A water-stop hot-melt connection structure between an asphalt concrete core wall and a bank slope or a building
By using a water-stop hot melt connection structure of concrete formwork, copper water stop sheet and hot melt rod at the connection between the asphalt concrete heart wall and the bank slope, the copper water stop tear problem caused by the settlement deformation of the dam body is solved, and simple , low-cost maintenance and safe operation.
Patent Information
- Application Number
- CN202110016705.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-01-07
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-01-07
AI Technical Summary
The connection between the existing asphalt concrete heart wall and the bank slopes or buildings on both sides of the dam or the deformed area due to the settlement and deformation of the earth and rock dam, which will cause copper water stop tearing and deformation cracks, affecting the safety of the dam body, and the maintenance cost is high, difficult, and requires Frequent demolition and reconstruction.
The water stop hot melt connection structure of concrete formwork, copper water stop sheet and hot melt rod is adopted. The working state of the hot melt rod is controlled through settlement observation, release the stress of the copper water stop sheet, and realize the overall combination of asphalt concrete core wall and shore slope. , avoid settlement and damage.
It achieves simple maintenance operation, low cost and short time, and can deal with settlement deformation in a timely manner without the need to demolish and reconstruct the damaged parts, which improves the safe operation of the dam and the efficiency of the reservoir.
Smart Images

Figure CN112627117B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of asphalt concrete core walls of water conservancy and hydropower engineering, and in particular relates to a water-stopping hot-melt connection structure between an asphalt concrete core wall and a bank slope or a building. Background Art
[0002] Asphalt concrete core wall earth-rock dam is a type of dam widely used in domestic water conservancy and hydropower projects. It has the advantages of using local materials, saving transportation costs, shortening construction time, improving construction efficiency, low construction technology difficulty, simple overall structure, low requirements for dam foundation, and strong overall adaptability to deformation. Due to the thick covering layer of the dam foundation and the loose structure of the earth-rock dam body, the deformation capacity is large. As the dam is in operation for a long time, the dam body will experience overall settlement.
[0003] At present, the connection method between the asphalt concrete core wall and the bank slopes on both sides of the dam and the concrete buildings in the dam body is generally direct connection with copper waterstop. The specific connection method is generally: after the bank slope is cleared to the bedrock, a concrete base of a certain thickness is poured, and a copper waterstop is buried on the base. When the asphalt concrete core wall is laid or poured, the other side of the copper waterstop is embedded in the middle of the core wall. As the asphalt temperature drops, the copper waterstop is consolidated into the core wall. With the increasing height of the earth-rock dam and the long-term operation, the cumulative settlement deformation of the dam body will also become larger and larger. Settlement damage is most likely to occur at the joints between the asphalt concrete core wall and the bank slopes or buildings on both sides of the dam, resulting in the tearing of the copper waterstop and deformation cracks at the joints between the asphalt concrete core wall and the bank slope, affecting the safety of the dam body. According to statistics, about 24% of earth-rock dams are caused by the destruction of the bank slope water-stop structure. For example, after a large reservoir in the north was in operation for 10 years, the earth-rock dam settled by 12 cm, causing the copper water-stop at the connection between the asphalt concrete core wall and the concrete irrigation hole of the dam body to tear. The construction unit removed 5m of the upper part and reinstalled the water-stop; after 5 years of operation, it deformed significantly again. Therefore, a water-stop connection structure is proposed to avoid the destruction of the bank slope or building due to the settlement and deformation of the dam body. In addition, the maintenance cost is high and the difficulty is great; after the settlement and deformation occur, the damaged part needs to be dismantled and rebuilt, which seriously affects the safe operation of the dam and the benefits of the reservoir. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a water-stopping hot-melt connection structure between an asphalt concrete core wall and a bank slope or a building.
[0005] In order to achieve the above object, the technical solution of the present invention is as follows:
[0006] A water-stop hot-melt connection structure between an asphalt concrete core wall and a bank slope or a building comprises a concrete formwork, a copper water-stop sheet and a plurality of hot-melt rods.
[0007] The concrete formwork is arranged outside the connection between the bank slope and the asphalt concrete core wall and wraps around both sides of the bank slope base and the end of the asphalt concrete core wall;
[0008] The copper water stop is set between the end of the asphalt concrete core wall and the bank slope base.
[0009] A plurality of hot melt rods are distributed close to the copper water stop;
[0010] A settlement observation instrument is installed at the top of the connection between the bank slope and the asphalt concrete core wall. According to the settlement results observed during the operation of the dam, the working state of the hot melt rod is controlled to release the stress of the copper water stop plate and consolidate and bond the copper water stop plate and the side wall of the bank slope again, so as to achieve the overall combination of the asphalt concrete core wall and the bank slope.
[0011] Furthermore, the length of the end of the concrete formwork away from the slope is not less than 1 m from the slope.
[0012] Furthermore, multiple hot-melt rods are vertically arranged in the middle and upper part of the asphalt concrete core wall; or multiple hot-melt rods are arranged in layers according to the height of the asphalt concrete core wall. If the asphalt concrete core wall is too high, multiple hot-melt rods are arranged in multiple layers in the vertical direction of the asphalt concrete core wall. Even if individual hot-melt rods fail, it will not affect the overall operation.
