Electronic device and method for beam failure recovery
By designing processing circuits in the 5G wireless communication system to detect beam failures and make quick recovery requests, the problem of signal interruption caused by beam failures is solved, resource overhead and delay are reduced, and the stability and efficiency of signal transmission are improved.
Patent Information
- Application Number
- CN202080001509.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2020-03-17
- Filing Date
- 2020-03-27
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2040-05-16
AI Technical Summary
In the 5G wireless communication system, beam failure causes signal transmission to be interrupted, and the existing technology is difficult to recover quickly, resulting in large resource overhead and high delay.
By designing processing circuits in electronic equipment, detecting beam faults and sending beam fault recovery requests, receiving priority scheduling, sending beam fault recovery requests, using physical uplink control channels and physical uplink shared channels for beam fault recovery, reducing resource overhead and reduce latency.
It achieves fast beam failure recovery, reduces resource overhead and delay, and improves the stability and efficiency of signal transmission.
Smart Images

Figure CN112005571B_ABST
Abstract
Description
[0001] Cross-references
[0002] This application claims the benefit of priority to U.S. Provisional Application No. 62 / 824,458, filed on March 27, 2019, “Method and Apparatus for SCell Beam Failure Recovery,” U.S. Provisional Application No. 62 / 841,908, filed on May 2, 2019, “Method and Apparatus for Beam Failure Recovery,” U.S. Provisional Application No. 62 / 863,948, filed on June 20, 2019, “Method and Apparatus for 2 Step RACH Beam Failure Recovery,” and U.S. Application No. 16 / 821,425, filed on March 17, 2020, the entire contents of the above-mentioned U.S. provisional applications are incorporated herein by reference. Technical Field
[0003] The present invention generally relates to wireless communication techniques including beamformed transmission and reception. Background Art
[0004] This background section is provided to generally present the content of the present invention. The work of the inventors named herein, the work to the extent described in this background section, and aspects of this section that did not constitute prior art at the time of filing are neither explicitly nor implicitly admitted to be prior art to the present invention.
[0005] Fifth-generation (5G) wireless communication systems use high frequency bands (e.g., above 6 gigahertz (GHz)) to increase system capacity. Beamforming schemes can be used to focus transmit and / or receive signals in a desired direction to compensate for path loss of high frequency signals. For example, a base station can use multiple beams to cover a service area in a 5G system. Summary of the invention
[0006] Aspects of the present invention provide an electronic device including a processing circuit and a method for beam failure recovery (BFR). When it is determined that a beam failure occurs on at least one of a plurality of cells configured for the electronic device, the processing circuit may send a BFR scheduling request (SR) to a network. The BFR SR may indicate the beam failure and request resources to report the beam failure. The processing circuit may receive priority scheduling of the resources from the network. The processing circuit may send a beam failure recovery request (BFRQ) using the resources. The BFRQ may indicate cell information of the at least one of the plurality of cells and new beam information of one or more new candidate beams for the at least one of the plurality of cells.
[0007] In one embodiment, the multiple cells include a primary cell (PCell) and a secondary cell (SCell). At least one of the multiple cells includes the SCell. The processing circuit may use a physical uplink control channel (PUCCH) configured for the PCell to send the BFR SR to the network. The processing circuit may receive the priority scheduling of a BFRQ media access control (MAC) control element (CE), the BFRQ MAC CE indicating a cell index of the SCell and a new beam index for a new candidate beam of the SCell. The resource may include the BFRQ MAC CE. The cell information may include the cell index. The one or more new candidate beams may include the new candidate beam. The new beam information may include the new beam index. The processing circuit may send the BFRQ MAC CE and receive a BFR response (BFR response, BFRR) from the network using a physical uplink shared channel (PUSCH) configured for the PCell.
[0008] In one embodiment, the multiple cells include a PCell and a SCell. The at least one cell among the multiple cells includes the SCell. The processing circuit may use a PUCCH configured for the PCell to send the BFR SR to the network. The processing circuit may receive scheduling of aperiodic CSI (A-CSI), the A-CSI indicating a cell index of the SCell and a new beam index for a new candidate beam of the SCell. The resources may include the A-CSI, the cell information may include the cell index, the one or more new candidate beams may include the new candidate beam, and the new beam information may include the new beam index. The processing circuit may send the A-CSI on the PUCCH configured for the PCell and receive the BFRR from the network.
[0009] In one embodiment, the at least one cell among the plurality of cells is a PCell configured with one or more service control channels to communicate with the network. When at least one of the one or more service control channels fails, the processing circuit may determine that the beam failure occurs on the PCell.
[0010] In one example, the processing circuit may send the BFR SR to the network using a PUCCH configured for the PCell. The processing circuit may receive the priority scheduling of a BFRQ MAC CE, the BFRQ MAC CE indicating a cell index of the PCell and a new beam index for a new candidate beam of the PCell. The resource may include the BFRQ MAC CE, the cell information may include the cell index, the one or more new candidate beams may include the new candidate beam, and the new beam information may include the new beam index. The processing circuit may send the BFRQ MAC CE using a PUSCH configured for the PCell and receive a new beam update from the network.
[0011] In one example, the processing circuit may send the BFR SR to the network using a PUCCH configured for the PCell. The processing circuit may receive a schedule of A-CSI indicating a cell index of the PCell and a new beam index of a new candidate beam. The resource may include the A-CSI, the cell information may include the cell index, the one or more new candidate beams may include the new candidate beam, and the new beam information may include the new beam index. The processing circuit may send the A-CSI on the PUCCH configured for the PCell and receive a new beam update from the network.
[0012] In one embodiment, the BFR SR has a BFR SR configuration including a period and an offset. In one example, the BFR SR configuration is associated with PUCCH format 0, and the PUCCH format 0 includes multiple cyclic shifts. One or more cyclic shifts of the multiple cyclic shifts can be configured for at least one of the following: 1) the BFR SR and 2) the BFR SR and at least one of a hybrid automatic repeat request (HARQ). In one example, when the BFR SR is scheduled simultaneously with the SR, the processing circuit can send the BFR SR before sending the SR or send the BFR SR and the SR simultaneously.
[0013] In one example, the plurality of cells include a first cell subset and a second cell subset, the BFR SR configuration is configured for the first cell subset to report a beam failure of the first cell subset, wherein the first cell subset includes the at least one cell in the plurality of cells. Another BFR SR configuration is configured for the second cell subset to report a beam failure of the second cell subset.
[0014] In one embodiment, the resource includes a BFRQ MAC CE sent on a PUSCH. The BFRQ MAC CE indicates the cell information and the new beam information. The cell information includes at least one cell index corresponding to the at least one cell in the multiple cells. The new beam information includes at least one new beam index for the at least one cell in the multiple cells. In one example, the at least one cell in the multiple cells includes an SCell and / or a PCell.
[0015] In one embodiment, the resource includes A-CSI sent on PUCCH. The A-CSI indicates the cell information and the new beam information. The cell information includes at least one cell index corresponding to the at least one cell in the multiple cells. The new beam information includes at least one new beam index for the at least one cell in the multiple cells. In one example, the at least one cell in the multiple cells includes an SCell and / or a PCell.
[0016] The electronic device and related method for beam failure recovery proposed by the present invention can reduce resource overhead and lower delay. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present invention proposes some embodiments as examples, which will be described in detail below with reference to the accompanying drawings, in which the same numbers represent the same elements, wherein:
[0018] Figure 1 A block diagram of an exemplary communication system 100 according to an embodiment of the present invention is shown;
[0019] Figure 2 A flow chart showing an exemplary process 200 according to an embodiment of the present invention is shown;
[0020] Figure 3 A flow chart showing an exemplary process 300 according to an embodiment of the present invention is shown;
[0021] Figure 4A-4B shows an example of beam failure in an SCell according to some embodiments of the present invention;
[0022] Figure 5 , Figure 6 , Fig. 7A , Figure 7B , Figure 8 and Fig. 9 Flowcharts showing exemplary processes 500, 600, 700A, 700B, 800 and 900, respectively, according to embodiments of the present invention;
[0023] Fig.10 shows an exemplary BFR SR configuration according to an embodiment of the present invention;
[0024] Figures 11A-11D An example of a PFO according to an embodiment of the present invention is shown;
[0025] Figures 12A-12C An example of a BFR SR configuration according to an embodiment of the present invention is shown;
[0026] Figures 13A-13BAn example of a PF0 having two symbols according to an embodiment of the present invention is shown;
[0027] Figures 14A-14D shows an example of a BFR SR configuration according to an embodiment of the present invention; and
[0028] Figures 15A-15D An example of a BFRQ MAC CE format according to an embodiment of the present invention is shown. DETAILED DESCRIPTION
[0029] Figure 1 A block diagram of an exemplary communication system 100 according to an embodiment of the present invention is shown. The communication system 100 includes a network 101 and an electronic device 110 that receives wireless communication services from the network 101. The base station 120 in the network 101 can be configured to form one or more cells for serving the electronic device 110. The one or more cells may include a first cell 125 having a first carrier and a second cell 126 having a second carrier. In carrier aggregation (CA), the first carrier and the second carrier can be aggregated and transmitted in parallel with the electronic device 110, thereby increasing the bandwidth and data rate. In an example, the base station 120 can control a first transmission reception point (TRP) 127 to cover the first cell 125, and control a second TRP 128 to cover the second cell 126. In an example, the network 101 includes a 5G radio access network (RAN) (or Next Generation (NG) RAN) and a 5G core network (5GC) using 5G mobile network technology. The base station 120 may be a next generation Node B (gNB) specified by the 5G new radio (NR) air interface standard developed by the 3rd Generation Partnership Project (3GPP).
[0030] In one embodiment, in the first cell 125, the electronic device 110 communicates wirelessly with the base station 120 via a wireless link 105 (also referred to as link 105), wherein the link 105 is associated with a beam 121 transmitted by the base station 120 and a beam 111 received by the electronic device 110. Typically, a beam is allocated with radio resources including a set of time and / or frequency resources. In some embodiments, a beam is also associated with a direction indicating a main propagation direction of the beam signal energy. For example, in the first cell 125, beams 121-122 transmitted from the first TRP 127 of the base station 120 are respectively mainly propagated along directions 121A-122A, and are therefore referred to as transmission beams (Tx beams) 121-122 of the base station 120. Beam 111 may be referred to as a reception beam (Rx beam) 111 that is mainly propagated along direction 111A. In some embodiments, a beam may refer to a signal or channel transmitted or received by the electronic device 110 or the base station 120.
