Anti-deviation lowering device for steel cofferdam

By using laser rangefinders and stress sensors for real-time monitoring and adjustment during the lowering process of the steel cofferdam, the problems of offset and emergency warning during the lowering process of the steel cofferdam are solved, and the safety and stability of the lowering process are improved.

CN112267482BInactive Publication Date: 2024-10-11ZHENGZHOU UNIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011141440.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-22
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Steel cofferdams are difficult to control during the lowering process, are prone to drift, and cannot be detected in real time, resulting in the inability to provide timely warnings and adjustments in emergencies.

Method used

A steel cofferdam anti-deflection device including two rows of side-by-side steel casing groups and a hoisting structure is designed. A laser rangefinder and stress sensor are used to monitor the position and stress changes of the steel cofferdam in real time, and an early warning is issued through an alarm system. And adjust the anti-offset device to ensure the safety of the lowering process.

Benefits of technology

Real-time monitoring and deviation prevention of the steel cofferdam lowering process are realized, which improves the safety and stability of the operation and ensures the safety and controllability of the steel cofferdam during the lowering process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112267482B_ABST
    Figure CN112267482B_ABST
Patent Text Reader

Abstract

The device for lowering the steel cofferdam against deviation comprises two rows of steel casing groups arranged side by side, each row of steel casing groups comprises a plurality of steel casings arranged at intervals in the front-rear direction, each steel casing is vertically arranged in the river channel, each section of the steel cofferdam is a rectangular cylindrical structure that is transparent from top to bottom, a hoisting structure for lowering the steel cofferdam is arranged on the top of the two rows of steel casing groups, two sets of lateral anti-deviation devices spaced up and down are arranged between the inner wall of the steel cofferdam and each steel casing, a channel steel track is vertically fixedly connected to the upper edge of the outer circular side of the steel casing facing the inner wall of the steel cofferdam, one end of the lateral anti-deviation device is fixedly installed on the inner wall of the first section of the steel cofferdam, and the other end of the lateral anti-deviation device is slidably or rollingly arranged on the channel steel track. The invention is very simple to operate, prevents the steel cofferdam from deflecting during the lowering process, and can also timely monitor the stability and safety of the structure through stress sensors, and issue early warnings for emergency situations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel cofferdams for pile foundation construction of bridge engineering, and in particular to a steel cofferdam anti-deviation lowering device. Background Art

[0002] The steel cofferdam (double wall) serves as a water retaining structure for the construction of the platform and as a supporting structure for the drilling platform. The loads it bears include the impact force of the water flow, the head pressure, and the vertical force exerted by the drilling platform. At present, when the steel cofferdam is lowered, there are problems such as the steel cofferdam being difficult to control, the inability to detect the lowering process of the steel cofferdam in real time, the tendency to deviate, being heavy and difficult to operate, and the inability to provide timely warnings and make adjustments before an emergency occurs. Summary of the invention

[0003] The purpose of the present invention is to provide a device for preventing the steel cofferdam from deflecting during lowering. The device is very simple to operate and can prevent the steel cofferdam from deflecting during the lowering process. It can also monitor the stability and safety of the structure in time through stress sensors and issue early warnings for emergency situations.

[0004] To achieve the above object, the present invention adopts the following technical solution:

[0005] The device for lowering the steel cofferdam against deviation comprises two rows of steel casing groups arranged side by side, each row of the steel casing groups comprises a number of steel casings arranged at intervals in the front-rear direction, each steel casing is vertically arranged in the river channel, and each section of the steel cofferdam is a rectangular cylindrical structure which is transparent from top to bottom. A hoisting structure for lowering the steel cofferdam is arranged on the top of the two rows of steel casing groups, and two sets of lateral anti-deviation devices spaced up and down are arranged between the inner wall of the steel cofferdam and each steel casing, a channel steel track is vertically fixedly connected to the upper edge of the outer circular side of the steel casing facing the inner wall of the steel cofferdam, one end of the lateral anti-deviation device is fixedly installed on the inner wall of the first section of the steel cofferdam, and the other end of the lateral anti-deviation device is slidably or rollingly arranged on the channel steel track.

