A device and method for detecting the top elevation of a mud-wall bored pile
By using detection balls and tank devices in the construction of mud wall-guarding piles, the alarm is triggered by using concrete pressure and buoyancy, the problem of low accuracy in pile top elevation detection in the prior art is solved, and an efficient and reliable construction process is achieved , reducing construction costs and material waste.
Patent Information
- Application Number
- CN201911010664.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-23
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2039-10-23
AI Technical Summary
In the construction of mud wall-guarding drilling piles, it is difficult to accurately control the pile top elevation, resulting in overfilling or insufficient concrete, increasing construction difficulty and waste of materials, and traditional testing methods have low accuracy and high cost.
Design a detection device including detection ball, tank, locking device and crossbar, installed on pile cage hanging bars, and trigger alarm devices using concrete pressure and buoyancy to ensure that concrete stops when pouring to the correct height, and realize double prompts to ensure that accuracy.
It improves the accuracy and reliability of pile top elevation inspection, reduces the frequency and cost of manual inspection, improves construction efficiency and quality, and is suitable for construction of large diameters and complex sites.
Smart Images

Figure CN112695810B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of construction engineering, and in particular relates to a device and a method for detecting the top elevation of a mud wall bored cast-in-place pile. Background Art
[0002] Mud-wall bored piles are a construction method widely used in construction projects. During the entire process of pouring concrete for mud-wall bored piles, the key lies in the control of the concrete top elevation. If the poured concrete height is too low or too high, secondary construction is required, which is difficult to construct, wastes labor, and is not easy to ensure the quality of the piles. Excessive over-poured concrete is crushed and transported out of the bottom of the trench, resulting in increased labor and mechanical equipment consumption for chiseling the pile head, as well as waste of concrete materials.
[0003] At present, the traditional process and method for controlling the pouring height of pile concrete generally adopts manual multiple detection and estimation to determine whether the pouring height is close to the top height of the pile, such as using a measuring rope with a hammer or a long measuring rod with an enlarged head to probe into the pile hole. Manual detection requires frequent shutdowns for measurement in the later stage of pouring, and when the pile diameter is large, the measurement accuracy is not high due to manual operation of the probe rod or measuring rope, the density change of the mixture requires operators to judge based on experience, and the on-site conditions are too complicated. In order to prevent insufficient pouring of concrete, over-pour of concrete will still be performed in the later stage according to the measured value, wasting concrete materials.
[0004] Alternatively, differential pressure sensors or signal detectors that use electrical signals to transmit information are not suitable for the construction of pile groups and large-diameter piles because the measurement range of the detection instrument is fixed and the scope of application is small. In addition, they require special personnel to operate, resulting in high labor and costs. Summary of the invention
[0005] The problem to be solved by the present invention is to provide a mud-wall bored pile top elevation detection device and detection method, which is suitable for the construction of bored piles with long virtual piles, especially the construction of mud-wall bored piles with a diameter of not less than 600mm.
[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0007] A mud wall bored pile top elevation detection device, comprising:
[0008] Several test balls;
[0009] A tank body, wherein the detection balls are arranged inside the tank body, and the detection balls are tangent to each other; the tank body is arranged on the pile cage suspension rod;
[0010] A locking device, the locking device being arranged at the middle and upper part of the inner side of the tank body;
[0011] A plurality of cross bars are fixed side by side at the bottom of the tank body.
[0012] Furthermore, the locking device includes a locking rod hinge, a locking rod, a tension spring, and a tension spring hinge, wherein the locking rod hinge is fixed on the top of the tank body, one end of the locking rod is hinged to the tank body through the locking rod hinge, and the other end of the locking rod is a free end; the tension spring hinge is fixed to the middle and upper part of the inner side of the tank body, the tension spring hinge is hinged to one end of the tension spring, and the other end of the tension spring is fixed to the locking rod.
[0013] Furthermore, an alarm device is provided on the locking rod.
[0014] Furthermore, the tank body is cylindrical, and the inner diameter of the tank body is larger than the diameter of the detection ball and smaller than twice the diameter of the detection ball.
[0015] Furthermore, the spacing between the cross bars is greater than the diameter of the cross bars and smaller than the diameter of the detection ball.
[0016] Furthermore, the cross bars are arranged in a grid shape.
[0017] Furthermore, the detection ball is a lightweight hollow ball.
[0018] A detection method for a mud wall bored pile top elevation detection device, using any of the above detection devices, comprising the following steps:
[0019] S1: Install the locking device, hinge the locking rod to the top of the tank body, one end of the locking rod is hingedly connected to the tank body through the locking rod hinge, and the other end of the locking rod is a free end; the tension spring hinge is fixed to the middle and upper part of the inner side of the tank body, one end of the tension spring is hingedly connected to the tension spring hinge, and the other end of the tension spring is fixed to the locking rod;
[0020] S2: Fix the cross bars side by side at the bottom of the tank body, and place the detection ball in the tank body, and the tension spring is in a natural state;
[0021] S3: placing the tank on the pile cage suspension rod, with the bottom of the tank located at the designed virtual pile top height position, adjusting the relative position between the tank and the pile cage suspension rod and fixing it, and lowering it to the designed virtual pile top height position along with the pile body reinforcement cage;
[0022] S4: After the hole is cleaned, concrete pouring begins; when the concrete is poured to the designed virtual pile top height position, the concrete enters the tank body through the cross bar, and the detection ball rises under the pressure of the concrete, and pushes the locking rod to trigger the alarm device; the detection balls are squeezed out of the tank body, and float to the mud surface in the pile hole under the buoyancy of the mud in the pile hole;
[0023] S5: Complete pouring of concrete and continue with subsequent construction.
