of the dry coke quenching production equipment, and then the control parameters of the dry coke quenching production equipment that meet the current operating condition are obtained based on the current operating condition and the above data. Therefore, step S2 can further include the following steps:
[0083] S21, constructing a time series set, the time series set including a first time series corresponding to historical operation data, a second time series corresponding to production plan data, and a third time series corresponding to current operation data.
[0084] S22, normalize the time series sequence set to obtain a dimensionless simplified sequence set, analyze the simplified sequence set and the preset working condition data set based on fuzzy control theory and adopt a decision tree analysis method, obtain the similarity probability between the working condition data corresponding to various working conditions in the working condition data set and the simplified sequence set, and use the working condition data with the highest probability of similarity to the simplified sequence set as the current working condition data of the current working condition of the dry coke quenching production equipment.
[0085] S23, obtaining historical operating condition data with the highest probability of being similar to the current operating condition data from the historical operating condition data, and obtaining control parameters corresponding to the current operating condition data according to the historical operating data corresponding to the historical operating condition data and the current operating data.
[0086] The current operating condition data may be understood as data reflecting the current operating condition, and may include the current corresponding operation data. The historical operating condition data may be understood as data reflecting the historical operating condition, and may include the historical operation data corresponding to the historical operating condition.
[0087] In this embodiment, a time series can be constructed based on historical operation data, production plan data and current operation data, and the time series can be normalized. Then, according to the decision tree analysis method, the historical operation data, the current operation data and the regularity of their changes are matched and analyzed with the preset working condition data set, and the working condition data with the highest probability of being similar to the normalized simplified sequence set is used as the current working condition data of the dry coke quenching production equipment, so as to determine the actual operation of the dry coke quenching production equipment, realize the derivation of the working condition, and evaluate the production status of the dry coke quenching production equipment. Then, according to the derived current working condition data, the control parameters that best meet the current working conditions can be formulated according to the process optimization algorithm, and then the optimization of the entire dry coke quenching production process can be realized based on the control parameters.
[0088] Furthermore, the above step S23 may further include the following steps:
[0089] S231, obtaining target historical operating condition data with the highest probability of being similar to the current operating condition data from the historical operating condition data, and obtaining process parameters corresponding to the current operating condition data based on the target historical operating condition data.
[0090] S232, from all historical operating data that meet the process parameters, obtain the target historical operating data with the highest probability of being similar to the current operating data, and adjust the value of the target historical operating data according to the similarity probability to obtain a new operating data value as the control parameter corresponding to the current operating condition data.
[0091] Among them, the process parameters can be understood as the operating environment parameter range that the dry coke quenching production equipment wants to achieve under the current working conditions, such as the dry coke quenching coke discharge temperature, boiler inlet temperature, pre-storage chamber material level control range and combustible gas composition control range. The control parameters can be understood as adjusting the current operating data with the process parameters as the target parameters to achieve the specific values of the above process parameters, such as the real-time coke discharge volume, circulating air volume and air introduction volume, boiler feed water volume and steam turbine generator effective power. The value can be a specific process value (for example, a specific coke discharge volume value, 50 tons), or a corresponding adjustment value (for example, an increase in the coke discharge volume value, 2 tons), which is not specifically limited in this embodiment.
[0092] In another specific embodiment of the present application, the dry coke quenching optimization control system may include a central server and an edge server. The central server may be connected to each edge server, and may obtain the real-time operation data of each dry coke quenching production equipment and the control parameters issued by the edge server from the edge server, and store the real-time operation data and control parameters in the historical database of the central server. The storage and computing power of the central server is often large, and the edge server may be set up close to the control server, or may be directly integrated into one or more control servers, so as to facilitate the acquisition and transmission of real-time data, so as to perform real-time dynamic management of the control server. Therefore, accordingly, the above steps S1 and S2 and the following step S3 can all be executed by the edge server to facilitate data acquisition and simple data processing. After acquiring the above data, the edge server can send it to the central server and store it in the historical database of the central server. The central server can compare and analyze the data in the historical database. If new operating condition data appears, the new operating condition data and its corresponding control parameters are written into the preset operating condition data set; if a better control parameter appears based on the historical operating condition, the preset operating condition data set is updated based on the better control parameter. The better control parameter can be understood as the operating result of the dry coke quenching production equipment after executing the control parameter is closer to or reaches the above target parameter faster. Since the edge server is close to the control server and the dry coke quenching production equipment, the data transmission is faster and the delay is less, so that the management system can perform dynamic planning, optimal control, control model (which can be understood as a model for mapping the above process parameters and control parameters), rolling optimization and feedback correction on the dry coke quenching production equipment. It should be noted that this implementation is only a preferred implementation of this embodiment, and this embodiment does not specifically limit this.