[0006] The hoisting structure includes two groups of Bailey beam groups arranged side by side on the left and right, each group of Bailey beam groups includes at least one Bailey beam, the length direction of the Bailey beam is horizontally arranged along the front-to-back direction, each Bailey beam is fixedly installed on the top of the corresponding row of steel casing groups, and a jack is fixedly installed on the front and back sides of the upper part of each Bailey beam. A first distribution beam is fixedly connected between the upper middle sides of the two corresponding Bailey beams on the left and right, and a second distribution beam is fixedly connected between the tops of the two corresponding jacks on the left and right. The first distribution beam and the second distribution beam are both horizontally arranged along the left and right directions, and the first distribution beam is located in the middle of the two front and rear second distribution beams. The left and right sides of the first distribution beam and the second distribution beam are both provided with round holes that are transparent from top to bottom. The left and right sides of the first distribution beam are slidably connected with a first threaded steel hanger passing through the corresponding round hole, and the left and right sides of the second distribution beam are slidably connected with a second threaded steel hanger passing through the corresponding round hole. The lower ends of the first threaded steel hanger and the second threaded steel hanger are fixedly connected with corbels, and the corbels are welded and fixed to the inner wall of the first section of the steel cofferdam. The first threaded steel hanger is threadedly connected with a first nut located on the upper part of the first distribution beam, and the second threaded steel hanger is threadedly connected with a second nut located on the upper part of the second distribution beam. The upper ends of the first threaded steel hanger and the second threaded steel hanger are both provided with threaded blind holes, and the lower ends of the first threaded steel hanger and the second threaded steel hanger are both provided with threaded connecting columns that are threadedly connected to the threaded blind holes.

[0007] The lateral anti-deviating device at the lower left side includes a horizontal thick square tube, an inclined thick square tube, a thin square tube and a snowflake pattern nylon directional pulley. The horizontal thick square tube is horizontally arranged in the left and right directions, and the inclined thick square tube is inclined in the left and right directions with the left side higher and the right side lower. The thin square tube is inserted and slid in the horizontal thick square tube with the same center. The left ends of the horizontal thick square tube and the inclined thick square tube are welded and fixed to the lower side of the left inner wall of the steel cofferdam, and the right end of the inclined thick square tube is welded and fixed to the right side of the horizontal thick square tube. There is a fixed connection between the right side of the middle of the horizontal thick square tube and the inclined thick square tube. A vertical support tube, the right end of the thin square tube extends out of the right end of the horizontal thick square tube, the snowflake pattern nylon directional pulley is rotatably installed on the right end of the thin square tube, the rotating shaft of the snowflake pattern nylon directional pulley is horizontally arranged in the front-to-back direction, the right side wheel surface of the snowflake pattern nylon directional pulley is rollingly arranged in the corresponding channel steel track, a rack structure is arranged on the upper side surface of the thin square tube, a ratchet is hingedly installed on the upper side of the right end of the horizontal thick square tube, the pin shaft at the hinge of the left end of the ratchet is arranged in the front-to-back direction and is installed with a torsion spring, and the right end of the ratchet is bent downward and clamped in the tooth groove of the rack structure;

[0008] A magnet is arranged on the top of the vertical support pipe, on which a laser rangefinder is adsorbed. Stress sensors are arranged on the inner wall of the steel cofferdam at the welding point with the horizontal thick square pipe and on the right side of the thin square pipe.

[0009] A plurality of guide pulleys are rotatably mounted on the left side of the thin square tube, and each guide pulley is rotatably arranged in a horizontal thick square tube.

[0010] Using the above technical solution, the operation method of the steel cofferdam anti-deviation lowering device has the following specific operation steps:

[0011] (1) Use two rows of steel casings as the pile bearing system to build a hoisting structure for lowering the steel cofferdam;

[0012] (2) Use the hoisting structure to lower the first section of the steel cofferdam vertically along two rows of steel casings to the predetermined position;

[0013] (3) Use a crane to hoist the second section of the steel cofferdam to the top of the first section of the steel cofferdam, so that the second section of the steel cofferdam and the first section of the steel cofferdam correspond to each other up and down and then weld them to fix;

[0014] (4) Repeat step (2) to continue lowering the second section of the steel cofferdam and the first section of the steel cofferdam until they reach the design elevation of the steel cofferdam.