[0031] Generally speaking, beam management (i.e., a set of processes for acquiring and maintaining a set of Tx and Rx beams) is implemented to form and maintain a suitable link for uplink (UL) and downlink (DL) transmission / reception between the base station 120 and the electronic device 110. In some embodiments, beam management includes initial beam establishment, beam adjustment (also known as beam tracking), and beam failure recovery. The initial establishment process can preliminarily establish a link between the base station 120 and the electronic device 110 (or a beam pair such as the link 105 including the Tx beam 121 and the Rx beam 111). After the link is established, beam adjustment including periodic re-evaluation and potential adjustment of the beam pair can be used to compensate for movement and rotation of the electronic device 110, gradual changes in the environment, etc. The feedback rate of the beamforming channel state can refer to the frequency of periodic re-evaluation of the beam pair. Although a higher feedback rate can provide more up-to-date information about the beam pair, a higher feedback rate can also result in greater signaling overhead. In some cases, motion or other events in the environment may cause a beam pair to be suddenly blocked, so a sudden connection loss occurs faster than the feedback rate, and there is not enough time for the beam adjustment to adapt, resulting in a beam failure of the first cell 125. For example, when a link is damaged and there is not enough time for regular beam adjustment to adapt to the damaged link, a beam failure (also known as a beam failure event) may occur on the first cell 125. Therefore, a set of processes (also known as beam failure recovery (BFR), beam recovery, BFR process) can be performed to handle beam failure. In one embodiment, BFR includes multiple steps: beam failure detection, new beam identification, BFRQ process and BFRR reception, etc.
[0032] According to various aspects of the present invention, when a beam failure is detected on the first cell 125, the electronic device 110 may send a request indicating the beam failure on the first cell 125 to the network 101. The request may request resources (e.g., UL authorization) for other information (such as cell information, new beam information, etc.) for reporting the beam failure. In one embodiment, the request is, for example, a BFR SR or SR-like request sent using a PUCCH. The electronic device 110 may receive priority scheduling of resources from the network 101. In one embodiment, since the priority of the request is higher than that of other requests (e.g., SRs not related to BFR), the resources are guaranteed.
[0033] In addition, the electronic device 110 may use the resources to send a BFR report. The BFR report may indicate cell information of the first cell 125 and new beam information of a new candidate beam of the first cell 125. In an example, the first cell 125 is an SCell, and the second cell 126 is a PCell or a primary secondary cell (PSCell). In an example, the first cell 125 is a PCell or a PSCell, and the second cell 126 is an SCell. The BFRQ process may include sending a request, receiving priority scheduling, and / or sending a BFR request.
[0034] The network 101 includes various base stations (e.g., base station 120) and core nodes interconnected using any suitable network technology (e.g., wired, wireless, cellular communication technology, local area network (LAN), wireless LAN (WLAN), fiber optical network, wide area network (WAN), peer-to-peer network, Internet, etc.). In some embodiments, the network 101 uses any suitable wireless communication technology (e.g., second generation (2G), third generation (3G) and fourth generation (4G) mobile network technology, 5G mobile network technology, global system for mobile communication (GSM), long-term evolution (LTE), NR technology, etc.) to provide wireless communication services to electronic devices (e.g., electronic device 110). In some examples, the network 101 uses wireless communication technology developed by 3GPPP. In one example, the base stations in the network 101 form one or more access networks, and the core nodes form one or more core networks. The access network may be a RAN such as a 5G RAN or a NG RAN. The core network may be an evolved packet core (EPC), a 5GC, etc.
[0035] In various examples, the base station 120 may be referred to as a NodeB, an evolved NodeB, a gNB, etc. The base station 120 includes hardware components and software components configured to enable wireless communication between the base station 120 and the electronic device 110. In addition, the core node includes hardware components and software components to form a backbone network (backbone) for managing and controlling the services provided by the network 101.
[0036] In some embodiments, high frequency (also referred to as millimeter wave (millimeter wave, mm-wave) frequency) is used as a carrier frequency in the communication system 100 to increase network capacity. In one example, the high frequency is higher than 6 GHz, for example, between 24-84 GHz. In one example, a carrier frequency below 6 GHz is called a low frequency, for example, between 600 megahertz (MHz) and below 6 GHz. For example, frequency range 1 (FR1) includes frequencies below 6 GHz, and frequency range 2 (FR2) includes frequencies between 24.25-52.6 GHz. Signals (or beams) with mm-wave frequencies as carrier frequencies (referred to as high frequency (HF)) may experience large propagation losses and be sensitive to blocking. Therefore, for HF signals, the base station 120 and the electronic device 110 may perform beamforming transmission and / or reception to compensate for propagation losses. In beamforming transmission, signal energy may be mainly concentrated in a specific direction, such as directions 121A-122A associated with Tx beams 121-122. Therefore, compared with omnidirectional antenna transmission, the antenna transmission gain can be improved. Similarly, in beamforming reception, signal energy mainly coming from a specific direction (eg, direction 111A associated with the Rx beam 111 of the electronic device 110 ) may be combined to obtain a higher antenna reception gain compared to omnidirectional antenna reception.
[0037] Reference Figure 1 , the base station 120 may control the first TRP 127 to form a directional Tx beam including Tx beams 121-122 to cover the first cell 125. The Tx beams may be formed simultaneously or in different time intervals. In addition, the base station 120 may control the second TRP 128 to cover the second cell 126. In one example, the base station 120 serves a plurality of electronic devices. In one example, the electronic device 110 is within the first cell 125 and the second cell 126 and is served by the first cell 125 and the second cell 126. The first cell 125 and the second cell 126 may overlap. In one example, the first cell 125 is within the second cell 126.
[0038] Refer to the following Figure 1 The beam failure process of the first cell 125 is described, where the first cell 125 and the second cell 126 are formed using the same base station 120. The description is also applicable to other scenarios, such as when the first cell 125 and the second cell 126 are formed using the same TRP, when the first cell 125 and the second cell 126 are formed using different base stations, and the like.
[0039] In one embodiment, the electronic device 110 can be any electronic device that implements beam failure recovery. The electronic device 110 can be configured to receive and transmit with multiple cells (e.g., the first and second cells 125-126) using multiple links (e.g., through carrier aggregation). In one example, the electronic device 110 can be a terminal device (e.g., user equipment) for wireless communication such as a mobile phone, a smart phone, a tablet computer, a laptop, a smart device, a wearable device, etc. Similarly, the electronic device 110 can use one or more antenna arrays to generate directional Tx or Rx beams for sending or receiving HF signals. The electronic device 110 and / or the base station 120 also include suitable transceivers and antennas for sending and receiving omnidirectional wireless signals.
[0040] In some embodiments, the electronic device 110 may be connected to multiple base stations via multiple links (e.g., Evolved Universal Terrestrial Radio Access (E-UTRA) and NR DC) using dual connectivity (dual connectivity, DC). For example, the electronic device 110 may be connected to the base station 120 via link 105 and to a second base station (not shown) via a second link (not shown). In one example, the electronic device 110 may be connected to the second base station using a directional Tx / Rx beam, an omnidirectional beam, or the like. In one example, the electronic device 110 may be connected to the base station 120 using NR radio access and to the second base station using E-UTRA.
[0041] Reference Figure 1 , the electronic device 110 includes a transceiver 130, a processing circuit 150, and a memory 146 coupled together, for example, using a bus structure (not shown). The transceiver 130 can be configured to receive and transmit wireless signals. In one example, the transceiver 130 includes a first transceiver 132 that sends and receives a low frequency (LF) signal (e.g., an omnidirectional wireless signal) and a second transceiver 134 that sends and receives a HF signal (e.g., FR2) including Tx and Rx beams (e.g., Rx beam 111). In one example, a link 105 is formed based on the Tx beam 121 and the Rx beam 111 of the electronic device 110 to receive a DL signal from the base station 120. Figure 1 In the example, by tuning the corresponding antennas of the electronic device 110 and / or the base station 120, the direction 111A of the Rx beam 111 and the direction 121A of the Tx beam 121 are matched.
[0042] In one example, the link 105 may be formed based on the Tx beam 121 and an omnidirectional receive beam (not shown) of the electronic device 110. In one example, the link 105 may be formed based on the Rx beam 111 and an omnidirectional transmit beam (not shown) of the base station 120.
[0043] The link 105 may also be used for the electronic device 110 to send a UL signal to the base station 120 through the Tx beam of the electronic device 110 and the Rx beam of the base station 120. In addition, the radio resources of the UL signal (e.g., the Tx beam of the electronic device 110) may be different from the radio resources of the DL signal. In one example, the electronic device 110 is configured with beam correspondence, and the directions of the UL signal (the Tx beam of the electronic device 110 and the Rx beam of the base station 120) in the link 105 are opposite to the directions 111A and 121A, respectively.
[0044] In one example, the second transceiver 134 transmits or receives an HF signal (e.g., FR2), and the first transceiver 132 enables the antenna to transmit or receive an LF signal (e.g., FR1). The LF signal may include an omnidirectional beam, a directional beam, etc. The directional beam in FR1 may be wider (e.g., have a larger angular spread) than the directional beam in FR2. For example, 4 directional beams in FR1 may cover an angular range, while 64 directional beams in FR2 may cover the same angular range.
[0045] In some embodiments, the transceiver 130 may be configured to receive signals (e.g., Tx beams and / or omni-directional beams) from the network 101. The signals may include reference signals (RS) used to estimate beam and link quality and facilitate BFR in one or more cells serving the electronic device 110. The RS may include a channel-state information reference signal (CSI-RS), a synchronization signal block (SSB), and the like. In some embodiments, the SSB including time-frequency resources is formed by a primary synchronization signal (PSS), a secondary synchronization signal (SSS), and a physical broadcast channel (PBCH). In one example, the received Tx beams include Tx beams 121-122 in the first cell 125, and the RS in the first cell 125 is used to detect a beam failure in the first cell 125. In one example, the RS in the second cell 126 is used to detect a beam failure in the first cell 125. In some examples, a RS from another base station may be used to detect beam failure in first cell 125 .
[0046] The transceiver 130 may receive a schedule used in the BFR process. In some embodiments, the schedule is a priority schedule for BFRQ MAC CE, A-CSI, etc. for beam reporting and is therefore guaranteed. In some embodiments, scheduling such as for BFRQ MAC CE is not guaranteed and is therefore delayed.
[0047] The transceiver 130 may receive a BFRR and / or a new beam update (e.g., indicating a new beam allocated by the network 101 to the electronic device 110) from the network 101 (e.g., the base station 120) on the first cell 125, the second cell 126, etc. The transceiver 130 may receive a BFRR and / or a new beam report from the network 101 (e.g., the base station 120) on the PCell, PSCell, SCell, etc.