[0093] In another specific embodiment of the present application, the central server may be a cloud server, and the cloud server may also be connected to a neighboring network edge server in an adjacent device network through a network cloud. The optimization control method may further include: obtaining the neighboring network real-time operation data of each neighboring network dry quenching coke production equipment and the neighboring network control parameters issued by the neighboring network edge server from the neighboring network edge server, and updating the preset operating condition data set based on the neighboring network real-time operation data and the neighboring network control parameters, that is, if new operating condition data (not included in the preset operating condition data set) appears in the neighboring network real-time operation data and the neighboring network control parameters, the new operating condition data and its corresponding control parameters are written into the preset operating condition data set; if a better control parameter based on historical operating conditions appears in the neighboring network control parameters, the preset operating condition data set is updated based on the better control parameter.
[0094] Step S3: sending the control parameters to the control server of the dry coke quenching production equipment, so that the control server controls the operation of the dry coke quenching production equipment based on the control parameters.
[0095] In this embodiment, after calculating and obtaining the control parameters, the dry coke quenching optimization control system can promptly send them to the control server of the dry coke quenching production equipment (one or more servers of the dry coke quenching DCS system), so that the control server can adjust the operating parameters of the dry coke quenching production equipment according to the received control parameters, thereby realizing real-time control and optimization adjustment of the dry coke quenching production equipment.
[0096] In another specific embodiment of the present application, the dry coke quenching optimization control method may also include the following processing: during the operation of the dry coke quenching production equipment, the edge server may optimize and update the control parameters in real time based on the working condition data set most recently updated by the cloud server and the real-time operation data of the dry coke quenching production equipment, and send the updated control parameters to the above control server in a timely manner, so as to achieve a more fine-grained optimization of the dry coke quenching production equipment.
[0097] In another specific embodiment of the present application, the CDQ optimization control method may further include the following processing: security monitoring of control parameters, and if the control parameters exceed a preset threshold range, sending an alarm message to a control server.
[0098] In this embodiment, the threshold range of each control parameter can be preset in the dry coke quenching optimization control system (specifically, it can be an edge server), and each control parameter sent to the control server can be security monitored. If it is found that the sent control parameter exceeds the preset threshold range (for example, when a module of the edge server fails), an alarm message can be sent to the control server to make the control server cut off the control of the edge server and attract the attention and intervention of the operator. The operator can manually input new control parameters through a display device connected to the control server, so as to manually control and manage the dry coke quenching production equipment when the control parameters sent by the dry coke quenching optimization control system are abnormal, so as to prevent operation accidents of the dry coke quenching production equipment caused by edge server failures.
[0099] The dry coke quenching optimization control method provided in this embodiment applies big data analysis and mining technology, and performs data analysis and processing on the acquired historical data, current operation data, production plan data and preset working condition data set, and combines the operation specifications and theoretical research of the dry coke quenching production equipment to construct the optimal working condition operation mode of the dry coke quenching production equipment, and establishes the working condition data set of the dry coke quenching production equipment based on the operation data under the optimal working condition operation mode. At the same time, combined with the production conditions of the coke oven and the dry quenching furnace (reference production plan data), an intelligent control algorithm is applied to obtain the control parameters of the dry coke quenching production equipment that meet the current working conditions, and then the optimal control parameters can be fed back to the control server (dry coke quenching DCS system), so that the control server controls the operation of the dry coke quenching production equipment based on the control parameters, thereby realizing the full automatic operation of the dry coke quenching production equipment, improving the operating efficiency of the dry coke quenching, reducing the operating difficulty of the dry coke quenching production equipment, and improving the operating level of the dry coke quenching production equipment.