[0024] Due to the adoption of the above technical solution, the detection device of the present invention is installed on the pile cage suspension bar, and its bottom is located at the designed virtual pile top height position. When the concrete is poured to the designed virtual pile top height position, the detection ball in the detection device rises due to the concrete pressure and triggers the alarm device, prompting to stop the concrete pouring for the first time; the detection balls are squeezed out of the tank body, and float to the mud surface in the pile hole under the buoyancy of the mud in the pile hole, prompting to stop the concrete pouring for the second time. The present invention is a detachable self-made component, which can be made in advance and fixedly installed at the construction site, with a simple structure, easy operation and low processing cost; it can be used in conjunction with complex and changeable construction sites, with a wide range of applications and high flexibility; it prompts to stop concrete pouring twice, and the result of detecting the concrete pile top elevation is highly reliable, which improves production efficiency and ensures construction progress and quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a structural schematic diagram of an embodiment of the present invention.
[0026] Figure 2 Schematic diagram of the implementation effect of an embodiment of the present invention
[0027] In the figure:
[0028] 1. Pile cage suspension bar 2. Locking rod hinge 3. Locking rod
[0029] 4. Extension spring 5. Extension spring hinge 6. Detection ball
[0030] 7. Tank body 8. Crossbar DETAILED DESCRIPTION
[0031] The present invention will be further described below in conjunction with embodiments and drawings:
[0032] In one embodiment of the present invention, Figure 1 As shown, a mud wall bored pile pile top elevation detection device includes a plurality of detection balls 6, a tank body 7, a locking device, and a plurality of cross bars 8. The detection balls 6 are arranged inside the tank body 7, and the spherical surfaces of the detection balls 6 are tangent to each other; the locking device is arranged at the middle and upper part of the inner side of the tank body 7; the tank body 7 is arranged on the pile cage suspension bar 1, and the bottom of the tank body 7 is located at the designed virtual pile top height position; preferably, the cross bars 8 are fixed side by side to the bottom of the tank body 7.
[0033] More preferably, the cross bars 8 are arranged in a grid shape.
[0034] The locking device includes a locking rod hinge 2, a locking rod 3, a tension spring 4, and a tension spring hinge 5. The locking rod hinge 2 is fixed to the top of the tank body 7, one end of the locking rod 3 is hinged to the tank body 7 through the locking rod hinge 2, and the other end of the locking rod 3 is a free end; the tension spring hinge 5 is fixed to the upper and middle part of the inner side of the tank body 7, the tension spring hinge 5 is hinged to one end of the tension spring 4, and the other end of the tension spring 4 is fixed to the locking rod 3.
[0035] Preferably, an alarm device is provided on the locking rod 3 .
[0036] Preferably, the tank body 7 is cylindrical, and the inner diameter of the tank body 7 is larger than the diameter of the detection ball 6 and smaller than twice the diameter of the detection ball 6 .
[0037] Preferably, the spacing between the cross bars 8 is larger than the diameter of the cross bars 8 and smaller than the diameter of the detection ball 6 .
[0038] like Figure 2 As shown, when the concrete is poured to the designed virtual pile top height position, the concrete enters the tank body 7, and the detection ball 6 rises due to the concrete pressure, pushes open the locking rod 3, and triggers the alarm device, prompting to stop the concrete pouring for the first time; the detection ball 6 is squeezed out of the tank body 7, and floats to the mud surface in the pile hole under the buoyancy of the mud in the pile hole, prompting to stop the concrete pouring for the second time.
[0039] Preferably, the detection ball 6 is a lightweight hollow ball, such as a colored ping-pong ball, whose obvious color facilitates rapid observation.