[0048] The transceiver 130 is configured to send various signals (such as HF signals and LF signals). In one embodiment, the transceiver 130 may send SR, BFRSR indicating beam failure, HARQ, etc. in UL control information (UCI). HARQ may be ACK, NACK, etc. For example, UCI may be sent on a PUCCH or NR-PUCCH of a PCell or PSCell such as the first cell 125 or the second cell 126. The transceiver 130 may, for example, use a UL physical channel such as a physical random access channel (PRACH) (e.g., contention-free (CF) PRACH, contention-based (CB) PRACH, NR-PRACH, etc.) to send a BFRQ to the base station 120, thereby indicating a beam failure on a cell (such as the first cell 125). In one example, the transceiver 130 may send cell information, new beam information, etc. to the base station 120 via PUCCH (eg, beam reporting using A-CSI), PUSCH (eg, using MAC CE, BFRQ MAC CE), etc.
[0049] The transceiver 130 may receive a schedule of a buffer status report (BSR) from the network 101 (e.g., the base station 120), for example, on a PCell or a PSCell. For example, the scheduling of the BSR may not be guaranteed due to a low priority of the BSR. The transceiver 130 may send the BSR to the network 101 (e.g., the base station 120) on the PCell or the PSCell.
[0050] The processing circuit 150 may implement BFR including beam failure detection (BFD), new beam identification, BFRQ process, BFRR reception, etc.
[0051] In one embodiment, the electronic device 110 is configured with one or more service control channels (or service control channel links) in the first cell 125. When at least one of the one or more service control channels fails, a beam failure may be declared for the first cell 125. In one example, when the one or more service control channels fail, a beam failure is declared for the first cell 125. In one example, when the quality of the service control channel is less than a threshold, it is determined that the service control channel has failed. For example, when the block error rate (BLER) of the PDCCH is greater than a threshold (e.g., a default BLER set by Radio Link Monitoring (RLM)), it is determined that the PDCCH has failed.
[0052] In one example, when a subset of one or more service control channels fails, a beam failure is declared for the first cell 125. When the number of subsets of one or more service control channels is less than the number of one or more service control channels, the beam failure may be referred to as a partial beam failure. For example, the electronic device 110 is configured with two service control channels (e.g., a first PDCCH and a second PDCCH) in the first cell 125. When the first PDCCH and the second PDCCH fail, a beam failure (also referred to as a complete beam failure) may be declared for the first cell 125. When the first PDCCH fails, a partial beam failure may be declared for the first cell 125. When the first cell 125 is a PCell or a PSCell, a partial beam failure may be declared.
[0053] When it is determined that each of the one or more service control channels has failed, the beam failure may be referred to as a complete beam failure. When multiple service control channels are configured for the electronic device 110, detecting a partial beam failure may be faster than detecting a complete beam failure, and thus the duration for beam failure detection may be shortened.
[0054] The processing circuit 150 may measure one or more signals (such as RS) to obtain signal qualities including reference signal receiving power (RSRP), reference signal received quality (RSRQ), BLER, etc. Beam failure detection may be based on one or more of the signal qualities. The electronic device 110 may use SSB, CSI-RS, etc. for beam failure detection (e.g., based on a predetermined rule). In one example, the electronic device 110 is served by the first cell 125. When one or more signal qualities of the RS in the first cell 125 are worse than a corresponding threshold, a beam failure may be declared. As described above, for example, when the signal quality of the RS corresponding to the service control channel is worse than a threshold, a partial beam failure may be declared. Alternatively, for example, when the signal quality corresponding to each service control channel is worse than a threshold, a complete beam failure may be declared. Alternatively, a beam failure instance (BFI) of the first cell 125 may be declared. In one example, when the number of consecutive BFIs of the first cell 125 is equal to or greater than a threshold value (such as a maximum number configured by Radio Resource Control (RRC)), a beam failure in the first cell 125 is detected or declared. Alternatively or additionally, a signal from the second cell 126 can be used for BFD in the first cell 125.
[0055] The processing circuit 150 may be configured to identify a new candidate beam for forming a new link in a failed cell such as the first cell 125. The new link may be used to communicate with the network 101. In one embodiment, the processing circuit 150 may measure or monitor RS (e.g., SSB, periodic CSI-RS) used for beam identification to determine the new candidate beam. The RS corresponds to the candidate beam. The processing circuit 150 may measure the signal quality of the RS (e.g., RSRP). In addition, the processing circuit 150 may determine the new candidate beam based on the signal quality of the candidate beam.
[0056] The processing circuit 150 may be configured to implement the BFRQ process. As described below, the BFRQ process may be implemented using various implementations.
[0057] In one embodiment, the processing circuit 150 may send a BFRQ to the network 101 (e.g., the base station 120) using a CF RACH (or PRACH)-based BFRQ process (or CF RACH BFRQ process) in which a dedicated RACH resource is associated with each candidate beam RS resource. The BFR process including the CF RACH BFRQ process may be referred to as a CFRACH process. For example, the first dedicated RACH resource is associated with the first candidate beam RS resource, the second dedicated RACH resource is associated with the second candidate beam RS resource, the Nth dedicated RACH resource is associated with the Nth candidate beam RS resource, and so on, where N is a positive integer. A new candidate beam corresponding to one of the candidate beam RS resources (such as the second candidate beam RS resource) is identified. Therefore, when a beam failure is detected and a new candidate beam is identified, the processing circuit 150 may send a second dedicated RACH resource associated with the second candidate beam RS resource. When the base station 120 receives the second dedicated RACH resource, the base station 120 may determine that the new candidate beam is the second candidate beam.
[0058] In one embodiment, the electronic device 110 is configured with a PCell and multiple SCells. The CF RACH process can be applied to the PCell and multiple SCells. When the CF RACH process is applied to the SCell, the CF RACH process can be called a CF RACH SCell BFR process (or CF RACH SCell BFR). When the above-mentioned non-contention RACH-based scheme is applied to multiple SCells, a relatively large number of dedicated (or non-contention) RACH resources on the PCell are used, and the UL overhead of the PCell may be relatively large. For example, the electronic device 110 is configured with 32 SCells, and 64 candidate beam RS resources corresponding to different beam directions are configured for each SCell. Therefore, 2048 dedicated RACH resources on the PCell will be reserved for 32 SCells.
[0059] According to various aspects of the present invention, the processing circuit 150 may implement a BFRQ process, wherein the first signal includes a request indicating a beam failure (e.g., a BFR SR), the second signal (e.g., a BFR report) includes cell information and / or new beam information for recovering the beam failure, and the first signal and the second signal may be sent separately to the network 101, for example, in two steps. In addition, the first signal may be configured with a high priority, so that the UL authorization may be guaranteed when the network 101 receives the first signal. Therefore, the resource configuration for the second signal has priority scheduling. The above-mentioned BFRQ process may be referred to as a BFR SR BFRQ process, and a BFR process including the BFR SR BFRQ process may be referred to as a BFR SR process. The BFR SR process may be applied to a PCell (or PSCell), a SCell, etc.
[0060] In one example, the electronic device 110 is configured with multiple SCells and one PCell, and multiple candidate beams may be configured for each SCell and PCell. The BFR SR process may be implemented by the processing circuit 150 as follows. In one embodiment, the processing circuit 150 may send a BFR SR (e.g., on the PUCCH of the PCell) indicating a beam failure to the network 101 (e.g., the base station 120). The BFR SR may indicate a beam failure of the PCell and / or one or more SCells in the multiple SCells. In one example, cell information (e.g., one or more cell indices of the failed cell) is not sent in the BFR SR, so the cell information is unknown to the network 101. Multiple cells (e.g., PCell and SCell) may be configured to serve the electronic device 110. When a beam failure is detected on at least one cell (e.g., SCell) among the multiple cells, the processing circuit 150 may send a BFR SR to the network 101 to indicate the beam failure without reporting the cell information of the at least one cell among the multiple cells. Therefore, it is unknown to the network 101 whether the SCell and / or PCell fails. According to one aspect of the present invention, the new beam information is not included in the BFR SR.
[0061] The BFR SR may have 1 bit. In one example, the processing circuit 150 uses a specific sequence (such as a preamble sequence) to indicate a beam failure (e.g., on the first cell 125). A sequence-based PUCCH resource (such as a preamble sequence) adapted according to the SR configuration for the SR may be used. Fig.10 , Figures 11A-11D , Figures 12A-12C , Figures 13A-13B and Figures 14A-14D As shown) to preconfigure the preamble sequence.
[0062] According to various aspects of the present invention, the processing circuit 150 can send a BFRQ (e.g., a BFR report) to the network 101, and thus report the cell information of the faulty cell such as the first cell 125, and the corresponding new beam information of the new candidate beam (e.g., through a payload sent on a UL channel). The cell information of the faulty cell may include one or more indexes of the faulty cell. The payload and the UL channel may be a MAC CE on a PUSCH (e.g., a BFRQ MAC CE), a UCI on a PUCCH (e.g., A-CSI), etc. In an example, the new beam information includes an index of a candidate beam resource corresponding to a new candidate beam. In an example, the new beam information includes multiple indexes of multiple candidate beam resources corresponding to multiple new candidate beams.
[0063] The BFR SR procedure may reduce UL overhead when compared to the CF RACH BFRQ procedure.
[0064] The processing circuit 150 may be configured to monitor, for example, a network response to a BFR report or a BFRQ or a BFRR. In one embodiment, after sending the BFR report, the processing circuit 150 monitors the downlink for BFRR. For example, the BFRR may be monitored for a predetermined duration. In one example, the processing circuit 150 receives a BFRR for a predetermined duration and thus completes the BFR. The processing circuit 150 may determine whether the beam failure recovery is successful based on the receipt of the BFRR for a predetermined duration.
[0065] The network response or BFRR may be sent in the faulty cell or another cell. In one example, the network response is sent in a non-faulty cell serving the electronic device 110. When the faulty cell such as the first cell 125 is an SCell, a network response, BFR SR and / or BFR report related to the SCell may be sent in a PCell or a PSCell serving the electronic device 110.
[0066] In one example, the electronic device 110 is in a DC state with the base station 120 and another base station. The new beam information may be transmitted to the base station 120 via the other base station. Therefore, various embodiments of the above-mentioned BFRQ process may be appropriately adjusted.
[0067] The processing circuit 150 may be implemented using various technologies, such as integrated circuits, one or more processors executing software instructions, and so forth.
[0068] The memory 146 may be any suitable device for storing data and instructions to control the operation of the electronic device 110. In one example, the memory 146 stores information (e.g., thresholds) and instructions associated with beam failure recovery and software instructions to be executed by a processor, such as the processing circuit 150. The memory 146 may store various results including signal quality.
