Integrated high temperature heat exchange system and heat exchange method thereof
By designing an integrated high-temperature heat exchange system, combining condenser and subcooler, and using multiple pipelines and shut-off valves to control it, the heat exchange needs under high temperature and high pressure conditions are solved, safe and reliable and efficient heat exchange is achieved, and the volume is reduced. Weight and cost.
Patent Information
- Application Number
- CN202011014443.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-24
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2040-09-24
AI Technical Summary
The existing high-temperature heat exchange system cannot meet the heat exchange requirements under high temperature and high pressure conditions, and the individual cooling and pressure reduction device is unstable, making it impossible to withstand large temperature difference operations and have high volume, weight and cost.
Design an integrated high-temperature heat exchange system, combined with condenser and subcooler, connected by multiple pipes, and controlled temperature using manual and electric shut-off valves to realize heat exchange treatment of high-temperature steam and raw water, forming suitable condensate and Out of water.
It realizes safe and reliable heat exchange under high temperature and high pressure conditions, with small size, light weight, low transportation and installation costs, small space occupies, and can withstand large temperature difference operations.
Smart Images

Figure CN112082417B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an integrated high-temperature heat exchange system and a heat exchange method thereof, and belongs to the technical field of electric power. Background Art
[0002] The integrated high-temperature heat exchange system relies on the boiler feed water treatment ultrafiltration reverse osmosis system of the project relocation and transformation project. The steam inlet temperature of this project is 300-414℃, and the pressure is 0.8-1.337MPa; the temperature is relatively high, and if a conventional shell and tube heat exchange system is used, the heat exchange temperature requirements can be met, but the layout space is small and the shell and tube heat exchange system cannot be arranged; if a fully welded plate heat exchange system is used, the heat exchange steam temperature must not be higher than 300℃. The steam temperature and pressure of this project are relatively high, and a cooling and pressure reduction device must be set in front of the heat exchange system, but a separate cooling and pressure reduction device is unstable. Summary of the invention
[0003] The purpose of the present invention is to provide an integrated high-temperature heat exchange system, and also to provide a heat exchange method for the integrated high-temperature heat exchange system, which can withstand the thermal stress generated by large temperature difference operation, is safe and reliable, has a small size, light weight, low transportation and installation costs, and occupies little space.
[0004] To solve the above technical problems, the present invention adopts the following technical scheme: an integrated high-temperature heat exchange system, including a condenser and a subcooler, the upper part of the condenser is provided with a steam inlet, the lower part of the condenser is provided with a steam outlet, the upper port of the steam inlet is provided with a first pipe, one end of the first pipe is connected to the steam inlet, the left side of the condenser is provided with a left cold side inlet and a left cold side outlet, the right side of the condenser is provided with a right cold side inlet and a right cold side outlet, the condenser also includes a second pipe connected to the right cold side outlet and a third pipe connected to the left cold side outlet, the upper part of the subcooler is provided with a subcooler water inlet, the lower part of the subcooler is provided with a subcooler water outlet, one side of the subcooler is provided with a subcooler side water inlet and a subcooler side water outlet, the subcooler also includes a fourth pipe connected to the subcooler side water inlet and a fifth pipe connected to the subcooler side water outlet, and the steam outlet is connected to the subcooler water inlet; it can withstand the thermal stress generated by large temperature difference operation, is safe and reliable, has a small size, light weight, low transportation and installation costs, and occupies a small space.
[0005] In the aforementioned integrated high-temperature heat exchange system, a manual stop valve A and a manual stop valve B are arranged on the first pipeline, an electric stop valve is arranged between the manual stop valve A and the manual stop valve B, a stop valve motor is arranged on the electric stop valve, a bypass pipeline is also arranged on the first pipeline, both ends of the bypass pipeline are connected to the first pipeline, the manual stop valve A and the manual stop valve B are distributed on the pipe section between the two ends of the bypass pipeline, and a bypass valve is arranged on the bypass pipeline; the manual stop valve A, the manual stop valve B and the electric stop valve are arranged to control the delivery of steam with a temperature of 414°C to the first pipeline.
[0006] In the aforementioned integrated high-temperature heat exchange system, a water outlet stop valve is provided on the second pipe, one end of the second pipe is flange-connected to one end of the right cold side outlet, and the other end of the second pipe is provided with a water outlet system.
[0007] The aforementioned integrated high-temperature heat exchange system, one end of the third pipe is flange-connected to one end of the left cold side outlet, and the other end of the third pipe is connected to the pipe section between the right cold side outlet and the outlet stop valve; so that raw water can also enter the water outlet system from the right cold side outlet.
[0008] In the aforementioned integrated high-temperature heat exchange system, one end of the fourth pipeline is connected to the water inlet flange on the subcooler side, and the other end of the fourth pipeline is provided with a raw water inlet pipe system, and the fourth pipeline is provided with a first stop valve; the first stop valve controls the raw water output flow in the raw water inlet pipe system.
[0009] In the aforementioned integrated high-temperature heat exchange system, one end of the fifth pipeline is connected to the water outlet flange on the subcooler side, the other end of the fifth pipeline is connected to the left cold side inlet flange, and the fifth pipeline is provided with a second stop valve.