[0015] Step (1) is specifically as follows: first, a channel steel rail is welded on the side wall of each steel casing, and then a crane is used to vertically lower each steel casing according to the construction requirements and fix it in the river channel. Similarly, a crane is used to hoist a plurality of Bailey beams to the top of the left and right rows of steel casing groups, and each Bailey beam is fixedly installed on the top of the left and right rows of steel casing groups, and then a jack is fixedly installed on the upper front and rear sides of each Bailey beam, a first distribution beam is fixedly connected between the upper middle sides of the two corresponding Bailey beams on the left and right, and a second distribution beam is fixedly connected between the tops of the two corresponding jacks on the left and right. Distribution beams, pass the corresponding first threaded steel hangers through the left and right round holes of the first distribution beams, pass the corresponding second threaded steel hangers through the left and right round holes of the second distribution beams, and fix a corbel on the lower end of each first threaded steel hanger and each second threaded steel hanger. Use a crane to put the first section of steel cofferdam on the outside of each steel casing, make the snowflake pattern nylon directional pulleys of each lateral anti-deviation device on the first section of steel cofferdam roll in the corresponding channel steel track, lower the first section of steel cofferdam to the predetermined initial position, and weld and fix each corbel on the inner wall of the first section of steel cofferdam.

[0016] Step (2) is specifically as follows: first, tighten the first nut on the first threaded steel hanger rod to firmly fix the first threaded steel hanger rod and the corresponding first distribution beam, so that the first section of the steel cofferdam is fixedly connected to the first distribution beam through the first threaded steel hanger rod, the first distribution beam bears the deadweight of the first section of the steel cofferdam, and the extended end of the jack is in a fully retracted state. At the same time, loosen the second nut on the second threaded steel hanger rod to move the second nut upward along the second threaded hanger rod to a distance equal to the maximum stroke of the extended end of the jack, and then, start each jack synchronously to push the extended end of each jack upward synchronously. The jack pushes the second distribution beam upward to the maximum stroke, so that the upper part of the second distribution beam is close to the corresponding second nut, and then the second nut is tightened. The nut is tightened to firmly fix the second distribution beam and the two second threaded steel hangers thereon, thereby making the first section of the steel cofferdam fixedly connected to the second distribution beam through the second threaded steel hanger. Afterwards, the first nut on the first threaded steel hanger is loosened to make the first nut move upward along the first threaded hanger to a distance equal to the maximum stroke of the extended end of the jack. Then, each jack is controlled to start synchronously, so that the extended end of each jack is synchronously retracted downward to a fully retracted position. The jack drives the second distribution beam to move downward, and the second distribution beam drives the first section of the steel cofferdam to move downward as a whole through the second threaded steel hanger, so that the first nut moves downward with the first threaded hanger to a position close to the upper part of the first distribution beam, and each jack stops moving.

[0017] Repeat the above operation process, that is: tighten the first nut on the first threaded steel hanger again, firmly fix the first threaded steel hanger and the corresponding first distribution beam, so that the first section of the steel cofferdam is fixedly connected to the first distribution beam through the first threaded steel hanger, and the first distribution beam bears the dead weight of the first section of the steel cofferdam. The extended end of the jack is in a fully retracted state. At the same time, loosen the second nut on the second threaded steel hanger, so that the second nut moves upward along the second threaded hanger to the same distance as the maximum stroke of the extended end of the jack, and then, start each jack synchronously, so that the extended end of each jack is synchronously pushed upward, the jack lifts the second distribution beam upward to the maximum stroke, so that the upper part of the second distribution beam is close to the corresponding second nut, and then the second The nut is tightened to firmly fix the second distribution beam and the two second threaded steel hangers thereon, thereby making the first section of the steel cofferdam fixedly connected to the second distribution beam through the second threaded steel hanger. Afterwards, the first nut on the first threaded steel hanger is loosened to make the first nut move upward along the first threaded hanger to a distance equal to the maximum stroke of the extended end of the jack. Then, each jack is controlled to start synchronously, so that the extended end of each jack is synchronously retracted downward to a fully retracted position. The jack drives the second distribution beam to move downward, and the second distribution beam drives the first section of the steel cofferdam to move downward as a whole through the second threaded steel hanger, so that the first nut moves downward with the first threaded hanger to a position close to the upper part of the first distribution beam, and each jack stops moving.

