Prestressed anchor cable steel strand recovery mechanism and construction method thereof

By designing a prestressed anchor wire strand recycling mechanism, using the knocking steel strand sheath to unlock the steel strand clamp, the rapid recycling of steel strands is achieved, and the complex mechanism, high cost and difficult recycling in the existing technology is solved. The problem of this improves recovery rate and operation efficiency.

CN112796318BActive Publication Date: 2024-11-08JINAN BASE GEOLOGICAL ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110115579.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-01-28
Publication Date
2024-11-08
Estimated Expiration
2041-01-28

AI Technical Summary

Technical Problem

The existing recyclable anchor cable device has complex mechanisms, high cost, high recycling difficulty, low recovery rate, and requires special auxiliary tools, which leads to inconvenient recycling of steel strands.

Method used

A prestressed anchor cable steel strand recycling mechanism is designed, including steel strand sheath, anchor seat, steel strand clamp, wire clamp position controller, spring and waterproof cap, and steel strand sheath is made by tapping the steel strand sheath. The stranded wire clip unlocks, enabling rapid recycling of steel strands without the need for special tools.

Benefits of technology

It realizes low-cost, simple and reliable recycling of steel strands, improves recycling rate and operating efficiency, reduces construction costs, and reduces the impact on surrounding buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112796318B_ABST
    Figure CN112796318B_ABST
Patent Text Reader

Abstract

The present invention relates to a prestressed anchor cable steel strand recovery mechanism and a construction method thereof. The mechanism comprises a steel strand sheath, an anchor seat with a cavity, a steel strand clamp, a wire clamp position controller, a spring and a waterproof cap. The lower end of the steel strand clamp is connected to a spring through the wire clamp position controller. The wire clamp position controller comprises a position controller body with a groove opening upward. The upper end of the position controller body is connected to the steel strand clamp, and the lower end is connected to the upper end of the spring. The spring is located in the waterproof cap, and the bottom of the spring is in contact with the bottom of the waterproof cap. When the waterproof cap is installed in place, the spring is in a slightly compressed state. The lower end of the steel strand passes through the cavity of the steel strand clamp and then abuts against the groove in the wire clamp position controller. The present invention does not require special dedicated recovery tools, such as jacks, winches and other pulling equipment. It only needs to give the steel strand an axial knocking force, and does not require a rotating force, so that the lock of the steel strand clamp on the steel strand can be released, thereby easily withdrawing the steel strand from the anchor cable hole.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of geotechnical engineering, and in particular to a prestressed anchor cable steel strand recovery mechanism and a construction method thereof. Background Art

[0002] Prestressed anchor cable anchoring means drilling through a weak rock layer or sliding surface, anchoring one end of the anchor cable in a hard rock layer or a stable body outside the sliding surface through an anchoring section (inner anchor head), setting a certain length of free section (steel strands are not bonded to the adhesive) at the other end of the anchor cable, tensioning it at the end and locking it through an anchor (outer anchor head), thereby pre-applying a certain tension to the rock layer and anchoring the unstable rock or sliding body. This device is called a prestressed anchor cable device, and the method of anchoring using this device is called prestressed anchor cable anchoring method.

[0003] Prestressed anchor cable devices are often used as an important part of the temporary support system in foundation pit support, especially deep foundation pit support projects. In the foundation pit support of temporary facilities, the steel strands used for anchor cables are usually not recyclable, which not only consumes a large amount of steel (reinforcement) strands and other materials, causing great waste; and these steel strands reserved underground will also have adverse effects on the later construction of surrounding buildings. If these temporary facilities are supported by recyclable prestressed anchor cables, they can be dismantled and recycled after the temporary support is completed, which can not only greatly reduce costs, but also eliminate the impact of steel strands left underground on later construction. Therefore, recyclable anchor cables are increasingly valued and favored by people. However, the existing recyclable anchor cable devices have the following shortcomings: 1. The structure is complex and the cost remains high; 2. The recovery is difficult and the recovery rate is low; 3. The recovery operation is complicated and difficult to operate on site, and even special auxiliary tools are required to extract the steel strands. Summary of the invention

[0004] The object of the present invention is to provide a prestressed anchor cable steel strand recovery mechanism, which can solve the deficiencies in the prior art and has the characteristics of low cost, simple and reliable operation, and high steel strand recovery rate.