[0010] The aforementioned integrated high-temperature heat exchange system is provided with a sixth pipe at one end of the right cold side inlet, one end of the sixth pipe is connected to the right cold side inlet flange, and the other end of the sixth pipe is connected to the pipe section between the second stop valve and the subcooler side outlet; so that the raw water output from the subcooler side outlet can enter the condenser from the right cold side inlet.
[0011] The aforementioned integrated high-temperature heat exchange system, a seventh pipeline is arranged between the fourth pipeline and the fifth pipeline, the seventh pipeline is provided with a third stop valve, one end of the seventh pipeline is connected to the pipe section between the second stop valve and the water outlet on the subcooler side, and the other end of the seventh pipeline is connected to the pipe section between the first stop valve and the raw water inlet pipe system; the seventh pipeline is used to transport 90% of the flow rate of raw water with a temperature of 5°C to the fifth pipeline.
[0012] The heat exchange method of the integrated high-temperature heat exchange system comprises the following steps:
[0013] S1, deliver steam with a temperature of 414°C to the first pipeline, open the stop valve motor to drive the electric stop valve, and open the manual stop valve A and the manual stop valve B at the same time, so that the steam with a temperature of 414°C enters the condenser from the steam inlet to form condensed water with a temperature of 200.5°C;
[0014] S2, transporting the condensed water with a temperature of 200.5°C from the steam outlet to the water inlet of the subcooler, so that the condensed water with a temperature of 200.5°C enters the subcooler and forms condensed water with a temperature of 50°C;
[0015] S3, the raw water inlet pipe system transports 10% of the raw water with a temperature of 5°C to the fourth pipe, opens the first stop valve to allow 10% of the raw water with a flow rate of 5°C to be transported from the water inlet of the subcooler to the subcooler, forming 10% of the raw water with a flow rate of 40°C, transports 90% of the raw water with a flow rate of 5°C to the fourth pipe through the raw water inlet pipe system, closes the first stop valve and opens the third stop valve at the same time, transports 90% of the raw water with a flow rate of 5°C to the fifth pipe through the seventh pipe, and transports 10% of the raw water with a flow rate of 40°C from the water outlet of the subcooler to the fifth pipe to mix with 90% of the raw water with a flow rate of 5°C, forming raw water with a temperature of 9.2°C;
[0016] S4, open the second stop valve, so that the raw water with a temperature of 9.2°C is transported from the left cold side inlet to the condenser through the fifth pipeline, and at the same time, the raw water with a temperature of 9.2°C is transported from the right cold side inlet to the condenser through the sixth pipeline. The raw water with a temperature of 9.2°C is processed by the condenser to form raw water with a temperature of 25°C;
[0017] S5, transport raw water with a temperature of 25°C from the left cold side outlet to the second pipe through the third pipe, and at the same time transport raw water with a temperature of 25°C from the right cold side outlet to the second pipe, open the outlet stop valve, and the raw water with a temperature of 25°C enters the water outlet system through the second pipe.
[0018] Compared with the prior art, the present invention includes a condenser and a subcooler, which are connected by multiple pipes, and heat-exchanges steam at a temperature of 414°C to form condensed water at a temperature of 50°C; and heat-exchanges raw water at a temperature of 5°C to form raw water at a temperature of 25°C, and also provides a heat exchange method for an integrated high-temperature heat exchange system. The present invention can withstand the thermal stress generated by large temperature difference operations, is safe and reliable, has a small size, light weight, low transportation and installation costs, and occupies little space. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a structural schematic diagram of the present invention.
[0020] Figure markings: 1-condenser, 2-subcooler, 3-steam inlet, 4-steam outlet, 5-first pipeline, 6-left cold side inlet, 7-left cold side outlet, 8-right cold side inlet, 9-right cold side outlet, 10-second pipeline, 11-third pipeline, 12-subcooler water inlet, 13-subcooler water outlet, 14-subcooler side water inlet, 15-subcooler side water outlet, 16-fourth pipeline, 17-fifth pipeline, 18-A manual stop valve, 19-B manual stop valve, 20-electric stop valve, 21-stop valve motor, 22-bypass pipeline, 23-bypass valve, 24-outlet stop valve, 25-water outlet system, 26-raw water inlet pipe system, 27-first stop valve, 28-second stop valve, 29-sixth pipeline, 30-seventh pipeline, 31-third stop valve.
[0021] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments. DETAILED DESCRIPTION
[0022] Embodiment 1 of the present invention: An integrated high-temperature heat exchange system, comprising a condenser 1 and a subcooler 2, wherein a steam inlet 3 is provided at the top of the condenser 1, a steam outlet 4 is provided at the bottom of the condenser 1, a first pipe 5 is provided at the upper end of the steam inlet 3, one end of the first pipe 5 is connected to the steam inlet 3, a left cold side inlet 6 and a left cold side outlet 7 are provided on the left side of the condenser 1, a right cold side inlet 8 and a right cold side outlet 9 are provided on the right side of the condenser 1, and the condenser 1 further comprises a second pipe 10 connected to the right cold side outlet 9 and a second pipe 11 connected to the left cold side outlet 7 A third pipeline 11, a subcooler water inlet 12 is arranged on the upper part of the subcooler 2, a subcooler water outlet 13 is arranged on the lower part of the subcooler 2, a subcooler side water inlet 14 and a subcooler side water outlet 15 are arranged on one side of the subcooler 2, the subcooler 2 also includes a fourth pipeline 16 connected to the subcooler side water inlet 14 and a fifth pipeline 17 connected to the subcooler side water outlet 15, and the steam outlet 4 is connected to the subcooler water inlet 12; it can withstand the thermal stress generated by large temperature difference operation, is safe and reliable, has a small size, light weight, low transportation and installation costs, and occupies a small space.