[0040] A detection method for a mud wall bored pile top elevation detection device, using the detection device as described above, comprises the following steps:
[0041] S1: Install the locking device, fix the locking rod hinge 2 to the top of the tank body 7, one end of the locking rod 3 is hinged to the tank body 7 through the locking rod hinge 2, and the other end of the locking rod 3 is a free end; the tension spring hinge 5 is fixed to the middle and upper part of the inner side of the tank body 7, one end of the tension spring 4 is hinged to the tension spring hinge 5, and the other end of the tension spring 4 is fixed to the locking rod 3;
[0042] S2: Fix the crossbar 8 side by side at the bottom of the tank body 7, and place the detection ball 6 in the tank body 1, with the tension spring 4 in a natural state;
[0043] S3: placing the tank body 7 on the pile cage suspension bar 1, with the bottom of the tank body 7 located at the designed virtual pile top height position, adjusting the relative position between the tank body 7 and the pile cage suspension bar 1 and fixing it, and lowering it to the designed virtual pile top height position along with the pile body reinforcement cage;
[0044] S4: After the hole is cleaned, concrete pouring begins; when the concrete is poured to the designed virtual pile top height position, the concrete enters the tank body 7 through the cross bar 8, and the detection ball 6 rises under the pressure of the concrete, and pushes the lock rod 3 to trigger the alarm device, prompting to stop concrete pouring for the first time; the detection balls 6 are squeezed out of the tank body 7, and float to the mud surface in the pile hole under the buoyancy of the mud in the pile hole, prompting to stop concrete pouring for the second time;
[0045] S5: Complete pouring of concrete and continue with subsequent construction.
[0046] When pouring concrete to the designed virtual pile top height position, the detection ball in the detection device of the present invention rises due to the concrete pressure and triggers the alarm device, prompting to stop concrete pouring for the first time; the detection balls are squeezed out of the tank body and float to the mud surface in the pile hole under the buoyancy of the mud in the pile hole, prompting to stop concrete pouring for the second time. The present invention is a detachable self-made component that can be made in advance and fixedly installed at the construction site, with a simple structure, easy operation, and low processing cost; it can be used in conjunction with complex and changeable construction sites, with a wide range of applications and high flexibility; it prompts to stop concrete pouring twice, and the result of detecting the concrete pile top elevation is highly reliable, which improves production efficiency and ensures construction progress and quality.
[0047] The embodiments of the present invention are described in detail above, but the contents described are only preferred embodiments of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. A mud wall bored pile top elevation detection device, comprising: A plurality of detection balls (6), wherein the detection balls (6) are lightweight hollow balls; A tank body (7), wherein the detection ball (6) is arranged inside the tank body (7), and the detection balls (6) are tangent to each other; the tank body (7) is arranged on the pile cage suspension bar (1), the bottom of the tank body (7) is located at the designed virtual pile top height position, the tank body (7) is cylindrical, and the internal diameter of the tank body (7) is larger than the diameter of the detection ball (6) and smaller than twice the diameter of the detection ball (6); A locking device, the locking device is arranged at the middle and upper part of the inner side of the tank body (7), the locking device comprises a locking rod hinge (2), a locking rod (3), a tension spring (4), and a tension spring hinge (5), the locking rod hinge (2) is fixed to the top of the tank body (7), one end of the locking rod (3) is hingedly connected to the tank body (7) through the locking rod hinge (2), and the other end of the locking rod (3) is a free end; the tension spring hinge (5) is fixed to the middle and upper part of the inner side of the tank body (7), the tension spring hinge (5) is hingedly connected to one end of the tension spring (4), and the other end of the tension spring (4) is fixed to the locking rod (3), and an alarm device is arranged on the locking rod (3); A plurality of cross bars (8) are fixed side by side at the bottom of the tank body (7), the spacing between the cross bars (8) is greater than the diameter of the cross bars (8) and smaller than the diameter of the detection ball (6), and the cross bars (8) are arranged in a grid shape.
2. A detection method for a mud wall bored pile top elevation detection device, characterized in that: Using the detection device as claimed in claim 1, the steps include: S1: Install the locking device, fix the locking rod hinge (2) on the top of the tank body (7), one end of the locking rod (3) is hingedly connected to the tank body (7) through the locking rod hinge (2), and the other end of the locking rod (3) is a free end; the tension spring hinge (5) is fixed to the middle and upper part of the inner side of the tank body (7), one end of the tension spring (4) is hingedly connected to the tension spring hinge (5), and the other end of the tension spring (4) is fixed to the locking rod (3); S2: The cross bars (8) are fixed side by side at the bottom of the tank body (7), and the detection ball (6) is placed in the tank body (7), and the tension spring (4) is in a natural state; S3: placing the tank body (7) on the pile cage suspension bar (1), with the bottom of the tank body (7) located at the designed virtual pile top height position, adjusting the relative position between the tank body (7) and the pile cage suspension bar (1) and fixing it, and lowering it to the designed virtual pile top height position along with the pile body reinforcement cage; S4: After the hole is cleaned, concrete pouring begins; when the concrete is poured to the designed virtual pile top height position, the concrete enters the tank body (7) through the cross bar (8), the detection ball (6) rises under the pressure of the concrete, and pushes open the locking rod (3) to trigger the alarm device; the detection ball (6) is squeezed out of the tank body (7) and floats to the mud surface in the pile hole under the buoyancy of the mud in the pile hole; S5: Complete pouring of concrete and continue with subsequent construction.
Citation Information
Patent Citations
Early warning apparatus for monitoring water level of cable pipe gallery
CN108983831A
Cast-in-situ bored pile top concrete elevation control device
CN109440841A
Floater magnetic turnover plate liquidometer
CN204330089U
Pile top elevation detection device for slurry retaining wall cast-in-situ bored pile
CN211395779U
Verticality measuring device
JP1997170233A
