Working method for assembling large-diameter tower equipment using a lifting work platform
By using an annular lifting working platform and an inner corbel hanger in the construction of large-diameter towers, the platform is lifted and combined with the inner corbel hanger for tube section assembly welding, which solves the problems of high material consumption and high construction difficulty in the existing construction methods. problem, achieving efficient and safe tower assembly.
Patent Information
- Application Number
- CN202011538121.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-23
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2040-12-23
AI Technical Summary
The existing large-diameter tower construction method requires a large amount of scaffolding, resulting in high material consumption, high construction difficulty, long construction period, and complicated safety control.
An annular lifting working platform and an inner corbel hanger are used, a hand chain hoist is used to lift the platform, and the inner corbel hanger is used for tube section assembly and welding, which reduces the amount of scaffolding and improves safety and construction efficiency.
It reduces material and labor costs, improves construction efficiency and safety, simplifies construction management, and shortens the construction period.
Smart Images

Figure CN112551369B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of aerial assembly of large-diameter towers, and in particular to a working method for assembling large-diameter tower equipment on a lifting working platform. Background Art
[0002] The tower is one of the important oil refining equipment for mass and heat transfer between gas-liquid and liquid-liquid. Conventional large-diameter towers are manufactured and installed on-site. Due to the limitations of the construction site and in order to save large crane hours, the prefabricated cylinder segments are usually installed in sections.
[0003] The existing construction method is to set up full-height scaffolding inside and outside the cylinder section, and raise the scaffolding as the tower body rises until the cylinder section is hoisted and welded. During the scaffolding erection process, the large-diameter tower equipment completes the construction of circumferential seam welding, radiographic detection, pipe and accessory installation, operating platform and ladder installation, etc. This traditional construction method requires the use of a large number of scaffolding, consumes a large amount of turnover material resources, and the difficulty of erecting scaffolding gradually increases with the increase in height, and the difficulty of construction management and safety control also increases, and the construction period is too long. Summary of the invention
[0004] 1. Technical issues to be solved
[0005] In view of the deficiencies in the prior art, the present invention provides a method for assembling large-diameter tower equipment using a lifting work platform that is placed outside the equipment cylinder. During the installation of the cylinder segments, a hand winch is used to lift the platform along with the cylinder segments, and the cylinder segments are welded together in combination with an internal corbel bracket, thereby improving safety and reliability of use, accelerating construction efficiency, and thus saving labor and material costs.
[0006] (II) Technical solution
[0007] To achieve the above object, the present invention provides the following technical solution: a working method for assembling a large-diameter tower device using a lifting work platform, comprising the following steps:
[0008] A. Prefabrication of cylinder sections of large-diameter tower equipment: Prefabricate the cylinder sections according to the design drawings and layout drawings. After prefabrication, confirm the cylinder section geometry, mark the cylinder section orientation lines, and complete the non-destructive testing of the cylinder section longitudinal welds and pass the test;
[0009] B. Reinforcement support: After assembling the cylinder segment according to the pre-drawn layout, in order to ensure that it does not deform during the lifting process, select steel pipes of appropriate specifications according to the diameter and wall thickness of the cylinder segment, and reinforce the inner diameter of the cylinder segment. If necessary, add a pad between the end of the supporting steel pipe and the inner wall of the cylinder segment;
[0010] C. Installation of lifting lugs: Determine the number and size of lifting lugs according to the weight and diameter of the cylinder segment. Before welding, make sure that the position of each cylinder segment lifting lug is consistent according to the reference scale line. The lifting lugs have double holes. The upper hole is hung with a clamping ring to connect the lifting rope buckle, and the lower hole is hung with a lifting chain.