[0069] In one embodiment, the memory 146 may be a non-volatile memory (such as a read-only memory, a flash memory, a magnetic computer storage device, a hard disk drive, a solid-state drive, a floppy disk, a magnetic tape, an optical disk, etc.). In one embodiment, the memory 146 may be a random access memory (RAM). In one embodiment, the memory 146 may include a non-volatile memory and a volatile memory.
[0070] Figure 2 A flow chart of an exemplary process 200 according to an embodiment of the present invention is shown. The process 200 may be used to implement BFR for a cell (such as a PCell, PSCell, etc.).
[0071] At step S210, a UE such as the electronic device 110 may detect a beam failure on a cell. One or more service control channels may be configured for the cell. In one example, a beam failure is declared when a failure occurs to each of the one or more service control channels (e.g., when a BLER of each of the one or more service control channels exceeds a default BLER).
[0072] At step S220, as described above, new candidate beams may be identified for BFR in the failed cell, for example, by monitoring RSs for beam identification.
[0073] At step S230, as described above, a BFRQ may be sent to a base station (BS) (e.g., gNB) on the CF RACH. In one embodiment, the BFRQ may indicate a beam failure of the failed cell and a new candidate beam identified in step S220.
[0074] At step S260, the BFRR may be transmitted from the BS to the UE and received by the UE. In one example, the BFRR is detected within a predetermined duration, and thus the beam failure recovery based on the reception of the BFRR is successful.
[0075] Subsequently, beam switching may be performed to form a new link in the cell. Process 200 is an example of a CFRACH BFRQ procedure.
[0076] Figure 3FIG. 3 is a flow chart of an exemplary process 300 according to an embodiment of the present invention. The process 300 may be used to implement BFR for a cell (such as a PCell, a PSCell, etc.). In one example, Figure 3 The BFR shown is called a layer 1 (L1) event-triggered BFR.
[0077] At step S310, a UE such as electronic device 110 may detect a partial beam failure on a cell. One or more service control channels may be configured for the cell. In one example, a partial beam failure is declared when it is determined that a subset of the plurality of service control channels has failed. As described above, the number of subsets of the plurality of service control channels may be less than the number of the plurality of service control channels.
[0078] At step S320 , as described above in step S220 , a new candidate beam may be identified for BFR of the failed cell, for example, by monitoring the RS for beam identification.
[0079] At step S330, a BFRQ and / or a beam report may be sent to a BS (e.g., a gNB). In one embodiment, the BFRQ may indicate a beam failure of the failed cell, and the beam report may indicate the new candidate beam identified in step S320.
[0080] At step S360, the new beam update may be sent from the BS to the UE and received by the UE. For example, the BS may allocate a new beam to the UE based on the new candidate beam and may indicate the new beam in the new beam update.
[0081] Figure 4A-4B An example of beam failure in an SCell according to an embodiment of the present invention is shown. Figure 4A In the example, UE 410 is configured with PCell 426 and SCell 425. SCell 425 is a DL / UL SCell, where UE 410 can send data to and receive data from the network using SCell 425. In one example, beam failure may occur in the DL of SCell 425. When beam failure occurs in SCell 425, a BFRQ or a request indicating beam failure on SCell 425 may be sent on PCell 426 or SCell 425.
[0082] exist Figure 4BIn the example, UE 410 is configured with PCell 426 and SCell 427. SCell 427 is a DL-only SCell, where UE 410 can receive data from the network in the DL. In one example, UE 410 cannot send data to the network. Beam failure may occur in the DL of SCell 427. In one example, when beam failure occurs in SCell 427, a BFRQ or a request indicating beam failure on SCell 427 will be sent on another cell (such as PCell 426).
[0083] PCell 426, SCell 425, or SCell 427 may have any suitable carrier frequency and may therefore be in FR1 or FR2. Figure 4A , PCell 426 is in FR1, and SCell 425 is in FR2. In one example, reference Figure 4B , PCell 426 is in FR1, and SCell 427 is in FR2.
[0084] In the above-mentioned CF RACH SCell BFR process, a dedicated RACH (or PRACH) resource can be used to send a BFRQ including new beam information. Therefore, the existing process and configuration for PCell in the CF RACH BFRQ process can be reused for SCell. As mentioned above, a relatively large amount of dedicated RACH resources on PCell are used, and the UL overhead of PCell may be relatively large. The CF RACH SCell BFR process may also cause high delays due to power ramping up for sending the RACH preamble in message 1 of the four-step RACH.
[0085] In one embodiment, the CB RACH procedure may be used for BFR of the SCell and may be referred to as a CB RACH SCell BFR procedure or a CB RACH SCell BFR procedure. Compared to the CF RACH SCell BFR procedure, the CB RACH SCell BFR procedure may use fewer resources (e.g., only one RACH resource). However, the CB RACH SCell BFR procedure results in a relatively long delay (e.g., due to power increase, contention, multiple message exchanges, etc.).
[0086] Figure 5 A flow chart of an exemplary process 500 according to an embodiment of the present invention is shown. The process 500 may be used to implement BFR of a cell (such as a SCell). The following description is given for a SCell.
[0087] At step S510 , the UE may detect beam failure on the SCell.
[0088] At step S520 , as described above, new candidate beams may be identified for beam failure recovery of the failed SCell (eg, by monitoring the RS for beam identification).
[0089] At step S530, an SR may be sent to a BS (eg, gNB) on a PUCCH configured for PCell to request resources. In one example, the SR is sent with 1 bit. The following reference may be used Fig.10 and Figures 11A-11D Describes the SR configuration to send an SR.
[0090] At step S532, the BS sends a schedule of a BSR to the UE on the PCell. The UE may receive the BSR.
[0091] At step S534, the UE may send a BSR to the BS on the PCell. The BS may receive the BSR. The BSR may indicate the payload size, and thus the BS may determine, for example, the data size to be sent in the BFRQ MAC CE.
[0092] At step S540, the BS may send the schedule of the BFRQ MAC CE to the UE.
[0093] At step S550, the UE may send a BFRQ MAC CE to the BS. The BFRQ MAC CE may indicate cell information (eg, cell index) of the SCell, new beam information (eg, new beam index corresponding to the new candidate beam), and the like.
[0094] At step S560, the BFRR may be sent to the UE on the SCell and received by the UE. In one example, the BFRR is detected within a predetermined duration, and thus beam failure recovery based on the reception of the BFRR is successful.
[0095] The BFRQ process described through steps S530 , S532 , S534 , S540 , and S550 may be referred to as an SR SCell BFRQ process, and the BFR process described in process 500 may be referred to as an SR SCell BFR or SR SCell BFR process.
[0096] In one embodiment, in the BFRQ process, a PUCCH format (such as PUCCH format 2, PUCCH format 3, or PUCCH format 4) may be used to send a BFRQ indicating a beam failure (e.g., a beam failure of an SCell), cell information (e.g., cell information of an SCell in which a failure occurs), and / or new beam information. When the above-mentioned BFRQ process is used for an SCell, the BFRQ process may be referred to as a PUCCH format 2 to PUCCH format 4 SCell BFRQ process, and a BFR process including a PUCCH format 2 to PUCCH format 4 SCell BFRQ process may be referred to as a PUCCH format 2 to PUCCH format 4 SCell BFR. Therefore, PUCCH resources will be reserved. In an example, PUCCH resources are highly protected and have a low coding rate, so the PUCCH resources to be reserved may be relatively large. PUCCH format 2, PUCCH format 3, and PUCCH format 4 may include more than 2 bits. The PUCCH format 2 to PUCCH format 4 SCell BFR process may have relatively low latency and large resource overhead.
[0097] Figure 6 A flowchart of an exemplary process 600 according to an embodiment of the present invention is shown. The process 600 may be used to implement beam failure recovery of a cell (such as a PCell, a PSCell, or a SCell). In an example, an electronic device (such as the electronic device 110) is configured to perform the process 600. The process 600 starts at step S601 and proceeds to step S610.
[0098] At step S610, a beam failure on a cell serving an electronic device may be detected. Signals (such as RS associated with one or more Tx beams from the cell) may be measured to obtain signal quality including RSRP, RSRQ, BLER, etc. As described above with reference to Figure 1 As described, beam failure can be detected based on signal quality. As described above, the electronic device can be configured with a set of service control channels in a cell. When the set of service control channels fails, a beam failure of the cell (e.g., a complete beam failure) can be determined or declared. Alternatively, when a subset of the set of service control channels fails, a beam failure of the cell (e.g., a partial beam failure) can be determined or declared. In one example, when the cell is a PCell or a PSCell, a partial beam failure can be declared. The above description can be suitable for detecting beam failures on another cell serving the electronic device.
[0099] At step S620, as described above, new candidate beams may be identified, for example, based on RSs, for beam failure recovery of a cell (or a failed cell).
[0100] At step S630, a beam failure may be indicated to a network (e.g., network 101) or a base station in the network (e.g., base station 120) by sending a request to the network (e.g., network 101). In one example, the base station is a gNB. The request may indicate a beam failure and request resources, which may be used to report additional information used in beam recovery (such as cell information of a failed cell, new beam information, etc.). As described above, a beam failure may be indicated using a specific sequence (such as a sequence-based PUCCH resource similar to or identical to the SR configuration used when sending the SR). In one embodiment, the request is a BFRSR indicating a beam failure and requesting resources. In one example, the length of the BFR SR is 1 bit. The BFR SR may be sent using PUCCH, NR-PUCCH, etc. In one example, cell information and new beam information are not carried in the BFR SR.
[0101] In one example, beam failure of one or more cells may be determined at step S610, and cell information of the one or more cells (eg, one or more cell indexes corresponding to the one or more cells) may not be carried in the BFR SR.
[0102] refer to Fig.10 , similar to the SR configuration, the configuration for BFR SR (referred to as BFR SR configuration) may include a resource identifier (ID) indicating that a PUCCH resource is provided for PUCCH transmission for transmitting the BFR SR. The BFR SR configuration may include a period and an offset of PUCCH transmission opportunities using the PUCCH resources. The period indicates the periodicity of the BFR SR configuration. The offset indicates the position of the PUCCH transmission opportunity in the time domain. The period of the BFR SR configuration may be the same as or different from the period of the SR configuration. The offset of the BFR SR configuration may be the same as or different from the offset of the SR configuration. The BFR SR configuration may include a period and an offset. The BFR SR configuration may also include a resource ID. In one example, as Fig.10 As shown, PUCCH resources are sent on PUCCH transmission opportunity 1010 only when a beam failure event (e.g., BFD) occurs on the cell (e.g., beam failure is detected). By replacing BFD with an SR event and making the PUCCH transmission opportunity 1010 for SR, Fig.10 The SR configuration can be indicated. A sequence-based PUCCH format (such as the one shown below) can be used. Figures 11A-11D , Figures 12A-12C , Figures 13A-13B and Figures 14A-14D PUCCH format 0 (PF0) described above is used to send PUCCH resources.