[0023] Embodiment 2 of the present invention: an integrated high-temperature heat exchange system, comprising a condenser 1 and a subcooler 2, wherein a steam inlet 3 is provided at the top of the condenser 1, a steam outlet 4 is provided at the bottom of the condenser 1, a first pipe 5 is provided at the upper port of the steam inlet 3, one end of the first pipe 5 is connected to the steam inlet 3, a left cold side inlet 6 and a left cold side outlet 7 are provided at the left side of the condenser 1, a right cold side inlet 8 and a right cold side outlet 9 are provided at the right side of the condenser 1, the condenser 1 further comprises a second pipe 10 connected to the right cold side outlet 9 and a third pipe 11 connected to the left cold side outlet 7, a subcooler water inlet 12 is provided at the top of the subcooler 2, a subcooler water outlet 13 is provided at the bottom of the subcooler 2, a subcooler side water inlet 14 and a subcooler side water outlet 15 are provided at one side of the subcooler 2, the subcooler 2 further comprises a fourth pipe 16 connected to the subcooler side water inlet 14 and a fourth pipe 17 connected to the subcooler side water outlet 18 15 connected to the fifth pipeline 17, the steam outlet 4 is connected to the subcooler water inlet 12; it can withstand the thermal stress caused by large temperature difference operation, is safe and reliable, has a small size, light weight, low transportation and installation costs, and occupies a small space; the first pipeline 5 is provided with an A manual stop valve 18 and a B manual stop valve 19, an electric stop valve 20 is provided between the A manual stop valve 18 and the B manual stop valve 19, and a stop valve motor 21 is provided on the electric stop valve 20, and a bypass pipeline 22 is also provided on the first pipeline 5, and both ends of the bypass pipeline 22 are connected to the first pipeline 5, the A manual stop valve 18 and the B manual stop valve 19 are distributed on the pipe section between the two ends of the bypass pipeline 22, and a bypass valve 23 is provided on the bypass pipeline 22; the A manual stop valve 18, the B manual stop valve and the 19 electric stop valve 20 are provided to control the delivery of steam with a temperature of 414°C to the first pipeline 5.
[0024] Embodiment 3 of the present invention: An integrated high-temperature heat exchange system, comprising a condenser 1 and a subcooler 2, wherein a steam inlet 3 is disposed at the top of the condenser 1, a steam outlet 4 is disposed at the bottom of the condenser 1, a first pipe 5 is disposed at the upper end of the steam inlet 3, one end of the first pipe 5 is connected to the steam inlet 3, a left cold side inlet 6 and a left cold side outlet 7 are disposed on the left side of the condenser 1, a right cold side inlet 8 and a right cold side outlet 9 are disposed on the right side of the condenser 1, and the condenser 1 also includes a right cold side outlet 9 and a right cold side outlet 9. The second pipe 10 connected to the left cold side outlet 7 and the third pipe 11 connected to the left cold side outlet 7, the upper part of the subcooler 2 is provided with a subcooler water inlet 12, the lower part of the subcooler 2 is provided with a subcooler water outlet 13, one side of the subcooler 2 is provided with a subcooler side water inlet 14 and a subcooler side water outlet 15, the subcooler 2 also includes a fourth pipe 16 connected to the subcooler side water inlet 14 and a fifth pipe 17 connected to the subcooler side water outlet 15, the steam outlet 4 is connected to the subcooler water inlet 12; it can be carried out It is resistant to thermal stress caused by large temperature difference operation, safe and reliable, small in size, light in weight, low in transportation and installation cost, and small in space; the first pipeline 5 is provided with an A manual stop valve 18 and a B manual stop valve 19, an electric stop valve 20 is provided between the A manual stop valve 18 and the B manual stop valve 19, and a stop valve motor 21 is provided on the electric stop valve 20, and a bypass pipeline 22 is also provided on the first pipeline 5, and both ends of the bypass pipeline 22 are connected to the first pipeline 5, and the A manual stop valve 18 and the B manual stop valve 19 are distributed on the pipe section between the two ends of the bypass pipeline 22, and a bypass valve 23 is provided on the bypass pipeline 22; the A manual stop valve 18, the B manual stop valve and the 19 electric stop valve 20 are provided to control the delivery of steam with a temperature of 414°C to the first pipeline 5; the second pipeline 10 is provided with a water outlet stop valve 24, one end of the second pipeline 10 is flange-connected to one end of the right cold side outlet 9, and the other end of the second pipeline 10 is provided with a water outlet system 25.