[0100] Based on the same concept as the above-mentioned dry coke quenching optimization control method, this embodiment further provides a dry coke quenching optimization control system, which is connected to the control server of the coke oven production management equipment and the dry coke quenching production equipment respectively, and is used to:
[0101] Obtain historical data and current operation data of the dry coke quenching production equipment from the control server, and obtain production plan data from the coke oven production management equipment; the historical data includes historical operation data and historical operating condition data corresponding to the historical operation data;
[0102] Perform data analysis and processing based on historical data, current operation data, production plan data and preset operating condition data sets to obtain control parameters of the CDQ production equipment that meet the current operating conditions;
[0103] The control parameters are sent to the control server so that the control server controls the operation of the dry coke quenching production equipment based on the control parameters.
[0104] The dry coke quenching optimization control system provided in this embodiment can implement the above-mentioned dry coke quenching optimization control method, so the dry coke quenching optimization control system at least has the beneficial effects of the above-mentioned dry coke quenching optimization control method, which will not be described in detail here.
[0105] In a specific embodiment of the present application, the dry coke quenching optimization control system can be further used for:
[0106] Constructing a time series set, the time series set including a first time series corresponding to historical operation data, a second time series corresponding to production plan data, and a third time series corresponding to current operation data;
[0107] The time series set is normalized to obtain a dimensionless simplified series set, and the simplified series set and the preset working condition data set are analyzed by using a decision tree analysis method to obtain the similarity probability between the working condition data corresponding to various working conditions in the working condition data set and the simplified series set, and the working condition data with the highest similarity probability to the simplified series set is used as the current working condition data of the current working condition of the dry coke quenching production equipment;
[0108] The historical operating condition data with the highest probability of being similar to the current operating condition data is obtained from the historical operating condition data, and the control parameters corresponding to the current operating condition data are obtained according to the historical operating data corresponding to the historical operating condition data and the current operating data.
[0109] In another specific embodiment of the present application, the dry coke quenching optimization control system may include at least one central server and at least one edge server;
[0110] The central server is connected to each edge server respectively. The central server is used to:
[0111] Obtain the real-time operation data of each CDQ production equipment and the control parameters issued by the edge server from the edge server, and store the real-time operation data and control parameters in its historical database;
[0112] The edge server is connected to the central server, the coke oven production management equipment and the control server respectively. The edge server is used to:
[0113] Obtain current operation data of the dry coke quenching production equipment from the control server, obtain historical data from the historical data, and obtain production plan data from the coke oven production management equipment; the historical data includes historical operation data and historical operating condition data corresponding to the historical operation data;
[0114] Constructing a time series set, the time series set including a first time series corresponding to historical operation data, a second time series corresponding to production plan data, and a third time series corresponding to current operation data;
[0115] The time series set is normalized to obtain a dimensionless simplified series set, and the simplified series set and the preset working condition data set are analyzed by using a decision tree analysis method to obtain the similarity probability between the working condition data corresponding to various working conditions in the working condition data set and the simplified series set, and the working condition data with the highest similarity probability to the simplified series set is used as the current working condition data of the current working condition of the dry coke quenching production equipment;
[0116] Obtain target historical operating condition data with the highest probability of being similar to the current operating condition data from the historical operating condition data, and obtain process parameters corresponding to the current operating condition data based on the target historical operating condition data;
[0117] From all historical operating data that meet the process parameters, the target historical operating data with the highest probability of being similar to the current operating data is obtained, and the value of the target historical operating data is adjusted according to the similarity probability to obtain a new operating data value as the control parameter corresponding to the current operating condition data;
[0118] The control parameters are sent to the control server so that the control server controls the operation of the dry coke quenching production equipment based on the control parameters.
[0119] In another specific embodiment of the present application, the central server may include a cloud server, which is connected to the local edge server and the neighboring network edge server in the adjacent device network, and is used to: obtain the neighboring network real-time operation data of each neighboring network dry quenching production equipment and the neighboring network control parameters issued by the neighboring network edge server from the neighboring network edge server, and update the preset working condition data set based on the neighboring network real-time operation data and the neighboring network control parameters
[0120] In another specific embodiment of the present application, the edge server includes a data communication module and a data computing module;
[0121] The data communication module communicates with the coke oven production management equipment, the control server and the central server respectively, so as to obtain the production plan data from the coke oven production management equipment, the current operation data of the dry coke quenching production equipment from the control server, and the historical data from the central server;
[0122] The data calculation module is connected to the data communication module and is used to perform the following processing on the data obtained by the data communication module:
[0123] Constructing a time series set, the time series set including a first time series corresponding to historical operation data, a second time series corresponding to production plan data, and a third time series corresponding to current operation data;
[0124] The time series set is normalized to obtain a dimensionless simplified series set, and the simplified series set and the preset working condition data set are analyzed by using a decision tree analysis method to obtain the similarity probability between the working condition data corresponding to various working conditions in the working condition data set and the simplified series set, and the working condition data with the highest similarity probability to the simplified series set is used as the current working condition data of the current working condition of the dry coke quenching production equipment;
[0125] Obtain target historical operating condition data with the highest probability of being similar to the current operating condition data from the historical operating condition data, and obtain process parameters corresponding to the current operating condition data based on the target historical operating condition data;
[0126] From all historical operating data that meet the process parameters, the target historical operating data with the highest probability of being similar to the current operating data is obtained, and the value of the target historical operating data is adjusted according to the similarity probability to obtain a new operating data value as the control parameter corresponding to the current operating condition data;
[0127] The data communication module is also used to send the control parameters to the control server, so that the control server controls the operation of the dry coke quenching production equipment based on the control parameters.
