Prefabricated board house and its construction method

By using aluminum plate mezzanine polyurethane plate wall panels, honeycomb aluminum plate floors and misaligned second-level corridors in the mobile board room, the problems of poor sound insulation, immunity and long construction time of the existing board room are solved, and better sound insulation is achieved , durability and quick build effect.

CN112144666BActive Publication Date: 2024-11-12CIXI LITIAN CONSTRUCT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910581249.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-06-29
Publication Date
2024-11-12
Estimated Expiration
2039-06-29

AI Technical Summary

Technical Problem

The existing movable board rooms have poor sound insulation performance, unweather resistance, poor thermal insulation performance, and long construction and installation period, resulting in noise interference, easy peeling of exterior walls, rusting of steel plates, weak insulation effect, long construction time and high cost.

Method used

Design a prefabricated panel house, using wall panels filled with polyurethane panels in the aluminum panel mezzanine. The floor consists of steel base layer, honeycomb aluminum plate and rubber layer. The second-level corridor is arranged on the floor to reduce noise interference. The foundation of the prefabricated panel house is quickly built. Use fluorocarbon paint and embedded electrical circuits to improve durability and safety.

Benefits of technology

It effectively reduces noise interference in the board room, improves sound insulation performance and service life, shortens construction time, improves stability and insulation effect, and reduces construction costs and construction waste disposal costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112144666B_ABST
    Figure CN112144666B_ABST
Patent Text Reader

Abstract

The present invention discloses an assembled board house and a construction method thereof. The assembled board house comprises a board house first floor, a staircase and a board house second floor. The board house second floor is offset forwardly relative to the board house first floor as a whole, and the offset portion of the top surface rear side of the board house first floor serves as a second floor corridor. The door of each box room in the board house second floor faces the second floor corridor. A first floor corridor is provided on the front side, left side or / and right side of the board house first floor, and the door of each box room in the board house first floor faces the first floor corridor. By offsetting the board house second floor as a whole forwardly relative to the board house first floor, the second floor corridor is arranged at the rear side of the board house second floor, and the first floor corridor is arranged at the front side of the board house first floor, so that the walking of the residents in the board house second floor or the walking and talking on the second floor corridor faces the rear side, while the walking or talking of the residents in the board house first floor faces the front side, thereby reducing the interference between the residents in the board house second floor and the board house first floor, and reducing the noise introduced into each room.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of movable board houses, and in particular to an assembled board house and a construction method thereof. Background Art

[0002] Prefab houses are houses supported by steel frames and built with sandwich panels as enclosure materials. They can be assembled and disassembled quickly and easily, are easy to transport and move, and are very suitable as temporary housing. They are mostly used as office spaces for construction site project management and as living quarters for construction workers.

[0003] The existing prefabricated houses have the following shortcomings: First, the sound insulation performance is poor. As for the prefabricated houses on the construction site, the prefabricated houses for project management offices and the prefabricated houses for construction workers' residences are built together, with a large number of people, and the office area and the living area are noisy. For a two-story prefabricated house where workers live, the people upstairs walk and talk, and the people living downstairs often hear loud noises; second, they are not weather-resistant. Affected by weather such as rain and snow, the paint on the exterior walls of the existing prefabricated houses is easy to peel off, and the steel plates are easy to rust after the paint peels off, which is not conducive to protecting the wall panels; third, the thermal insulation performance is poor. The wall panels of the current prefabricated houses are iron sandwich panels, and the wall panels are filled with foam, and the thermal insulation is weak; fourth, the on-site construction and installation period is long. The construction process of the existing prefabricated houses includes building the foundation, building the steel frame, installing the wall panels, installing the stairs, and installing the floor panels. The amount of construction work on site is large and it takes a long time to build. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a prefabricated house to solve the technical problem of poor sound insulation of prefabricated houses in the prior art.

[0005] To solve the above technical problems, the first aspect of the present invention is:

[0006] A prefabricated house is designed, comprising a first floor, a staircase and a second floor, wherein the first floor and the second floor each comprise a plurality of box rooms arranged side by side, the second floor is installed on the top of the first floor, the staircase extends from the first floor to the second floor, the second floor as a whole is displaced forward relative to the first floor, the displaced portion on the rear side of the top surface of the first floor serves as a second-floor corridor, the door of each box room on the second floor faces the second-floor corridor, a first-floor corridor is provided on the front, left side or / and right side of the first floor, the door of each box room on the first floor faces the first-floor corridor.