[0018] By repeating the above process, the first section of the steel cofferdam can be gradually lowered to the predetermined position, and the upper end of the first section of the steel cofferdam is ensured to be above the water surface; during the lowering process of the first section of the steel cofferdam, the distance between the first section of the steel cofferdam and the corresponding steel casing is monitored in real time by various laser rangefinders. When the distance monitored by a certain laser rangefinder exceeds the limit, it means that the steel cofferdam as a whole has shifted in the lateral direction. In this case, the staff needs to dive underwater and reach the lateral anti-deviation device where the laser rangefinder is located. The staff member moves the ratchet of the lateral anti-deviation device with one hand to move one end of the ratchet out of the tooth groove of the rack structure, and the staff member moves the ratchet with the other hand to move one end of the ratchet out of the tooth groove of the rack structure. On the one hand, according to the actual monitoring situation of the laser rangefinder, the corresponding thin square tube is extended or retracted into the corresponding horizontal thick square tube, and the distance between the steel cofferdam and the corresponding steel casing at that position is adjusted to prevent the steel cofferdam from shifting during the lowering process. In addition, various stress sensors are used to monitor the stress changes at the welding point between the horizontal thick square tube and the steel cofferdam and the right side of the thin square tube in real time. When the stress value reaches 80% of the maximum stress, an early warning is issued through the alarm system at the construction site. The staff promptly stops the lowering operation, finds the cause, and makes an emergency plan to ensure the safety of the overall lowering of the steel cofferdam, thereby preventing the occurrence of emergencies.

[0019] Before the construction work in step (4), the lower end threaded connection columns of the other several first threaded steel hangers are respectively screwed into the upper end threaded blind holes of the corresponding first threaded steel hangers to extend the first threaded steel hangers. Similarly, the lower end threaded connection columns of the other several second threaded steel hangers are respectively screwed into the upper end threaded blind holes of the corresponding second threaded steel hangers to extend the second threaded steel hangers, and then repeat step (2) to continue to lower the second section of the steel cofferdam and the first section of the steel cofferdam until the design elevation of the steel cofferdam is reached.

[0020] Compared with the prior art, the present invention has outstanding substantial features and significant progress. Specifically, the present invention is very simple to operate. When lowering the steel cofferdam, the length of the thin square tube extending out of the corresponding horizontal thick square tube can be adjusted in advance according to the distance between the inner wall of the steel cofferdam and the corresponding steel casing, which greatly improves the scope of application and practicality of the lateral anti-deviation device. In addition, the distance between the steel cofferdam lowering process and each steel casing can be monitored in real time by a laser rangefinder, which is convenient for timely adjusting the state of the steel cofferdam, preventing the steel cofferdam from deflecting, and facilitating the overall control of the steel cofferdam. The stress changes at the welding point between the horizontal thick square tube and the steel cofferdam and the right side of the thin square tube are monitored in real time by various stress sensors. When the stress value reaches 80% of the maximum stress, an early warning is issued by the alarm system at the construction site, and the staff promptly stops the lowering operation, finds the cause, and makes an emergency plan to ensure the safety of the overall lowering of the steel cofferdam, thereby preventing the occurrence of emergencies. The use of stress sensors greatly improves the stability and safety of the structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a structural schematic diagram of the present invention.

[0022] Figure 2 It is a structural schematic diagram of the hoisting structure of the present invention.

[0023] Figure 3 yes Figure 1 A partial enlarged view of point A in the middle.

[0024] Figure 4 yes Figure 1 A partial enlarged view of point B in the middle.

[0025] Figure 5 yes Figure 2 A partial enlarged view of point C in the middle.

[0026] Figure 6 It is a connection schematic diagram of connecting another second threaded steel hanger rod at the upper end of the second threaded steel hanger rod of the present invention. DETAILED DESCRIPTION

[0027] The embodiments of the present invention are further described below with reference to the accompanying drawings.

[0028] like Figure 1-6 As shown, the device for lowering the steel cofferdam against deviation comprises two rows of steel casing groups arranged side by side, each row of the steel casing groups comprises a plurality of steel casings 1 arranged at intervals in the front-rear direction, each steel casing 1 is vertically arranged in the river channel, each section of the steel cofferdam 2 is a rectangular cylindrical structure which is transparent from top to bottom, a hoisting structure for lowering the steel cofferdam is arranged on the top of the two rows of steel casing groups, two sets of lateral anti-deviation devices 3 spaced up and down are arranged between the inner wall of the steel cofferdam 2 and each steel casing 1, a channel steel track is vertically fixedly connected to the upper edge of the outer circular side portion of the steel casing 1 facing the inner wall of the steel cofferdam, one end of the lateral anti-deviation device 3 is fixedly installed on the inner wall of the first section of the steel cofferdam 2, and the other end of the lateral anti-deviation device 3 is slidably or rollingly arranged on the channel steel track.

