A sand-filled bag for deep-sea wind turbine foundation protection, anti-scouring and ballasting

By designing a sandbag filling system, the problem of anti-scouring and ballast construction of wind power infrastructure in deep water areas has been solved, fast and accurate sandbag installation and filling has been achieved, cost and difficulty have been reduced, and the stability of the deep-sea wind turbine foundation has been ensured.

CN112302056BActive Publication Date: 2024-10-22JLANGSU DAODA OFFSHORE WIND CONSTR TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910497212.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-06-10
Publication Date
2024-10-22
Estimated Expiration
2039-06-10

AI Technical Summary

Technical Problem

In deep water or sea areas with high current speeds, traditional sandbags and sand quilts are difficult to install accurately, resulting in high cost and difficulty in anti-scouring and ballast construction of offshore wind power infrastructure. The cost of traditional riprap protection has also increased significantly, making it impossible to effectively solve deep-sea problems. Stability issues of the fan foundation.

Method used

A sandbag filling system is designed, including foundation piles, main poles, ballast sandbags and sand filling bags arranged in a ring. The main pole is connected to the sand filling branch pipe, and a mud pump and winch are used to achieve fast and accurate sandbag installation and filling. Nylon ropes and geotextile sandbags are used to improve stability and reliability.

Benefits of technology

It realizes the rapid and accurate installation of sand-filled bags, avoids the influence of water flow and the need for divers to go into the water to untie and tie, improves the stability and installation accuracy of sand-filled pipes, reduces construction costs and difficulties, and ensures the anti-scouring and anti-scouring of the foundation of deep-sea wind turbines. Ballast effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112302056B_ABST
    Figure CN112302056B_ABST
Patent Text Reader

Abstract

The present invention provides a sand-filled bag for deep-sea wind turbine foundation protection, anti-scouring and ballasting, which specifically relates to the technical field of marine engineering and offshore new energy engineering, including a wind power foundation structure, the bottom of the wind power foundation structure is located on the seabed surface, the end of the wind power foundation structure is exposed above the sea level, and the wind power foundation structure includes a plurality of foundation piles arranged in a ring, the foundation piles are connected in series in sequence, a main pole is arranged on the foundation pile, and the support poles are connected by reinforcing ribs; a supporting structure is arranged on the periphery of the foundation pile, a plurality of ballast sandbags are arranged on the upper end of the foundation pile, and a plurality of sand-filled bags are arranged on the supporting structure; the main pole is a hollow tube, and a plurality of sand-filled branch pipes are arranged at the lower end of the main pole, and the sand-filled branch pipes connect the main pole with the sand-filled bag; a sand-filled pipe is arranged at the upper end of the main pole, and the sand-filled pipe connects the main pole with a mud pump, and the mud pump is arranged on a sand-filling ship. The present invention can realize the rapid and accurate installation of the sand-filled bag and the filling construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of marine engineering and offshore new energy engineering, and specifically relates to a sand-filled bag used for protecting, anti-scouring and ballasting of deep-sea wind turbine foundations. Background Art

[0002] The deep-sea offshore wind power foundation is the supporting structure of the wind turbine. The stability of the foundation has an important impact on the structural safety and operation of the offshore wind turbine. As the water depth increases, affected by ocean currents and tides, the soil around the foundation structure is affected by disturbances, which is prone to foundation scouring, thus affecting the safety of the foundation structure.

[0003] In some gravity-based foundation structures, in order to improve the stability of the foundation and solve the problems of foundation pull-out and overturning resistance, it is necessary to ballast the foundation and increase the foundation's own weight. To solve the problems of scour prevention and ballasting of offshore wind power foundations, the traditional technology is to use riprap protection or make protective structures such as sandbags and sand blankets; but with the increase in the water depth of offshore wind power projects, the cost of riprap protection for the protection and ballasting of deep-water offshore wind power foundation structures has increased significantly, and traditional sandbags and sand blankets cannot be accurately installed due to the increase in water depth. Therefore, in deep water or sea areas with high flow rates, the cost and difficulty of scour prevention and ballasting of offshore wind power foundation structures are high; Summary of the invention

[0004] In view of the above-mentioned deficiencies, the present invention provides a sand-filled bag for deep-sea wind turbine foundation protection, anti-scouring and ballasting, which can realize rapid and accurate installation and filling construction of the sand-filled bag.