[0007] Preferably, a shielding plate for shielding the second-floor corridor is provided on the rear side of the top of the second-floor board house, and railings are provided on the sides of the second-floor corridor; and the displaced portion of the front side of the second-floor board house shields the first-floor corridor.

[0008] Preferably, it also includes a prefabricated house foundation, which is composed of a number of panels, and the prefabricated house foundation is partially buried in the ground, and the buried depth of the prefabricated house foundation is not less than 500mm.

[0009] Compared with the existing prefabricated house foundation formed by pouring concrete, the prefabricated house foundation in the present application is formed by assembling several panels, which is convenient for installation, has a short installation period, reduces workload, and saves construction costs; and the prefabricated house foundation formed by this assembly does not generate dust during the installation process, and is environmentally friendly; in addition, the prefabricated house foundation formed by this assembly is easy to disassemble and can be repeatedly hoisted to other construction sites for use, without generating any construction waste, while the treatment cost of construction waste is high and is not environmentally friendly.

[0010] Preferably, the wall panels around the container room are made of polyurethane panels filled in an aluminum plate sandwich, and the outer surface of the wall panels is coated with a fluorocarbon paint layer.

[0011] Preferably, the container house is provided with a floor and a roof panel, wherein the floor comprises a steel base layer, a honeycomb aluminum plate layer and a rubber layer from bottom to top; and the roof panel is made of a polyurethane plate filled in an aluminum plate sandwich.

[0012] Preferably, the container house includes an assembly frame, the assembly frame includes left and right vertical frames, the vertical frame includes front and rear columns, a horizontal beam is respectively connected between the upper and lower ends of the columns, and a longitudinal beam is respectively connected between the vertical frames on the left and right sides at four corners; L-shaped supporting plates for supporting the roof of the panel house are respectively provided on the inner sides of the two horizontal beams and the two longitudinal beams at the top of the assembly frame; and a plurality of brackets for supporting the floor of the panel house are respectively provided on the inner sides of the two horizontal beams and the two longitudinal beams at the bottom of the assembly frame.

[0013] Preferably, power lines are pre-buried in the wall panels, floors and / or roof panels of the container house; a low-voltage socket connected to the power lines is provided in the container house; and a generator power interface is provided in the main power supply circuit of the prefabricated house.

[0014] Preferably, a smash-proof buffer shed is provided on the top of the second floor of the board house, and the smash-proof buffer shed is assembled from a plurality of unit sheds, and the unit shed includes legs fixed to the top of the second floor of the board house and a double-layer steel springboard installed on the top of the legs.

[0015] The second aspect of the present invention is:

[0016] Design a method for building a prefabricated house, including:

[0017] (1) Laying the foundation of the prefabricated house: the prefabricated concrete slabs are used to assemble the foundation of the prefabricated house. A number of studs for fixing the container house are embedded in the concrete slabs. The foundation of the prefabricated house is partially buried in the ground;

[0018] (2) Assembling container houses: Use steel to assemble the frame of the container house, and install the walls, floors and roof panels of the container house on the assembled frame. In this way, assemble several container houses required for building a panel house;

[0019] (3) Building a prefabricated house: placing a plurality of the container houses side by side on the prefabricated house foundation to form a first floor of the prefabricated house, and the frames of the container houses on the first floor of the prefabricated house are connected to the studs pre-buried in the prefabricated house foundation; hoisting the remaining container houses to the top of the first floor of the prefabricated house side by side to form a second floor of the prefabricated house, and the container houses on the second floor of the prefabricated house are offset forward along the first floor of the prefabricated house, and the frames of the container houses on the second floor of the prefabricated house are connected to the frames of the corresponding container houses on the first floor of the prefabricated house through a plurality of bolts; a first floor corridor is arranged on the front side, left side or / and right side of the first floor of the prefabricated house, and the offset portion of the rear part of the top surface of the first floor of the prefabricated house serves as a second floor corridor, the doors of the container houses on the first floor of the prefabricated house face the first floor corridor, and the doors of the container houses on the second floor of the prefabricated house face the second floor corridor, and stairs are arranged extending from the first floor corridor to the second floor corridor.