[0005] To achieve the above object, the present invention adopts the following technical solutions:

[0006] A prestressed anchor cable steel strand recovery mechanism includes a steel strand sheath sleeved on the outside of the steel strand, an anchor seat with a cavity in the middle below the steel strand sheath, a steel strand clamp installed in the anchor seat cavity, a wire clamp position controller arranged at the lower end of the steel strand clamp, a spring arranged at the lower end of the wire clamp position controller, and a waterproof cap connected to the lower end of the anchor seat. The steel strand clamp is a hollow truncated cone with a narrow top and a wide bottom, which is used to clamp the steel strand; the wire clamp position controller includes a position controller body with a groove opening upward; the upper end of the position controller body is connected to the lower end of the steel strand clamp, and the lower end is connected to the upper end of the spring; the spring is located in the waterproof cap, and the bottom of the spring is in contact with the bottom of the waterproof cap; when the waterproof cap is installed in place, the spring is in a slightly compressed state; the lower end of the steel strand passes through the cavity of the steel strand clamp and abuts against the groove in the wire clamp position controller.

[0007] Furthermore, an inner groove of the wire clamp is provided on the inner wall of the lower end of the steel strand wire clamp; the wire clamp position controller also includes a wire clamp position controller boss 1 arranged along the outer periphery of the upper end of the controller body and a wire clamp position controller boss 2 arranged along the outer periphery of the middle section of the controller body; the wire clamp position controller boss 1 extends into the inner groove of the wire clamp, and the wire clamp position controller boss 2 is located below the steel strand wire clamp, and its outer diameter is larger than the outer diameter of the steel strand wire clamp; a rubber ring for connecting the steel strand wire clamp and the wire clamp position controller as a whole is installed on the outer wall of the steel strand wire clamp.

[0008] Furthermore, the stranded wire clamp is surrounded by a plurality of evenly distributed stranded wire clamping pieces, and the number of the stranded wire clamping pieces is 3.

[0009] Furthermore, the steel strand sheath is a PVR tube, and the steel strand sheath is connected to the anchor seat through a connector; the connector is a hollow cavity with openings at both ends, and its upper end is sleeved on the outside of the lower end of the steel strand sheath, and the lower end is embedded in the upper opening of the anchor seat cavity.

[0010] Furthermore, the spring, the steel strand and the steel strand clamp are coaxially arranged.

[0011] Furthermore, the shape of the anchor seat cavity is adapted to the shape of the steel strand clamp.

[0012] Furthermore, a rubber ring placement groove is provided on the outer periphery of the lower end of the steel strand clamp.

[0013] The present invention also relates to a construction method of the above-mentioned prestressed anchor cable steel strand recovery mechanism, the method comprising the following steps:

[0014] (1) Assembly

[0015] First, assemble the steel strand sheath, connector, anchor seat, steel strand clamp, wire clamp positioner, rubber ring, spring, and waterproof cap. Then, pass the steel strand through the steel strand sheath and connector in sequence, and extend it into the steel strand clamp in the cavity of the anchor seat. The steel strand clamp is in close contact with the cavity of the anchor seat, and the spring applies an upward force to the steel strand clamp, so that the steel strand is clamped by the steel strand clamp, completing the assembly of the anchor cable.

[0016] (2) Grouting

[0017] After the anchor hole is completed, a grouting pipe is laid as needed, and the assembled anchor cable is lowered into the anchor hole. The anchoring section is grouted once or twice by the grouting pipe; the grouting pipe is used to inject bonding material into the anchor hole.

[0018] (3) Tensioning and locking

[0019] When the grouting body and the anchor cable are solidified into one and reach a certain strength, an external anchor is installed on the upper end of the steel strand to apply prestress to the anchor cable for tensioning and locking, thereby completing the anchoring of the anchor body.