[0128] In another specific implementation of the present application, the data calculation module may include an analysis submodule, an optimization submodule, and a decision submodule;
[0129] The analysis submodule is connected to the optimization submodule, and is used to obtain the target historical operation data with the highest probability of being similar to the current operation data from all historical operation data that meet the process parameters, and send the target historical operation data to the optimization submodule;
[0130] The optimization submodule is also connected to the decision submodule to adjust the value of the target historical operation data according to the similarity probability to obtain a new operation data value;
[0131] The decision submodule is used to determine the new operating data value as the control parameter corresponding to the current operating condition data.
[0132] In another specific embodiment of the present application, the dry coke quenching optimization system may further include a display device, and the display device is connected to the control server;
[0133] The display device is used to display the real-time status and real-time operation data of the dry coke quenching production equipment; and provides a human-computer interaction interface for operators to input data, so that the control server controls the operation of the dry coke quenching production equipment based on the data input by the operator.
[0134] In another specific embodiment of the present application, the CDQ optimization system may further include a monitoring module; the monitoring module is connected to the control server and is used to perform security monitoring on the control parameters, and if the control parameters exceed a preset threshold range, an alarm message is sent to the control server.
[0135] It is to be understood that the above embodiments are merely exemplary embodiments used to illustrate the principles of the present application, but the present application is not limited thereto. For those skilled in the art, various modifications and improvements can be made without departing from the spirit and substance of the present application, and these modifications and improvements are also considered to be within the scope of protection of the present application.
[0136] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0137] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.
[0138] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0139] In the description of this specification, specific features, structures, materials or characteristics may be combined in an appropriate manner in any one or more embodiments or examples.
[0140] The above are only some implementation methods of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.
Claims
1. A coke dry quenching optimization control method, characterized in that: include: Acquire historical data, current operation data and production plan data of the dry coke quenching production equipment; the historical data includes historical operation data and historical operating condition data corresponding to the historical operation data; Performing data analysis and processing based on the historical data, the current operating data, the production plan data and a preset operating condition data set to obtain control parameters of the dry coke quenching production equipment that meet the current operating conditions; The control parameters are sent to the control server of the dry coke quenching production equipment so that the control server controls the operation of the dry coke quenching production equipment based on the control parameters; the data analysis and processing based on the historical data, the current operation data, the production plan data and the preset working condition data set to obtain the control parameters of the dry coke quenching production equipment that meet the current working conditions further includes: Constructing a time series set, the time series set comprising a first time series corresponding to the historical operation data, a second time series corresponding to the production plan data, and a third time series corresponding to the current operation data; Normalizing the time series set to obtain a dimensionless simplified sequence set, and using a decision tree analysis method to analyze the simplified sequence set and the preset operating condition data set to obtain similarity probabilities between the operating condition data corresponding to various operating conditions in the operating condition data set and the simplified sequence set, and using the operating condition data with the highest similarity probability to the simplified sequence set as the current operating condition data of the current operating condition of the dry coke quenching production equipment; The historical operating condition data with the highest probability of being similar to the current operating condition data is obtained from the historical operating condition data, and the control parameters corresponding to the current operating condition data are obtained according to the historical operating data corresponding to the historical operating condition data and the current operating data.