[0011] D. Prefabrication of lifting platform: The ring-shaped lifting platform is prefabricated, and the frame is made of angle steel of ∠63 or ∠75. The hanging chain is made of channel steel. The lifting lugs for hanging the lifting chain are welded on the channel steel. The nodes of the angle steel frame are welded firmly, and a 3mm thick patterned steel plate is laid on it. The width is 800mm. The longitudinal and transverse guardrails are made of round steel with a diameter of 20mm and a height of 1200mm. The outer circle of the guardrail is enclosed with a dense safety net;
[0012] E. Installation of guide wheels for lifting platform: Guide wheels are evenly distributed along the circumference of the lifting platform, the number of which is the same as the number of lifting ears, and the orientation is staggered with the lifting ears;
[0013] F. Installation of the first cylinder section and lifting platform: After the foundation acceptance process is handed over, confirm that the equipment is in the correct position, install the tower skirt in place, fix the anchor bolts after alignment, check and accept the first cylinder section, the lifting lugs have been welded firmly, the lifting locks have been installed firmly, the lifting chain has been hung, the inner bracket hanger has been hung, and temporary straight ladders are installed inside and outside the cylinder section to ensure that the straight ladder is smoothly connected and vertical to the cylinder body to meet the construction requirements of the working platform. Lift the first cylinder section and fix it on the skirt. After confirming the verticality and horizontality, start welding the fillet weld between the cylinder section and the skirt. After the welding of the fillet weld between the first cylinder section and the skirt is completed, use a crane to lift the lifting platform into place, connect the lifting chain hung on the first cylinder section with the lifting lug on the platform, install and fix the lifting platform, adjust the chain to keep it horizontal, and the lifting platform is about 1.2 meters away from the top of the cylinder section. This distance is convenient for the assembly, caulking, and circumferential welding of the first and second cylinder sections.
[0014] G. Assembly of the second cylinder section: Check the second cylinder section to confirm that the orientation is correct, the welding of the lifting lugs meets the standards, the lifting rigging is secure, the lifting chain is hung, and the inner bracket hanger is hung; install temporary straight ladders inside and outside the cylinder section for personnel and equipment and material access; hang a temporary straight ladder on the cylinder section for use when removing the rigging, lift the second cylinder section, the construction personnel have climbed up to the lifting platform through the straight ladder, and start to assemble the first and second cylinder sections. The construction personnel wear safety belts and fall arresters. When assembling, first use the positioning plate and gap block to caulk and adjust the seams. The verticality of the tower body is checked from two mutually perpendicular directions with the pre-arranged theodolite. After the quality standard is met, the cylinder segments are fixed by positioning welding, the rigging and temporary straight ladder are removed, and the lifting fall chain hung on the second cylinder segment is connected, tightened and fixed with the lifting lug on the lifting platform. The fall chain between the original first cylinder segment and the lifting platform is removed and replaced with a basket bolt for fixing (the removed fall chain is used for the subsequent cylinder segment assembly). This not only plays a double insurance role, but also saves the amount of fall chain.
[0015] H. Welding of the first and second cylinder sections: After checking the annular lifting platform again to confirm that it is stable and reliable, weld the annular weld between the first and second cylinder sections on the outer lifting platform; after the outer bevel side welding is completed, clean the root and weld the annular weld between the first and second cylinder sections on the inner bull leg hanger platform. During the construction process, the welding handle wire should be protected to prevent short circuit and damage to the suspension rigging;
[0016] I. Lifting of the lifting platform: After the annular seam welding and radiographic inspection between the first and second cylinder sections are completed and passed by all parties, remove the turnbuckle bolts and use the fall chains to lift the annular platform. Each fall chain should be lifted slowly, evenly and synchronously. Stop when it is about 1.2 meters from the top of the second cylinder section, check the horizontality of the lifting platform, and prepare to lift the third cylinder section;
[0017] J. Assembly welding and installation of accessories for the remaining cylinder segments: Assemble the third and subsequent cylinder segments in the same way as described in G, H, and I until the entire tower body is assembled; lower the outer lifting platform in the reverse method of the lifting platform, remove the lifting ears from top to bottom, install manholes, pipes, tower operating platforms, railing ladders and other accessories, use the inner corbel bracket platform and straight ladder of each cylinder segment to grind the internal welds and temporary welding points, install the internal parts, and then remove the inner corbel bracket from top to bottom.