[0020] (4) Recycling

[0021] When the anchoring task is completed, the steel strand needs to be pulled out for recycling; first remove the external anchor, separate a certain length (tens of centimeters) of the steel strand from the steel strand sheath, and split the steel strand into bundle A and bundle B. Bundle A consists of 2 to 3 steel strands, and the sum of bundle A and bundle B is the total number of steel strands; then knock down the bundle A of the steel strands in the steel strand sheath from directly above, and the two bundles A and B of the steel strands will produce relative displacement, driving the wire clamp positioner to move downward, and the wire clamp positioner drives the steel strand clamp to move downward. When the steel strand clamp moves downward, it is no longer in close contact with the anchor seat cavity, and the clamping force applied by the anchor seat on the steel strand clamp gradually decreases. During the downward movement, the steel strand clamp and the anchor The gap between the seat cavities gradually increases, and the steel strand clamp is no longer in close contact with the steel strand; the A strand is forced to move forward, and after encountering the reaction force of the wire clamp positioner and the spring, the B strand moves backward in the opposite direction. When the relative displacement of the A and B strands exceeds the constraint length of the steel strand clamp, only the A strand is left in the steel strand clamp cavity. At this time, the steel strand clamp completely loses its clamping effect on the steel strand, and the entire steel strand can be pulled out of the steel strand clamp and the anchor seat. The steel strand can be pulled out of the inner anchor at one time, and the anchor cable recovery can be completed quickly and conveniently.

[0022] It can be seen from the above technical solutions that the present invention does not require special dedicated recovery tools, such as jacks, winches and other pulling equipment. It only needs to give the steel strand an axial knocking force, and does not require rotational force, to release the lock of the steel strand clamp on the steel strand, so that the steel strand can be easily withdrawn from the anchor hole. Under the combined action of the truncated cone-shaped cavity of the anchor seat and the spring pressure, the steel strand clamp locks the steel strand in one direction, and the magnitude of the locking force is proportional to the tension transmitted to the steel strand by the external anchor. When two or more steel wire bundles in the steel strand are continuously knocked, the steel wire bundle pushes the wire clamp controller together with the steel strand clamp to move away from the anchor seat cavity, thereby achieving the purpose of unlocking. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a structural schematic diagram of the prestressed anchor cable steel strand recovery mechanism of the present invention;

[0024] Figure 2 It is a structural schematic diagram of the prestressed anchor cable steel strand recovery mechanism in a locked state;

[0025] Figure 3 It is a structural schematic diagram of the prestressed anchor cable steel strand recovery mechanism in the released state;

[0026] Figure 4 yes Figure 2 Enlarged view of part A in the middle;

[0027] Figure 5 yes Figure 3 Enlarged view of middle part B;

[0028] Figure 6 It is a longitudinal cross-sectional view of the steel strand clamp;

[0029] Figure 7 It is a longitudinal cross-sectional view of the wire clamp positioner;

[0030] Figure 8 It is a schematic diagram of the state change of the steel strand during the construction process of the present invention.

[0031] in:

[0032] 1. Steel strand, 2. Steel strand sheath, 3. Connector, 4. Anchor seat, 5. Steel strand clamp, 51. Inner groove of wire clamp, 52. Groove for placing rubber ring, 53. Inner boss of wire clamp, 6. Wire clamp positioner, 61. Inner groove of wire clamp positioner, 62. Boss one of wire clamp positioner, 63. Outer groove of wire clamp positioner, 64. Boss two of wire clamp positioner, 7. Rubber ring, 8. Spring, 9. Waterproof cap. DETAILED DESCRIPTION

[0033] The present invention will be further described below in conjunction with the accompanying drawings:

[0034] like Figure 1-Figure 5The prestressed anchor cable steel strand recovery mechanism shown includes a steel strand sheath 2 sleeved on the outside of the steel strand 1, an anchor seat 4 with a truncated cone-shaped cavity in the middle below the steel strand sheath 2, a steel strand clamp 5 installed in the cavity of the anchor seat 4, a wire clamp position controller 6 arranged at the lower end of the steel strand clamp 5, a spring 8 arranged at the lower end of the wire clamp position controller 6, and a waterproof cap 9 connected to the lower end of the anchor seat 4. The steel strand 1 is used to transfer the prestress provided by the outer anchor to the inner anchor. The shape of the cavity of the anchor seat 4 is adapted to the shape of the steel strand clamp 5. The lower end of the steel strand clamp 5 is connected to a spring 8 through the wire clamp position controller 6. The spring 8 is located in the waterproof cap 9, and the bottom of the spring 8 is in contact with the bottom of the waterproof cap 9. When the waterproof cap 9 is installed in place, the spring 8 is in a slightly compressed state. The spring 8, the steel strand 1, and the steel strand clamp 5 are coaxially arranged. The steel strand sheath 2 is a PVR tube, and the steel strand sheath 2 is connected to the anchor seat 4 through a connector 3; the connector 3 is a hollow cavity with upper and lower ends opening, and its upper end is sleeved on the outer side of the lower end of the steel strand sheath 2, and the lower end is embedded and installed in the upper end opening of the cavity of the anchor seat 4. The steel strand sheath 2 is used to prevent cement slurry and other adhesives from adhering to the steel strand. Under normal conditions, the steel strand clamp 5 automatically locks the steel strand 1 under the combined action of the anchor seat cavity and the spring pressure transmitted by the wire clamp positioner, and is in a micro-locked state. When the steel strand 1 is not subjected to external force along its axial direction, the slightly locked steel strand clamp 5 will maintain close contact with the wall of the anchor seat cavity, the steel strand clamp 5 will not loosen, and the steel strand 1 can be firmly clamped by the steel strand clamp 5. Since the spring 8 is in a slightly compressed state, it will always apply an upward force to the wire clamp positioner and the steel strand clamp. In this way, in the slightly locked state, even if the entire recovery mechanism is hit by external force, once the external force disappears, the steel strand clamp will lock the steel strand again, and the steel strand will not easily fall off the anchor seat, thereby ensuring the stability and reliability of the recovery mechanism.

[0035] like Figure 6As shown, the strand clamp 5 is a hollow truncated cone which is narrow at the top and wide at the bottom, and the hollow truncated cone is surrounded by a number of evenly distributed strand clamps. The number of strand clamps is 3. The strand clamp 5 is used to clamp the strand 1. An inner clamp groove 51 and an inner clamp boss 53 are provided on the inner wall of the lower end of the strand clamp 5. A rubber ring for connecting the strand clamp 5 and the clamp position controller 6 as a whole is installed on the outer wall of the strand clamp 5. A rubber ring placement groove 52 is provided on the outer periphery of the lower end of the strand clamp 5 for placing a rubber ring 7. The rubber ring 7 is used to form three strand clamps into a whole on the one hand, and to connect the strand clamp 5 and the clamp position controller 6 as a whole on the other hand. Preferably, the rubber ring 7 is a rubber ring. By setting the anchor seat 4 cavity to be a truncated cone shape that is compatible with the steel strand clamp 5, when the steel strand clamp 5 is placed in the anchor seat 4 cavity under the action of external force, the higher it is placed, the more firmly the anchor seat 4 cavity and the steel strand clamp 5 are connected, so that the steel strand clamp 5 can clamp the steel strand 1 passing through it. When a bundle of steel strands is subjected to a downward impact force, the bundle will move downward, and the bundle moving downward will push the wire clamp positioner 6 to move downward, and the wire clamp positioner 6 will move the steel strand clamp 5 downward. When the steel strand clamp 5 moves downward, the gap between it and the anchor seat 4 cavity will become larger and larger. At the same time, when some bundles of steel strands are subjected to a downward impact force, under the reaction of the wire clamp positioner 6 and the spring 8, the other bundles of steel strands will retreat in the opposite direction. When their relative displacement is greater than the constraint length of the steel strand clamp 5, the clamping anchor seat 4 cavity cannot clamp the steel strand 1 through the constraint of the steel strand clamp 5. At this time, by pulling up the other strands of the steel strand, all the steel strands 1 can be pulled out.