[0005] The present invention provides the following technical solutions:

[0006] A sand-filled bag for deep-sea wind turbine foundation protection, anti-scouring and ballasting, comprising a wind power foundation structure, the bottom of which is located on the seabed, the end of which is exposed above the sea level, the wind power foundation structure comprising a plurality of foundation piles arranged in a ring, the foundation piles being connected in series in sequence, a main pole being arranged on the foundation piles, and the support poles being connected by reinforcing ribs;

[0007] A supporting structure is provided on the periphery of the foundation pile, a plurality of ballast sandbags are provided on the upper end of the foundation pile, and a plurality of sand-filled bags are provided on the supporting structure;

[0008] The main rod is a hollow tube, and a plurality of sand-filled branch pipes are provided at the lower end of the main rod, and the sand-filled branch pipes connect the main rod with the ballast sandbag and the sand-filled bag;

[0009] A sand filling pipe is arranged at the upper end of the main rod, and the sand filling pipe connects the main rod with a mud pump, and the mud pump is arranged on a sand filling ship.

[0010] Preferably, the center of the ballast sandbag is hollow, the main rod passes through the center of the ballast sandbag, and the lower end of the ballast sandbag is located on the foundation pile.

[0011] Preferably, the lower end surface of the ballast sandbag is concave, the foundation pile is provided with a protrusion, the main rod is arranged on the protrusion, and the protrusion of the foundation pile is embedded in the concave structure of the ballast sandbag.

[0012] Preferably, the sand-filled bags are arranged around the periphery of the foundation piles, one end of the sand-filled bags is connected to the sand-filled branch pipe, and the other end of the sand-filled bags is rolled up so that the sand-filled bags are columnar;

[0013] The sand-filled bag is fixed to the periphery of the foundation pile by tying ropes around the sand-filled bag;

[0014] A winch is provided on the sand-filling ship, and the winch is connected to the tie rope through a steel wire rope.

[0015] Preferably, the tie rope is made of nylon; the ballast sandbags and the sand-filled sandbags are both geotextile sandbags, and the thickness of the sandbags is greater than 200 mm.

[0016] Beneficial effects of the present invention:

[0017] (1) The present invention fixes the sandbags at the position of the foundation that needs to be protected and ties them up for protection, thereby solving the problem that the sandbags are transported with the foundation and are not affected by water flow during installation, resulting in poor installation accuracy.

[0018] (2) The present invention uses a steel wire rope to control the tying rope for fixing the sandbags. The steel wire rope can be pulled out by a winch at the water installation platform of the basic structure to release all the tying and fixing points, thereby avoiding the problem of traditional underwater sandbags that require divers to go into the water to release the tying;

[0019] (3) Traditional sand filling pipes are easily broken, blocked, and cannot be fixed under deep water conditions due to the influence of water flow. The present invention uses the main rod of the foundation structure as the sand filling pipe, which has a large diameter, high rigidity, and is completely fixed, thus solving the problem of setting up the sand filling pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0021] Figure 1 It is a side view of the present invention;

[0022] Figure 2 This is the top view of the foundation pile;

[0023] Figure 3 This is the side view of the foundation pile;

[0024] Figure 4 This is a side view of the ballast sandbag;

[0025] The markings in the figure are: 1. foundation piles; 2. main pole; 3. ballast sandbags; 4. sand-filling branch pipes; 5. sand-filling bags; 6. sand-filling pipes; 7. mud pumps; 8. supporting structure; 9. ropes; 10. reinforcement ribs; 11. sand-filling boat. DETAILED DESCRIPTION