2. The method according to claim 1, characterized in that The acquiring, from the historical operating condition data, the historical operating condition data having the highest probability of being similar to the current operating condition data, and obtaining the control parameters corresponding to the current operating condition data according to the historical operating data corresponding to the historical operating condition data and the current operating data, further comprises: Acquire target historical operating condition data having the highest probability of being similar to the current operating condition data from the historical operating condition data, and obtain process parameters corresponding to the current operating condition data according to the target historical operating condition data; From all historical operating data that meet the process parameters, obtain the target historical operating data with the highest probability of being similar to the current operating data, and adjust the value of the target historical operating data according to the similarity probability to obtain a new operating data value as the control parameter corresponding to the current operating condition data.
3. The method according to claim 2, characterized in that The process parameters include one or more of the dry coke quenching discharge temperature, the boiler inlet temperature, the pre-storage chamber material level control range and the combustible gas composition control range.
4. The method according to any one of claims 1 to 3, characterized in that: The control parameters include one or more of the real-time coke removal volume, circulating air volume and air introduction volume values, boiler feed water volume and effective power of the steam turbine generator.
5. The method according to any one of claims 1 to 3, characterized in that: The obtaining of production plan data further comprises: Obtaining red coke out of the coke oven data and coke oven maintenance data, and formulating a production plan for dry coke quenching production equipment based on the red coke out of the coke oven data and the coke oven maintenance data; The production plan data is generated based on the production plan and the production and maintenance plan of the dry coke quenching production equipment.
6. The method according to claim 2 or 3, characterized in that: Also includes: The obtained process parameters and control parameters are stored, and the preset operating condition data set is updated based on the process parameters and the control parameters.
7. The method according to any one of claims 1 to 3, characterized in that: Also includes: The neighboring network real-time operation data of each neighboring network dry quenching coke production equipment and the neighboring network control parameters issued by the neighboring network edge server are obtained from the neighboring network edge server, and the preset operating condition data set is updated based on the neighboring network real-time operation data and the neighboring network control parameters.
8. The method according to any one of claims 1 to 3, characterized in that: Also includes: The control parameter is monitored for safety, and if the control parameter exceeds a preset threshold range, an alarm message is sent to the control server.
9. The method according to any one of claims 1 to 3, characterized in that: The operation data includes one or more of the periodic loading amount of the coke loading rail scale, the material level of the CDQ furnace, the circulating air volume, the real-time value of the belt scale, the temperature parameters and pressure parameters of the CDQ furnace, and the temperature parameters and pressure parameters of the boiler.
10. A dry coke quenching optimization control system, characterized in that: They are connected to the control servers of the coke oven production management equipment and the dry coke quenching production equipment respectively, and are used for: Acquire historical data and current operation data of the dry coke quenching production equipment from the control server, and acquire production plan data from the coke oven production management equipment; the historical data includes historical operation data and historical operating condition data corresponding to the historical operation data; Performing data analysis and processing based on the historical data, the current operating data, the production plan data and a preset operating condition data set to obtain control parameters of the dry coke quenching production equipment that meet the current operating conditions; Sending the control parameters to the control server so that the control server controls the operation of the dry coke quenching production equipment based on the control parameters; Constructing a time series set, the time series set comprising a first time series corresponding to the historical operation data, a second time series corresponding to the production plan data, and a third time series corresponding to the current operation data; Normalizing the time series set to obtain a dimensionless simplified sequence set, and using a decision tree analysis method to analyze the simplified sequence set and the preset operating condition data set to obtain similarity probabilities between the operating condition data corresponding to various operating conditions in the operating condition data set and the simplified sequence set, and using the operating condition data with the highest similarity probability to the simplified sequence set as the current operating condition data of the current operating condition of the dry coke quenching production equipment; The historical operating condition data with the highest probability of being similar to the current operating condition data is obtained from the historical operating condition data, and the control parameters corresponding to the current operating condition data are obtained according to the historical operating data corresponding to the historical operating condition data and the current operating data.