[0025] Embodiment 4 of the present invention: An integrated high-temperature heat exchange system, comprising a condenser 1 and a subcooler 2, wherein a steam inlet 3 is provided at the top of the condenser 1, a steam outlet 4 is provided at the bottom of the condenser 1, a first pipe 5 is provided at the upper end of the steam inlet 3, one end of the first pipe 5 is connected to the steam inlet 3, a left cold side inlet 6 and a left cold side outlet 7 are provided on the left side of the condenser 1, a right cold side inlet 8 and a right cold side outlet 9 are provided on the right side of the condenser 1, and the condenser 1 further comprises a second pipe 10 connected to the right cold side outlet 9 and a second pipe 11 connected to the left cold side outlet 7 A third pipeline 11, a subcooler water inlet 12 is provided at the upper part of the subcooler 2, a subcooler water outlet 13 is provided at the lower part of the subcooler 2, a subcooler side water inlet 14 and a subcooler side water outlet 15 are provided on one side of the subcooler 2, the subcooler 2 also includes a fourth pipeline 16 connected to the subcooler side water inlet 14 and a fifth pipeline 17 connected to the subcooler side water outlet 15, and the steam outlet 4 is connected to the subcooler water inlet 12; it can withstand the thermal stress generated by large temperature difference operation, is safe and reliable, has a small size, light weight, low transportation and installation costs, and occupies a small space; The first pipeline 5 is provided with an A manual stop valve 18 and a B manual stop valve 19, an electric stop valve 20 is provided between the A manual stop valve 18 and the B manual stop valve 19, and a stop valve motor 21 is provided on the electric stop valve 20. A bypass pipeline 22 is also provided on the first pipeline 5, and both ends of the bypass pipeline 22 are connected to the first pipeline 5. The A manual stop valve 18 and the B manual stop valve 19 are distributed on the pipe section between the two ends of the bypass pipeline 22, and a bypass valve 23 is provided on the bypass pipeline 22; the A manual stop valve 18 and the B manual stop valve 19 are provided. The stop valve 19 and the electric stop valve 20 are used to control the delivery of steam with a temperature of 414°C to the first pipeline 5; the second pipeline 10 is provided with a water outlet stop valve 24, one end of the second pipeline 10 is flange-connected to one end of the right cold side outlet 9, and the other end of the second pipeline 10 is provided with a water outlet system 25; one end of the third pipeline 11 is flange-connected to one end of the left cold side outlet 7, and the other end of the third pipeline 11 is connected to the pipe section between the right cold side outlet 9 and the water outlet stop valve 24; so that raw water can also enter the water outlet system 25 from the right cold side outlet 9.
[0026] Embodiment 5 of the present invention: An integrated high-temperature heat exchange system, comprising a condenser 1 and a subcooler 2, wherein a steam inlet 3 is provided at the top of the condenser 1, a steam outlet 4 is provided at the bottom of the condenser 1, a first pipe 5 is provided at the upper port of the steam inlet 3, one end of the first pipe 5 is connected to the steam inlet 3, a left cold side inlet 6 and a left cold side outlet 7 are provided on the left side of the condenser 1, a right cold side inlet 8 and a right cold side outlet 9 are provided on the right side of the condenser 1, the condenser 1 further comprises a second pipe 10 connected to the right cold side outlet 9 and a third pipe 11 connected to the left cold side outlet 7, and a subcooler water inlet is provided at the top of the subcooler 2 A subcooler outlet 13 is provided at the lower part of the subcooler 2, a subcooler side water inlet 14 and a subcooler side water outlet 15 are provided on one side of the subcooler 2, the subcooler 2 also includes a fourth pipe 16 connected to the subcooler side water inlet 14 and a fifth pipe 17 connected to the subcooler side water outlet 15, and the steam outlet 4 is connected to the subcooler water inlet 12; it can withstand the thermal stress generated by large temperature difference operation, is safe and reliable, has a small size, light weight, low transportation and installation costs, and occupies a small space; the first pipeline 5 is provided with an A manual stop valve 18 and a B manual stop valve 19, the A manual stop valve 18 and the B manual stop valve 1 9, an electric stop valve 20 is arranged between the two ends of the bypass pipe 22, and a stop valve motor 21 is arranged on the electric stop valve 20. A bypass pipe 22 is also arranged on the first pipe 5, and both ends of the bypass pipe 22 are connected to the first pipe 5. A manual stop valve 18 and a manual stop valve 19 are distributed on the pipe section between the two ends of the bypass pipe 22, and a bypass valve 23 is arranged on the bypass pipe 22; the manual stop valve 18, the manual stop valve 19 and the electric stop valve 20 are arranged to control the delivery of steam with a temperature of 414°C to the first pipe 5; the second pipe 10 is provided with a water outlet stop valve 24, and one end of the second pipe 10 is connected to the right One end of the cold side outlet 9 is flange-connected, and the other end of the second pipe 10 is provided with a water outlet system 25; one end of the third pipe 11 is flange-connected to one end of the left cold side outlet 7, and the other end of the third pipe 11 is connected to the pipe section between the right cold side outlet 9 and the water outlet stop valve 24; so that raw water can also enter the water outlet system 25 from the right cold side outlet 9; one end of the fourth pipe 16 is flange-connected to the subcooler side water inlet 14, and the other end of the fourth pipe 16 is provided with a raw water inlet pipe system 26, and the fourth pipe 16 is provided with a first stop valve 27; the first stop valve 27 controls the raw water output flow in the raw water inlet pipe system 26.