[0020] Preferably, the thickness of the concrete slab is not less than 500 mm, and the buried depth of the foundation of the board house is not less than 500 mm; there is a space for installing a container room on the first floor and the second floor of the board house, which is reserved as a space for installing a staircase room, and the stairs are arranged in the staircase room.

[0021] The beneficial technical effects of the present invention are:

[0022] 1. The prefabricated house provided by the present invention is arranged by displacing the second floor of the house forward relative to the first floor of the house as a whole, arranging the second floor corridor at the rear side of the second floor of the house, and arranging the first floor corridor at the front side of the first floor of the house, so that the sounds of the residents walking on the second floor of the house or walking and talking on the second floor corridor face the rear side, while the sounds of the residents walking or talking on the first floor of the house face the front side, thereby reducing the interference between the residents on the second floor and the first floor of the house and reducing the noise introduced into each box room.

[0023] 2. Compared with the current method of building a separate corridor in front of the second floor of the board house, the second-floor corridor in the present invention uses the top surface of the first floor of the board house as the corridor. The top surface of the first floor of the board house is obviously more stable, the vibration and noise generated by people walking on the second-floor corridor are small, and the vibration and noise in each box room on the first floor of the board house are even smaller.

[0024] 3. By designing a prefabricated board house foundation, the foundation construction speed of the prefabricated board house of this application is fast, which is conducive to the rapid construction of the entire board house. The overall thickness of the board house foundation is thick and the buried depth is deep, which makes the board house stable, the first floor of the board house is not easy to be affected by moisture, and the floor of each room on the first floor of the board house is thick and has no hollow feeling.

[0025] 4. The aluminum plate used in the wall panel is corrosion-resistant and has a long service life. The polyurethane board is fire-resistant and has good thermal insulation and sound insulation effects. The fluorocarbon paint surface of the wall panel is self-cleaning, making the outer surface of the wall panel resistant to dirt.

[0026] 5. The honeycomb aluminum plate layer of the floor plays a moisture-proof role, while the rubber layer can increase walking comfort. Moreover, since the honeycomb aluminum plate layer has many small holes, it can reduce the vibration of the steel base layer of the floor caused by the residents walking indoors, and can play a sound insulation role. The rubber layer is elastic and can also reduce the vibration of the floor caused by the residents walking indoors, so that the floor of the container room has a good sound insulation effect.

[0027] 5. The method for building a prefabricated house of the present invention builds the components of the prefabricated house by assembling them, so that the prefabricated house can be built quickly, and the prefabricated house foundation is thick, the built prefabricated house is stable and durable, and the disassembly and assembly and transfer are convenient and can be reused. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 This is a schematic diagram of the three-dimensional structure of an assembled board house according to an embodiment of the present invention;

[0029] Figure 2 This is a structural schematic diagram of a prefabricated house foundation in an embodiment of the present invention;

[0030] Figure 3 It is a schematic structural diagram of a wall panel of a container house in an assembled board house according to an embodiment of the present invention;

[0031] Figure 4 This is a schematic structural diagram of a floor of a container house in an assembled board house according to an embodiment of the present invention;

[0032] Figure 5 It is a structural schematic diagram of the legs in the assembled board house according to one embodiment of the present invention;

[0033] Figure 6 It is a three-dimensional structural schematic diagram of an assembly frame of a container house in an assembled panel house according to an embodiment of the present invention;

[0034] Figure 7 The present invention is a flowchart of a method for building a prefabricated house according to an embodiment of the present invention.

[0035] In the figure, the reference numerals are indicated as: a first floor of a prefabricated house 10, a first floor corridor 11, a second floor of a prefabricated house 20, a second floor corridor 21, a baffle 22, a triangular supporting beam 221, a railing 23, a supporting column 231, a staircase 30, a prefabricated house foundation 40, a plate 41, an embossed aluminum plate 51, a polyurethane plate 52, a power line 53, a low-voltage socket 54, a steel base layer 61, a honeycomb aluminum plate layer 62, a rubber layer 63, a double-layer steel springboard 70, a leg 71, a lower connecting plate 711, an upper connecting plate 712, a screw hole 713, an oblique support 72, a column 81, a cross beam 82, a longitudinal beam 83, an L-shaped support plate 84, and a bracket 85. DETAILED DESCRIPTION

[0036] The specific implementation modes of the present invention are described below in conjunction with the accompanying drawings and examples. However, the following examples are only used to illustrate the present invention in detail and do not limit the scope of the present invention in any way.