11. The dry coke quenching optimization control system according to claim 10, characterized in that: comprising at least one central server and at least one edge server; The central server is connected to each of the edge servers respectively; The central server is used for: Acquire the real-time operation data of each of the dry coke quenching production equipment and the control parameters issued by the edge server from the edge server, and store the real-time operation data and the control parameters in its historical database; The edge server is connected to the central server, the coke oven production management equipment and the control server respectively, and the edge server is used for: Acquire the current operation data of the dry coke quenching production equipment from the control server, acquire the historical data from the historical data, and acquire the production plan data from the coke oven production management equipment; the historical data includes the historical operation data and the historical operating condition data corresponding to the historical operation data; Constructing a time series set, the time series set comprising a first time series corresponding to the historical operation data, a second time series corresponding to the production plan data, and a third time series corresponding to the current operation data; Normalizing the time series set to obtain a dimensionless simplified sequence set, and using a decision tree analysis method to analyze the simplified sequence set and the preset operating condition data set to obtain similarity probabilities between the operating condition data corresponding to various operating conditions in the operating condition data set and the simplified sequence set, and using the operating condition data with the highest similarity probability to the simplified sequence set as the current operating condition data of the current operating condition of the dry coke quenching production equipment; Acquire target historical operating condition data having the highest probability of being similar to the current operating condition data from the historical operating condition data, and obtain process parameters corresponding to the current operating condition data according to the target historical operating condition data; From all the historical operating data that meet the process parameters, obtain the target historical operating data with the highest probability of being similar to the current operating data, and adjust the value of the target historical operating data according to the similarity probability to obtain a new operating data value as the control parameter corresponding to the current operating condition data; The control parameters are sent to the control server, so that the control server controls the operation of the dry coke quenching production equipment based on the control parameters.
12. The dry coke quenching optimization control system according to claim 11, characterized in that: The central server includes a cloud server, and the cloud server is connected to the local edge server and the neighboring network edge server in the adjacent device network, and is used to: The neighboring network real-time operation data of each neighboring network dry quenching coke production equipment and the neighboring network control parameters issued by the neighboring network edge server are obtained from the neighboring network edge server, and the preset operating condition data set is updated based on the neighboring network real-time operation data and the neighboring network control parameters.
13. The dry coke quenching optimization control system according to claim 11, characterized in that: The edge server includes a data communication module and a data calculation module; The data communication module performs data communication with the coke oven production management device, the control server and the central server respectively, so as to obtain the production plan data from the coke oven production management device, obtain the current operation data of the dry coke quenching production device from the control server, and obtain the historical data from the central server; The data calculation module is connected to the data communication module and is used to perform the following processing on the data acquired by the data communication module: Constructing a time series set, the time series set comprising a first time series corresponding to the historical operation data, a second time series corresponding to the production plan data, and a third time series corresponding to the current operation data; Normalizing the time series set to obtain a dimensionless simplified sequence set, and using a decision tree analysis method to analyze the simplified sequence set and the preset operating condition data set to obtain similarity probabilities between the operating condition data corresponding to various operating conditions in the operating condition data set and the simplified sequence set, and using the operating condition data with the highest similarity probability to the simplified sequence set as the current operating condition data of the current operating condition of the dry coke quenching production equipment; Acquire target historical operating condition data having the highest probability of being similar to the current operating condition data from the historical operating condition data, and obtain process parameters corresponding to the current operating condition data according to the target historical operating condition data; From all historical operating data that meet the process parameters, obtain target historical operating data with the highest probability of being similar to the current operating data, and adjust the value of the target historical operating data according to the similarity probability to obtain a new operating data value as the control parameter corresponding to the current operating condition data; The control parameters are sent to the control server, so that the control server controls the operation of the dry coke quenching production equipment based on the control parameters.
14. The dry coke quenching optimization control system according to claim 13, characterized in that: The data calculation module includes an analysis submodule, an optimization submodule and a decision submodule; The analysis submodule is connected to the optimization submodule, and is used to obtain the target historical operation data with the highest probability of being similar to the current operation data from all the historical operation data that meet the process parameters, and send the target historical operation data to the optimization submodule; The optimization submodule is also connected to the decision submodule, and is used to adjust the value of the target historical operation data according to the similarity probability to obtain a new operation data value; The decision submodule is used to determine the new operating data value as the control parameter corresponding to the current operating condition data.
15. The dry coke quenching optimization control system according to claim 11, characterized in that: Also includes a display device, the display device is connected to the control server; The display device is used to display the real-time status and real-time operation data of the dry coke quenching production equipment; and provide a human-computer interaction interface for an operator to input data, so that the control server controls the operation of the dry coke quenching production equipment based on the data input by the operator.
16. The dry coke quenching optimization control system according to claim 14, characterized in that: The edge server also includes a monitoring module; The monitoring module is connected to the control server and is used to perform security monitoring on the control parameters. If the control parameters exceed a preset threshold range, an alarm message is sent to the control server.