[0027] Embodiment 6 of the present invention: An integrated high-temperature heat exchange system comprises a condenser 1 and a subcooler 2, wherein a steam inlet 3 is arranged at the top of the condenser 1, a steam outlet 4 is arranged at the bottom of the condenser 1, a first pipe 5 is arranged at the upper port of the steam inlet 3, one end of the first pipe 5 is connected to the steam inlet 3, a left cold side inlet 6 and a left cold side outlet 7 are arranged at the left side of the condenser 1, a right cold side inlet 8 and a right cold side outlet 9 are arranged at the right side of the condenser 1, the condenser 1 further comprises a second pipe 10 connected to the right cold side outlet 9 and a third pipe 11 connected to the left cold side outlet 7, a subcooler water inlet 12 is arranged at the top of the subcooler 2, and a subcooler water inlet 13 is arranged at the bottom of the subcooler 2 The subcooler 2 has a water outlet 13, a subcooler side water inlet 14 and a subcooler side water outlet 15 on one side, the subcooler 2 also includes a fourth pipe 16 connected to the subcooler side water inlet 14 and a fifth pipe 17 connected to the subcooler side water outlet 15, and the steam outlet 4 is connected to the subcooler water inlet 12; it can withstand the thermal stress caused by large temperature difference operation, is safe and reliable, has a small size, light weight, low transportation and installation costs, and occupies a small space; the first pipeline 5 is provided with an A manual stop valve 18 and a B manual stop valve 19, an electric stop valve 20 is provided between the A manual stop valve 18 and the B manual stop valve 19, and a stop valve motor 2 is provided on the electric stop valve 20 1, a bypass pipeline 22 is also provided on the first pipeline 5, and both ends of the bypass pipeline 22 are connected to the first pipeline 5, and the manual stop valve A 18 and the manual stop valve B 19 are distributed on the pipe section between the two ends of the bypass pipeline 22, and a bypass valve 23 is provided on the bypass pipeline 22; the manual stop valve A 18, the manual stop valve B and the electric stop valve 20 19 are provided to control the delivery of steam with a temperature of 414°C to the first pipeline 5; the second pipeline 10 is provided with a water outlet stop valve 24, one end of the second pipeline 10 is flange-connected to one end of the right cold side outlet 9, and the other end of the second pipeline 10 is provided with a water outlet system 25; one end of the third pipeline 11 is flange-connected to the left cold side outlet One end of the third pipe 11 is flange-connected to the outlet 7 on the right cold side, and the other end of the third pipe 11 is connected to the pipe section between the right cold side outlet 9 and the outlet stop valve 24; so that raw water can also enter the outlet system 25 from the right cold side outlet 9; one end of the fourth pipe 16 is flange-connected to the subcooler side water inlet 14, and the other end of the fourth pipe 16 is provided with a raw water inlet pipe system 26, and the fourth pipe 16 is provided with a first stop valve 27; the first stop valve 27 controls the raw water output flow in the raw water inlet pipe system 26; one end of the fifth pipe 17 is flange-connected to the subcooler side water outlet 15, and the other end of the fifth pipe 17 is flange-connected to the left cold side inlet 6, and the fifth pipe 17 is provided with a second stop valve 28.
[0028] Embodiment 7 of the present invention: An integrated high-temperature heat exchange system comprises a condenser 1 and a subcooler 2, wherein a steam inlet 3 is arranged at the top of the condenser 1, a steam outlet 4 is arranged at the bottom of the condenser 1, a first pipe 5 is arranged at the upper port of the steam inlet 3, one end of the first pipe 5 is connected to the steam inlet 3, a left cold side inlet 6 and a left cold side outlet 7 are arranged at the left side of the condenser 1, a right cold side inlet 8 and a right cold side outlet 9 are arranged at the right side of the condenser 1, the condenser 1 further comprises a second pipe 10 connected to the right cold side outlet 9 and a third pipe 11 connected to the left cold side outlet 7, a subcooler water inlet 12 is arranged at the top of the subcooler 2, a subcooler water outlet 13 is arranged at the bottom of the subcooler 2, and a subcooler is arranged on one side of the subcooler 2. The subcooler 2 further comprises a fourth pipe 16 connected to the subcooler side water inlet 14 and a fifth pipe 17 connected to the subcooler side water outlet 15, and the steam outlet 4 is connected to the subcooler water inlet 12; it can withstand the thermal stress caused by large temperature difference operation, is safe and reliable, has a small size, light weight, low transportation and installation costs, and occupies a small space; the first pipe 5 is provided with an A manual stop valve 18 and a B manual stop valve 19, an electric stop valve 20 is provided between the A manual stop valve 18 and the B manual stop valve 19, and a stop valve motor 21 is provided on the electric stop valve 20, and a bypass pipe 22 is also provided on the first pipe 5, and both ends of the bypass pipe 22 are connected to the first pipe 5, A manual stop valve 18 and B manual stop valve 19 are distributed on the pipe section between the two ends of the bypass pipe 22, and