[0037] Embodiment 1:

[0038] A prefabricated house, please refer to Figures 1 to 7 .

[0039] like Figure 1 As shown, the prefabricated house provided in the embodiment of the present invention includes a first floor 10, a second floor 20 and a staircase 30. The staircase 30 extends from the first floor 10 to the second floor 20. The first floor 10 and the second floor 20 both include a plurality of box rooms arranged side by side. The second floor 20 is installed on the top of the first floor 10. The second floor 20 is displaced forward relative to the first floor 10 as a whole. The displaced portion on the rear side of the top surface of the first floor 10 is used as a second floor corridor 21. The doors of the box rooms in the second floor 20 face the second floor corridor 21. A first floor corridor 11 is provided on the front and left sides of the first floor 10. The doors of the box rooms in the first floor 10 face the first floor corridor 11. There is no need to build a shelter above the first floor corridor 11.

[0040] A shielding plate 22 for shielding the second-floor corridor 21 is provided on the rear side of the top of the second-floor prefabricated house 20. The shielding plate 22 is fixedly installed on the top of the second-floor prefabricated house 20 through a triangular support beam 221. A railing 23 is provided on the side of the second-floor corridor 21. The supporting column 231 of the railing 23 is fixed on the top of the first-floor prefabricated house 10. The displaced part on the front side of the second-floor prefabricated house 20 shields the part of the first-floor corridor 11 located on the front side of the first-floor prefabricated house 10.

[0041] By displacing the second floor 20 of the board house forward relative to the first floor 10 of the board house as a whole, setting the second floor corridor 21 at the rear side of the second floor 20 of the board house, and setting the first floor corridor 11 at the front side of the first floor 10 of the board house, the width of the second floor corridor 21 is 2 meters, which is convenient for people to move around and prevent crowding. In this way, the residents on the second floor 20 of the board house walk or talk on the second floor corridor 21 facing the rear side, while the residents on the first floor 10 of the board house walk or talk facing the front side, thereby reducing the interference between the residents on the second floor 20 and the first floor 10 of the board house and reducing the noise introduced into each box room.

[0042] Compared with the current method of building a separate corridor in front of the second floor 20 of the board house, the second floor corridor 21 in the present invention uses the top surface of the first floor 10 of the board house as the corridor. The top surface of the first floor 10 of the board house is obviously more stable, and the vibration and noise generated by people walking on the second floor corridor 21 are small, and the vibration and noise in each box room of the first floor 10 of the board house are even smaller.

[0043] The prefabricated house also includes a house foundation, such as Figure 2 As shown, the board house foundation 40 is composed of a plurality of panels 41, which are prefabricated concrete panels, and a steel cage is provided inside the concrete panel to improve its strength. A plurality of studs for connecting the container house are pre-buried in the panel 41. The board house foundation 40 is partially buried in the ground. In this embodiment, the buried depth H1 of the board house foundation 40 is 600 mm, and the thickness H of the board house foundation 40 is 700 mm.

[0044] By designing the prefabricated board house foundation 40, the foundation construction speed of the prefabricated board house of the present application is fast, which is conducive to the rapid construction of the entire board house. The overall thickness of the board house foundation 40 is thick and the buried depth is deep, so that the board house has good stability, the first floor 10 of the board house is not easy to be damp, and the floor of each room on the first floor 10 of the board house is thick and has no hollow feeling.

[0045] Furthermore, the wall panels around each box house of the prefabricated board house of the present application are made of polyurethane panels filled in the aluminum plate sandwich, such as Figure 3 As shown, the wall panel includes embossed aluminum plates 51 on both sides and a polyurethane plate 52 in the middle, and the outer surface of the wall panel is coated with a fluorocarbon paint layer.