[0103] At step S640, the electronic device may receive priority scheduling of resources from the network or base station. The resources may be used for MAC CE for BFR on PUSCH (referred to as BFRQ MAC CE), UCI (e.g., A-CSI) on PUCCH, etc. For example, due to the high priority of BFR SR relative to another SR (e.g., non-BFR SR), priority scheduling may be guaranteed.
[0104] At step S650, a BFRQ (e.g., a BFR report) indicating cell information (e.g., a cell index) of the cell may be sent to the network, for example, via a payload on a UL channel. Corresponding new beam information (e.g., a new candidate beam index) may also be sent in the BFR report. The payload and UL channel may be a BFR MAC CE on a PUSCH, a UCI on a PUCCH, etc.
[0105] At step S660, a BFRR or new beam report may be received from the network. Figure 1 As described, the electronic device may monitor the PDCCH in the designated search space set for BFRR. Process 600 proceeds to step S699 and terminates.
[0106] The steps in process 600 may be implemented in any suitable order. When a beam failure is detected, steps S630, S640, and S650 may be implemented. In one example, steps S630, S640, and S650 are implemented after step S610. Process 600 for beam failure recovery may be appropriately adjusted for various applications and scenarios in a communication system. In one example, a BFRR or a new beam report is detected within a predetermined duration, and thus beam failure recovery is successful based on the receipt of the BFRR or the new beam report. Subsequently, beam switching may be performed to form a new link in the cell.
[0107] The above description may be appropriately adjusted for multiple cells, where the BFR process may be applied to one or more cells where a failure occurs. Figure 7A-7B , Figure 8 and Fig. 9 An example of process 600 applicable in various scenarios for a PCell, PSCell, or SCell is shown.
[0108] Fig. 7A A flowchart of an exemplary process 700A according to an embodiment of the present invention is shown. The process 700A may be used to implement beam failure recovery of a cell (such as a PCell, a PSCell, etc.). In one example, the process 700A is called L1 event triggered BFR. In one example, the cell serves a UE.
[0109] At step S710A, as described above, such as reference Figure 1 At step S310, the UE may detect a partial beam failure on the cell. A plurality of service control channels may be configured for the cell. In one example, a partial beam failure is declared when a subset of the plurality of service control channels fails. As described above, the number of subsets of the plurality of service control channels may be less than the number of the plurality of service control channels.
[0110] At step S720A, as described above, such as reference Figure 1 And step S220, a new candidate beam can be identified to perform beam failure recovery in the cell, for example, by monitoring the RS used for beam identification.
[0111] At step S730A, such as the above reference Figure 1 and Figure 6 As described above, a BFR SR on the PUCCH may be sent to a BS (e.g., a gNB) to indicate a beam failure and request resources. Figure 6 and Fig.10 The BFR SR configuration described above is used to send the BFR SR. The length of the BFR SR may be 1 bit. In an example, the BFR SR does not carry cell information and new beam information.
[0112] At step S740A, as described above with reference to Figure 1 and Figure 6 As described, priority scheduling of resources may be sent by the BS and received by the UE. Priority scheduling may be used for BFRQ MAC CE on PUSCH. For example, priority scheduling may be guaranteed due to the high priority of BFR SR.
[0113] The BFRQ MAC CE may indicate cell information (eg, cell index) of the cell. The BFRQ MAC CE may include corresponding new beam information (eg, new candidate beam index). The BFRQ MAC CE may also include beam measurement results (eg, RSRP).
[0114] At step S750A, a BFRQ MAC CE may be sent to the BS on a PUSCH configured for the cell.
[0115] At step S760A, a new beam update indicating a new beam may be sent by the BS and received by the UE. For example, the BS may allocate a new beam to the UE based on the new beam information.
[0116] Figure 7BA flowchart of an exemplary process 700B according to an embodiment of the present invention is shown. Process 700B can be used to implement beam failure recovery of a cell (such as a PCell, a PSCell, etc.). In an example, process 700B is called BFR triggered by an L1 event. In an example, the cell serves a UE.
[0117] At step S710B, as described above in step S710A, the UE may detect partial beam failure on the cell.
[0118] At step S720B, as described above in step S720A, new candidate beams may be identified for beam failure recovery in the cell, for example, by monitoring RSs for beam identification.
[0119] At step S730B, as described above in step S730A, a BFR SR on the PUCCH configured for the cell may be sent to a BS (e.g., gNB) to indicate a beam failure and request resources.
[0120] At step S740B, the scheduling of resources may be sent by the BS and received by the UE. The resources may be A-CSI for beam reporting on the PUCCH. The beam report may indicate or include cell information (e.g., cell index) of the cell, corresponding new beam information (e.g., new candidate beam index), etc. In one example, the beam report also includes beam measurement results (such as RSRP).
[0121] At step S750B, an L1 report may be sent to the BS with reference to the A-CSI on the PUCCH configured for the cell.
[0122] At step S760B, the UE may receive a new beam update indicating a new beam. The BS may determine a new beam based on the new beam information.
[0123] The above processes 700A and 700B may be adjusted appropriately. For example, a complete beam failure may be detected at step S710A or step S710B.
[0124] Figure 8 A flow chart of an exemplary process 800 according to an embodiment of the present invention is shown. The process 800 may be used to implement beam failure recovery of a cell (such as an SCell). In one example, the SCell and the PCell (or PSCell) serve a UE.
[0125] At step S810, as described above with reference to Figure 1 and Figure 6 As described, the UE can detect beam failure on the SCell.
[0126] At step S820, as described above with reference to Figure 1 and Figure 6 As described, a new candidate beam may be identified for beam failure recovery of an SCell, for example, by monitoring an RS used for beam identification.
[0127] At step S830, a BFR SR on PUCCH may be sent from the UE to the BS (e.g., gNB) to indicate beam failure and request resources (e.g., UL grant, priority scheduling). In one example, PUCCH is configured for PCell. As described above with reference to Figure 1 and Fig.10 As described above, a BFR SR configuration may be used to send a BFR SR. The length of the BFR SR may be 1 bit. In one example, as described above with reference to Figure 6 As described above, the BFR SR does not carry cell information and new beam information.
[0128] At step S840, as described above in step S740A, priority scheduling of resources may be sent by the BS on the PCell and received by the UE. The resources may be, for example, BFRQ MAC CE on PUSCH. For example, due to the high priority of BFR SR, priority scheduling may be guaranteed.
[0129] The BFRQ MAC CE may indicate the cell information (eg, cell index) of the SCell. The BFRQ MAC CE may include the corresponding new beam information (eg, new candidate beam index). The BFRQ MAC CE may also include beam measurement results (eg, RSRP).
[0130] At step S850 , as described above in step S750A, a BFRQ MAC CE may be sent to the BS on the PUSCH of the PCell.
[0131] At step S860, a BFRR indicating the new beam may be sent by the BS and received by the UE. The BS may determine the new beam based on the new beam information. In one example, the BFRR is sent on the PDCCH or PDSCH of the SCell using the new beam. In one example, the BFRR is sent on the PDCCH or PDSCH of the PCell using the new beam configuration or activation.
[0132] Fig. 9 A flow chart of an exemplary process 900 according to an embodiment of the present invention is shown. The process 900 may be used to implement beam failure recovery of a cell (such as an SCell). In one example, the SCell and the PCell (or PSCell) serve a UE.
[0133] At step S910 , as described in step S810 , the UE may detect beam failure on the SCell.
[0134] At step S920 , as described in step S820 , a new candidate beam may be identified for beam failure recovery of the SCell, for example, by monitoring the RS for beam identification.
[0135] At step S930, as described in step S830, the UE may send a BFR SR on the PUCCH to the BS (e.g., gNB) to indicate beam failure and request resources (e.g., UL grant, priority scheduling). In one example, the PUCCH is configured for PCell. As described in reference Figure 1 and Fig.10 As described, the BFR SR configuration may be used to send the BFR SR. The length of the BFR SR may be 1 bit. In an example, the BFR SR does not carry cell information and new beam information.
[0136] At step S940, the scheduling of resources may be sent by the BS via the PCell and received by the UE. The resource may be an A-CSI for beam reporting on the PUCCH of the PCell (such as described in step S640). The beam report may indicate or include cell information (e.g., a cell index) of the cell, corresponding new beam information (e.g., a new candidate beam index), etc. In one example, the beam report also includes beam measurement results (such as RSRP). The cell information may include cell indexes of multiple cells with beam failures. The new beam information may include new candidate beam indices for the corresponding multiple cells.
[0137] At step S950 , the UE may be configured to send A-CSI to the BS on the PUCCH for the PCell.
[0138] At step S960, a BFRR indicating the new beam may be sent by the BS and received by the UE. The BS may determine the new beam based on the new beam information. In one example, the BFRR is sent on the PDCCH or PDSCH of the SCell using the new beam. In one example, the BFRR is sent on the PDCCH or PDSCH of the PCell using the new beam configuration or activation.
[0139] Figure 6 The BFR process described in can be applied to BFR in PCell, PSCell or SCell. Figure 7A-7B Shows when Figure 6 Example of the BFR process in when applied to PCell or PSCell. Figure 8-9 Shows when Figure 6 Example of the BFR process in when applied to SCell. Therefore, Figure 6 , Figure 8 and Fig. 9 Includes examples of BFR SR BFRQ processes.
[0140] The electronic device 110 may be served by multiple cells. In one embodiment, beam failure may be detected in many of the multiple cells. The many cells may include a PCell and multiple SCells. Figure 6 , Figure 7A-7B , Figure 8 and Fig. 9 The BFR processes described in may be appropriately adjusted or combined for use with the many cells.
[0141] refer to Figure 6 , step S610 and step S620 may be applied to many cells, so new candidate beams for many cells may be identified in step S620. Step S630 may remain the same and the request (e.g., BFR SR) may indicate beam failure on many cells. Step S650 may be adjusted and the BFR report includes cell information for many cells and new beam information corresponding to the many cells. At step S660, the BFRR or beam report may include many new beams corresponding to many cells. Similarly, adjustments may be applied to Figure 7A-7B to include BFR for multiple SCells. Adjustments can also be applied to Figure 8-9 To include BFR for one PCell and other SCells.