a bypass valve 23 is arranged on the bypass pipe 22; A manual stop valve 18, B manual stop valve and 19 electric stop valve 20 are arranged to control the delivery of steam with a temperature of 414°C to the first pipe 5; a water outlet stop valve 24 is arranged on the second pipe 10, one end of the second pipe 10 is flange-connected to one end of the right cold side outlet 9, and the other end of the second pipe 10 is provided with a water outlet system 25; one end of the third pipe 11 is flange-connected to one end of the left cold side outlet 7, and the other end of the third pipe 11 is connected to the pipe section between the right cold side outlet 9 and the water outlet stop valve 24; so that raw water can also enter from the right cold side outlet 9 A water outlet system 25; one end of the fourth pipeline 16 is flange-connected to the water inlet 14 on the subcooler side, the other end of the fourth pipeline 16 is provided with a raw water inlet pipe system 26, and the fourth pipeline 16 is provided with a first stop valve 27; the first stop valve 27 controls the raw water output flow in the raw water inlet pipe system 26; one end of the fifth pipeline 17 is flange-connected to the water outlet 15 on the subcooler side, the other end of the fifth pipeline 17 is flange-connected to the left cold side inlet 6, and the fifth pipeline 17 is provided with a second stop valve 28; one end of the right cold side inlet 8 is provided with a sixth pipeline 29, one end of the sixth pipeline 29 is flange-connected to the right cold side inlet 8, and the other end of the sixth pipeline 29 is connected to the pipe section between the second stop valve 28 and the water outlet 15 on the subcooler side;The raw water output from the water outlet 15 on the subcooler side can enter the condenser 1 from the right cold side inlet 8. ;
[0029] Embodiment 8 of the present invention: An integrated high-temperature heat exchange system comprises a condenser 1 and a subcooler 2, wherein a steam inlet 3 is arranged at the top of the condenser 1, a steam outlet 4 is arranged at the bottom of the condenser 1, a first pipe 5 is arranged at the upper port of the steam inlet 3, one end of the first pipe 5 is connected to the steam inlet 3, a left cold side inlet 6 and a left cold side outlet 7 are arranged at the left side of the condenser 1, a right cold side inlet 8 and a right cold side outlet 9 are arranged at the right side of the condenser 1, the condenser 1 further comprises a second pipe 10 connected to the right cold side outlet 9 and a third pipe 11 connected to the left cold side outlet 7, a subcooler water inlet 12 is arranged at the top of the subcooler 2, a subcooler water outlet 13 is arranged at the bottom of the subcooler 2, and a subcooler is arranged on one side of the subcooler 2. The subcooler 2 further comprises a fourth pipe 16 connected to the subcooler side water inlet 14 and a fifth pipe 17 connected to the subcooler side water outlet 15, and the steam outlet 4 is connected to the subcooler water inlet 12; it can withstand the thermal stress caused by large temperature difference operation, is safe and reliable, has a small size, light weight, low transportation and installation costs, and occupies a small space; the first pipe 5 is provided with an A manual stop valve 18 and a B manual stop valve 19, an electric stop valve 20 is provided between the A manual stop valve 18 and the B manual stop valve 19, and a stop valve motor 21 is provided on the electric stop valve 20, and a bypass pipe 22 is also provided on the first pipe 5, and both ends of the bypass pipe 22 are connected to the first pipe 5, A manual stop valve 18 and B manual stop valve 19 are distributed on the pipe section between the two ends of the bypass pipe 22, and a bypass valve 23 is arranged on the bypass pipe 22; A manual stop valve 18, B manual stop valve and 19 electric stop valve 20 are arranged to control the delivery of steam with a temperature of 414°C to the first pipe 5; a water outlet stop valve 24 is arranged on the second pipe 10, one end of the second pipe 10 is flange-connected to one end of the right cold side outlet 9, and the other end of the second pipe 10 is provided with a water outlet system 25; one end of the third pipe 11 is flange-connected to one end of the left cold side outlet 7, and the other end of the third pipe 11 is connected to the pipe section between the right cold side outlet 9 and the water outlet stop valve 24; so that raw water can also enter from the right cold side outlet 9 A water outlet system 25; one end of the fourth pipeline 16 is flange-connected to the water inlet 14 on the subcooler side, the other end of the fourth pipeline 16 is provided with a raw water inlet pipe system 26, and the fourth pipeline 16 is provided with a first stop valve 27; the first stop valve 27 controls the raw water output flow in the raw water inlet pipe system 26; one end of the fifth pipeline 17 is flange-connected to the water outlet 15 on the subcooler side, the other end of the fifth pipeline 17 is flange-connected to the left cold side inlet 6, and the fifth pipeline 17 is provided with a second stop valve 28; one end of the right cold side inlet 8 is provided with a sixth pipeline 29, one end of the sixth pipeline 29 is flange-connected to the right cold side inlet 8, and the other end of the sixth pipeline 29 is connected to the pipe section between the second stop valve 28 and the water outlet 15 on the subcooler side;The raw water output from the subcooler side water outlet 15 can enter the condenser 1 from the right cold side inlet 8; a seventh pipeline 30 is arranged between the fourth pipeline 16 and the fifth pipeline 17, and a third stop valve 31 is arranged on the seventh pipeline 30. One end of the seventh pipeline 30 is connected to the pipe section between the second stop valve 28 and the subcooler side water outlet 15, and the other end of the seventh pipeline 30 is connected to the pipe section between the first stop valve 27 and the raw water inlet pipe system 26; the seventh pipeline 30 is used to transport 90% of the raw water with a temperature of 5°C to the fifth pipeline 17. ;