[0046] The embossed aluminum plate is corrosion-resistant and has a long service life, the polyurethane plate 52 is fire-resistant and has good thermal insulation and sound insulation effects, and the fluorocarbon paint surface is self-cleaning, making the outer surface of the wall panel resistant to dirt.

[0047] Furthermore, a power line 53 is embedded in the polyurethane board 52 of the container house wall panel. The upper end of the power line 53 can be connected to the main power supply line laid on the top of each floor of the board house. A low-voltage socket 54 connected to the power line 53 is provided in the box house, and the low-voltage socket 54 provides a 36V power supply. By embedding the power lines and setting the low-voltage sockets, the lines are avoided from being exposed, and the use of 220V high voltage electricity indoors is avoided, thereby reducing the safety risk of electricity use. In addition, the power lines for lighting and air conditioners are embedded in the roof board, and the main power supply line of the assembled board house is provided with a generator power supply interface. During power outages or in areas where it is difficult to supply power in the wild, power can be supplied by a generator.

[0048] Each container room is equipped with floor and roof panels. The material of the roof panel is the same as that of the wall panel, which is also made of polyurethane board filled in the aluminum sandwich. Figure 4 As shown, the floor comprises a steel base layer 61, a honeycomb aluminum plate layer 62 and a rubber layer 63 from bottom to top. The steel base layer 61 is a 10 mm thick steel plate, the honeycomb aluminum plate layer 62 is 5 mm thick, and the rubber layer 63 is 10 mm thick.

[0049] The steel base layer 61 plays a supporting role, the honeycomb aluminum plate layer 62 plays a moisture-proof role, and the rubber layer 63 increases walking comfort. In addition, since the honeycomb aluminum plate layer 62 has many small holes, it can reduce the vibration of the steel base layer 61 caused by the residents walking indoors, and can play a sound insulation role. The rubber layer 63 is elastic and can also reduce the vibration of the floor caused by the residents walking indoors. Therefore, the floor of the container room has a good sound insulation effect.

[0050] Further, such as Figure 1 As shown, an anti-smashing buffer shed is provided on the top of the second floor 20 of the board house. The anti-smashing buffer shed is assembled from a plurality of unit sheds. The unit shed includes a support leg 71 fixed to the top of the second floor 20 of the board house and a double-layer steel springboard 70 installed on the top of the support leg 71. The double-layer steel springboard 70 covers the entire board house. An inclined support 72 is provided under the backward extending portion of the double-layer steel springboard 70. The double-layer steel springboard 70 has a strong anti-smashing capability.

[0051] like Figure 5 As shown, in this embodiment, a lower connecting plate 711 is fixedly welded to the bottom of the supporting leg 71, and an upper connecting plate 712 is welded to the top. Screw holes 713 are provided on the lower connecting plate 711 and the upper connecting plate 712. The lower connecting plate 711 is fixedly installed on the supporting beam on the top of the box house corresponding to the second floor 20 of the plate house by bolts, and the double-layer steel springboard 70 is fixed to the upper connecting plate 712 by bolts for easy assembly.

[0052] Further, the container house includes an assembly frame, such as Figure 6As shown, the assembly frame includes left and right vertical frames, and the vertical frames include front and rear columns 81. A cross beam 82 is connected between the upper and lower ends of the columns 81, and a longitudinal beam 83 is connected between the left and right vertical frames at four corners. The columns 81, cross beams 82 and longitudinal beams 83 in this embodiment are all square steels. The connections between the columns 81, cross beams 82 and longitudinal beams 83 are welded, and the gaps between the columns 81, cross beams 82 and longitudinal beams 83 are filled with waterproof glue.

[0053] A wall panel is installed between adjacent columns 81. The wall panel is a sandwich wall panel. The wall panel is fixed to the corresponding column 81 by an L-shaped aluminum alloy strip and screws. During installation, one side plate of the L-shaped aluminum alloy strip is first fixed to the side of the wall panel by screws, and then the other side plate of the L-shaped aluminum alloy strip is fixed to the column 81.