[0018] Preferably, in step C, a transition plate is welded between the lifting lug and the cylinder section made of different materials.
[0019] Preferably, in the step H, when welding the annular weld between the first and second cylinder sections on the external lifting platform, multiple welders perform welding evenly and symmetrically at the same time to prevent deformation of the weld due to uneven heating.
[0020] A lifting work platform for assembling large-diameter tower equipment comprises a lifting platform sleeved on the outside of a cylinder section, multiple groups of hand-pulled hoist mechanisms for lifting the platform, multiple groups of basket bolts for temporarily fixing the lifting platform, an inner bull leg hanger arranged on the inner side wall of the cylinder section, and a straight ladder.
[0021] Preferably, a lifting guide wheel is provided on the inner side of the lifting platform, and a gap of 2-3 mm is left between the lifting guide wheel and the outer wall of the cylinder section.
[0022] Preferably, the lifting platform includes a skeleton angle steel, a channel steel installed inside the skeleton angle steel, and a patterned plate laid on the top of the skeleton angle steel.
[0023] Preferably, the straight ladder comprises an external straight ladder arranged outside the cylinder segment and an internal straight ladder arranged inside the cylinder segment, and both the external straight ladder and the internal straight ladder can be detachably mounted on the cylinder segment.
[0024] (III) Beneficial effects
[0025] Compared with the prior art, the present invention provides a working method for assembling a large-diameter tower device using a lifting work platform, which has the following beneficial effects:
[0026] 1. The working method of assembling large-diameter tower equipment with the lifting platform is to use the annular lifting platform placed outside the equipment cylinder, use the hand chain hoist to lift the platform along with the cylinder during the cylinder segment installation process, and combine with the inner bracket bracket to weld the cylinder segment, so as to improve safety and reliability and speed up construction efficiency;
[0027] 2. The working method of assembling large-diameter tower equipment on the lifting work platform reduces the workload of scaffolding erection and the use of circulating materials, thereby saving labor and material costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a structural schematic diagram of the lifting work platform of the present invention;
[0029] Figure 2 It is a schematic diagram of the top view of the lifting work platform of the present invention;
[0030] Figure 3 It is a schematic flow diagram of the working method of the present invention;
[0031] Markings in the attached drawings: 1. Cylinder section; 2. Lifting platform; 3. Hand chain hoist mechanism; 4. Basket bolt; 5. Inner corbel bracket; 6. Straight ladder; 7. Lifting guide wheel; 8. Skeleton angle steel; 9. Channel steel; 10. Patterned plate. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] See also Figure 1-3 A working method for assembling a large-diameter tower device using a lifting work platform of the present invention comprises the following steps:
[0034] A. Prefabrication of cylinder sections of large-diameter tower equipment: Prefabricate the cylinder sections according to the design drawings and layout drawings. After prefabrication, confirm the cylinder section geometry, mark the cylinder section orientation lines, and complete the non-destructive testing of the cylinder section longitudinal welds and pass the test;
[0035] B. Reinforcement support: After assembling the cylinder segment according to the pre-drawn layout, in order to ensure that it does not deform during the lifting process, select steel pipes of appropriate specifications according to the diameter and wall thickness of the cylinder segment, and reinforce the inner diameter of the cylinder segment. If necessary, add a pad between the end of the supporting steel pipe and the inner wall of the cylinder segment;
[0036] C. Installation of lifting lugs: Determine the number and size of lifting lugs according to the weight and diameter of the cylinder segment. Before welding, make sure that the position of each cylinder segment lifting lug is consistent according to the reference scale line. The lifting lugs have double holes. The upper hole is hung with a clamp to connect the lifting rope buckle, and the lower hole is hung with a lifting chain. If the lifting lugs and cylinder segments are made of different materials, a transition plate will be welded between them.