[0142] Alternatively, Fig. 7A Can be used with Figure 8 Combined for BFR for one PCell and multiple SCells. For example, step S710A is for the PCell and step S810 is for multiple SCells. Step S730A and step S830 are combined, and a single BFR SR can indicate beam failure for the PCell and multiple SCells. Step S750A and step S850 are combined, and a single BFRQ MAC CE is used for the PCell and multiple SCells. Similarly, Figure 7B and Fig. 9 The BFR for the PCell and multiple SCells may be combined.
[0143] Various BFR processes for SCells are compared in Table 1. The BFR process includes the BFR SR process (e.g., Figure 6 , Figure 8 and Fig. 9As shown in ), CF RACH SCell BFR, CB RACH SCell BFR, SR SCell BFR and PUCCH format 2 to PUCCH format 4 SCell BFR.
[0144] As shown in Table 1, the BFR SR process (e.g., Figure 6 , Figure 8 and Fig. 9 ) may have low resource overhead. For example, at step S630 (or step S730A, step S730B, step S830, step S930), the BFR SR (e.g., having a length of 1 bit) indicates beam failure of one or more cells and beam failure of one or more beams. In addition, no additional resources (e.g., PUCCH resources) are used to send additional information in the BFR SR (e.g., cell information and / or new beam information). Therefore, when compared to the resource overhead in CF RACH SCellBFR (in which a relatively large number of CF RACH resources on the PCell are reserved for multiple SCells (e.g., 32) and multiple beams (e.g., 64) configured for each SCell), the resource overhead used in the BFR SR process may be relatively low. When compared to the resource overhead in PUCCH format 2 to PUCCH format 4 SCell BFR, the resource overhead in the BFR SR procedure may be relatively low because a large amount of resources used in PUCCH format 2 to PUCCH format 4 are not required in the BFR SR procedure.
[0145] As shown in Table 1, the BFR SR process (e.g., Figure 6 , Figure 8 and Fig. 9 ) can have low latency. The BFR SR can have a higher priority than other data to be sent (e.g., non-BFR SR, other UE data), so due to priority scheduling, the resources requested by the BFR SR can be guaranteed. In addition, the steps associated with the BSR in the SR SCell BFR (e.g., step S532 and step S534) may cause additional delays. Therefore, when compared with the SR SCell BFR, the BFR SR can have low latency. When compared with the CB RACH SCell BFR, there is no contention in the BFR SR process. In addition, in one example, unlike the CB RACH SCell BFR and the CF RACH SCell BFR, no power increase delay occurs in the BFR SR process. Therefore, when compared with the CB RACH SCell BFR, the delay in the BFR SR process may be low.
[0146] Table 1 Comparison of various BFR processes
[0147] The BFR Process Delay Resource overhead BFR SR Process Low Low CF RACH SCell BFR Low high CB RACH SCell BFR high Low SR SCell BFR high Low PUCCH format 2-4SCell BFR Low high
[0148] Figures 11A-11D An example of PFU according to an embodiment of the present invention is shown. PFU is also called short PUCCH format. Figures 11A-11B , PF0 can occupy 1 physical resource block (PRB) in the frequency domain. PF0 can send 1 or 2 bits (or UCI bits) and can span 1 or 2 Orthogonal Frequency Division Multiplex (OFDM) symbols in the time domain. In one example, 2 OFDM symbols can be sent to enhance coverage.
[0149] In one example, sequence selection is the basis of PFO. In one example, the transmit sequence is generated by different phase rotations of the same base sequence of length 12, so the phase rotation applied to the base sequence carries the information to be transmitted (such as beam failure). Twelve different phase rotations can be defined for the same base sequence, thereby providing up to 12 different orthogonal sequences from each base sequence. Fig. 11C As shown in , linear phase rotation in the frequency domain is equivalent to applying a cyclic shift (CS) in the time domain. Fig.11D In the example shown, 30 sequences of length 12 may be selected with low cross-correlation and may therefore be used in 30 different cells (e.g., including multiple SCells) to maintain low inter-cell interference. In one example, the phase rotation applied to a particular OFDM symbol also depends on a reference rotation, which enables multiple electronic devices to be multiplexed on the same time-frequency resource. In one example, the phase rotation applied to a particular OFDM symbol may be used. Fig. 11B The 12 CSs indicated in the figure are used to multiplex 12 electronic devices.
[0150] In one embodiment, UCI transmission may be achieved through sequence selection. In one example, when a specific sequence is given, the presence of the specific sequence indicates BFD or BFR SR transmission, and the absence of the specific sequence indicates no BFR SR transmission. In one example, the initial CS may be used to define a sequence associated with a PUCCH resource.
[0151] UCI may include various elements (such as HARQ (e.g., ACK / NACK), SR, BFR SR, CSI, etc.). One or more elements may be sent separately or may be combined and sent. UCI may be carried by a UL channel (such as PUCCH, PUSCH, etc.). Various PUCCH formats (e.g., PUCCH format 0 to PUCCH format 4) may be used for UCI elements. Typically, for a PUCCH format (e.g., PF0), CS, symbol, offset, period, etc. may be used to represent a UCI element or a combination of UCI elements. Therefore, as hereinafter used using PF0 as an example in Figures 12A-12C , Figures 13A-13B as well as Figures 14A-14D As described in, different CSs, symbols, offsets, periods, etc. can be used to represent different UCI elements or different combinations of UCI elements.
[0152] In one example, the BFR SR configuration used to send the BFR SR may be different from the SR configuration used to send the SR.
[0153] In one example, the period and offset of the SR configuration and the period and offset of the BFR SR configuration can be configured separately and can have different values. The existing structure of the SR configuration can be reused for the BFR SR configuration. The existing RRC configuration structure of the SR can be reused for the BFR SR. Separate resources (e.g., PRB, CS) can be used to send the SR and BFR SR.
[0154] Figures 12A-12C An example of a BFR SR configuration according to an embodiment of the present invention is shown. Fig. 12AAn example of 2 HARQ bits is shown. The 12 CSs 1211 to 1222 of PF0 can represent 12 different combinations of UCI elements. The following three combinations can be used: 1) HARQ only, without SR and BFR SR; 2) SR with HARQ; 3) BFR SR with HARQ. HARQ only can include 4 different combinations: ACK and ACK (e.g., CS 1211); NACK and ACK (e.g., CS 1214); NACK and NACK (e.g., CS 1217); and ACK and NACK (e.g., CS 1220). SR with HARQ can include 4 different combinations: SR, ACK and ACK (e.g., CS 1212); SR, NACK and ACK (e.g., CS 1215); SR, NACK and NACK (e.g., CS1218); and SR, ACK and NACK (e.g., CS 1221). BFR SR with HARQ may include 4 different combinations: BFRSR, ACK and ACK (e.g., CS 1213); BFR SR, NACK and ACK (e.g., CS 1216); BFR SR, NACK and NACK (e.g., CS 1219); and BFR SR, ACK and NACK (e.g., CS 1222). Therefore, when a beam failure is detected, for example, in step S630, step S730A, step S730B, step S830, step S930, etc., one of CS 1213, CS 1216, CS 1219, and CS 1222 (e.g., CS 1213) may be used to send BFR SR on the PUCCH. In one example, when the BS receives CS 1213, the BS determines that a beam failure occurs.
[0155] Fig. 12BAn example of 1 HARQ bit is shown. The 6 CS 1231 to 1236 of PF0 can represent 6 different combinations of UCI elements. HARQ only can include 2 different combinations: ACK (e.g., CS 1231) and NACK (e.g., CS 1234). SR with HARQ can include 2 different combinations: SR and ACK (e.g., CS 1232); and SR and NACK (e.g., CS 1235). BFR SR with HARQ can include 2 different combinations: BFR SR and ACK (e.g., CS 1233); and BFR SR and NACK (e.g., CS 1236). Therefore, when a beam failure is detected, for example in step S630, step S730A, step S730B, step S830, step S930, etc., one of CS 1233 and CS 1236 can be used to send BFR SR on PUCCH. In one example, when the BS receives CS 1233, the BS determines that a beam failure occurs.
[0156] In one example, the remaining 6 CSs of PF0 can be used to represent 6 different combinations of UCI elements of another electronic device. Fig. 12B The example shown is to multiplex two electronic devices or UEs. In general, the number of electronic devices that can be multiplexed may depend on the number of CSs of the PUCCH format.
[0157] Fig. 12C An example without HARQ is shown. CS 1241 may be used to send SR. CS 1242 may be used to send BFR SR. Thus, when beam failure is detected, for example, in step S630, step S730A, step S730B, step S830, step S930, etc., CS 1242 may be used to send BFR SR on PUCCH. In one example, the remaining 10 CSs of PF0 may be allocated to 5 other electronic devices. Thus, CS 1242 may be used to send BFR SR on PUCCH. Fig. 12C The example shown multiplexes six electronic devices or UEs.
[0158] Figures 12A-12C The following example is shown, where the existing structure of the SR configuration can be reused for the BFR SR configuration, and separate resources (such as different CSs) can be used to send UCI elements or combinations of UCI elements. Taking the 12 CSs of PF0 as an example, it is illustrated that SR transmission and BFR SR transmission can be achieved by sequence selection (e.g., by using different CSs). In one example, when a specific sequence (e.g., Fig. 12AWhen the CS 1213 in the PUCCH is present, the presence of the specific sequence indicates BFR SR transmission, and the absence of the specific sequence indicates no BFR SR transmission. Of course, any suitable PUCCH format with any suitable number of sequences (e.g., CS) can be used for BFR SR.
[0159] Figures 13A-13B An example is shown where PF0 has 2 symbols. The first symbol (e.g., symbol N) is used for SR and the second symbol (e.g., symbol N+1) is used for BFR SR. Fig.13A , the eight CSs 1311 to 1318 of PF0 may represent eight different combinations of UCI elements. HARQ alone may include four different combinations: ACK and ACK (e.g., CS 1311); NACK and ACK (e.g., CS 1313); NACK and NACK (e.g., CS 1315); and ACK and NACK (e.g., CS 1317). SR with HARQ may include four different combinations: SR, ACK, and ACK (e.g., CS 1312); SR, NACK, and ACK (e.g., CS 1314); SR, NACK, and NACK (e.g., CS 1316); and SR, ACK, and NACK (e.g., CS 1318).