[0054] Furthermore, L-shaped support plates 84 for carrying the roof of the container house are respectively provided on the inner sides of the two horizontal beams 82 and the two longitudinal beams 83 at the top of the assembly frame, and the back of the vertical plate part of the L-shaped support plate 84 is correspondingly welded to the inner side of the horizontal beam 82 or the longitudinal beam 83, and waterproof glue is filled between the back of the vertical plate part of the L-shaped support plate 84 and the inner side of the corresponding horizontal beam 82 or longitudinal beam 83 to prevent water leakage or water ingress into the gaps, resulting in rust and shortening the service life of the frame. The roof of the container house is correspondingly installed on the L-shaped support plate 84.

[0055] Furthermore, a plurality of brackets 85 for supporting the floor of the board house are respectively provided on the inner sides of the two cross beams 82 and the two longitudinal beams 83 at the bottom of the assembly frame. Figure 6 As shown, several brackets 85 are arranged at intervals in the middle of the cross beam 82 and the two longitudinal beams 83. The brackets 85 are L-shaped short plates welded to the inner side of the cross beam 82 or the longitudinal beam 83. The floor of the container room is supported on the brackets 85, which is convenient to install.

[0056] Embodiment 2:

[0057] A method for building a prefabricated house, please refer to Figure 7 .

[0058] The method for constructing a prefabricated house according to an embodiment of the present invention includes:

[0059] S100: Laying the foundation of the prefabricated house: dig a foundation pit on the ground where the prefabricated house is to be built and level it. Use prefabricated concrete slabs to assemble the prefabricated house foundation at the foundation pit. The thickness of the concrete slabs shall not be less than 500mm. The entire prefabricated house foundation is partially buried in the ground, and the burial depth of the prefabricated house foundation is not less than 500mm. Pre-embed a number of studs for fixing the container house in each concrete slab.

[0060] S200: Assembling container houses: Use pre-prepared steel materials such as channel steel, angle steel and connecting bolts to assemble the frame of the container house. During the frame assembly process, install the wall, floor and roof panels of the container house on the frame, and assemble several container houses required for building a prefabricated house. During the container house assembly process, for each container house on the second floor of the prefabricated house, first insert the connecting bolts into the corresponding angle steel longitudinal beam at the bottom of the frame, so as to connect to the top of the frame of each container house on the first floor of the prefabricated house.

[0061] S300: Building a prefabricated house:

[0062] S310: placing multiple container houses side by side on the foundation of the prefabricated house to form a first floor of the prefabricated house, and the frames of the container houses on the first floor of the prefabricated house are correspondingly connected to the studs embedded in the foundation of the prefabricated house;

[0063] S320: hoist the remaining container houses to the top of the first floor of the prefabricated house and arrange them side by side to form the second floor of the prefabricated house, and the container houses on the second floor of the prefabricated house are staggered forward along the first floor of the prefabricated house, and the frames of the container houses on the second floor of the prefabricated house are connected to the frames of the corresponding container houses on the first floor of the prefabricated house by bolts;

[0064] S330: A first-floor corridor is paved with anti-slip floor tiles on the front and left sides of the first floor of the prefabricated house. The offset part of the rear top surface of the first floor of the prefabricated house is directly used as the second-floor corridor. The doors of each container room on the first floor of the prefabricated house face the first-floor corridor, and the doors of each container room on the second floor of the prefabricated house face the second-floor corridor. A staircase is set up to extend from the first-floor corridor to the second-floor corridor.

[0065] When the first and second floors of the prefabricated house are built as mentioned above, a space for installing a container room on the first and second floors is reserved as a space for installing a stair room. The stair room has the same assembly frame as the other container rooms. Only wall panels are installed on the back side of the first-floor stair room and the front side of the second-floor stair room, and the stairs are installed in the stair room.

[0066] The present invention has been described in detail above with reference to the accompanying drawings and embodiments. However, those skilled in the art will appreciate that, without departing from the spirit of the present invention, the specific parameters in the above embodiments may be changed to form a plurality of specific embodiments, which are all within the common variation range of the present invention and will not be described in detail herein.