[0029] The hoisting structure includes two groups of Bailey beam groups arranged side by side on the left and right, each group of Bailey beam groups includes at least one Bailey beam 5, the length direction of the Bailey beam 5 is horizontally arranged along the front-to-back direction, each Bailey beam 5 is respectively fixedly installed on the top of the corresponding row of steel casing groups, and a jack 6 is fixedly installed on the front and back sides of the upper part of each Bailey beam 5. A first distribution beam 7 is fixedly connected between the upper middle sides of the two corresponding Bailey beams 5 on the left and right, and a second distribution beam 8 is fixedly connected between the tops of the two corresponding jacks 6 on the left and right. The first distribution beam 7 and the second distribution beam 8 are both horizontally arranged along the left and right directions, and the first distribution beam 7 is located in the middle of the front and rear second distribution beams 8. The left and right sides of the first distribution beam 7 and the second distribution beam 8 are both provided with round holes that are transparent from top to bottom. The left and right sides of the supporting beam 7 are slidably connected with a first threaded steel hanger 9 passing through the corresponding circular hole, and the left and right sides of the second distribution beam 8 are slidably connected with a second threaded steel hanger 10 passing through the corresponding circular hole. The lower ends of the first threaded steel hanger 9 and the second threaded steel hanger 10 are fixedly connected with corbels 11, and the corbels 11 are welded and fixed on the inner wall of the first section of the steel cofferdam 2. The first threaded steel hanger 9 is threadedly connected with a first nut 12 located on the upper part of the first distribution beam 7, and the second threaded steel hanger 10 is threadedly connected with a second nut 13 located on the upper part of the second distribution beam 8. The upper ends of the first threaded steel hanger and the second threaded steel hanger are both provided with threaded blind holes, and the lower ends of the first threaded steel hanger and the second threaded steel hanger are both provided with threaded connecting columns 26 that are threadedly connected to the threaded blind holes.

[0030] The lateral anti-deviating device 3 at the lower left side includes a horizontal thick square tube 14, an inclined thick square tube 15, a thin square tube 16 and a snowflake pattern nylon directional pulley 17. The horizontal thick square tube 14 is horizontally arranged in the left-right direction, and the inclined thick square tube 15 is inclined in the left-right direction with the left side higher and the right side lower. The thin square tube 16 is inserted and slid in the horizontal thick square tube 14 with the same center. The left ends of the horizontal thick square tube 14 and the inclined thick square tube 15 are welded and fixed to the lower side of the left inner wall of the steel cofferdam, and the right end of the inclined thick square tube 15 is welded and fixed to the right side of the horizontal thick square tube 14. The right side of the middle of the horizontal thick square tube 14 and the inclined thick square tube 15 are fixedly connected. A vertical support tube 18, the right end of the thin square tube 16 extends out of the right end of the horizontal thick square tube 14, the snowflake nylon directional pulley 17 is rotatably installed on the right end of the thin square tube 16, the rotating shaft of the snowflake nylon directional pulley 17 is horizontally arranged in the front-to-back direction, the right side wheel surface of the snowflake nylon directional pulley 17 is rollingly arranged in the corresponding channel steel track, a rack structure 19 is arranged on the upper side of the thin square tube 16, a ratchet 20 is hingedly installed on the upper side of the right end of the horizontal thick square tube 14, the pin shaft at the hinge of the left end of the ratchet 20 is arranged in the front-to-back direction and is installed with a torsion spring, and the right end of the ratchet 20 is bent downward and clamped in the tooth groove of the rack structure 19;

[0031] A magnet 21 is provided on the top of the vertical support tube 18 , and a laser rangefinder 22 is adsorbed on the magnet 21 . Stress sensors 23 are provided on the inner wall of the steel cofferdam where the horizontal thick square tube 14 is welded and on the right side of the thin square tube 16 .

[0032] A plurality of guide pulleys 24 are rotatably mounted on the left side of the thin square tube 16 , and each guide pulley 24 is rotatably arranged in the horizontal thick square tube 14 .

[0033] The operation method of the steel cofferdam anti-deviation lowering device is as follows:

[0034] (1) Using two rows of steel casings 1 as the pile bearing system, a hoisting structure for lowering the steel cofferdam is erected;

[0035] (2) Use the hoisting structure to vertically lower the first section of the steel cofferdam 2 along the two rows of steel casings 1 to the predetermined position;

[0036] (3) Use a crane to hoist the second section of the steel cofferdam 2 to the top of the first section of the steel cofferdam 2, so that the second section of the steel cofferdam 2 and the first section of the steel cofferdam 2 correspond to each other up and down and then weld them to fix;

[0037] (4) Repeat step (2) to continue lowering the second section of steel cofferdam 2 and the first section of steel cofferdam 2 until the design elevation of steel cofferdam 2 is reached.