[0030] The heat exchange method of the integrated high-temperature heat exchange system comprises the following steps:
[0031] S1, deliver steam with a temperature of 414°C to the first pipeline 5, open the stop valve motor 21 to drive the electric stop valve 20, and open the manual stop valve A 18 and the manual stop valve B 19 at the same time, so that the steam with a temperature of 414°C enters the condenser 1 from the steam inlet 3 to form condensed water with a temperature of 200.5°C;
[0032] S2, transporting the condensed water with a temperature of 200.5°C from the steam outlet 4 to the water inlet 12 of the subcooler, so that the condensed water with a temperature of 200.5°C enters the subcooler 2 to form condensed water with a temperature of 50°C;
[0033] S3, the raw water inlet pipe system 26 transports 10% of the raw water with a temperature of 5°C to the fourth pipe 16, opens the first stop valve 27 to allow 10% of the raw water with a flow rate of 5°C to be transported from the subcooler side water inlet 14 to the subcooler 2, forming 10% of the raw water with a flow rate of 40°C, transports 90% of the raw water with a flow rate of 5°C to the fourth pipe 16 through the raw water inlet pipe system 26, closes the first stop valve 27 and opens the third stop valve 31, transports 90% of the raw water with a flow rate of 5°C to the fifth pipe 17 through the seventh pipe 30, and transports 10% of the raw water with a flow rate of 40°C from the subcooler side water outlet 15 to the fifth pipe 17 to mix with 90% of the raw water with a flow rate of 5°C, forming raw water with a temperature of 9.2°C;
[0034] S4, open the second stop valve 28, so that the raw water with a temperature of 9.2°C is transported from the left cold side inlet 6 to the condenser 1 through the fifth pipeline 17, and at the same time, the raw water with a temperature of 9.2°C is transported from the right cold side inlet 8 to the condenser 1 through the sixth pipeline 29. The raw water with a temperature of 9.2°C is processed by the condenser 1 to form raw water with a temperature of 25°C;
[0035] S5, raw water with a temperature of 25°C is transported from the left cold side outlet 7 to the second pipe 10 through the third pipe 11, and at the same time, raw water with a temperature of 25°C is transported from the right cold side outlet 9 to the second pipe 10, the outlet stop valve 24 is opened, and the raw water with a temperature of 25°C enters the water outlet system 25 through the second pipe 10.
[0036] The working principle of an embodiment of the present invention is as follows: the present invention first transports steam with a temperature of 414°C to the first pipeline 5, so that the steam with a temperature of 414°C enters the condenser 1 from the steam inlet 3 to form condensed water with a temperature of 200.5°C, and transports the condensed water with a temperature of 200.5°C from the steam outlet 4 to the subcooler water inlet 12, so that the condensed water with a temperature of 200.5°C enters the subcooler 2 to form condensed water with a temperature of 50°C; then, the raw water inlet pipe system 26 transports 10% of the raw water with a flow rate of 5°C to the fourth pipeline 16, so that 10% of the raw water with a flow rate of 5°C is transported from the subcooler side water inlet 14 to the subcooler 2 to form 10% of the raw water with a flow rate of 40°C, and 90% of the raw water with a flow rate of 5°C is transported to the fourth pipeline 16 through the raw water inlet pipe system 26, so that 90% of the raw water with a flow rate of Raw water at a temperature of 5°C is transported to the fifth pipe 17 through the seventh pipe 30, and 10% of the raw water at a temperature of 40°C is transported from the subcooler side outlet 15 to the fifth pipe 17 and mixed with 90% of the raw water at a temperature of 5°C to form raw water at a temperature of 9.2°C, and the raw water at a temperature of 9.2°C is transported to the condenser 1 from the left cold side inlet 6 through the fifth pipe 17, and at the same time, the raw water at a temperature of 9.2°C is transported to the condenser 1 from the right cold side inlet 8 through the sixth pipe 29. The raw water at a temperature of 9.2°C is processed by the condenser 1 to form raw water at a temperature of 25°C, and the raw water at a temperature of 25°C is transported from the left cold side outlet 7 to the second pipe 10 through the third pipe 11, and at the same time, the raw water at a temperature of 25°C is transported from the right cold side outlet 9 to the second pipe 10, so that the raw water at a temperature of 25°C enters the water outlet system 25 through the second pipe 10.