Claims

1. An assembled board house, comprising a board house first floor, a staircase and a board house second floor, wherein the board house first floor and the board house second floor each comprise a plurality of box rooms arranged side by side, the board house second floor is installed on the top of the board house first floor, and the staircase extends from the board house first floor to the board house second floor, characterized in that: The second floor of the board house is offset forward relative to the first floor of the board house as a whole, and the offset portion of the rear side of the top surface of the first floor of the board house serves as a second-floor corridor, and the door of each of the box rooms on the second floor of the board house faces the second-floor corridor. A first-floor corridor is provided on the front side, left side or / and right side of the first floor of the board house, and the door of each of the box rooms on the first floor of the board house faces the first-floor corridor; A shielding plate for shielding the second-floor corridor is provided on the rear side of the top of the second-floor board house, and a railing is provided on the side of the second-floor corridor; the dislocated part of the front side of the second-floor board house shields the first-floor corridor; The container house includes an assembly frame, which includes vertical frames on left and right sides, and the vertical frame includes columns on front and rear sides, a horizontal beam is connected between the upper and lower ends of the columns, and a longitudinal beam is connected between the vertical frames on the left and right sides at four corners; L-shaped supporting plates for supporting the roof of the board house are respectively provided on the inner sides of the two horizontal beams and two longitudinal beams at the top of the assembly frame; and multiple brackets for supporting the floor of the board house are respectively provided on the inner sides of the two horizontal beams and two longitudinal beams at the bottom of the assembly frame.

2. The prefabricated house according to claim 1, characterized in that: It also includes a prefabricated house foundation, which is composed of a number of panels. The prefabricated house foundation is partially buried in the ground, and the buried depth of the prefabricated house foundation is not less than 500mm.

3. The prefabricated house according to claim 1, characterized in that: The wall panels around the container house are made of polyurethane panels filled in aluminum plate sandwiches, and the outer surfaces of the wall panels are coated with a fluorocarbon paint layer.

4. The prefabricated house according to claim 1, characterized in that: The container house is provided with a floor and a roof panel, wherein the floor comprises a steel base layer, a honeycomb aluminum plate layer and a rubber layer in sequence from bottom to top; and the roof panel is made of a polyurethane plate filled in an aluminum plate sandwich.

5. The prefabricated house according to claim 1, characterized in that: The wall panels, floors and / or roof panels of the container house are pre-buried with power lines; the container house is provided with a low-voltage socket connected to the power lines; the main power supply circuit of the assembled panel house is provided with a generator power supply interface.

6. The prefabricated house according to claim 1, characterized in that: An anti-smashing buffer shed is arranged on the top of the second floor of the board house. The anti-smashing buffer shed is assembled from a plurality of unit sheds. The unit shed comprises legs fixed to the top of the second floor of the board house and a double-layer steel springboard installed on the top of the legs.

7. A method for building a prefabricated house, characterized in that: include: (1) Laying the foundation of the prefabricated house: The prefabricated reinforced concrete slabs are used to assemble the foundation of the prefabricated house. A number of studs for fixing the container house are embedded in the concrete slabs. The foundation of the prefabricated house is partially buried in the ground. (2) Assembling container houses: Use steel to assemble the frame of the container house, and install the walls, floors and roof panels of the container house on the assembled frame. In this way, assemble several container houses required for building a panel house; (3) Building prefabricated houses: Placing a plurality of the container houses side by side on the foundation of the board house to form a first layer of the board house, wherein the frames of the container houses on the first layer of the board house are correspondingly connected to the studs pre-buried in the foundation of the board house; The remaining container houses are hoisted to the top of the first floor of the board house and arranged side by side to form the second floor of the board house, and the container houses in the second floor of the board house are staggered forward along the first floor of the board house, and the frames of the container houses in the second floor of the board house are connected to the frames of the corresponding container houses in the first floor of the board house by bolts; A first-floor corridor is arranged on the front side, left side or / and right side of the first floor of the board house, and the displaced part of the rear part of the top surface of the first floor of the board house serves as a second-floor corridor. The door of each of the box rooms on the first floor of the board house faces the first-floor corridor, and the door of each of the box rooms on the second floor of the board house faces the second-floor corridor. A staircase extending from the first-floor corridor to the second-floor corridor is arranged.

8. The method for constructing a prefabricated house according to claim 7, characterized in that: The thickness of the concrete slab is not less than 500mm, and the buried depth of the foundation of the board house is not less than 500mm; there is a space for installing a container room on the first floor and the second floor of the board house, which is reserved as a space for installing a staircase room, and the stairs are arranged in the staircase room.