[0038] Step (1) is specifically as follows: first, a channel steel rail is welded on the side wall of each steel casing 1, and then each steel casing 1 is vertically lowered and fixed in the river channel according to the construction requirements by a crane. Similarly, a plurality of Bailey beams 5 are hoisted to the top of the left and right rows of steel casing groups by a crane, and each Bailey beam 5 is fixedly installed on the top of the left and right rows of steel casing groups, and then a jack 6 is fixedly installed on the upper front and rear sides of each Bailey beam 5, a first distribution beam 7 is fixedly connected between the upper middle sides of the two corresponding Bailey beams 5 on the left and right, and a second distribution beam 8 is fixedly connected between the tops of the two corresponding jacks 6 on the left and right. The corresponding first threaded steel hangers 9 are respectively passed through the left and right round holes of the first distribution beams 7, and the corresponding second threaded steel hangers 10 are respectively passed through the left and right round holes of the second distribution beams 8. A corbel 11 is fixedly installed at the lower end of each first threaded steel hanger 9 and each second threaded steel hanger 10. A crane is used to put the first section of steel cofferdam 2 on the outside of each steel casing 1, so that the snowflake pattern nylon directional pulley 17 of each lateral anti-deviation device 3 on the first section of steel cofferdam 2 rolls in the corresponding channel steel track, and the first section of steel cofferdam 2 is lowered to the predetermined initial position, and each corbel 11 is welded and fixed to the inner wall of the first section of steel cofferdam 2.

[0039] Step (2) is specifically as follows: first, tighten the first nut 12 on the first threaded steel hanger 9 to firmly fix the first threaded steel hanger 9 and the corresponding first distribution beam 7, so that the first section of the steel cofferdam 2 is fixedly connected to the first distribution beam 7 through the first threaded steel hanger 9, the first distribution beam 7 bears the deadweight of the first section of the steel cofferdam 2, and the extended end of the jack 6 is in a fully retracted state. At the same time, loosen the second nut 13 on the second threaded steel hanger 10 to move the second nut 13 upward along the second threaded hanger to a distance equal to the maximum stroke of the extended end of the jack 6, and then, start each jack 6 synchronously to push the extended end of each jack 6 upward synchronously, and the jack 6 pushes the second distribution beam 8 upward to the maximum stroke, so that the upper part of the second distribution beam 8 is close to the corresponding second nut 13, and then tighten the second nut 13. The cap 13 is tightened to firmly fix the second distribution beam 8 and the two second threaded steel hangers 10 thereon, so that the first section of the steel cofferdam 2 is fixedly connected to the second distribution beam 8 through the second threaded steel hanger 10. After that, the first nut 12 on the first threaded steel hanger 9 is loosened to make the first nut 12 move upward along the first threaded hanger to a distance equal to the maximum stroke of the extended end of the jack 6. Then, each jack 6 is controlled to start synchronously so that the extended end of each jack 6 is synchronously retracted downward to a fully retracted position. The jack 6 drives the second distribution beam 8 to move downward, and the second distribution beam 8 drives the first section of the steel cofferdam 2 to move downward as a whole through the second threaded steel hanger 10, so that the first nut 12 moves downward with the first threaded hanger to a position close to the upper part of the first distribution beam 7, and each jack 6 stops moving;