[0037] D. Prefabrication of lifting platform: The ring-shaped lifting platform is prefabricated, and the frame is made of angle steel of ∠63 or ∠75. The hanging chain is made of channel steel. The lifting lugs for hanging the lifting chain are welded on the channel steel. The nodes of the angle steel frame are welded firmly, and a 3mm thick patterned steel plate is laid on it. The width is 800mm. The longitudinal and transverse guardrails are made of round steel with a diameter of 20mm and a height of 1200mm. The outer circle of the guardrail is enclosed with a dense safety net to improve safety performance;
[0038] E. Installation of guide wheels for lifting platform: Guide wheels are evenly distributed along the circumference of the lifting platform. The number of guide wheels is the same as the number of lifting ears, and the orientation is staggered with the lifting ears to avoid affecting the lifting of the platform;
[0039] F. Installation of the first cylinder section and lifting platform: After the foundation acceptance process is handed over, confirm that the equipment is in the correct position, install the tower skirt in place, fix the anchor bolts after alignment, check and accept the first cylinder section, the lifting lugs have been welded firmly, the lifting locks have been installed firmly, the lifting chain has been hung, the inner bracket hanger has been hung, and temporary straight ladders are installed inside and outside the cylinder section to ensure that the straight ladder is smoothly connected and vertical to the cylinder body to meet the construction requirements of the working platform. Lift the first cylinder section and fix it on the skirt. After confirming the verticality and horizontality, start welding the fillet weld between the cylinder section and the skirt. After the welding of the fillet weld between the first cylinder section and the skirt is completed, use a crane to lift the lifting platform into place, connect the lifting chain hung on the first cylinder section with the lifting lug on the platform, install and fix the lifting platform, adjust the chain to keep it horizontal, and the lifting platform is about 1.2 meters away from the top of the cylinder section. This distance is convenient for the assembly, caulking, and circumferential welding of the first and second cylinder sections.
[0040] G. Assembly of the second cylinder section: Check the second cylinder section to confirm that the orientation is correct, the welding of the lifting lugs meets the standards, the lifting rigging is secure, the lifting chain is hung, and the inner bracket hanger is hung; install temporary straight ladders inside and outside the cylinder section for personnel and equipment and material access; hang a temporary straight ladder on the cylinder section for use when removing the rigging, lift the second cylinder section, the construction personnel have climbed up to the lifting platform through the straight ladder, and start to assemble the first and second cylinder sections. The construction personnel wear safety belts and fall arresters. When assembling, first use the positioning plate and gap block to caulk and adjust the seams. The verticality of the tower body is checked from two mutually perpendicular directions with the pre-arranged theodolite. After the quality standard is met, the cylinder segments are fixed by positioning welding, the rigging and temporary straight ladder are removed, and the lifting fall chain hung on the second cylinder segment is connected, tightened and fixed with the lifting lug on the lifting platform. The fall chain between the original first cylinder segment and the lifting platform is removed and replaced with a basket bolt for fixing (the removed fall chain is used for the subsequent cylinder segment assembly). This not only plays a double insurance role, but also saves the amount of fall chain.
[0041] H. Welding of the first and second cylinder sections: After checking the annular lifting platform again to confirm that it is stable and reliable, the annular welds between the first and second cylinder sections are welded on the outer lifting platform. During welding, multiple welders weld evenly and symmetrically at the same time to prevent the welds from being deformed due to uneven heating. After the welding of the outer bevel side is completed, the root cleaning and welding of the annular welds between the first and second cylinder sections are carried out on the inner bull leg bracket platform. During the construction process, the welding handle wire should be protected to prevent short circuits from damaging the suspension rigging;
[0042] I. Lifting of the lifting platform: After the annular seam welding and radiographic inspection between the first and second cylinder sections are completed and passed by all parties, remove the turnbuckle bolts and use the fall chains to lift the annular platform. Each fall chain should be lifted slowly, evenly and synchronously. Stop when it is about 1.2 meters from the top of the second cylinder section, check the horizontality of the lifting platform, and prepare to lift the third cylinder section;
[0043] J. Assembly welding of remaining cylinder segments and installation of accessories: Weld the third and subsequent cylinder segments in the same manner as described in G, H, and I until the entire tower body is assembled; lower the outer lifting platform in the reverse method of the lifting platform, remove the lifting ears from top to bottom, install manholes, pipes, tower operating platforms, railing ladders and other accessories, use the inner corbel bracket platform and straight ladder of each cylinder segment to grind the internal welds and temporary welding points, install the internal parts, and then remove the inner corbel bracket from top to bottom.