[0036] like Figure 7As shown, the wire clamp position controller 6 includes a position controller body with a groove 61 opening upward. The upper end of the position controller body is connected to the steel strand clamp 5, and the lower end is connected to the upper end of the spring 8. The lower end of the steel strand 1 passes through the cavity of the steel strand clamp 5 and then abuts against the inner groove 61 of the wire clamp position controller, and the steel strand 1 is clamped by the steel strand clamp 5. The wire clamp position controller 6 also includes a wire clamp position controller boss 1 62 arranged along the outer periphery of the upper end of the position controller body and a wire clamp position controller boss 2 64 arranged along the outer periphery of the middle section of the position controller body. The wire clamp position controller boss 1 62 extends into the inner groove 61 of the wire clamp. The size of the groove 61 corresponds to the size of the steel strand 1. The wire clamp position controller boss 1 62 and the inner groove 61 of the wire clamp are mutually limited, and then the steel strand clamp and the wire clamp position controller 6 can be connected as one by the rubber ring 7 wrapped around the outer ring of the steel strand clamp 5. When the wire clamp position controller 6 moves, it will drive the steel strand clamp 5 to move together. The wire clamp position controller boss 2 64 is located below the steel strand clamp 5, and its outer diameter is larger than the outer diameter of the steel strand clamp 5. The wire clamp position controller boss 2 64 is used to support and fix the steel strand clamp 5 at the bottom, and is used to transfer the elastic force of the spring in the compressed state upward to the steel strand clamp 5, so that the steel strand clamp 5 and the anchor seat 4 are closely matched, so that the steel strand 1 installed in the steel strand clamp 5 can be clamped by the steel strand clamp 5.

[0037] The present invention also relates to a construction method of the above-mentioned prestressed anchor cable steel strand recovery mechanism, the method comprising the following steps:

[0038] (1) Assembly

[0039] First, assemble the steel strand sheath, connector, anchor seat, steel strand clamp, wire clamp positioner, rubber ring, spring, and waterproof cap. Then, pass the steel strand through the steel strand sheath and connector in sequence, and then extend it into the steel strand clamp in the anchor seat cavity. The steel strand clamp is in close contact with the anchor seat cavity, and the spring exerts an upward force on the steel strand clamp, so that the steel strand is clamped by the steel strand clamp, and the assembly of the anchor cable is completed. Figure 2 As shown, at this time, the steel strand is in a locked state, and the steel strand and the steel strand clamp, as well as the steel strand clamp and the anchor seat are relatively static. Existing similar technologies must use a large preload during assembly to make the steel strand clamp lock the steel strand.

[0040] (2) Grouting

[0041] After the anchor hole is completed, a grouting pipe is laid as needed, and the assembled anchor cable is lowered into the anchor hole. The anchoring section is grouted once or twice by the grouting pipe; the grouting pipe is used to inject bonding material into the anchor hole.

[0042] (3) Tensioning and locking

[0043] When the grouting body and the anchor cable are solidified into one and reach a certain strength, an external anchor is installed on the upper end of the steel strand to apply prestress to the anchor cable for tensioning and locking, thereby completing the anchoring of the anchor body.