[0040] Repeat the above operation process, that is: tighten the first nut 12 on the first threaded steel hanger 9 again, fix the first threaded steel hanger 9 and the corresponding first distribution beam 7 firmly, so that the first section of steel cofferdam 2 is fixedly connected to the first distribution beam 7 through the first threaded steel hanger 9, the first distribution beam 7 bears the dead weight of the first section of steel cofferdam 2, and the extended end of the jack 6 is in a fully retracted state. At the same time, loosen the second nut 13 on the second threaded steel hanger 10, so that the second nut 13 moves upward along the second threaded hanger to the same distance as the maximum stroke of the extended end of the jack 6, and then, start each jack 6 synchronously, so that the extended end of each jack 6 is synchronously pushed upward, and the jack 6 pushes the second distribution beam 8 upward to the maximum stroke, so that the upper part of the second distribution beam 8 is close to the corresponding second nut 13, and then tighten the second nut 13. The cap 13 is tightened to firmly fix the second distribution beam 8 and the two second threaded steel hangers 10 thereon, so that the first section of the steel cofferdam 2 is fixedly connected to the second distribution beam 8 through the second threaded steel hanger 10. After that, the first nut 12 on the first threaded steel hanger 9 is loosened to make the first nut 12 move upward along the first threaded hanger to a distance equal to the maximum stroke of the extended end of the jack 6. Then, each jack 6 is controlled to start synchronously so that the extended end of each jack 6 is synchronously retracted downward to a fully retracted position. The jack 6 drives the second distribution beam 8 to move downward, and the second distribution beam 8 drives the first section of the steel cofferdam 2 to move downward as a whole through the second threaded steel hanger 10, so that the first nut 12 moves downward with the first threaded hanger to a position close to the upper part of the first distribution beam 7, and each jack 6 stops moving;

[0041] By repeating the above process, the first section of the steel cofferdam 2 can be gradually lowered to the predetermined position, and the upper end of the first section of the steel cofferdam 2 is ensured to be above the water surface; during the lowering process of the first section of the steel cofferdam 2, the distance between the first section of the steel cofferdam 2 and the corresponding steel casing 1 is monitored in real time by each laser rangefinder 22. When the distance monitored by a certain laser rangefinder 22 exceeds the limit, it indicates that the steel cofferdam as a whole has shifted in the lateral direction. In this case, the staff needs to dive underwater and reach the lateral anti-deviating device 3 where the laser rangefinder 22 is located, and use one hand to move the ratchet 20 of the lateral anti-deviating device 3, so that one end of the ratchet 20 moves out of the tooth groove of the rack structure 19. The laser rangefinder 22 is used to monitor the distance between the steel cofferdam and the corresponding steel casing 1 to prevent the steel cofferdam from being offset during its lowering process. The stress sensors 23 are used to monitor the stress changes at the welding point between the horizontal thick square tube 14 and the steel cofferdam and the right side of the thin square tube 16 in real time. When the stress value reaches 80% of the maximum stress, an early warning is issued through the alarm system at the construction site. The staff promptly stops the lowering operation, finds the cause, and makes an emergency plan to ensure the safety of the overall lowering of the steel cofferdam, thereby preventing the occurrence of emergencies.

[0042] Before the construction work in step (4), the lower end threaded connecting columns 26 of the other plurality of first threaded steel hangers are respectively screwed into the upper end threaded blind holes of the corresponding first threaded steel hangers to extend the first threaded steel hangers. Similarly, the lower end threaded connecting columns 26 of the other plurality of second threaded steel hangers are respectively screwed into the upper end threaded blind holes of the corresponding second threaded steel hangers to extend the second threaded steel hangers. Then, step (2) is repeated to continue lowering the second section of the steel cofferdam and the first section of the steel cofferdam until the design elevation of the steel cofferdam is reached.

[0043] The operation of the present invention is very simple. When lowering the steel cofferdam, the length of the thin square tube 16 extending out of the corresponding horizontal thick square tube 14 can be adjusted in advance according to the distance between the inner wall of the steel cofferdam and the corresponding steel casing 1, which greatly improves the application scope and practicality of the lateral anti-deviation device 3. In addition, the distance between the steel cofferdam lowering process and each steel casing 1 can be monitored in real time by a laser rangefinder 22, which is convenient for timely adjusting the state of the steel cofferdam, preventing the steel cofferdam from deflecting, and facilitating the overall control of the steel cofferdam. The stress changes at the welding point between the horizontal thick square tube 14 and the steel cofferdam and the right side of the thin square tube 16 are monitored in real time by each stress sensor 23. When the stress value reaches 80% of the maximum stress, an early warning is issued by the alarm system at the construction site, and the staff promptly stops the lowering operation, finds the cause, and makes an emergency plan to ensure the safety of the overall lowering of the steel cofferdam, thereby preventing the occurrence of emergencies. The use of the stress sensor 23 greatly improves the stability and safety of the structure.

[0044] The above embodiments are only used to illustrate rather than limit the technical solutions of the present invention. Although the present invention is described in detail with reference to the above embodiments, those skilled in the art should understand that the present invention can still be modified or replaced by equivalents. Any modification or partial replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.