[0160] refer to Fig. 13B , the eight CSs 1321 to 1328 of PF0 may represent eight different combinations of UCI elements. HARQ alone may include four different combinations: ACK and ACK (e.g., CS 1321); NACK and ACK (e.g., CS 1323); NACK and NACK (e.g., CS 1325); and ACK and NACK (e.g., CS 1327). BFR SR with HARQ may include four different combinations: BFR SR, ACK and ACK (e.g., CS 1322); BFR SR, NACK and ACK (e.g., CS 1324); BFR SR, NACK and NACK (e.g., CS 1326); and BFR SR, ACK and NACK (e.g., CS 1328). Therefore, when a beam failure is detected, for example, in step S630, step S730A, step S730B, step S830, step S930, etc., one of CS 1322, CS 1324, CS 1326, and CS 1328 may be used to send a BFR SR on the PUCCH. Figures 13A-13B As shown, in addition to sending the BFR SR with different symbols, Fig.13A The SR configuration shown in can be reused for the BFR SR configuration. Therefore, SR and BFR SR share the same configuration.
[0161] Figures 13A-13B An example of 2 HARQ bits is shown, and the description may be adjusted appropriately for 1 HARQ bit or 0 HARQ bits (ie, no HARQ).
[0162] refer to Figures 14A-14D , a BFR SR can be sent using the SR configuration except that the BFR SR has a different offset (called BFR offset). Fig.14A , the eight CSs 1411 to 1418 of PF0 may represent eight different combinations of UCI elements. HARQ alone may include four different combinations: ACK and ACK (e.g., CS 1411); NACK and ACK (e.g., CS 1413); NACK and NACK (e.g., CS 1415); and ACK and NACK (e.g., CS 1417). SR with HARQ may include four different combinations: SR, ACK, and ACK (e.g., CS 1412); SR, NACK, and ACK (e.g., CS 1414); SR, NACK, and NACK (e.g., CS 1416); and SR, ACK, and NACK (e.g., CS 1418).
[0163] refer to Fig. 14B , the eight CSs 1421 to 1428 of PF0 may represent eight different combinations of UCI elements. HARQ alone may include four different combinations: ACK and ACK (e.g., CS 1421); NACK and ACK (e.g., CS 1423); NACK and NACK (e.g., CS 1425); and ACK and NACK (e.g., CS 1427). BFR SR with HARQ may include four different combinations: BFR SR, ACK and ACK (e.g., CS 1422); BFR SR, NACK and ACK (e.g., CS 1424); BFR SR, NACK and NACK (e.g., CS 1426); BFR SR, ACK and NACK (e.g., CS 1428). Therefore, when a beam failure is detected, for example, in step S630, step S730A, step S730B, step S830, step S930, etc., one of CS 1422, CS 1424, CS 1426, and CS 1428 may be used to send a BFR SR on the PUCCH. Figures 14A-14B As shown, in addition to sending the BFR SR with a BFR offset (e.g., the shift between the BFR offset and the SR offset is O time slots, where O is an integer), Fig.14A The SR configuration shown can be reused for BFR SR. Figures 14A-14B As shown, in addition to sending BFR SR at different offsets, Fig.14A The SR configuration shown in can be reused for BFR SR. Therefore, BFR SR transmission shares the existing structure with SR transmission using SR configuration. Resources are mapped, for example, CS 1411 to CS 1418 are mapped to CS 1421 to CS 1428.
[0164] like Fig.14A and Fig. 14C As shown in , the period of SR configuration is 2P time slots, where P is a positive integer. Fig. 14B and Fig.14D It can be seen that the BFR SR configuration can have the same period: 2P time slots. Figures 14A-14D An example of 2 HARQ bits is shown, and the description may be adjusted appropriately for 1 HARQ bit or 0 HARQ bits (ie, no HARQ).
[0165] The BFR SR configuration may be used for one or more cells (such as one or more SCells). The electronic device 110 may be configured with multiple cells or component carriers (CCs) (such as CC1 to CC9). In one embodiment, multiple BFR SR configurations may be used for multiple cells. For example, a first BFR SR configuration is used for CC1 to CC8, and a second BFR SR configuration is used for CC9. Therefore, when one or more CCs in CC1 to CC8 fail, the BFR SR is sent using the first BFR SR configuration. When CC9 fails, the BFR SR is sent using the second BFR SR configuration.
[0166] In one example, a BFR SR configuration (eg, a first BFR SR configuration) is used for only one cell (eg, CC1).
[0167] In one example, a BFR SR configuration (eg, a first BFR SR configuration) is used for each of a plurality of cells (eg, CC1 to CC9 ) configured for the electronic device 110 .
[0168] Conflict rules may be applied to handle conflicts between a BFR SR and another signal to be sent (such as another request, SR, etc.). The following description uses SR as an example. In one embodiment, a conflict may occur when a BFR SR and a SR are scheduled to be sent at the same time or when the scheduled BFR SR and the scheduled SR overlap in time. Figures 14A-14B, when 0 time slots are set to 0, a collision may occur when the BFR SR and the SR overlap in time. In one example, when a collision occurs between the BFR SR and the SR, the BFR SR has a higher priority than the SR, and therefore, the BFR SR is sent before the SR is sent. Subsequently, the SR may be sent, for example, at the next opportunity (e.g., in the next cycle). Alternatively, the SR is suspended or discarded. In one example, for example, when sufficient resources are allocated for both the BFR SR and the SR, the BFR SR and the SR are sent simultaneously. When the other signal is different from the SR, the description may be appropriately adjusted.
[0169] As described above, the BFRQ MAC CE may indicate cell information and new beam information. The cell information may include one or more cell indexes of the failed cell. The new beam information may include one or more new candidate beam indexes of the corresponding one or more new candidate beams. The BFRQ MAC CE may also indicate beam measurement results (such as RSRP used in beam reporting). The BFRQ MAC CE may also indicate (e.g., via 1 bit) whether the electronic device 110 can identify a new candidate beam that meets the minimum RSRP condition and thereby facilitate the BS (e.g., gNB) to deactivate the SCell. For example, when a SCell fails and no new candidate beam is identified for the failed SCell, the gNB may deactivate the failed SCell.
[0170] Figures 15A-15D Examples of BFRQ MAC CE formats 1510 to 1513 according to embodiments of the present invention are respectively shown. BFRQ MAC CE formats 1510 to 1513 are exemplified using corresponding BFRQ MAC CE formats 1510A to 1513A. BFRQ MAC CE formats 1510 to 1513 may include various fields (such as 'Cell Information', 'New Beam Information', 'Beam Measurement Results', etc.) indicating cell information, new beam information, beam measurement results, etc. N ', 'R', 'E', 'NBI', 'RSRP', etc.). N may be an integer and indicates a cell number or a cell index. N Indicates whether the new beam information is available for the Nth cell in the corresponding BFRQ MAC CE. The Nth cell can be a PCell, PSCell or SCell. 1 bit can be used for C N For example, C N A value of 1 indicates that the Nth cell fails (or it is determined that the Nth cell has failed), and new beam information can be used for the Nth cell. NA value of 0 indicates that the new beam information is not available for the Nth cell. N A value of 0 indicates that the Nth cell may be deactivated, or no beam failure is detected for the Nth cell.
[0171] 'R' may indicate a reserved field or a reserved field. In one example, 1 bit is used for 'R' and 'R' is set to 0. 'NBI' may indicate a cell with a failure (eg, Figures 15A-15D 'E' may indicate whether the corresponding beam measurement result (e.g., RSRP) is available in the corresponding BFRQ MAC CE. In one example, 1 bit is used for 'E'. 'E' is 0, indicating that the corresponding RSRP is not available in the corresponding BFRQ MAC CE. 'E' is 1, indicating that the corresponding RSRP is available in the corresponding BFRQ MAC CE (e.g., after the corresponding new candidate beam index).
[0172] In one embodiment, the BFRQ MAC CE format (such as one of BFRQ MAC CE format 1510 to BFRQ MAC CE format 1513) may have a variable size. In one example, the BFRQ MAC CE format may include an ascending order based on, for example, a serving cell index, a new beam index, etc. Therefore, the new beam information and / or beam measurement results may be arranged in ascending order. Figures 15A-15D , i is less than j and j is less than k. Generally, any suitable order can be used in the BFRQ MAC CE format. The order can be ascending, descending, etc. For different scenarios, the various fields in the BFRQ MAC CE format can be appropriately modified, added, removed, combined, etc.
[0173] In one embodiment, the electronic device 110 may be configured with a PCell (or PSCell) having a cell index of 0 and SCells having cell indexes of 1 to 31. In some examples, such as Figures 15A-15B As shown, the cell information of PCell is excluded from the BFRQ MAC CE (e.g., 1510A, 1511A). In some examples, such as Figures 15C-15D As shown, the cell information of the PCell is included in the BFRQ MAC CE (eg, 1512A, 1513A).
[0174] refer to Fig.15A, BFRQ MAC CE format 1510 includes fields C1 to C31 for SCell 1 to SCell 31. 'R' 1521 is reserved. In one example, beam failures of SCell i, SCell j, and SCell k are detected, and new candidate beams are identified for SCell i, SCell j, and SCell k, respectively. i, j, k are integers greater than 0 and less than 32, and i, j, and k are in ascending order, where j is greater than i and less than k. The field 'NBI' of serving cell (or SCell) i, serving cell j, and serving cell k may include new candidate beam indices of SCell i, SCell j, and SCell k, respectively. Fields 'E' 1523 to 1525 may indicate whether the RSRP is after the corresponding field 'NBI' of SCell i, SCell j, and SCell k. For example, when 'E' 1523 is 1, RSRP i is after the NBI of SCell i. When 'E' 1523 is 0, RSRPi is not after the NBI of SCelli and may be excluded from the BFRQ MAC CE format 1510 .
[0175] Except for excluding fields 'E' and 'RSRP', Fig. 15B Included with Fig.15A The beam measurement result is excluded from the BFRQ MAC CE format 1511. Therefore, the BFRQ MAC CE format 1511 is more compact than the BFRQ MAC CE format 1510 and can save resources.
[0176] In addition to the following differences, Fig. 15C Included with Fig.15A For PCell 0, Fig.15A The 'R' in 1521 is Fig. 15CIn one example, C0 is 1 to indicate a beam failure in PCell 0, and an NBI field is present in the BFRQ MAC CE format 1512. In addition, i is an integer greater than or equal to 0. In one example, a partial beam failure is declared for PCell 0, and a BFRQ MAC CE having the same format as the BFRQ MAC CE format 1512 may be used to indicate a partial beam failure. The BFRQ MAC CE may have a different logical channel ID (LCID). In one example, the BFRQ MAC CE format 1512 may include an additional field. The additional field may indicate a partial beam failure. In one example, the BFRQ MAC CE indicates a partial beam failure and includes an RSRP. When a network (e.g., network 101, base station 120) receives the BFRQ MAC CE, when the received RSRP is greater than the corresponding RSRP in the beam table, the network may update the beam table previously reported by the electronic device (e.g., electronic device 110).