[0044] (4) Recycling

[0045] When the anchoring task is completed, the steel strand 1 needs to be pulled out for recycling. First, remove the external anchor, and separate a certain length (tens of centimeters) of the steel strand 1 from the steel strand sheath 2. At the same time, split the steel strand 1 into bundle A and bundle B. Bundle A is 2 to 3 steel strands. Then, knock down the bundle A of steel strands in the steel strand sheath 2 from directly above, and the two bundles A and B of steel strands will produce relative displacement. A and B are both positive integers, and A is less than B. Preferably, the value of A is 2 to 3, and the rest is B. Since the bottom of the steel strand 1 is against the groove 61, when the bundle A of steel strands moves downward, it will give a downward force to the groove 61, driving the wire clamp positioner 6 to move downward. The wire clamp positioner 6 is connected to the steel strand clamp 5 as a whole. The downward movement of the wire clamp positioner 6 will drive the steel strand clamp 5 to move downward. When the steel strand clamp 5 moves downward, it is no longer in close contact with the cavity of the anchor seat 4, and the clamping force applied by the anchor seat 4 on the steel strand clamp 5 gradually decreases. During the downward movement, the gap between the steel strand clamp 5 and the cavity of the anchor seat 4 gradually increases, and the steel strand clamp 5 is no longer in close contact with the steel strand 1. At the same time, when the A bundle of the steel strands is subjected to the downward knocking force, under the reaction of the wire clamp positioner 6 and the spring 8, the B bundle of steel strands will retreat in the opposite direction. When their relative displacement is greater than the constraint length of the steel strand clamp 5, the clamping of the cavity of the anchor seat 4 cannot be clamped by the steel strand clamp 5 on the steel strand 1. At this time, Figure 3 In the unlocked state shown, the entire steel strand 1 can be pulled out from the steel strand clamp 5 and the anchor seat 4 by pulling it upwards. The steel strand 1 can be pulled out from the inner anchor at one time, and the anchor cable recovery can be completed quickly and conveniently. The restraint length is the length of the steel strand clamped by the steel strand clamp.

[0046] In the prior art, the entire steel strand is knocked to make the entire steel strand move axially, causing the clamp to move and unlock. Although this method can also recover the steel strand, there is a large resistance to the axial movement of the entire steel strand when using this method to recover the steel strand. The recovery process is time-consuming and labor-intensive, and the success rate is low. In addition, in actual use, if an external force is applied, the steel strand clamp is easily separated from the anchor seat, causing the mechanism described in the present invention to lose the function of recovering the steel strand. The present invention divides the steel strand into two bundles, A and B, where bundle A consists of 2-3 steel wires, which are separated, such as Figure 8 As shown in a. When the steel wire of strand A is struck, no matter how long the entire strand is (20m, 40m, 60m), the two strands A and B will have relative displacement as shown in Figure 8As shown in b. Because one of the bundles is hit, the other bundle becomes equivalent to the existing track of the bundle, and the track is spiral, lubricated with grease throughout, and has very little resistance. The movement between the two bundles of steel strands is a spiral movement, which is more reliable, more labor-saving to operate, and has a higher success rate. Even if some foreign matter enters the protective tube, it will not prevent one bundle from producing relative displacement in the spiral track formed by the other bundle. Moreover, the steel strand recovery mechanism described in the present invention is simpler to assemble in the factory, does not require pre-tensioning, has higher locking reliability, and can increase assembly efficiency by 60%.

[0047] The embodiments described above are merely descriptions of preferred implementation modes of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A prestressed anchor cable steel strand recovery mechanism, characterized in that: It comprises a steel strand sheath sleeved on the outside of the steel strand, an anchor seat arranged below the steel strand sheath and having a cavity in the middle, a steel strand clamp installed in the cavity of the anchor seat, a wire clamp position controller arranged at the lower end of the steel strand clamp, a spring arranged at the lower end of the wire clamp position controller and a waterproof cap connected to the lower end of the anchor seat; the steel strand clamp is a hollow truncated cone narrow at the top and wide at the bottom, which is used to clamp the steel strand; the wire clamp position controller comprises a position controller body with a groove opening upward; the upper end of the position controller body abuts against the lower end of the steel strand clamp, and the lower end is connected to the upper end of the spring; the spring is located in the waterproof cap, and the bottom of the spring contacts the bottom of the waterproof cap; the spring is in a slightly compressed state; the lower end of the steel strand passes through the cavity of the steel strand clamp and abuts against the groove in the wire clamp position controller; The inner wall at the lower end of the steel strand wire clamp is provided with an inner groove and an inner boss; the wire clamp positioner also includes a wire clamp positioner boss 1 arranged along the outer periphery of the upper end of the controller body and a wire clamp positioner boss 2 arranged along the outer periphery of the middle section of the controller body; the wire clamp positioner boss 1 extends into the inner groove of the wire clamp, and the wire clamp positioner boss 2 is located below the steel strand wire clamp, and its outer diameter is larger than the outer diameter of the steel strand wire clamp; a rubber ring for connecting the steel strand wire clamp and the wire clamp positioner as a whole is installed on the outer wall of the steel strand wire clamp.