[0013] Furthermore, the plurality of hot melt rods are electrically connected in parallel or in series and are numbered according to their elevations, and connecting wires are led out along the bank slope.
[0014] Beneficial effects: The water-stopping hot-melt connection structure of the present invention has the characteristics of simple maintenance operation, low cost and short time; after the dam sinks and deforms, it can be handled in time without the need to dismantle and rebuild the damaged parts. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a top view of the structure of the present invention;
[0016] Figure 2 It is a structural schematic diagram of the present invention.
[0017] In the figure, 1-bank slope, 2-bank slope base, 3-copper water stop, 4-concrete formwork, 5-asphalt concrete core wall, 6-hot melt rod. DETAILED DESCRIPTION
[0018] The present invention is described below with reference to specific examples. It will be appreciated by those skilled in the art that these examples are only used to illustrate the present invention and are not intended to limit the scope of the present invention in any way.
[0019] A water-stop hot-melt connection structure between an asphalt concrete core wall and a bank slope or a building, such as Figure 1 and Figure 2 As shown, it includes a concrete formwork 4, a copper water stop 3 and five hot melt rods 6.
[0020] The concrete formwork 4 is arranged outside the connection between the bank slope 1 and the asphalt concrete core wall 5 and wraps around both sides of the bank slope base 2 and the end of the asphalt concrete core wall 5;
[0021] The copper water stop sheet 3 is vertically arranged between the end of the asphalt concrete core wall 5 and the bank slope base 2.
[0022] Five hot melt rods 6 are distributed near the copper water stop 3 and are vertically arranged in the middle and upper part of the asphalt concrete core wall 5. The five hot melt rods 6 are electrically connected in parallel or series and are numbered according to the elevation. The connecting wires are led out along the slope 1; a settlement observation instrument (not shown) is arranged on the top of the connection between the slope 1 and the asphalt concrete core wall 5. According to the settlement results observed during the operation of the dam, the working status of the five hot melt rods 6 is controlled. If settlement occurs, the hot melt rods 6 are turned on to melt the asphalt concrete of the asphalt concrete core wall 5 through the hot melting effect. The copper water stop 3 and the asphalt concrete core wall 5 are separated under the action of the settlement stress, and the stress of the copper water stop 3 is released; after the stress is released, the hot melt rods 6 are turned off, the asphalt concrete core wall 5 is naturally cooled, and then consolidated and bonded with the copper water stop 3 and the side wall of the slope 1 again, so as to realize the overall combination of the asphalt concrete core wall 5 and the slope 1, thereby playing a role in anti-seepage.
[0023] In this embodiment, the five hot melt rods 6 can also be arranged in layers according to the height of the asphalt concrete core wall 5. If the asphalt concrete core wall 5 is too high, the five hot melt rods 6 are arranged in multiple layers in the vertical direction of the asphalt concrete core wall 5. Even if individual hot melt rods 6 fail, it will not affect the overall operation.
[0024] In this embodiment, the distance between the end of the concrete formwork 4 away from the bank slope 1 and the bank slope 1 is not less than 1 m.
[0025] In this embodiment, the bank slope 1 can be replaced by a building.
[0026] The working principle of the present invention: Due to the different heights of the dam, as the height of the dam increases, the height of the asphalt concrete core wall 5 also increases. Generally, at a position above half the height of the asphalt concrete core wall 5, the cumulative deformation of the dam becomes larger and larger, and the arrangement of hot-melt rods 6 can effectively solve the cumulative deformation; in the range below half of the asphalt concrete core wall 5, the cumulative deformation is small, and the natural settlement of the dam body can be solved by the expansion and contraction performance of the copper water stop.
Claims
1. A water-stop hot-melt connection structure between an asphalt concrete core wall and a bank slope or a building, characterized in that: Including concrete formwork, copper water stop and multiple hot melt rods, The concrete formwork is arranged outside the connection between the bank slope and the asphalt concrete core wall and wraps around both sides of the bank slope base and the end of the asphalt concrete core wall; The copper water stop is set between the end of the asphalt concrete core wall and the bank slope base. A plurality of hot melt rods are distributed close to the copper water stop; A settlement observation instrument is installed at the top of the connection between the bank slope and the asphalt concrete core wall. According to the settlement results observed during the operation of the dam, the working state of the hot melt rod is controlled to release the stress of the copper water stop sheet and consolidate and bond the copper water stop sheet and the side wall of the bank slope again, so as to achieve the overall combination of the asphalt concrete core wall and the bank slope. The distance between the end of the concrete formwork away from the slope and the slope is not less than 1m; A plurality of the hot melt rods are vertically arranged in the middle and upper part of the asphalt concrete core wall; or a plurality of the hot melt rods are arranged in layers according to the height of the asphalt concrete core wall. If the asphalt concrete core wall is too high, a plurality of the hot melt rods are arranged in multiple layers in the vertical direction of the asphalt concrete core wall. Even if individual hot melt rods fail, the overall operation is not affected. The multiple hot melt rods are electrically connected in parallel or in series and are numbered according to their elevations, and the connecting wires are led out along the bank slope.