[0044] A lifting work platform for assembling large-diameter tower equipment includes a lifting platform 2 sleeved on the outside of a cylinder section 1, multiple groups of hand-pulled hoist mechanisms 3 for lifting the platform, multiple groups of basket bolts 4 for temporarily fixing the lifting platform 2, an inner bracket hanger 5 arranged on the inner wall of the cylinder section 1, and a straight ladder 6.
[0045] A lifting guide wheel 7 is arranged on the inner side of the lifting platform 2 , and a gap of 2-3 mm is left between the lifting guide wheel 7 and the outer wall of the cylinder section 1 , so as to ensure the stability of the lifting platform 2 .
[0046] The lifting platform 2 includes a frame angle steel 8, a channel steel 9 installed inside the frame angle steel 8, and a patterned plate 10 laid on the top of the frame angle steel 8 to ensure the overall strength.
[0047] The vertical ladder 6 includes an external vertical ladder 6 arranged outside the cylinder segment 1 and an internal vertical ladder 6 arranged inside the cylinder segment 1. Both the external vertical ladder 6 and the internal vertical ladder 6 can be detachably installed on the cylinder segment 1. The detachable internal and external vertical ladders 6 facilitate workers to go up and down.
[0048] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0049] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A working method for assembling a large diameter tower device using a lifting work platform, It is characterized in that The following steps are involved: A. Prefabrication of cylinder sections of large-diameter tower equipment: Prefabricate the cylinder sections according to the design drawings and layout drawings. After prefabrication, confirm the cylinder section geometry, mark the cylinder section orientation lines, and complete the non-destructive testing of the cylinder section longitudinal welds and pass the test; B. Reinforcement support: After assembling the cylinder segment according to the pre-drawn layout, in order to ensure that it does not deform during the lifting process, select steel pipes of appropriate specifications according to the diameter and wall thickness of the cylinder segment, and reinforce the inner diameter of the cylinder segment. If necessary, add a pad between the end of the supporting steel pipe and the inner wall of the cylinder segment; C. Installation of lifting lugs: Determine the number and size of lifting lugs according to the weight and diameter of the cylinder segment. Before welding, make sure that the position of each cylinder segment lifting lug is consistent according to the reference scale line. The lifting lugs have double holes. The upper hole is hung with a clamping ring to connect the lifting rope buckle, and the lower hole is hung with a lifting chain. D. Prefabrication of lifting platform: The ring-shaped lifting platform is prefabricated, and the frame is made of angle steel of ∠63 or ∠75. The hanging chain is made of channel steel. The lifting lugs for hanging the lifting chain are welded on the channel steel. The nodes of the angle steel frame are welded firmly, and a 3mm thick patterned steel plate is laid on it. The width is 800mm. The longitudinal and transverse guardrails are made of round steel with a diameter of 20mm and a height of 1200mm. The outer circle of the guardrail is enclosed with a dense safety net; E. Installation of guide wheels for lifting platform: Guide wheels are evenly distributed along the circumference of the lifting platform, the number of which is the same as the number of lifting ears, and the orientation is staggered with the lifting ears; F. Installation of the first cylinder segment and lifting platform: Install the tower skirt in place, fix the anchor bolts after alignment, inspect and accept the first cylinder segment, lift the first cylinder segment, fix it on the skirt, confirm the verticality and horizontality, and start welding the fillet weld between the cylinder segment and the skirt; After the welding of the fillet weld between the first cylinder segment and the skirt is completed, lift the lifting platform in place with a crane, connect the lifting fall chain hung on the first cylinder segment with the lifting lug on the platform, install and fix the lifting platform, adjust the fall chain to keep it horizontal, and the lifting platform is about 1.2 meters away from the top of the cylinder segment. This distance is convenient for the assembly, caulking and circumferential welding of the first and second cylinder segments; G. Assembly of the second cylinder section: Check the second cylinder section, lift the second cylinder section, the construction personnel have climbed up to the lifting platform through the straight ladder, and started to assemble the first