[0026] like Figures 1 to 4 As shown, a sand-filled bag for deep-sea wind turbine foundation protection, anti-scouring and ballasting includes a wind power foundation structure, the bottom of the wind power foundation structure is located on the seabed surface, and the end of the wind power foundation structure is exposed above the sea level. The wind power foundation structure includes a plurality of foundation piles 1 arranged in a ring, the foundation piles 1 are connected in series in sequence, a main pole 2 is arranged on the foundation piles 1, and the support poles 2 are connected by reinforcing ribs 10; a supporting structure 8 is arranged on the periphery of the foundation piles 1, a plurality of ballast sand bags are arranged on the upper end of the foundation piles 1, and a plurality of sand-filled bags 5 are arranged on the supporting structure 8; the main pole 2 is a hollow tube, and a plurality of sand-filled branch pipes 4 are arranged at the lower end of the main pole 2, and the sand-filled branch pipes 4 The main pole 2 is connected with the ballast sandbag 3 and the sand-filling bag 5; a sand-filling pipe 6 is provided at the upper end of the main pole 2, and the sand-filling pipe 6 connects the main pole 2 with a mud pump 7, and the mud pump 7 is arranged on a sand-filling ship 11; mud and sand are flushed into the ballast sandbag 3 and the sand-filling bag 3 through the sand-filling pipe 6, the main pole 2, and finally through the sand-filling branch pipe 4 by the mud pump 7; the sand-filling bag is fixed at the position where the foundation needs to be protected, which solves the problem that the sand-filling bag is transported with the foundation and is not affected by the water flow during installation, resulting in poor installation accuracy; small-diameter high-pressure water jets can be installed at the branch and connection parts of the main pole 2 to dredge and prevent sediment deposition;

[0027] The center of the ballast sandbag 3 is hollow, the main rod 2 passes through the center of the ballast sandbag 3, and the lower end of the ballast sandbag 3 is located on the foundation pile 1; the lower end surface of the ballast sandbag 3 is concave, the foundation pile 1 is provided with a protrusion, the main rod 2 is arranged on the protrusion, and the protrusion of the foundation pile 1 is embedded in the concave structure of the ballast sandbag 3; the main rod 1 can improve the stability of the ballast sandbag 3, and the protrusion of the foundation pile 1 is embedded in the concave structure of the ballast sandbag 3, which can further improve the stability of the ballast sandbag; the sandbags 5 are arranged around the periphery of the foundation pile 1 , one end of the sand-filled bag 5 is connected to the sand-filled branch pipe 4, and the other end of the sand-filled bag 5 is rolled up to make the sand-filled bag 5 columnar; the outer periphery of the sand-filled bag 5 is fixed to the outer periphery of the foundation pile 1 by a tie rope 9; a winch is provided on the sand-filled ship, and the winch is connected to the tie rope 9 by a steel wire rope; the tie rope 9 is untied by winding the steel wire by the winch, thereby avoiding the problem of traditional underwater sandbags requiring divers to go into the water to untie the tie; the tie protection solves the problem of the sand-filled bag being transported with the foundation, and at the same time avoids the influence of water flow during installation. The tie rope 9 is made of nylon, which is corrosion-resistant and easy to untie by mechanical external force; the ballast sandbag 3 and the sand-filled bag 5 are both geotextile sandbags, and the thickness of the sandbag is greater than 200 mm, ensuring the reliability of the ballast sandbag 3 and the sand-filled bag 5.

[0028] The working mode of the present invention is:

[0029] See also Figures 1 to 4 , untie the sandbags, use a high-pressure water pump to inject high-pressure water into the sandbags through the main pole of the foundation, and use the pressure difference to expand the sandbags quickly to cover the surface of the seabed. Then use a certain proportion of mortar to replace water, and inject mortar into the sandbags through the main pole and branches. After being filtered by the sandbags, the sand is deposited in the sandbags to form sand-filled bags, which cover the surface of the seabed, form anti-scouring protection, and provide ballast for the foundation. In the later stage of diving exploration, if it is found that the sand filling is insufficient, the high-pressure water nozzle can be used to dredge the pipeline and continue to inject mortar into the sandbags.

[0030] Before construction, the prefabricated sandbags are installed on the foundation structure and installed at the same time as the foundation structure. The quick release mechanism is used to contact the sandbags and tie them up. High-pressure water is used to unfold the sandbags. Through sand flushing construction, mortar with a certain water-sand ratio is used to replace the water in the bag, so that the sandbags can be quickly and accurately installed and filled.

[0031] The anti-scour and ballast construction of deep-water cylindrical jacket foundations in soft sandy seabeds with a water depth of more than 30 meters is designed to prevent scour within a range of 5 to 10 meters around the foundation. The thickness of the sandbags required for scour protection is not less than 200 mm. In order to meet the design anti-scour requirements, geotextile sandbags are made and arranged radially around the foundation near the seabed surface, and rolled up in the unfolding direction. They are tied with ropes and fixed to the rings around the foundation. The other end of the rope is connected to the wire rope in a live buckle. The soft steel wire rope extends through the main pole of the foundation to the winch of the sand-filling ship, forming a quick unhooking and untying system. The mass of the designed ballast is greater than 200 tons of underwater bulk density, that is, the volume of sand is not less than 300 cubic meters. According to the shape of the foundation surface, the ballast sandbags are designed and made, and fixed to the foundation surface after radial sewing.