Claims

1. The device for preventing the steel cofferdam from deviating and lowering includes two rows of steel casing groups arranged side by side. Each row of steel casing groups includes a plurality of steel casings arranged at intervals along the front-back direction. Each steel casing is vertically arranged in the river channel. Each section of the steel cofferdam is a rectangular cylindrical structure that is transparent from top to bottom. The characteristics are as follows: A hoisting structure for lowering the steel cofferdam is arranged on the top of the two rows of steel casing groups. Two sets of transverse anti-deviation devices are arranged between the inner wall of the steel cofferdam and each steel casing at an interval of one above the other. A channel steel track is vertically fixedly connected to the upper edge of the outer circular side of the steel casing directly facing the inner wall of the steel cofferdam. One end of the transverse anti-deviation device is fixedly installed on the inner wall of the first section of the steel cofferdam, and the other end of the transverse anti-deviation device is slidably or rollingly arranged on the channel steel track. The hoisting structure includes two groups of Bailey beam groups arranged side by side on the left and right, each group of Bailey beam groups includes at least one Bailey beam, the length direction of the Bailey beam is horizontally arranged along the front-to-back direction, each Bailey beam is fixedly installed on the top of the corresponding row of steel casing groups, and a jack is fixedly installed on the front and back sides of the upper part of each Bailey beam. A first distribution beam is fixedly connected between the upper middle sides of the two corresponding Bailey beams on the left and right, and a second distribution beam is fixedly connected between the tops of the two corresponding jacks on the left and right. The first distribution beam and the second distribution beam are both horizontally arranged along the left and right directions, and the first distribution beam is located in the middle of the two front and rear second distribution beams. The left and right sides of the first distribution beam and the second distribution beam are both provided with round holes that are transparent from top to bottom. , the left and right sides of the first distribution beam are slidably connected with a first threaded steel hanger rod passing through the corresponding circular hole, the left and right sides of the second distribution beam are slidably connected with a second threaded steel hanger rod passing through the corresponding circular hole, the lower ends of the first threaded steel hanger rod and the second threaded steel hanger rod are fixedly connected with a corbel, the corbel rod is welded and fixed to the inner wall of the first section of the steel cofferdam, the first threaded steel hanger rod is threadedly connected with a first nut located at the upper part of the first distribution beam, the second threaded steel hanger rod is threadedly connected with a second nut located at the upper part of the second distribution beam, the upper ends of the first threaded steel hanger rod and the second threaded steel hanger rod are both provided with a threaded blind hole, and the lower ends of the first threaded steel hanger rod and the second threaded steel hanger rod are both provided with a threaded connection column threadedly connected to the threaded blind hole; The lateral anti-deviating device at the lower left side includes a horizontal thick square tube, an inclined thick square tube, a thin square tube and a snowflake pattern nylon directional pulley. The horizontal thick square tube is horizontally arranged in the left and right directions, and the inclined thick square tube is inclined in the left and right directions with the left side higher and the right side lower. The thin square tube is inserted and slid in the horizontal thick square tube with the same center. The left ends of the horizontal thick square tube and the inclined thick square tube are welded and fixed to the lower side of the left inner wall of the steel cofferdam, and the right end of the inclined thick square tube is welded and fixed to the right side of the horizontal thick square tube. There is a fixed connection between the right side of the middle of the horizontal thick square tube and the inclined thick square tube. A vertical support tube, the right end of the thin square tube extends out of the right end of the horizontal thick square tube, the snowflake pattern nylon directional pulley is rotatably installed on the right end of the thin square tube, the rotating shaft of the snowflake pattern nylon directional pulley is horizontally arranged in the front-to-back direction, the right side wheel surface of the snowflake pattern nylon directional pulley is rollingly arranged in the corresponding channel steel track, a rack structure is arranged on the upper side surface of the thin square tube, a ratchet is hingedly installed on the upper side of the right end of the horizontal thick square tube, the pin shaft at the hinge of the left end of the ratchet is arranged in the front-to-back direction and is installed with a torsion spring, and the right end of the ratchet is bent downward and clamped in the tooth groove of the rack structure; A magnet is arranged on the top of the vertical support pipe, on which a laser rangefinder is adsorbed. Stress sensors are arranged on the inner wall of the steel cofferdam at the welding point with the horizontal thick square pipe and on the right side of the thin square pipe.

2. The anti-deviation lowering device for steel cofferdam according to claim 1 is characterized in that: A plurality of guide pulleys are rotatably mounted on the left side of the thin square tube, and each guide pulley is rotatably arranged in a horizontal thick square tube.