2. A prestressed anchor cable steel strand recovery mechanism according to claim 1, characterized in that: The steel strand clamp is formed by a plurality of evenly distributed steel strand clamping pieces.

3. The prestressed anchor cable steel strand recovery mechanism according to claim 1, characterized in that: The steel strand sheath is a PVR tube, which is connected to the anchor seat through a connector; the connector is a hollow cavity with upper and lower ends opened, the upper end of which is sleeved on the outside of the lower end of the steel strand sheath, and the lower end is embedded in the upper opening of the anchor seat cavity.

4. A prestressed anchor cable steel strand recovery mechanism according to claim 1, characterized in that: The steel strand, steel strand clamp, wire clamp position controller and spring are coaxially arranged.

5. The prestressed anchor cable steel strand recovery mechanism according to claim 1, characterized in that: The shape of the anchor seat cavity is adapted to the shape of the steel strand clamp.

6. A prestressed anchor cable steel strand recovery mechanism according to claim 1, characterized in that: The outer periphery of the lower end of the steel strand clamp is provided with a rubber ring placement groove.

7. The construction method of the prestressed anchor cable steel strand recovery mechanism according to any one of claims 1 to 6, characterized in that: The method comprises the following steps: (1) Assembly First, assemble the steel strand sheath, connector, anchor seat, steel strand clamp, wire clamp positioner, rubber ring, spring, and waterproof cap. Then, pass the steel strand through the steel strand sheath and connector in sequence, and then extend it into the steel strand clamp in the cavity of the anchor seat. The steel strand clamp is in close contact with the cavity of the anchor seat, and the spring exerts an upward force on the steel strand clamp, so that the steel strand is clamped by the steel strand clamp, and the assembly of the anchor cable is completed. (2) Grouting After the anchor cable hole is completed, a grouting pipe is laid as needed, and the assembled anchor cable is lowered into the anchor cable hole. The grouting pipe is used to perform primary or secondary grouting on the anchoring section; (3) Tensioning and locking When the grouting body and the anchor cable are solidified into one and reach a certain strength, an external anchor is installed on the upper end of the steel strand to apply prestress to the anchor cable for tensioning and locking, thus completing the anchoring of the anchor body; (4) Recycling When the anchoring task is completed, the steel strand needs to be pulled out for recycling; first remove the external anchor, and separate a certain length of the steel strand from the steel strand sheath. At the same time, split the steel strand into bundle A and bundle B. Bundle A consists of 2 to 3 steel strands, and the sum of bundle A and bundle B is the total number of steel strands; then knock down the bundle A steel strand in the steel strand sheath from directly above, and the two bundles A and B steel strands will have relative displacement, driving the wire clamp positioner to move downward, and the wire clamp positioner drives the steel strand clamp to move downward. When the steel strand clamp moves downward, it is no longer in close contact with the anchor seat cavity, and the anchor The clamping force applied by the seat on the steel strand clamp gradually decreases. During the downward movement, the gap between the steel strand clamp and the cavity of the anchor seat gradually increases. The steel strand clamp and the steel strand are no longer in close contact. Bundle A moves forward under the force, and after encountering the reaction force of the wire clamp positioner and the spring, bundle B moves backward in the opposite direction. When the relative displacement of bundles A and B exceeds the constraint length of the steel strand clamp, only bundle A is left in the cavity of the steel strand clamp. At this time, the steel strand clamp completely loses its clamping effect on the steel strand, and the entire steel strand can be pulled out of the steel strand clamp and the anchor seat.