[0032] Each basic ballast sandbag and sand-filling bag is equipped with one or more sand-filling branch pipes according to design requirements. The sand-filling branch pipes are connected to the main pole and communicated with the main pole. The top of the main pole is closed with a flange, and a 200 mm diameter sand-filling pipe and a 150 mm diameter water pipe are led out from the side and valves are installed. The sand-filling pipe, water pipe, main pole, and sand-filling branch pipe together constitute a basic sand-filling pipeline system;

[0033] After the foundation is installed at the designated location, first install the water pipe, prepare the sand-filling boat and the sand-filling pipeline, and ensure that the pipeline system is unobstructed, then remove the tying wire rope, use the winch to retract the tying wire rope, and quickly untie the sandbags. To avoid water flow disturbing the sandbags, the tying should be removed during low tide and low flow rate. Once the tying is released, immediately inject high-pressure water into the pipeline to quickly expand the sandbags. Once the pressure is stable, use underwater video to check the filling of the sandbags. If the sandbags are filled in place, replace the water with mortar, flush the mortar into the sandbags, and complete the filling of the sandbags.

[0034] During the filling of sandbags, if abnormalities such as increased pressure are found, check the filling status of the sandbags. If the pipeline is blocked by mud and sand, high-pressure water can be injected into the sand filling pipe to clear the pipeline. After the filling is completed, in order to ensure the filling effect, the anti-scouring and ballast sandbag filling status of the foundation can be monitored by underwater video or depth-scanning equipment.

[0035] In this order, the filling operation of each part of the foundation structure is completed in turn. After the filling is completed, the water pipes and sand pipes are removed, the valves are closed, and the protection project is completed.

[0036] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A sand filling system for deep-sea wind turbine foundation protection, anti-scouring and ballasting, comprising a wind power foundation structure, the bottom of which is located on the seabed, the end of which is exposed above the sea level, the wind power foundation structure comprising a plurality of foundation piles arranged in a ring, the foundation piles are connected in series in sequence, the foundation piles are provided with main poles, the main poles are connected by reinforcing ribs, and the characteristics are: A supporting structure is provided on the periphery of the foundation pile, a plurality of ballast sandbags are provided on the upper end of the foundation pile, and a plurality of sand-filled bags are provided on the supporting structure; The main rod is a hollow tube, and a plurality of sand-filled branch pipes are provided at the lower end of the main rod, and the sand-filled branch pipes connect the main rod with the ballast sandbag and the sand-filled bag; The upper end of the main rod is provided with a sand filling pipe, which connects the main rod with a mud pump, and the mud pump is arranged on a sand filling ship; the top of the main rod is closed with a flange, and a 200 mm diameter sand filling pipe and a 150 mm diameter water pipe are led out from the side, and valves are installed; The sand-filled bags are arranged around the periphery of the foundation piles, one end of the sand-filled bags is connected to the sand-filled branch pipe, and the other end of the sand-filled bags is rolled up so that the sand-filled bags are columnar; The sand-filled bag is fixed to the periphery of the foundation pile by tying ropes around the sand-filled bag; A winch is provided on the sand-filling ship, and the winch is connected to the tie rope through a steel wire rope.

2. The sand filling system for deep sea wind turbine foundation protection, anti-scouring and ballasting according to claim 1 is characterized by: The center of the ballast sandbag is hollow, the main rod passes through the center of the ballast sandbag, and the lower end of the ballast sandbag is located on the foundation pile.

3. The sand filling system for deep sea wind turbine foundation protection, anti-scouring and ballasting according to claim 2 is characterized by: The lower end surface of the ballast sandbag is concave, the foundation pile is provided with a protrusion, the main rod is arranged on the protrusion, and the protrusion of the foundation pile is embedded in the concave structure of the ballast sandbag.

4. The sand filling system for deep sea wind turbine foundation protection, anti-scouring and ballasting according to claim 1 is characterized by: The tie rope is made of nylon; the ballast sandbags and the sand-filled sandbags are both geotextile sandbags, and the thickness of the sandbags is greater than 200 mm.