Claims
1. Integrated high-temperature heat exchange system, characterized in that: The invention comprises a condenser (1) and a subcooler (2), wherein the upper portion of the condenser (1) is provided with a steam inlet (3), the lower portion of the condenser (1) is provided with a steam outlet (4), the upper end of the steam inlet (3) is provided with a first pipe (5), one end of the first pipe (5) is connected to the steam inlet (3), the left side of the condenser (1) is provided with a left cold side inlet (6) and a left cold side outlet (7), the right side of the condenser (1) is provided with a right cold side inlet (8) and a right cold side outlet (9), the condenser (1) further comprises a second pipe (10) connected to the right cold side outlet (9) and a third pipe (11) connected to the left cold side outlet (7), and the upper portion of the subcooler (2) is provided with a subcooler water inlet (12). The subcooler (2) is provided with a subcooler water outlet (13) at the lower part, and a subcooler side water inlet (14) and a subcooler side water outlet (15) are provided on one side of the subcooler (2). The subcooler (2) further comprises a fourth pipe (16) connected to the subcooler side water inlet (14) and a fifth pipe (17) connected to the subcooler side water outlet (15). The steam outlet (4) is connected to the subcooler water inlet (12); the first pipe (5) is provided with an A manual stop valve (18) and a B manual stop valve (19), an electric stop valve (20) is provided between the A manual stop valve (18) and the B manual stop valve (19), and a stop valve motor (21) is provided on the electric stop valve (20). A bypass pipe (22) is also provided on the pipe (5), both ends of the bypass pipe (22) are connected to the first pipe (5), a manual stop valve (18) and a manual stop valve (19) are distributed on the pipe section between the two ends of the bypass pipe (22), and a bypass valve (23) is provided on the bypass pipe (22); a water outlet stop valve (24) is provided on the second pipe (10), one end of the second pipe (10) is flange-connected to one end of the right cold side outlet (9), and the other end of the second pipe (10) is provided with a water outlet system (25); one end of the fourth pipe (16) is flange-connected to the water inlet (14) on the subcooler side, and the other end of the fourth pipe (16) is provided with a raw water inlet pipe system (26). The fourth pipe (16) is provided with a first stop valve (27); one end of the fifth pipe (17) is flange-connected to the water outlet (15) on the subcooler side, the other end of the fifth pipe (17) is flange-connected to the left cold side inlet (6), and the fifth pipe (17) is provided with a second stop valve (28); a seventh pipe (30) is provided between the fourth pipe (16) and the fifth pipe (17), and the seventh pipe (30) is provided with a third stop valve (31); one end of the seventh pipe (30) is connected to the pipe section between the second stop valve (28) and the water outlet (15) on the subcooler side, and the other end of the seventh pipe (30) is connected to the pipe section between the first stop valve (27) and the raw water inlet pipe system (26).
2. The integrated high-temperature heat exchange system according to claim 1, characterized in that: One end of the third pipe (11) is flange-connected to one end of the left cold side outlet (7), and the other end of the third pipe (11) is connected to the pipe section between the right cold side outlet (9) and the water outlet stop valve (24).
3. The integrated high-temperature heat exchange system according to claim 1, characterized in that: A sixth pipe (29) is provided at one end of the right cold side inlet (8), one end of the sixth pipe (29) is flange-connected to the right cold side inlet (8), and the other end of the sixth pipe (29) is connected to the pipe section between the second stop valve (28) and the subcooler side water outlet (15).
4. The heat exchange method of the integrated high-temperature heat exchange system according to any one of claims 1 to 3, characterized in that: The following steps are involved: S1, delivers steam with a temperature of 414°C to the first pipeline (5), opens the stop valve motor (21) to drive the electric stop valve (20), and simultaneously opens the manual stop valve A (18) and the manual stop valve B (19), so that the steam with a temperature of 414°C enters the condenser (1) from the steam inlet (3), forming condensed water with a temperature of 200.5°C; S2, transporting the condensed water with a temperature of 200.5°C from the steam outlet (4) to the water inlet (12) of the subcooler, so that the condensed water with a temperature of 200.5°C enters the subcooler (2) to form condensed water with a temperature of 50°C; S3, the raw water inlet pipe system (26) transports 10% of the raw water with a temperature of 5°C to the fourth pipe (16), opens the first stop valve (27) to allow the raw water with a temperature of 5°C to be transported from the subcooler side water inlet (14) to the subcooler (2), forming 10% of the raw water with a temperature of 40°C, transports 90% of the raw water with a temperature of 5°C to the fourth pipe (16) through the raw water inlet pipe system (26), closes the first stop valve (27) and opens the third stop valve (31) at the same time, transports 90% of the raw water with a temperature of 5°C to the fifth pipe (17) through the seventh pipe (30), and transports 10% of the raw water with a temperature of 40°C from the subcooler side water outlet (15) to the fifth pipe (17) to mix with the 90% of the raw water with a temperature of 5°C, forming raw water with a temperature of 9.2°C; S4, open the second stop valve (28), so that the raw water with a temperature of 9.2°C is transported from the left cold side inlet (6) to the condenser (1) through the fifth pipe (17), and at the same time, the raw water with a temperature of 9.2°C is transported from the right cold side inlet (8) to the condenser (1) through the sixth pipe (29). The raw water with a temperature of 9.2°C is processed by the condenser (1) to form raw water with a temperature of 25°C; S5, raw water at a temperature of 25°C is transported from the left cold side outlet (7) to the second pipe (10) through the third pipe (11), and at the same time, raw water at a temperature of 25°C is transported from the right cold side outlet (9) to the second pipe (10), the outlet stop valve (24) is opened, and the raw water at a temperature of 25°C enters the water outlet system (25) through the second pipe (10).