[0177] Except for excluding fields 'E' and 'RSRP', Fig.15D Included with Fig. 15C The beam measurement result is excluded from the BFRQ MAC CE format 1512. Therefore, the BFRQ MAC CE format 1513 is more compact than the BFRQ MAC CE format 1512 and can save resources.
[0178] As described above, the A-CSI may indicate cell information and new beam information. The cell information may include one or more cell indices of the failed cell. The new beam information may include one or more new candidate beam indices of the corresponding one or more new candidate beams. The A-CSI may also indicate beam measurement results (such as RSRP used in beam reporting). The A-CSI may also indicate (e.g., via 1 bit) whether the electronic device 110 can identify a new candidate beam that meets the minimum RSRP condition, and thus facilitate the BS (e.g., gNB) to deactivate the SCell. For example, when an SCell fails and no new candidate beam is identified for the failed SCell, the gNB may deactivate the failed SCell.
[0179] The various circuits, circuit systems, components, modules, etc. in the present invention may be implemented using any suitable technology (such as an integrated circuit (IC), multiple ICs, a digital signal processor (DSP), a microprocessor, a central processing unit (CPU), a field programmable gate array (FPGA), an application specific integrated circuit (ASIC), etc.). In one example, the various circuits, components, modules, etc. may also include one or more processing circuits that execute software instructions.
[0180] Although aspects of the present invention have been described in conjunction with specific exemplary embodiments, various substitutions, modifications and changes may be made to these examples. Therefore, the embodiments described in the present invention are merely illustrative and not restrictive. Changes may be made without departing from the scope set forth in the claims.
Claims
1. A beam failure recovery method, characterized in that: include: When it is determined that a beam failure occurs on a secondary cell among a plurality of cells configured for the electronic device, Sending a beam failure recovery scheduling request to a network using a physical uplink control channel configured for a primary cell among the plurality of cells, the beam failure recovery scheduling request indicating the beam failure and requesting resources to report the beam failure; receiving priority scheduling of the resources from the network using a channel configured for the primary cell; the resources comprising aperiodic channel state information, the aperiodic channel state information indicating a cell index of the secondary cell and a new beam index for a new candidate beam of the secondary cell; Sending a beam failure recovery request using the resources by sending the aperiodic channel state information on a physical uplink control channel configured for the primary cell, the beam failure recovery request indicating the cell index of the secondary cell and the new beam index of the new candidate beam for the secondary cell; as well as A beam failure recovery response is received from the network.
2. The beam failure recovery method according to claim 1, characterized in that: The multiple cells also include another secondary cell; When it is determined that a beam failure occurs on the another secondary cell, the method further includes: sending another beam failure recovery scheduling request to the network using the physical uplink control channel configured for the primary cell; receiving a priority scheduling of a beam failure recovery request medium access control control element, wherein the beam failure recovery request medium access control control element indicates a cell index of the another secondary cell and another new beam index of a new candidate beam for the another secondary cell; Sending the beam failure recovery request medium access control element by using a physical uplink shared channel configured for the primary cell to send another beam failure recovery request, the another beam failure recovery request indicating the cell index of the another secondary cell and the another new beam index of the new candidate beam for the another secondary cell; and Another beam failure recovery response is received from the network.
3. The beam failure recovery method according to claim 1, characterized in that: The beam failure recovery scheduling request has a beam failure recovery scheduling request configuration including a period and an offset.
4. The beam failure recovery method according to claim 3, characterized in that: The beam failure recovery scheduling request configuration is associated with a physical uplink control channel format 0, the physical uplink control channel format 0 comprising a plurality of cyclic shifts, one or more of the plurality of cyclic shifts being configured for at least one of: 1) the beam failure recovery scheduling request; and 2) at least one of the beam failure recovery scheduling request and a hybrid automatic repeat request.
5. The beam failure recovery method according to claim 3, characterized in that: The step of sending the beam failure recovery scheduling request also includes: When the beam failure recovery scheduling request and the scheduling request are scheduled at the same time, the beam failure recovery scheduling request is sent before sending the scheduling request, or the beam failure recovery scheduling request and the scheduling request are sent at the same time.
6. The beam failure recovery method according to claim 3, characterized in that: The plurality of cells include a first subset of cells and a second subset of cells; The beam failure recovery scheduling request configuration is configured for the first cell subset to report a beam failure of the first cell subset, the first cell subset including the secondary cell; and Another beam failure recovery scheduling request configuration is configured for the second subset of cells to report a beam failure of the second subset of cells.
7. A beam failure recovery method, characterized in that: include: When at least one of the one or more service control channels fails, determining that a beam failure occurs on a primary cell, the primary cell included in a plurality of cells configured for the electronic device and configured with one or more service control channels for communicating with a network; When it is confirmed that the beam failure occurs on the primary cell, Sending the beam failure recovery scheduling request to the network using a physical uplink control channel configured for the primary cell, the beam failure recovery scheduling request indicating the beam failure and requesting resources to report the beam failure; receiving, from the network using a channel configured for the primary cell, a priority schedule of the resources, the resources comprising a beam failure recovery request medium access control control element, the beam failure recovery request medium access control control element indicating a cell index of the primary cell and a new beam index for a new candidate beam of the primary cell; sending a beam failure recovery request to the network using the resources by sending the beam failure recovery request medium access control element on a physical uplink shared channel configured for the primary cell, the beam failure recovery request indicating the cell index of the primary cell and the new beam index of the new candidate beam for the primary cell; A new beam update is received from the network.
8. The beam failure recovery method according to claim 7, characterized in that: The beam failure recovery scheduling request has a beam failure recovery scheduling request configuration including a period and an offset.
9. The beam failure recovery method according to claim 8, characterized in that: The beam failure recovery scheduling request configuration is associated with a physical uplink control channel format 0, the physical uplink control channel format 0 comprising a plurality of cyclic shifts, one or more of the plurality of cyclic shifts being configured for at least one of: 1) the beam failure recovery scheduling request; and 2) at least one of the beam failure recovery scheduling request and a hybrid automatic repeat request.
10. The beam failure recovery method according to claim 8, characterized in that: The step of sending the beam failure recovery scheduling request also includes: When the beam failure recovery scheduling request and the scheduling request are scheduled at the same time, the beam failure recovery scheduling request is sent before sending the scheduling request, or the beam failure recovery scheduling request and the scheduling request are sent at the same time.
11. The beam failure recovery method according to claim 8, characterized in that: The plurality of cells include a first subset of cells and a second subset of cells; The beam failure recovery scheduling request configuration is configured for the first cell subset to report a beam failure of the first cell subset, the first cell subset including the primary cell; and Another beam failure recovery scheduling request configuration is configured for the second subset of cells to report a beam failure of the second subset of cells.
12. An electronic device for beam fault recovery, characterized in that: The electronic device includes a processing circuit configured to: When it is determined that a beam failure occurs on a secondary cell among a plurality of cells configured for the electronic device, Sending a beam failure recovery scheduling request to a network using a physical uplink control channel configured for a primary cell among the plurality of cells, the beam failure recovery scheduling request indicating the beam failure and requesting resources to report the beam failure; receiving priority scheduling of the resources from the network using a channel configured for the primary cell; the resources comprising aperiodic channel state information, the aperiodic channel state information indicating a cell index of the secondary cell and a new beam index for a new candidate beam of the secondary cell; Sending a beam failure recovery request using the resources by sending the aperiodic channel state information on a physical uplink control channel configured for the primary cell, the beam failure recovery request indicating the cell index of the secondary cell and the new beam index of the new candidate beam for the secondary cell; as well as A beam failure recovery response is received from the network.
13. The electronic device according to claim 12, characterized in that: The plurality of cells further include another secondary cell; and The processing circuit is configured to: sending another beam failure recovery scheduling request to the network using the physical uplink control channel configured for the primary cell; receiving the priority scheduling of a beam failure recovery request medium access control control element, the beam failure recovery request medium access control control element indicating a cell index of the another secondary cell and another new beam index of a new candidate beam for the another secondary cell; Sending the beam failure recovery request medium access control element by using a physical uplink shared channel configured for the primary cell to send another beam failure recovery request, the another beam failure recovery request indicating the cell index of the another secondary cell and another new beam index for the new candidate beam of the another secondary cell; and Another beam failure recovery response is received from the network.
14. The electronic device according to claim 12, characterized in that: The processing circuit is configured to: When at least one of the one or more service control channels fails, determining that a beam failure occurs on a primary cell, the primary cell included in a plurality of cells configured for the electronic device and configured with one or more service control channels for communicating with a network; When it is confirmed that the beam failure occurs on the primary cell, Sending the beam failure recovery scheduling request to the network using a physical uplink control channel configured for the primary cell, the beam failure recovery scheduling request indicating the beam failure of the primary cell and requesting other resources to report the beam failure; receiving, from the network using a channel configured for the primary cell, a priority schedule of the other resources, the other resources comprising a beam failure recovery request medium access control control element indicating a cell index of the primary cell and a new beam index for a new candidate beam of the primary cell; sending a beam failure recovery request to the network using the other resources by sending the beam failure recovery request medium access control element on a physical uplink shared channel configured for the primary cell, the beam failure recovery request indicating the cell index of the primary cell and the new beam index of the new candidate beam for the primary cell; A new beam update is received from the network.
15. The electronic device according to claim 12, characterized in that: The beam failure recovery scheduling request has a beam failure recovery scheduling request configuration including a period and an offset.
16. The electronic device according to claim 15, characterized in that: The beam failure recovery scheduling request configuration is associated with a physical uplink control channel format 0, the physical uplink control channel format 0 comprising a plurality of cyclic shifts, one or more of the plurality of cyclic shifts being configured for at least one of: 1) the beam failure recovery scheduling request; and 2) at least one of the beam failure recovery scheduling request and a hybrid automatic repeat request.
17. The electronic device according to claim 15, characterized in that: The step of sending the beam failure recovery scheduling request also includes: When the beam failure recovery scheduling request and the scheduling request are scheduled at the same time, the beam failure recovery scheduling request is sent before sending the scheduling request, or the beam failure recovery scheduling request and the scheduling request are sent at the same time.
18. The electronic device according to claim 15, characterized in that: The plurality of cells include a first subset of cells and a second subset of cells; The beam failure recovery scheduling request configuration is configured for the first cell subset to report a beam failure of the first cell subset, the first cell subset including the secondary cell; and Another beam failure recovery scheduling request configuration is configured for the second subset of cells to report a beam failure of the second subset of cells.