and second cylinder sections. The construction personnel wear safety belts and fall arresters. When assembling, first use the positioning plate and gap block to caulk, adjust the assembly gap and the amount of error, and then use the pre-arranged theodolite to check the verticality of the tower body from two mutually perpendicular directions. After meeting the quality standard requirements, the cylinder sections are fixed by positioning welding, the rigging and temporary straight ladder are removed, and the lifting fall chain hung on the second cylinder section is connected, tightened and fixed with the lifting lug on the lifting platform. The fall chain between the original first cylinder section and the lifting platform is removed and replaced with a basket bolt for fixing. The removed fall chain is used for the subsequent assembly of cylinder sections; H. Welding of the first and second cylinder sections: After checking the annular lifting platform again to confirm that it is stable and reliable, weld the annular weld between the first and second cylinder sections on the outer lifting platform; after the outer bevel side welding is completed, clean the root and weld the annular weld between the first and second cylinder sections on the inner bull leg bracket platform. During the construction process, the welding handle wire should be protected to prevent short circuits from damaging the suspension rigging I. Lifting of the lifting platform: After the annular seam welding and radiographic inspection between the first and second cylinder sections are completed and passed by all parties, remove the turnbuckle bolts and use the fall chains to lift the annular platform. Each fall chain should be lifted slowly, evenly and synchronously. Stop when it is about 1.2 meters from the top of the second cylinder section, check the horizontality of the lifting platform, and prepare to lift the third cylinder section; J. Assembly welding and installation of accessories for the remaining cylinder segments: Install the third and subsequent cylinder segments in the same manner according to the steps described in G, H, and I until the entire tower body is assembled; lower the outer lifting platform in the reverse method of the lifting platform, remove the lifting ears from top to bottom, install the manhole, connecting pipe, tower body operating platform and railing ladder accessories, use the inner corbel bracket platform and straight ladder of each cylinder segment to grind the internal welds and temporary welding points, and remove the inner corbel bracket from top to bottom after installing the internal parts.
2. A working method for assembling a large-diameter tower device using a lifting work platform according to claim 1, It is characterized in that In the step C, a transition plate is welded between the lifting lug and the cylinder section which are made of different materials.
3. A method for assembling a large-diameter tower device using a lifting work platform according to claim 1, It is characterized in that In the step H, when welding the annular weld between the first and second cylinder sections on the external lifting platform, multiple welders perform welding evenly and symmetrically at the same time to prevent the weld from being deformed due to uneven heating.
4. A lifting work platform used in the working method for assembling a large-diameter tower equipment according to any one of claims 1 to 3, It is characterized in that It includes a lifting platform sleeved on the outer side of the cylinder section, multiple groups of hand-pulled hoist mechanisms for lifting the platform, multiple groups of basket bolts for temporarily fixing the lifting platform, an inner bull leg hanger arranged on the inner side wall of the cylinder section, and a straight ladder.
5. A lifting work platform for assembling large-diameter tower equipment according to claim 4, It is characterized in that A lifting guide wheel is arranged on the inner side of the lifting platform, and a gap of 2-3 mm is left between the lifting guide wheel and the outer wall of the cylinder section.
6. A lifting work platform for assembling large-diameter tower equipment according to claim 4, It is characterized in that The lifting platform comprises a frame angle steel, a channel steel installed inside the frame angle steel, and a patterned plate laid on the top of the frame angle steel.
7. A lifting work platform for assembling large-diameter tower equipment according to claim 4, It is characterized in that The straight ladder comprises an external straight ladder arranged outside the cylinder segment and an internal straight ladder arranged inside the cylinder segment. Both the external straight ladder and the internal straight ladder can be detachably mounted on the cylinder segment.